CPCG - MEP Equipment Material Procurement Schedule Rev01 (10oct2022) - TATA
CPCG - MEP Equipment Material Procurement Schedule Rev01 (10oct2022) - TATA
HVAC
Air Conditioning
Air conditioning - VRV Daikin Japan Thailand PT. Azali Sumber Sejahtera □ □
Air conditioning - Split Daikin Japan Thailand / Malaysia PT. Azali Sumber Sejahtera □ □
Ventilation System
PROP Type Conexa Singapore Singapore PT. Simtex Mechatronic Indojaya □ □
Equipment and Material List - 1
FIRE PROTECTION
Foam System HD Fire (FM Approved) India India PT. Tonisko Tribuana Energi □ □
PLUMBING
Portable □ □
Water Fountain (RO) Niagara Indonesia Indonesia PT. Angkasindo Dunia □ □
Eye Wash (EW) Safeguard China China Hasana Safety Indonesia □ □
HVAC Material
Air Conditioning
Refrigerant Pipe (ASTM B280) Elgin Korea Korea PT. Radita Nutrin Selaras □ □
Pipe Insulation Aeroflex Thailand Thailand PT. Radita Nutrin Selaras □ □
Diffuser / Grille Defa Indonesia Indonesia PT. Defa Angkasa Utama □ □
Ventilation System
Ducting Sonduct Indonesia Indonesia PT. Son Duct Sejahtera □ □
Diffuser / Grille Defa Indonesia Indonesia PT. Defa Angkasa Utama □ □
PLUMBING
Clean Water & Recycle
Hdpe Pipe (Piping Pumproom) Rucika Indonesia Indonesia PT. Laksmana Karya Adiyasa □ □
China / Japan /
Valves Gala / Weflo / Kitz/Yuta China / Japan PT.Figo Teknik / PT. Genair / PT. Flow Solution Indonesia □ □
Indonesia
Flexible Joint Tozen Japan Japan PT. Galaxy / PT. Cahaya Panca □ □
GIP Seamless Pipe Sch40 ex China China China PT. Cahaya Panca Sukses Sentosa □ □
Fitting Steel Pipe ex China China China PT. Cahaya Panca Sukses Sentosa □ □
Ppr Pipe PN 10 Rifeng China China
PT. Wavin Trading Indonesia
PT. Cahaya Panca Sukses Sentosa □ □
Equipment and Material List - 2
PVC Pipe Class AW Wavin Indonesia Indonesia PT. Wavin Trading Indonesia □ □
Flexible Connection Muraflex Indonesia Indonesia PT. Flow Solution □ □
Pressure Gauge VPG Indonesia Indonesia PT. Flow Solution □ □
Pressure Switch Saginomiya Japan Japan PT. Flow Solution □ □
Flow Meter / Water Meter B&R Indonesia Indonesia PT. Flow Solution □ □
Automatic Air Vent (AAV) Yoshitake Japan JapanPT. Flow Solution PT. Cahaya Kalimas Utama □ □
Float Valve Yuta Indonesia China PT. Flow Solution □ □
Foot Valve Socla France France PT. Flow Solution □ □
PRV Claval USA USA PT. Piping System Indonesia □ □
Portable □ □
Ppr Pipe PN 10 Vinilon Indonesia Indonesia PT. Flow Solution Indonesia □ □
Valves Gala / Weflo / Kitz China / Japan China / Japan PT.Figo Teknik / PT. Genair / PT. Flow Solution Indonesia □ □
Foot Valves Arita Malaysia Malaysia PT. Arita Prima Indonesia □ □
Float Valves Klasee / Watts China China PT. Afaflow Indonesia □ □
Flexible Joint Tozen Japan Japan PT. Galaxy / PT. Cahaya Panca □ □
Pressure Indicator c/w Ball valve Nagano / Wika Japan Japan PT. Cahaya Kalimas Utama □ □
Pressure Switch Fanal / Saginomiya Japan Japan PT. Cahaya Kalimas Utama □ □
COMPRESSOR SYSTEM
Galv. Steel Pipe Sch.40 Seamless Ex. China China China PT. Mentari Suplindo / PT. Cahaya Panca Sukses Sentosa □ □
