Swasana Indekost - SHOP Drawing
Swasana Indekost - SHOP Drawing
ARSITEKTURAL
Perencanaan Kos Izza Khawra
TAMPAK PERSPEKTIF
SKALA 1 : 100
Perencanaan Kos Izza Khawra
TAMPAK DEPAN
SKALA 1 : 100
Perencanaan Kos Izza Khawra
TAMPAK FACADE
SKALA 1 : 100
Perencanaan Kos Izza Khawra
TAMPAK SAMPING
SKALA 1 : 100
Perencanaan Kos Izza Khawra
TAMPAK BELAKANG
SKALA 1 : 100
Perencanaan Kos Izza Khawra
TAMPAK ATAS
SKALA 1 : 100
B
3200
270 400 152 248 400 400 400 300 330 300
KM/WC
ELV +0.15
[Link]
ELV +0.20
A A
CORRIDOR
200
100
PARKING AREA
1193
1193
200
2270 930
270 400 250 150 150 250 250 150 400 150
BALKON
BALKON KM/WC KM/WC KM/WC ELV +3.55
200
KAMAR 1 KAMAR 2
VIP CLASS KAMAR 6 KAMAR 7 KAMAR 8 VIP CLASS
ELV +3.60 STANDART STANDART STANDART ELV +3.60
ELV +3.60 ELV +3.60 ELV +3.60
KM/WC
200
ELV +3.54
KM/WC
A ELV +3.54 A
BALKON
ELV +3.60 ELV +3.60 ELV +3.60
ELV +3.55 DROP OFF
1200
KAMAR 3 KAMAR 3 KAMAR 3 KAMAR 3 KAMAR 3
STANDART STANDART STANDART STANDART STANDART RUANG SANTAI
OUTDOOR
400
ELV +3.60 ELV +3.60 ELV +3.60 ELV +3.60 ELV +3.60
ELV +3.55
287 2153 57
197
624
270
864
397
385
3222
145
111
197
212
150
267
1009
975
120
40
SWASANA Kost Exlusive
360
332
25
25
32 161 374 113 228 292
1200
+ 8.64
+ 7.32
Plafond + 7.32 Plafond + 7.32 Plafond + 7.32
110
+ 6.22
225
+ 3.25
300
- 1.20
30
- 1.50
300
- 4.50
1870 1330
3200
30
115
+ 8.64
95
+ 7.69
37
+ 7.32
Plafond + 7.32 Plafond + 7.32 Plafond + 7.32
335
KAMAR 3
STANDART CORRIDOR KAMAR 1 VIP CLASS
+ 3.97 + 3.97 + 3.97
+ 3.97
122
+ 2.75
245
- 1.20
30
- 1.50
300
- 4.50
93 1100
1193
270 400 152 248 400 400 400 300 330 300
KM/WC
STORAGE DAPUR ELV +0.15 MUSHOLA
305
CORRIDOR
295
PARKING AREA
1193
1193
KAMAR 1 KAMAR 2 KAMAR 1
VIP CLASS DELUXE DELUXE
RUANG SANTAI ELV +0.30 ELV +0.30 ELV +0.30
ELV +0.30
400
KAMAR 1 KAMAR 2
VIP CLASS KAMAR 6 KAMAR 7 KAMAR 8 VIP CLASS
ELV +3.60 STANDART STANDART STANDART ELV +3.60
ELV +3.60 ELV +3.60 ELV +3.60
KM/WC
200
ELV +3.54
KM/WC
ELV +3.54
BALKON
ELV +3.60 ELV +3.60 ELV +3.60
ELV +3.55
1200
KAMAR 3 KAMAR 3 KAMAR 3 KAMAR 3 KAMAR 3
STANDART STANDART STANDART STANDART STANDART RUANG SANTAI
OUTDOOR
400
ELV +3.60 ELV +3.60 ELV +3.60 ELV +3.60 ELV +3.60
ELV +3.55
10
90 70 90 65
200
200
140 155
90 70
250
220
220
220
FIN. BROWN
195
DAUN PINTU KAYU SOLID PINTU KAMAR MANDI DAUN PINTU SLEDING DAUN PINTU KAYU SOLID DAUN PINTU KUPU TARUNG
KAMPER FIN. SERAT KAYU FIN. PVC SOLID KACA BENING 5 MM KAMPER FIN. SERAT KAYU KACA BENING 5 MM
10
12
10 10
220
195
250
220
250
10 10
10
200
10
210
120
105 200
ALUMUNIUM ALUMUNIUM
4 INCH 4 INCH
ALUMUNIUM
FIN. DARK FIN. DARK
4 INCH
BROWN BROWN
FIN. DARK
250
BROWN
220
ENGSEL TANAM
LANTAI
DAUN PINTU SLEDING DAUN PINTU SLEDING KACA BENING 6 MM
KACA BENING 5 MM KACA BENING 5 MM
10 10 10
250
250
250
Perencanaan Kos Izza Khawra
DETAIL RENCANA PINTU DAN JENDELA
SKALA 1 : 100
180 65 100
10
ALUMUNIUM 4 INCH
DAUN JENDELA
100
160
ALUMUNIUM
4 INCH
65
180
45
250
KACA BENING 5 MM KACA MATI
