0% found this document useful (0 votes)
239 views6 pages

PMI Procedure

Uploaded by

eyas12h
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
239 views6 pages

PMI Procedure

Uploaded by

eyas12h
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
(Ba feguard Positive Material Identification Test Procedure Procedure # GPEC-JDP-PWP-OG-WE-009 Positive Material Identification Test Procedure Project: 2x23SMW Attarat Oil Shale Power Plant-Jordan. Prepared By ‘Approved By ng, Fouad Zayadin ASNT Squad Indra Tapes Senices Level I (28629) ea fect rma (re st) Seema] Sinan CBatequara Positive Material Identification Test Procedure Verifetion Bethads nn ‘talifeaton of Perrone Tet Cantilon nen latte tent of Veifation enon Shetutng fn ‘eceptanee cera Rejection eter Matin BREgS ove e rere (Batequard Positive Material Identi “This procedre describes the poste Matt! entistin (Mt) method and procedure to be implemented to ‘very hack the nmin composton of ater ‘The procedure apes to plant, shop anal abet ofthe ppg components 1 ASME dole and presse vessel code Seton part Band: 215, 2. Projet Spceaton. {30 oeFINATIONS ‘My Material: ny metal iclug er metal for welding aly materi) canting aoying element such 3 ‘voi rick or mlfodenum that are intentional aed to enhance mechani or phe andor Corrosion resistance Does netincude Nigh strength alo (miro aye) sels and mac tvtedctbon sets Pt: Poste Matar denticaton ~ Veriton that th nomial hema compestiono nalloy mater ‘pected an ordered The term apis to prograns, proceses, procedure and testin azordonce wth the senda Pa Testing: noha evahuation or est of materia mest the equtemens of this standart conn ‘hat the material which has bean or wil be placed into Seviee Is eastent wth the selected or speed aay ‘Theinstrument uses stale orienting the material by quattative mensixementof he major lying laments requredin the appleable mater petexton or wldng procadresecestne. 5.0 QUALINCATION OF Pu PERSONNEL "enone Cert by Sfegard Company to perfor PMI Test shale tne a “Cris PM pert shallony be eee to cont he test (Ba fegquard sitive Material Identification Test Procedure “eri hl Operatr~ Certicatio acleved by an ofthe folowing metho: (9 Anindidul vane by he equipment martacturer (3) Anindidu! waned by safeguard Trang program mt house bated on equsment manufacture. This Ineuses 20 contacts Minimum. aon othe above, 210 hrs onthe ob rang or inthe Inboratory wth minimum 20 sails (i Acandiate previous eter employe rained 60 Tes conomions ‘The surface tobe anaed shallbe ean bare meta ee fens of al Pal tesing of wld al be dane ater ema ef ago odes rom the weld surface. The wel reinforement shale fushed or grinded for 3 macth urface a requ to place the PM probe 7.9 cAURATION ‘Te unt shale calibrated daly before the tar of work {8.0 EXTENT OF VERFIEATION Shallbe as pei bythe cet. sale pefomedn the Same manner sf a5 the aacot base meta. ra esting of weld mater ean be performed aytine 300 ACCEPTANCE CRETERIA \hen quantitate mut stern anahstiperfnme, mater components tl contin the amount of oy | ‘ements specfedinthe ASME SECII parts, and Als inucng easing salle acceptable 110 REJECTN CRITERIA Ire alley veraton ests vary he acceptance ranges the tm shall be retested for confirmation, Belore retest the instrument calibration shal be e-heced aga fit fal agin wl jee athe materi Alice atv lb klted and Non Conformance Report wile subrited to fe ual onto 320 MARKING ‘components and wel that re found tobe unacceptate shale marked inmedlate wth are red ‘verted materi wh an acceptable ana shall be marked wt the eter PM. “Therathing sha be placed a follows: 1. Pipe ‘ne mar, 75m am ene enon the outer surface ofthe pipe 2 Welds Pca the welder'smarkon the wel 3. Fitings nd Forings Adjacent tothe manufaeturermarngs 4. Valves ‘Adjacent tothe manfacturermatting o bss andthe pressure pats 5. castings Adjacent tothe easing manutacturer’smathing ndhest numbers A postive Mater entiation Report willbe completed. The inspection report whave 2 complet description ‘leach tem tested incising mater pes, shade, weld. and mul-lemens suits (Safeguard Positive Material Identi nied Boal TE AF

You might also like