0% found this document useful (0 votes)
109 views10 pages

SITRAIN Automation Training Guide

The document discusses training objectives for commissioning and troubleshooting control hardware. It provides information on: 1) Reading and handling parameters as well as familiarizing with software routines required for commissioning. 2) Details on the electronic box, control board interfaces, data storage, parameterization, communication interfaces, and settings for commissioning drives. 3) Procedures for accessing and changing parameters, saving data, adjusting drive settings, and using optimization routines.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
109 views10 pages

SITRAIN Automation Training Guide

The document discusses training objectives for commissioning and troubleshooting control hardware. It provides information on: 1) Reading and handling parameters as well as familiarizing with software routines required for commissioning. 2) Details on the electronic box, control board interfaces, data storage, parameterization, communication interfaces, and settings for commissioning drives. 3) Procedures for accessing and changing parameters, saving data, adjusting drive settings, and using optimization routines.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Control hardware and commissioning

Training objectives:
You know how to read and handle parameters

You are familiar with software routines required


for commissioning and trouble shooting

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 1

Commissioning and software-routines

Content Page
Electronic box and Control board...................................................................................................... 3
Local bus adapter, installation locations and slot assignments.......................................................... 4
Control board and I/O-interfaces....................................................................................................... 5
Data storage.................................................................................................................................... 6
Parameterization via PMU (ParaMeterizing Unit).............................................................................. 7
Communication CUVC PG/PC.................................................................................................. 8
Settings for the serial interface on the PG/PC................................................................................... 9
Properties of Serial Interfaces.......................................................................................................... 10
Access to change parameters / Selection of function macros........................................................... 11
Saving Data / Upload, Download...................................................................................................... 12
Operating status display / Power section definitions.......................................................................... 13
Adjustment of converter current and converter supply voltage.......................................................... 14
Load class and load cycles............................................................................................................... 15
Motor data....................................................................................................................................... 16
Speed feedback via encoder or EMF................................................................................................ 17
Field control / Field weakening......................................................................................................... 18
Current and torque limits / Ramp function generator......................................................................... 19
Optimization routines....................................................................................................................... 20

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 2
Electronic box and Control board

Electronic box:

Terminals for
programmable digital

SIMOREG 6RA70 850 A units


and analog input and
output signals;
Terminals for second
serial interface

+ additional slots for


Option boards

Display and
keypad (PMU)
USS-serial interface
(for commissioning)

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 3

Local bus adapter, installation locations and slot assignments

1 3 2
location number Æ
sequence of installation

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 4
Control board and I/O-interfaces

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 5

Data storage

Booting FW
P53

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 6
Parameterization via PMU (ParaMeterizing Unit)

P Δ P P Δ P
0009 r000 P462 i 001 10.00 20.00 P462

example: setting a ramp time of 20 s for dataset 1 (initial condition: ready to switch on)

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 7

Communication CUVC ÅÆ PG/PC

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 8
Settings for the serial interface on the PG/PC

SIMOREG DC-Master

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 9

Properties of Serial Interfaces

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 10
Access to change parameters / Selection of function macros

upload, download

Online: the parameter can be changed in all converter operating states


Offline: the parameter can only be changed in converter operating states of > 01.0

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 11

Saving Data / Upload, Download

P051=6 *

Download

Upload
P051=7 *

* set automatically by DriveMonitor when requesting Upload, Download

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 12
Operating status display / Power section definitions

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 13

Adjustment of converter current and converter supply voltage

load class rsp.


US-rating

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 14
Load class and load cycles

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 15

Motor data

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 16
Speed feedback via encoder or EMF

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 17

Field control / Field weakening

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 18
Current and torque limits / Ramp function generator

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 19

Optimization routines

during optimization
runs the drive will
accelearate up to
maximum speed

SITRAIN Training for


DC MASTER Date: 08.03.2007
Automation and Drives
Siemens AG 2007. All rights reserved. File: ABU DHABI: Page 2 - 20

You might also like