BENING 6 MM
10
45
250
180
10
10
270 400 152 248 400 400 400 300 330 300
KM/WC
ELV +0.15
STORAGE DAPUR MUSHOLA
305
CORRIDOR
295
PARKING AREA
1193
1193
KAMAR 1 KAMAR 2 KAMAR 1
VIP CLASS DELUXE DELUXE
RUANG SANTAI ELV +0.30 ELV +0.30 ELV +0.30
ELV +0.30
400
KAMAR 1 KAMAR 2
VIP CLASS KAMAR 6 KAMAR 7 KAMAR 8 VIP CLASS
ELV +3.60 STANDART STANDART STANDART ELV +3.60
ELV +3.60 ELV +3.60 ELV +3.60
KM/WC
200
ELV +3.54
KM/WC
ELV +3.54
BALKON
ELV +3.60 ELV +3.60 ELV +3.60
ELV +3.55
1200
KAMAR 3 KAMAR 3 KAMAR 3 KAMAR 3 KAMAR 3
STANDART STANDART STANDART STANDART STANDART RUANG SANTAI
OUTDOOR
400
ELV +3.60 ELV +3.60 ELV +3.60 ELV +3.60 ELV +3.60
ELV +3.55
270 400 150 250 400 400 400 300 330 300
300
BAK
CONTROL
300
1193
1193
400
BAK BAK
CONTROL CONTROL
BAK
CONTROL
1000
200
1200
400
270 400 152 248 400 400 400 300 330 300
305
295
1193
1193
400
100
93
270 400 152 248 400 400 400 300 330 300
305
295
1193
1193
400
100
93
270 400 152 248 400 400 400 300 330 300
305
295
1193
1193
400
100
93
II II
I I
50
20
15
25
POTONGAN I - I POTONGAN II - II
80
20
10
70
80
270 400 152 248 400 400 400 300 330 300
305
295
1193
1193
400
100
93
270 400 152 248 400 400 400 300 330 300
305
295
1193
1193
400
100
93
1200
400
100
1200
400
100
1200
400
100
1200
400
100
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
17
270
18
100 400
16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
17
270
18
Lantai 2
ELV +3.97
Raling Tangga
Lantai 3
ELV +7.69
+ 7.69 18
17
36
+ 7.33
16
15
14
13
12
336
7 Anak Tangga
5
Lantai 2
4
2
Lantai 2
ELV +3.97 1
+ 3.97 18
17
36
+ 3.61
16
Balok B2
15
14
13
12
11
10 TANGGA 1
Kisi - kisi Raling Tangga
9
8
336
6 Anak Tangga
2 Sloof
RUANG SANTAI
+ 0.30 1
+0.25
Raling Tangga
Lantai 3
ELV +7.69
+ 7.69 18
17
36
21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 24
+ 7.33
16 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27
15
14
95
13
12
11
TANGGA 2
10
336
7
2
Lantai 2
ELV +3.97 1
+ 3.97 18
17
36
21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
+ 3.61
16 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27
15
14
27 27 27
13
79
12
11
15
21
10 TANGGA 1
D12 -150 9
21
8 Plat Tebal : 15 Cm
336
7
15
6 Tul D12 mm - 150 mm 15
15
5
2
RUANG SANTAI
+ 0.30
DETAIL A
1 DETAIL A
+0.25 SKALA 1 : 25
270 400 152 248 400 400 400 300 330 300
POB 06 DL POB 06 DL
Downlight Outbow Downlight Outbow Downlight Outbow Downlight Outbow Downlight Outbow Downlight Outbow
E27 Ip65
295
1193
POB 06 DL POB 06 DL POB 06 DL
Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4''
POB 06 DL
POB 06 DL POB 06 DL Downlight Outbow AC 21 PK AC AC AC 12 PK AC AC 21 PK
Downlight Outbow
Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4''
Downlight Outbow
Downlight Inbow 4''
Lamp Track Rell Spotlight
POB 06 DL POB 06 DL POB 06 DL
Downlight Inbow 4'' Downlight Inbow 4''
E27 Ip65
KETERANGAN :
Perencanaan Kos Izza Khawra
[Link] KETERANGAN
1
DENAH INSTALASI LISTRIK LT 1 2.
