0% found this document useful (0 votes)
461 views44 pages

Swasana Indekost - SHOP Drawing

The document contains 6 architectural drawings related to the planning of Izza Khawra Student Housing. The drawings include a front elevation, facade, side view, rear view, and top view at a scale of 1:100. Additionally, there are 2 floor plans at a scale of 1:100 - one for the first floor and one for the second floor. The drawings provide details of the building layout, room types, and dimensions to visualize and plan the student housing project.

Uploaded by

Drafter Cimory
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
461 views44 pages

Swasana Indekost - SHOP Drawing

The document contains 6 architectural drawings related to the planning of Izza Khawra Student Housing. The drawings include a front elevation, facade, side view, rear view, and top view at a scale of 1:100. Additionally, there are 2 floor plans at a scale of 1:100 - one for the first floor and one for the second floor. The drawings provide details of the building layout, room types, and dimensions to visualize and plan the student housing project.

Uploaded by

Drafter Cimory
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

DRAWING

ARSITEKTURAL
Perencanaan Kos Izza Khawra
TAMPAK PERSPEKTIF
SKALA 1 : 100
Perencanaan Kos Izza Khawra
TAMPAK DEPAN
SKALA 1 : 100
Perencanaan Kos Izza Khawra
TAMPAK FACADE
SKALA 1 : 100
Perencanaan Kos Izza Khawra
TAMPAK SAMPING
SKALA 1 : 100
Perencanaan Kos Izza Khawra
TAMPAK BELAKANG
SKALA 1 : 100
Perencanaan Kos Izza Khawra
TAMPAK ATAS
SKALA 1 : 100
B

3200

270 400 152 248 400 400 400 300 330 300

KM/WC
ELV +0.15

STORAGE DAPUR MUSHOLA


300

ELV +0.30 ELV +0.30 ELV +0.30

[Link]
ELV +0.20

A A
CORRIDOR
200
100

PARKING AREA
1193

1193
200

KAMAR 1 KAMAR 2 KAMAR 1


VIP CLASS DELUXE DELUXE
RUANG SANTAI ELV +0.30 ELV +0.30 ELV +0.30
ELV +0.30

KM/WC KM/WC KM/WC


200

ELV +0.25 ELV +0.25 ELV +0.25


100

TAMAN KAMAR SATPAM POS SATPAM


ELV -0.40 ELV +0.10 ELV +0.10
93

270 400 250 150 150 250 250 150 1330


3200

Perencanaan Kos Izza Khawra


DENAH KOS LANTAI 1
SKALA 1 : 100
B

2270 930
270 400 250 150 150 250 250 150 400 150

BALKON
BALKON KM/WC KM/WC KM/WC ELV +3.55
200

ELV +3.55 ELV +3.54 ELV +3.54 ELV +3.54

KAMAR 1 KAMAR 2
VIP CLASS KAMAR 6 KAMAR 7 KAMAR 8 VIP CLASS
ELV +3.60 STANDART STANDART STANDART ELV +3.60
ELV +3.60 ELV +3.60 ELV +3.60
KM/WC
200