Galv. Steel Pipe Medium Class Spindo Indonesia Indonesia PT. Mentari Suplindo / PT. Cahaya Panca Sukses Sentosa □ □
Gala China China PT. Figo Teknik □ □
Valves
Yuta Indonesia China PT. Flow Solution □ □
MANUFACTUR LIST
Country of First Time Factory
Items Manufacturer Country of Origin Agent / Dealer
Manufacture Use Inspection
Electrical Equipment
Electrical Work
Lighting Fixture OPPLE China China PT. ANF Global Solusi □ □
LED Lighting OPPLE China China PT. ANF Global Solusi □ □
Emergency Lighting Maxspid Singapore Singapore PT. ANF Global Solusi □ □
Lighting Fixture Explotion Proof Vyrtych Italia Italia PT. ANF Global Solusi □ □
General Socket Outlet BOSS Indonesia Indonesia PT. Australindo Graha Nusa □ □
Industrial Socket 3Phase BOSS Indonesia Indonesia PT. Australindo Graha Nusa □ □
Socket Explotion Proof EEW China China PT. Mitra Energi Abadi (Sentraelektrik) □ □
Lightning Protection System Raychem India India Indopetir Solusindo □ □
Grounding System for Building Raychem India India Indopetir Solusindo □ □
Electronic Equipment
Sound System
List - 1
Public Address & Broadcasting Syst TOA Japan Indonesia Galva Technologies □ □
Ceilling Speaker TOA Japan Indonesia Galva Technologies □ □
Wall Speaker TOA Japan Indonesia Galva Technologies □ □
Horn Speaker TOA Japan Indonesia Galva Technologies □ □
LIFT
Cargo Lift weight 3000/4000 kg FUJIKNK Indonesia Indonesia PT. Tanjung Raya Elesca □ ■
TRUCK WEIGHT
Gewinn
Truck Weight Scale 60 Ton Spanyol Indonesia PT. Gewinn Gold Hotama □ □
MANUFACTUR LIST
Country of First Time Factory
Items Manufacturer Country of Origin Agent / Dealer
Manufacture Use Inspection
Electrical Material
Sumi Indo / K.Metal / PT.Sumi Indo / PT.Mega Kreasi /
LV Cable Indonesia Indonesia □ □
Jembo PT. Jembo Cable Company Tbk.
Cable Tray Tri Abadi / Onaji Indonesia Indonesia PT. Tri Abadi Prima / PT. Onaji Tri Indo □ □
HDPE Pipe Pralon Indonesia Indonesia PT. Laksmana Karya □ □
BOSS/ PT.Mega Enim/
Conduit Pipe (HI-Impact) Indonesia □ □
EGA Indonesia PT. Cahaya Kalimas Utama
Panasonic Thailand Thailand PT.Mega Enim □ □
Conduit Pipe (Steel)
Cakra Indonesia Indonesia PT. Mega Agung Selaras □ □
List - 2
Electronic Material
Sound System
Pyrotec Malaysia Malaysia PT. Jaya Sukses Semesta □ □
FRC Cable
Jembo Indonesia Indonesia PT. Jembo Cable Company Tbk. □ □
Equipment and Material
Communication System
FO Cable Singelmode & Multimode LS Korea Korea PT. Infotech Digital System □ □
STP Cat-6 LS Korea Korea PT. Infotech Digital System □ □
Conduit Pipe (HI-Impact) EGA Indonesia Indonesia PT. Cahaya Kalimas Utama □ □
DELIVERY SCHEDULE OF MAIN EQUIPMENTS / MATERIALS LEGEND REPORTED ON : 12-Oct-22
REV : 00
d A M F D I
PROJECT : PT. PGC CENTRAL JAVA INDUSTRIAL PEKALONGAN FACTORY REPORTED BY : PT. Kajima Indonesia
SYSTEM : MECHANICAL WORKS (HVAC)
DRAWING & CATALOGUE APPROVED MANUFACTURING FACTORY INSPECTION DELIVERY ON SITE INSTALLATION PARTIAL PT. KAJIMA INDONESIA
POWER ON HANDOVER
Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 DATE OF PROGRESS (FINISHING DATE OF EACH ACTIVITY)
