Tunku Abdul Rahman University College ACADEMIC YEAR : 2020/2021
Faculty of Built Environment Course Title : Measurement of Superstructure Works
Course Code : ATBD2564
ATBD2564 MEASUREMENT OF SUPERSTRUCTURE WORKS
GROUP ASSIGNMENT 1
Date of Issue : Week 2
Before or on Week 5 not later than 12.00 noon,
Date of Submission :
Friday, 27th. November, 2020
Learning Outcomes:
CLO1 - Measure the quantities with comprehensive description for superstructure works in
accordance with the principles of measurement based on Malaysian Standard Method
of Measurement of Building Works, Second Edition (SMM2). (C4) (CTPS)
CLO2 - Write comprehensive specification for superstructure works. (C3) (CTPS)
CLO3 - Produce the structured Bills of Quantities for superstructure works. (C3) (CS)
INSTRUCTION ON TASK:
You are required to form a group of MAXIMUM 5 students. Referring the structural drawing
provided, each group need to accomplish:
a. The taking off measurement of reinforced concrete, formwork and reinforcement for
Staircase Structure and prepare Bills of Quantities.
b. Subsequently, prepare a comprehensive specification of reinforced concrete, formwork
and reinforcement for Staircase Structure by referring to JKR Standard Specifications for
Building Works.
Group Assignment 1 / Page 1
Your submission of Group Assignment 1 shall include, but not limited to the followings:
a) Front cover
b) Student’s Declaration of Originality
c) Assessment and Marking Scheme sheet,
d) Taking off List and Assumption List
e) Taking off measurements
f) Bills of Quantities
g) Specification
Your submission shall be HANDWRITTEN/TYPEWRITTEN in the softcopy format e.g.
Word file, Excel File or PDF file. Rename your file with your name e.g.
ATBD2564_GROUPANDREW.pdf and submit in Google Classroom to your respective Tutors.
You shall make necessary reasonable assumptions for information that NOT provided in the
drawings, if applicable.
Assessment and Marking Scheme
The Assignment 1 will contribute 50% towards the 100% coursework marks of ATBD2564
Measurement of Superstructure Works.
Any late submission of assignment without acceptable reason or permission from the assessor
will be deducted 5 marks for each day of delay from the final assignment marks awarded.
Students with less than satisfactory work will be required to make good the assignment.
Group Assignment 1 / Page 2
Faculty of Built Environment
ATBD2564
MEASUREMENT OF SUPERSTRUCTURE WORKS
GROUP ASSIGNMENT 1
Lecturer In-Charged : _______________________
Tutorial Group No. : _______________________
NO. STUDENT NAME STUDENT ID NO. TOTAL MARKS
1. /100
2. /100
3. /100
4. /100
5. /100
** Please fill in and bind this page as front cover of your group assignment for submission
Group Assignment 1 / Page 3
ATBD2564 MEASUREMENT OF SUPERSTRUCTURE WORKS
Marking Scheme Assessment Sheet
GROUP ASSIGNMENT 1
TUTORIAL GROUP :
NAME OF GROUP
1) (ID NO: )
MEMBERS :
2) (ID NO: )
3) (ID NO: )
4) (ID NO: )
5) (ID NO: )
Marks to be
0 1 2 3 4 5
allotted
Not done at Poor : Poorly Below Average: Average: Good: Excellence :
all or Did not done with little Better than Poor Works are acceptable Works are above Works are superior
understand understanding but not good and can be average can have quality, exceed
Description enough to pass. considered possibility of expectations and
to pass. distinction work. showing great
initiative
Allocated Total
ASSESSMENT CRITERIA Weightage Marks Marks Maximum
(A) (B) (A) x (B)
CLO1 - DIMENSION MEASUREMENT
Ability to list out proper Taking off List with
a
reasonable assumptions
1.0 5
b Showing detailed side cast and annotations 2.0 10
c Ability to measure all items correctly 8.0 40
Clear descriptions of work items complying to
d
SMM2
3.0 15
14.0 70
CLO2 - SPECIFICATION
Ability to write a comprehensive specification
e
for superstructure works
3.0 15
CLO3 - BILLS OF QUANTITIES
f Ability to sequence items and present in 3.0 15
proper BQ format
TOTAL : 20 100
Group Assignment 1 / Page 4