ELV +3.54
KM/WC
A ELV +3.54 A

CORRIDOR CORRIDOR CORRIDOR


1000
200

BALKON
ELV +3.60 ELV +3.60 ELV +3.60
ELV +3.55 DROP OFF

1200
KAMAR 3 KAMAR 3 KAMAR 3 KAMAR 3 KAMAR 3
STANDART STANDART STANDART STANDART STANDART RUANG SANTAI
OUTDOOR
400

ELV +3.60 ELV +3.60 ELV +3.60 ELV +3.60 ELV +3.60
ELV +3.55

KM/WC KM/WC KM/WC KM/WC KM/WC


ELV +3.54 ELV +3.54 ELV +3.54 ELV +3.54 ELV +3.54
100

270 400 400 400 400 400


3200

Perencanaan Kos Izza Khawra


DENAH KOS LANTAI 2
SKALA 1 : 100
2498

287 2153 57

197
624

270

864
397
385

298 388 250 285 245 503 290 965

3222

Perencanaan Kos Izza Khawra


TAMPAK DEPAN
SKALA 1 : 100
1165

50 100 1015 300


565

145

111
197
212

150
267
1009

975
120
40
SWASANA Kost Exlusive
360

332
25

25
32 161 374 113 228 292

1200

Perencanaan Kos Izza Khawra


TAMPAK SAMPING
SKALA 1 : 100
2270

270 400 400 400 400 400 162

+ 8.64

PLAT DAK PLAT DAK PLAT DAK PLAT DAK


95

+ 7.69 + 7.69 + 7.69 + 7.69 + 7.69


37

+ 7.32
Plafond + 7.32 Plafond + 7.32 Plafond + 7.32
110

+ 6.22
225

CORRIDOR CORRIDOR CORRIDOR BALKON


+ 3.97 + 3.97 + 3.97 + 3.92
+ 3.97
72

+ 3.25
300

DAPUR MUSHOLA CORRIDOR


+ 0.30 + 0.30 + 0.25 PARKING AREA
+0.25
25

MUKA TANAH ASLI


120

- 1.20
30

- 1.50
300

- 4.50

1870 1330

3200

Perencanaan Kos Izza Khawra


POTONGAN A - A
SKALA 1 : 100
+ 10.00
+ 9.79

30
115
+ 8.64

95
+ 7.69

37
+ 7.32
Plafond + 7.32 Plafond + 7.32 Plafond + 7.32

335
KAMAR 3
STANDART CORRIDOR KAMAR 1 VIP CLASS
+ 3.97 + 3.97 + 3.97
+ 3.97
122

+ 2.75
245

RUANG SANTAI CORRIDOR DAPUR


+ 0.30 + 0.25 + 0.30
+0.30 + 0.10 + 0.20
20

+ 0.10 MUKA TANAH ASLI


125

- 1.20
30

- 1.50
300

- 4.50

93 1100
1193

Perencanaan Kos Izza Khawra


POTONGAN B - B
SKALA 1 : 100
3200

270 400 152 248 400 400 400 300 330 300

KM/WC
STORAGE DAPUR ELV +0.15 MUSHOLA
305

ELV +0.30 ELV +0.30 ELV +0.30

CORRIDOR
295

PARKING AREA
1193

1193
KAMAR 1 KAMAR 2 KAMAR 1
VIP CLASS DELUXE DELUXE
RUANG SANTAI ELV +0.30 ELV +0.30 ELV +0.30
ELV +0.30
400

KM/WC KM/WC KM/WC


ELV +0.25 ELV +0.25 ELV +0.25
100

TAMAN KAMAR SATPAM POS SATPAM


ELV -0.40 ELV +0.10 ELV +0.10
93

270 400 400 400 400 1330


3200

Perencanaan Kos Izza Khawra


DENAH RENCANA PINTU DAN JENDELA LT 1
SKALA 1 : 100
2270 930
270 400 400 400 400 400 150

BALKON KM/WC KM/WC KM/WC


200

ELV +3.55 ELV +3.54 ELV +3.54 ELV +3.54

KAMAR 1 KAMAR 2
VIP CLASS KAMAR 6 KAMAR 7 KAMAR 8 VIP CLASS
ELV +3.60 STANDART STANDART STANDART ELV +3.60
ELV +3.60 ELV +3.60 ELV +3.60
KM/WC
200

