A B C D E F G
1
A
2 B
1 3 C
F
2
G
3
ISOMETRIC PLAN
PLUMBING LAYOUT
LEGEND :
GENERAL NOTES:
* ALL PLUMBING INSTALLATIONS SHALL BE DONE IN ACCORDANCE WITH THE LATEST
EDITION OF THE PHILIPPINE PLUMBING CODE AND IN CONFORMITY WITH THE
LOCAL PLUMBING ORDINANCE.
* ALL HORIZONTAL PIPING INSTALLATIONS SHALL BE RUN IN PRACTICAL ALIGNMENT
AND SHALL BE PROVIDED WITH A SLOPE OF NOT LESS THAN 2%.
* ALL PLUMBING PIPES PASSING THRU OR UNDER CONCRETE SHALL BE FULLY
PROTECTED AGAINST BREAKAGE.
* VERIFY ACTUAL LOCATION AND ELEVATION OF STREET DRAINAGE AND WATER
SOURCE FOR CONNECTION BEFORE CONSTRUCTION.
CERTIFICATION * ALL PLUMBING INSTALLLATION SHALL BE DONE UNDER THE DIRECT SUPERVISION
OF A DULY LICENSED PLUMBING ENGINEER OR MASTER PLUMBER.
THIS TO CERTIFY THAT THERE IS NO EXISTING ARTESIAN WELL WITHIN * POLYVINYL CHLORIDE (PVC) PIPES FOR WASTE, DRAIN AND VENT SHALL BE
CATCH BASIN
MOLDEX BRAND, NO REPLACEMENT OF MATERIALS SHALL BE MADE WITHOUT THE
THE RADIUS OF 25.00 METERS AWAY FROM THE PROPOSED SEPTIC TANK. SEPTIC TANK DETAIL
CONSENT OF THE DESIGNER.
MASTER PLUMBER
PROPOSED TWO STOREY
LODGING HOUSE