Titik Lampu Utama Downlight Inbow 4''
SKALA 1 : 100
3 Saklar Tunggal
4 Saklar Ganda
5 Stop Kontak
6 AC AC 21 PK
POB 06 DL
200
POB 06 DL
Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4''
1
AC AC 2 PK
1 Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4''
AC AC 2 PK
Downlight Inbow 4''
Downlight Inbow 4''
Downlight Inbow 4'' POB 06 DL POB 06 DL POB 06 DL POB 06 DL
POB 06 DL
1
AC 21 PK AC AC AC 2 PK AC 21 PK AC POB 06 DL
200
KWH METER KWH METER KWH METER KWH METER KWH METER
Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4''
1200
Downlight Outbow
1
AC AC 2 PK AC 21 PK AC
1
AC AC 2 PK AC 21 PK AC AC 21 PK AC
Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4''
400
Downlight Outbow
POB 06 DL
Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4''
100
KETERANGAN :
Perencanaan Kos Izza Khawra
[Link] KETERANGAN
DENAH INSTALASI LISTRIK LT 2 1 Titik Lampu Utama Downlight Inbow 4''
3 Saklar Tunggal
4 Saklar Ganda
5 Stop Kontak
6 AC AC 21 PK
3200
270 400 152 248 400 400 400 300 330 300
DARI ROOFTANK
SW
300
BC SUMUR
KR
KR
KR
A A
200
100
1193
1193
SW SW SW
200
CL CL CL
Pipa PVC 3/4"
DARI ROOFTANK
100
PVC 3/4"
93
KR
B
KETERANGAN :
[Link] KETERANGAN [Link] KETERANGAN
1 Pipa Saluran Distribusi PVC 1/2 - 3/4" 7 BC Bak Cuci Piring
Perencanaan Kos Izza Khawra 3 Pipa Saluran Air Kotor PVC 4" 9 BK Bak Kontrol
CL CL CL
200
SW SW SW
SW
200
SW
CL CL
Pipa PVC 3/4"
1000
200
1200
400
CL CL CL CL CL
SW SW SW SW SW
Pipa PVC 3/4" Pipa PVC 3/4"
Pipa PVC 3/4"
Pipa PVC 3/4" Pipa PVC 3/4"
DARI ROOFTANK
100
KETERANGAN :
[Link] KETERANGAN [Link] KETERANGAN
1 Pipa Saluran Distribusi PVC 1/2 - 3/4" 7 BC Bak Cuci Piring
Perencanaan Kos Izza Khawra 3 Pipa Saluran Air Kotor PVC 4" 9 BK Bak Kontrol
3200
270 400 152 248 400 400 400 300 330 300
CL
300
BC
FD
DARI LANTAI 2
A A
VC 3"
200
Pipa P
Pipa
DARI LANTAI 2
100
PVC
1193
1193
Pipa PVC 4"
4"
Pipa PVC 3"
200
FD FD 3" FD
PVC
a
200
p
Pi
3"
C4 "
4"
a PV
aP
PVC
Pip
PVC
Pip
4"
100
KETERANGAN :
[Link] KETERANGAN [Link] KETERANGAN
1 Pipa Saluran Distribusi PVC 1/2 - 3/4" 7 BC Bak Cuci Piring
Perencanaan Kos Izza Khawra 3 Pipa Saluran Air Kotor PVC 4" 9 BK Bak Kontrol
4"
i pa PVC
P
1200
400
KE RESAPAN KE RESAPAN
LANTAI 1 LANTAI 1
Pipa PVC 4" Pipa PVC 4" Pipa PVC 4" Pipa PVC 4"
KE SEPTICKTANK
100
LANTAI 1
KETERANGAN :
[Link] KETERANGAN [Link] KETERANGAN
1 Pipa Saluran Distribusi PVC 1/2 - 3/4" 7 BC Bak Cuci Piring
Perencanaan Kos Izza Khawra 3 Pipa Saluran Air Kotor PVC 4" 9 BK Bak Kontrol
30
30
Plat Beton Plat Beton
8
8
100
100
238
238
300
300
100
100
Pasir Urug Pasir Urug
60
100
Timbunan Kerikil
40
Cor Beton Pasir Urug
10
10
7 10 80 10 7
7 10 80 10 7
100
100
A A
7 10 80 10 7 7 10 80 10 7
Perencanaan Kos Izza Khawra 100 Perencanaan Kos Izza Khawra 100
DETAIL SEPTICKTANK DETAIL RESAPAN
SKALA 1 : 25 SKALA 1 : 25