ELV +3.54
KM/WC
ELV +3.54

CORRIDOR CORRIDOR CORRIDOR


1000
200

BALKON
ELV +3.60 ELV +3.60 ELV +3.60
ELV +3.55

1200
KAMAR 3 KAMAR 3 KAMAR 3 KAMAR 3 KAMAR 3
STANDART STANDART STANDART STANDART STANDART RUANG SANTAI
OUTDOOR
400

ELV +3.60 ELV +3.60 ELV +3.60 ELV +3.60 ELV +3.60
ELV +3.55

KM/WC KM/WC KM/WC KM/WC KM/WC


ELV +3.54 ELV +3.54 ELV +3.54 ELV +3.54 ELV +3.54
100

270 400 400 400 400 400


3200

Perencanaan Kos Izza Khawra


DENAH RENCANA PINTU DAN JENDELA LT 2
SKALA 1 : 100
140

10
90 70 90 65
200

200
140 155
90 70

KUSEN KAYU ALUMUNIUM KUSEN KAYU HANDLE


KAMPER 4 INCH KAMPER STAINLESS
FIN. DARK
KACA BENING BROWN KACA BENING KUSEN
TBL 5 MM TBL 5 MM ALUMUNIUM

250
220

220

220
FIN. BROWN

195
DAUN PINTU KAYU SOLID PINTU KAMAR MANDI DAUN PINTU SLEDING DAUN PINTU KAYU SOLID DAUN PINTU KUPU TARUNG
KAMPER FIN. SERAT KAYU FIN. PVC SOLID KACA BENING 5 MM KAMPER FIN. SERAT KAYU KACA BENING 5 MM

10
12
10 10
220

195

250

220

250
10 10

Perencanaan Kos Izza Khawra


DETAIL RENCANA PINTU DAN JENDELA
SKALA 1 : 100
105

10
200

10
210

120
105 200

ALUMUNIUM ALUMUNIUM
4 INCH 4 INCH
ALUMUNIUM
FIN. DARK FIN. DARK
4 INCH
BROWN BROWN
FIN. DARK

250
BROWN

220
ENGSEL TANAM
LANTAI
DAUN PINTU SLEDING DAUN PINTU SLEDING KACA BENING 6 MM
KACA BENING 5 MM KACA BENING 5 MM

10 10 10
250

250

250
Perencanaan Kos Izza Khawra
DETAIL RENCANA PINTU DAN JENDELA
SKALA 1 : 100
180 65 100

10
ALUMUNIUM 4 INCH
DAUN JENDELA
100
160
ALUMUNIUM
4 INCH

65

180

45

250
KACA BENING 5 MM KACA MATI
BENING 6 MM

10

45

250
180
10

10

Perencanaan Kos Izza Khawra


DETAIL RENCANA PINTU DAN JENDELA
SKALA 1 : 100
3200

270 400 152 248 400 400 400 300 330 300

KM/WC
ELV +0.15
STORAGE DAPUR MUSHOLA
305

ELV +0.30 ELV +0.30 ELV +0.30

CORRIDOR
295

PARKING AREA
1193

1193
KAMAR 1 KAMAR 2 KAMAR 1
VIP CLASS DELUXE DELUXE
RUANG SANTAI ELV +0.30 ELV +0.30 ELV +0.30
ELV +0.30
400

KM/WC KM/WC KM/WC


ELV +0.25 ELV +0.25 ELV +0.25
100

TAMAN KAMAR SATPAM POS SATPAM


ELV -0.40 ELV +0.10 ELV +0.10
93

270 400 400 400 400 1330


3200

Perencanaan Kos Izza Khawra


DENAH RENCANA LANTAI 1
SKALA 1 : 100
2270 930
270 400 250 150 150 250 250 150 400 150

BALKON KM/WC KM/WC KM/WC


200

ELV +3.55 ELV +3.54 ELV +3.54 ELV +3.54

KAMAR 1 KAMAR 2
VIP CLASS KAMAR 6 KAMAR 7 KAMAR 8 VIP CLASS
ELV +3.60 STANDART STANDART STANDART ELV +3.60
ELV +3.60 ELV +3.60 ELV +3.60
KM/WC
200

