Sanitary Layout Plan for Cebu Project

This document is a building plan for a common restroom showing the drainage, sanitary, and water distribution layouts. It includes a location map, general notes, and blow-up drawings of the common restroom labeled with plumbing features like drain lines, vent pipes, and water supply lines. The plans have been recommended for approval by the head of the sanitary/plumbing section and signed off by the building official.

Uploaded by

Irish Barte
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
921 views1 page

Sanitary Layout Plan for Cebu Project

This document is a building plan for a common restroom showing the drainage, sanitary, and water distribution layouts. It includes a location map, general notes, and blow-up drawings of the common restroom labeled with plumbing features like drain lines, vent pipes, and water supply lines. The plans have been recommended for approval by the head of the sanitary/plumbing section and signed off by the building official.

Uploaded by

Irish Barte
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

REPUBLIC OF THE PHILIPPINES

Carlos Gothong
D.E.P.W.
High School
PAHINA University of San OFFICE OF THE BUILDING OFFICIAL
Jose Recoletos

San Nicolas Church


SAN NICOLAS NAMRIA CITY OF CEBU

San Nicolas Academy


RECOMMENDING APPROVAL:

Pasil Fish
Market

GUA
HEAD SANITARY/PLUMBING SEC. DATE
SUBA PASIL
SITE Carbon Public Market

DAL
APPROVED BY:

UPE
Sawang Calero ERMITA
SAWANG CALERO Elem. School

RIV
ER
PARIL ABUNO [Link] DATE

GENERAL NOTES:

LOCATION MAP
DRAWN NOT TO SCALE

50mmØVS
COMMON RESTROOM (BLOW-UP)

IPE
DRAINAGE & SANITARY LAYOUT PLAN COMMON RESTROOM (BLOW-UP)
T. P 50m
EN
HV mØ SCALE: 1:60 MTS.
CB
R ANC PV
CB
RA
WATER DISTRIBUTION LINE LAYOUT PLAN
PV NC
mØ HV SCALE: 1:60 MTS.
50m EN
T. P
IPE

RWT
SV SV

COMMON RESTROOM DRAINAGE & SANITARY


PIPING ISOMETRIC LAYOUT
SCALE: 1:60 MTS.

LEGENDS & SYMBOLS:


WC
LAV
KS
FD
CO
FCO
SS
MSP
VS
VSTR
SV
DD
DS
CB
PPR
PVC
F
UP UP
DFP
CERTIFICATION: UFP

COMMON RESTROOM WATER DISTRIBUTION EXISTING GROUND FLOOR


GV
CV PIPING ISOMETRIC LAYOUT DRAINAGE & SANITARY LAYOUT PLAN
WM SCALE: 1:60 MTS. SCALE: 1:200 MTS.

FROM THE OFFICE OF: PREPARED: CHECKED: RECOMMENDING APPROVAL: PROJECT TITLE: APPROVED AS TO PLANS: APPROVED: SHEET NO.

REPUBLIC OF THE PHILIPPINES


C E B U C I T Y G O V E R N M E N T
P-1
OFFICE OF THE CITY ENGINEER
"RENOVATION OF CEBU CITY SPORTS INSTITUTE"
DEPARTMENT OF ENGINEERING KENNETH C.M. ENRIQUEZ EDGARDO C. LABELLA
HERMES A. RAGASAJO JR. MIRIAM S. FERNANDEZ ELEAZAR R. LIPANG
AND PUBLIC WORKS
1979

3RD FLR. YUTIVO BLDG. JAKOSALEM ST. CEBU CITY ENGINEERING ASSISTANT ENGINEER III, REG. MASTER PLUMBER ARCHITECT IV, HEAD-PLANNING DIVISION LOCATION: BRGY. SAN NICOLAS PROPER, CEBU CITY CITY ENGINEER CITY MAYOR