ELV +3.54
KM/WC
ELV +3.54

CORRIDOR CORRIDOR CORRIDOR


1000
200

BALKON
ELV +3.60 ELV +3.60 ELV +3.60
ELV +3.55

1200
KAMAR 3 KAMAR 3 KAMAR 3 KAMAR 3 KAMAR 3
STANDART STANDART STANDART STANDART STANDART RUANG SANTAI
OUTDOOR
400

ELV +3.60 ELV +3.60 ELV +3.60 ELV +3.60 ELV +3.60
ELV +3.55

KM/WC KM/WC KM/WC KM/WC KM/WC


ELV +3.54 ELV +3.54 ELV +3.54 ELV +3.54 ELV +3.54
100

270 400 400 400 400 400


3200

Perencanaan Kos Izza Khawra


DENAH RENCANA LANTAI LT 2
SKALA 1 : 100
3200

270 400 150 250 400 400 400 300 330 300
300

BAK
CONTROL
300
1193

1193
400

BAK BAK BAK


CONTROL CONTROL CONTROL
100
93

270 400 400 400 400 1330


3200

Perencanaan Kos Izza Khawra


DENAH RENCANA PLAFOND LT 1
SKALA 1 : 100
2270 930
270 400 250 150 150 250 250 150 400 150

BAK BAK BAK


CONTROL CONTROL CONTROL
200
200

BAK BAK
CONTROL CONTROL

BAK
CONTROL
1000
200

1200
400

BAK BAK BAK BAK BAK


CONTROL CONTROL CONTROL CONTROL CONTROL
100

270 400 400 400 400 400


3200

Perencanaan Kos Izza Khawra


DENAH RENCANA PLAFOND LT 2
SKALA 1 : 100
DRAWING
STRUKTURAL
3200

270 400 152 248 400 400 400 300 330 300
305
295
1193

1193
400
100
93

270 400 400 400 400 1330


3200

Perencanaan Kos Izza Khawra


DENAH RENCANA PONDASI BATU KALI
SKALA 1 : 100
3200

270 400 152 248 400 400 400 300 330 300
305
295
1193

1193
400
100
93

270 400 400 400 400 1330


3200

Perencanaan Kos Izza Khawra


DENAH RENCANA PONDASI FOOTPLATE
SKALA 1 : 100
3200

270 400 152 248 400 400 400 300 330 300
305
295
1193

1193
400
100
93

270 400 400 400 400 1330


3200

Perencanaan Kos Izza Khawra


DENAH RENCANA PONDASI STROUS
SKALA 1 : 100
II II

II II

I I

50
20
15
25

POTONGAN I - I POTONGAN II - II
80
20
10

70
80

Perencanaan Izza Khwara


DETAIL PONDASI
SKALA 1 : 20
3200

270 400 152 248 400 400 400 300 330 300
305
295
1193

1193
400
100
93

270 400 400 400 400 1330


3200

Perencanaan Kos Izza Khawra


DENAH RENCANA SLOOF
SKALA 1 : 100
3200

270 400 152 248 400 400 400 300 330 300
305
295
1193

1193
400
100
93

270 400 400 400 400 1330


3200

Perencanaan Kos Izza Khawra


DENAH RENCANA KOLOM LT 1
SKALA 1 : 100
2270 930
270 400 250 150 150 250 250 150 400 150
200
200
1000
200

1200
400
100

270 400 400 400 400 400


3200

Perencanaan Kos Izza Khawra


DENAH RENCANA KOLOM LT 2
SKALA 1 : 100
2270 930
270 400 400 400 400 400 150
300
300
1000

1200
400
100

270 400 400 400 400 400


3200

Perencanaan Kos Izza Khawra


DENAH RENCANA BALOK LT 1
SKALA 1 : 100
2270 930
270 400 400 400 400 400 150
300
300
1000

1200
400
100

270 400 400 400 400 400


3200

Perencanaan Kos Izza Khawra


DENAH RENCANA BALOK LT 2
SKALA 1 : 100
2270 930
270 400 250 150 150 250 250 150 400
200
200
1000
200

1200
400
100

270 400 400 400 400 400


3200

Perencanaan Kos Izza Khawra


DENAH PLAT DAK
SKALA 1 : 100
600

100 400 100

16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
17

270
18

Lantai 3/Plat Atap


ELV +7.69

Perencanaan Kos Izza Khawra


DENAH TANGGA 2
SKALA 1 : 50

100 400

16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
17
270

18

Lantai 2
ELV +3.97

Perencanaan Kos Izza Khawra


DENAH TANGGA 1
SKALA 1 : 50
500
95 405

Raling Tangga

Lantai 3
ELV +7.69
+ 7.69 18
17

36
+ 7.33
16

15

14

13

12

11 Kisi - kisi Raling Tangga


TANGGA 2
10

336
7 Anak Tangga

5
Lantai 2
4

2
Lantai 2
ELV +3.97 1
+ 3.97 18

17
36

+ 3.61
16
Balok B2
15

14

13

12

11
10 TANGGA 1
Kisi - kisi Raling Tangga
9

8
336

6 Anak Tangga

2 Sloof
RUANG SANTAI
+ 0.30 1
+0.25

Perencanaan Kos Izza Khawra


TAMPAK TANGGA 1 & 2
SKALA 1 : 50
79 405
484
500
95

Raling Tangga

Lantai 3
ELV +7.69
+ 7.69 18
17

36

21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 24
+ 7.33
16 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27
15

14
95
13

12

11
TANGGA 2
10

336
7

2
Lantai 2
ELV +3.97 1
+ 3.97 18

17
36

21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21 21
+ 3.61
16 27 27 27 27 27 27 27 27 27 27 27 27 27 27 27
15

14
27 27 27
13
79
12

11

15

21
10 TANGGA 1
D12 -150 9

21
8 Plat Tebal : 15 Cm
336

7
15
6 Tul D12 mm - 150 mm 15
15
5

2
RUANG SANTAI
+ 0.30
DETAIL A
1 DETAIL A
+0.25 SKALA 1 : 25

Perencanaan Kos Izza Khawra


DETAIL TANGGA 1 & 2
SKALA 1 : 50
79 405
484
DRAWING MEP
(MEKANIKAL, ELEKTRIKAL, PLUMBING)
3200

270 400 152 248 400 400 400 300 330 300

POB 06 DL POB 06 DL

Downlight Inbow 4''


305

Downlight Outbow Downlight Outbow Downlight Outbow


Downlight Inbow 4'' Downlight Outbow Downlight Inbow 4''
E27 Ip65
POB 06 DL POB 06 DL

Downlight Outbow Downlight Outbow Downlight Outbow Downlight Outbow Downlight Outbow Downlight Outbow
E27 Ip65
295

KWH METER KWH METER KWH METER


1193

1193
POB 06 DL POB 06 DL POB 06 DL
Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4''
POB 06 DL
POB 06 DL POB 06 DL Downlight Outbow AC 21 PK AC AC AC 12 PK AC AC 21 PK

POB 06 DL POB 06 DL POB 06 DL E27 Ip65


400

Downlight Outbow
Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4''

Downlight Outbow
Downlight Inbow 4''
Lamp Track Rell Spotlight
POB 06 DL POB 06 DL POB 06 DL
Downlight Inbow 4'' Downlight Inbow 4''

E27 Ip65 E27 Ip65


100

POB 06 DL E27 Ip65 E27 Ip65

E27 Ip65

Downlight Inbow 4'' Downlight Inbow 4''


93

E27 Ip65 E27 Ip65 E27 Ip65 E27 Ip65

POB 06 DL POB 06 DL POB 06 DL

270 400 400 400 400 1330


3200

KETERANGAN :
Perencanaan Kos Izza Khawra
[Link] KETERANGAN
1
DENAH INSTALASI LISTRIK LT 1 2.
Titik Lampu Utama Downlight Inbow 4''

Lamp Downlight POB 06 DL

SKALA 1 : 100
3 Saklar Tunggal

4 Saklar Ganda

5 Stop Kontak

6 AC AC 21 PK

7 Lamp Track Rell Spotlight

8 Lamp Taman E27 Ip65


2270 930
270 400 250 150 150 250 250 150 400 150

POB 06 DL POB 06 DL POB 06 DL POB 06 DL POB 06 DL

POB 06 DL
200

POB 06 DL
Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4''
1
AC AC 2 PK
1 Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4''
AC AC 2 PK
Downlight Inbow 4''
Downlight Inbow 4''
Downlight Inbow 4'' POB 06 DL POB 06 DL POB 06 DL POB 06 DL
POB 06 DL
1
AC 21 PK AC AC AC 2 PK AC 21 PK AC POB 06 DL
200

Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4''


POB 06 DL POB 06 DL POB 06 DL
Downlight Inbow 4'' Downlight Inbow 4''
POB 06 DL

Downlight Inbow 4''

KWH METER KWH METER KWH METER KWH METER KWH METER

POB 06 DL POB 06 DL POB 06 DL POB 06 DL POB 06 DL


1000
200

Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4''

POB 06 DL POB 06 DL POB 06 DL POB 06 DL POB 06 DL


KWH METER KWH METER KWH METER KWH METER KWH METER

1200
Downlight Outbow

POB 06 DL POB 06 DL POB 06 DL POB 06 DL POB 06 DL

1
AC AC 2 PK AC 21 PK AC
1
AC AC 2 PK AC 21 PK AC AC 21 PK AC
Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4''
400

POB 06 DL POB 06 DL POB 06 DL POB 06 DL POB 06 DL


Downlight Inbow 4'' POB 06 DL

Downlight Outbow

POB 06 DL
Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4'' Downlight Inbow 4''
100

Downlight Inbow 4''

POB 06 DL POB 06 DL POB 06 DL POB 06 DL POB 06 DL

270 400 400 400 400 400


3200

KETERANGAN :
Perencanaan Kos Izza Khawra
[Link] KETERANGAN
DENAH INSTALASI LISTRIK LT 2 1 Titik Lampu Utama Downlight Inbow 4''

SKALA 1 : 100 2. Lamp Downlight POB 06 DL

3 Saklar Tunggal

4 Saklar Ganda

5 Stop Kontak

6 AC AC 21 PK

7 Lamp Track Rell Spotlight

8 Lamp Taman E27 Ip65


B

3200

270 400 152 248 400 400 400 300 330 300
DARI ROOFTANK

Pipa PVC 3/4" Pipa PVC 3/4"


CL NAIK KE ROOFTANK JET PUMP

SW
300

BC SUMUR
KR
KR
KR

A A
200
100
1193

1193
SW SW SW
200

CL CL CL
Pipa PVC 3/4"
DARI ROOFTANK
100

PVC 3/4"
93

KR

270 400 250 150 150 250 250 150


3200

B
KETERANGAN :
[Link] KETERANGAN [Link] KETERANGAN
1 Pipa Saluran Distribusi PVC 1/2 - 3/4" 7 BC Bak Cuci Piring

2. Pipa Saluran Air Kotor PVC 3" 8 WS Wastafel

Perencanaan Kos Izza Khawra 3 Pipa Saluran Air Kotor PVC 4" 9 BK Bak Kontrol

INSTALASI AIR BERSIH LT. 1 4 KR Kran Air Distribusi 10 MC Mesin Cuci

SKALA 1 : 100 5 FD Floor Drain 11 SW Shower

6 CL Closed Duduk 12 Water Heater


2270 930
270 400 250 150 150 250 250 150 400
Pipa PVC 3/4" DARI ROOFTANK Pipa PVC 3/4"

CL CL CL
200

SW SW SW

SW
200

SW
CL CL
Pipa PVC 3/4"
1000
200

1200
400

CL CL CL CL CL

SW SW SW SW SW
Pipa PVC 3/4" Pipa PVC 3/4"
Pipa PVC 3/4"
Pipa PVC 3/4" Pipa PVC 3/4"
DARI ROOFTANK
100

270 400 400 400 400 400


3200

KETERANGAN :
[Link] KETERANGAN [Link] KETERANGAN
1 Pipa Saluran Distribusi PVC 1/2 - 3/4" 7 BC Bak Cuci Piring

2. Pipa Saluran Air Kotor PVC 3" 8 WS Wastafel

Perencanaan Kos Izza Khawra 3 Pipa Saluran Air Kotor PVC 4" 9 BK Bak Kontrol

INSTALASI AIR BERSIH LT. 2 4 KR Kran Air Distribusi 10 MC Mesin Cuci

SKALA 1 : 100 5 FD Floor Drain 11 SW Shower

6 CL Closed Duduk 12 Water Heater


B

3200

270 400 152 248 400 400 400 300 330 300

CL
300

BC
FD
DARI LANTAI 2

A A

VC 3"
200

Pipa P
Pipa
DARI LANTAI 2
100

PVC
1193

1193
Pipa PVC 4"
4"
Pipa PVC 3"
200

FD FD 3" FD
PVC
a
200

p
Pi
3"

DARI LANTAI 2 CL CL DARI LANTAI 2 CL


VC

C4 "
4"

a PV
aP

PVC

Pip
PVC
Pip

4"
100

RESAPAN SEPTICKTANK RESAPAN


93

270 400 250 150 150 250 250 150 1330


3200

KETERANGAN :
[Link] KETERANGAN [Link] KETERANGAN
1 Pipa Saluran Distribusi PVC 1/2 - 3/4" 7 BC Bak Cuci Piring

2. Pipa Saluran Air Kotor PVC 3" 8 WS Wastafel

Perencanaan Kos Izza Khawra 3 Pipa Saluran Air Kotor PVC 4" 9 BK Bak Kontrol

INSTALASI AIR KOTOR LT. 1 4 KR Kran Air Distribusi 10 MC Mesin Cuci

SKALA 1 : 100 5 FD Floor Drain 11 SW Shower

6 CL Closed Duduk 12 Water Heater


2270 930
270 400 250 150 150 250 250 150 400

Pipa PVC 3"


FD CL FD FD
CL CL
200

4"
i pa PVC
P

Pipa PVC 3"


FD
200

KE RESAPAN Pipa PVC 4" Pipa PVC 4"


CL
CL
LANTAI 1
Pipa PVC 4"
KE SEPTICKTANK
LANTAI 1
1000
200

1200
400

Pipa PVC 3" Pipa PVC 3"


CL FD FD CL CL FD FD CL FD CL
PVC 4"
PVC 4"

KE RESAPAN KE RESAPAN
LANTAI 1 LANTAI 1
Pipa PVC 4" Pipa PVC 4" Pipa PVC 4" Pipa PVC 4"
KE SEPTICKTANK
100

LANTAI 1

270 400 400 400 400 400


3200

KETERANGAN :
[Link] KETERANGAN [Link] KETERANGAN
1 Pipa Saluran Distribusi PVC 1/2 - 3/4" 7 BC Bak Cuci Piring

2. Pipa Saluran Air Kotor PVC 3" 8 WS Wastafel

Perencanaan Kos Izza Khawra 3 Pipa Saluran Air Kotor PVC 4" 9 BK Bak Kontrol

INSTALASI AIR KOTOR LT. 2 4 KR Kran Air Distribusi 10 MC Mesin Cuci

SKALA 1 : 100 5 FD Floor Drain 11 SW Shower

6 CL Closed Duduk 12 Water Heater


PIPA HAWA PVC 2 "

TANAH URUG Lubang Kontrol 30 x 30 TANAH URUG Lubang Kontrol 30 x 30

30
30
Plat Beton Plat Beton

8
8

100
100

238
238

300
300

100
100
Pasir Urug Pasir Urug

60
100
Timbunan Kerikil

40
Cor Beton Pasir Urug

10
10
7 10 80 10 7
7 10 80 10 7
100
100

Pasir Urug Pasir Urug

A A

7 10 80 10 7 7 10 80 10 7

Perencanaan Kos Izza Khawra 100 Perencanaan Kos Izza Khawra 100
DETAIL SEPTICKTANK DETAIL RESAPAN
SKALA 1 : 25 SKALA 1 : 25

You might also like