MANUFACTURE COUNTRY OF MANUFACTURING
ITEM EQUIPMENT NAME REMARKS
(AGEN / DEALER) MANUFACTURE DAYS
7 14 21 30 7 14 21 28 7 14 21 30 7 14 21 31 7 14 21 31 7 14 21 30 7 14 21 31 7 14 21 28 7 14 21 31 7 14 21 30 7 14 21 31 7 14 21 31 7 14 21 31 7 14 21 31 7 14 21 30 d A M F D I
D
DAIKIN PLAN 90 DAYS d I 15-Nov-22 15-Dec-22 15-Mar-23 NA 15-Apr-23 15-Jun-23
M
HV01 AIR CONDITIONING MALAYSIA
D
CONEXA / NICOTRA PLAN 90 DAYS d I 15-Nov-22 15-Dec-22 15-Mar-23 NA 15-Apr-23 15-Jun-23
M
SINGAPORE/
HV02 VENTILATION
ITALY
PT. SIMTEX MECHATRONIC
ACTUAL
INDOJAYA
DELIVERY SCHEDULE OF MAIN EQUIPMENTS / MATERIALS LEGEND REPORTED ON : 12-Oct-22
REV : 00
d A M F D I
PROJECT : PT. PGC CENTRAL JAVA INDUSTRIAL PEKALONGAN FACTORY REPORTED BY : PT. Kajima Indonesia
SYSTEM : MECHANICAL WORKS (PLUMBING)
PARTIAL
PT. KAJIMA INDONESIA
DRAWING & CATALOGUE APPROVED MANUFACTURING FACTORY INSPECTION DELIVERY ON SITE INSTALLATION
POWER ON HANDOVER
Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 DATE OF PROGRESS (FINISHING DATE OF EACH ACTIVITY)
MANUFACTURE COUNTRY OF MANUFACTURING
ITEM EQUIPMENT NAME REMARKS
(AGEN / DEALER) MANUFACTURE DAYS
7 14 21 30 7 14 21 28 7 14 21 30 7 14 21 31 7 14 21 31 7 14 21 30 7 14 21 31 7 14 21 28 7 14 21 31 7 14 21 30 7 14 21 31 7 14 21 31 7 14 21 31 7 14 21 31 7 14 21 30 d A M F D I
d A D
RUCIKA PLAN 60 DAYS M I 31-Oct-22 21-Nov-22 21-Jan-23 N.A 31-Jan-23 15-Jun-23
d A D
VINILON / WESTPEX PLAN 60 DAYS M I 31-Oct-22 21-Nov-22 21-Jan-23 N.A 31-Jan-23 15-Jun-23
d A D
PRALON PLAN 60 DAYS M I 31-Oct-22 21-Nov-22 21-Jan-23 N.A 31-Jan-23 15-Jun-23
A D I
GALA / WEFLO / KITZ PLAN 60 DAYS d M 31-Oct-22 21-Nov-22 21-Jan-23 N.A 31-Jan-23 15-Jun-23
A D I
TOZEN PLAN 60 DAYS d M 31-Oct-22 21-Nov-22 21-Jan-23 N.A 31-Jan-23 15-Jun-23
A D I
ARITA PLAN 60 DAYS d M 31-Oct-22 21-Nov-22 21-Jan-23 N.A 31-Jan-23 15-Jun-23
A D I
KLASEE / WATTS PLAN 60 DAYS d M 31-Oct-22 21-Nov-22 21-Jan-23 N.A 31-Jan-23 15-Jun-23
A D I
NAGANO / WIKA PLAN 60 DAYS d M 31-Oct-22 21-Nov-22 21-Jan-23 N.A 31-Jan-23 15-Jun-23
PRESSURE INDICATOR c/w
PL08 JAPAN
BALL VALVE
PT. CAHAYA KALIMAS UTAMA ACTUAL
A D I
FANAL /SAGINOMIYA PLAN 60 DAYS d M 31-Oct-22 21-Nov-22 21-Jan-23 N.A 31-Jan-23 15-Jun-23
d A D I
SAFEGUARD PLAN 120 DAYS M 31-Oct-22 21-Nov-22 30-Apr-23 N.A 7-May-23 15-Jun-23
Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 DATE OF PROGRESS (FINISHING DATE OF EACH ACTIVITY)
MANUFACTURE COUNTRY OF MANUFACTURING
ITEM EQUIPMENT NAME REMARKS
(AGEN / DEALER) MANUFACTURE DAYS
7 14 21 30 7 14 21 28 7 14 21 30 7 14 21 31 7 14 21 31 7 14 21 30 7 14 21 31 7 14 21 28 7 14 21 31 7 14 21 30 7 14 21 31 7 14 21 31 7 14 21 31 7 14 21 31 7 14 21 30 d A M F D I
d A D
EX - CHINA PLAN 60 DAYS M I 31-Oct-22 30-Nov-22 31-Jan-23 N.A 28-Feb-23 30-Jun-23
GALV. STEEL PIPE SCH 40
CM01 CHINA
SEAMLESS
PT. MENTARI SUPLINDO / PT. GALAXY / PT.
ACTUAL
UNGGUL PRIMA PERKASA
d A D
SPINDO PLAN 60 DAYS M I 31-Oct-22 21-Nov-22 21-Jan-23 N.A 31-Jan-23 30-Jun-23
A D
GALA / WEFLO / KITZ PLAN 100 DAYS d M I 31-Oct-22 30-Nov-22 10-Mar-23 N.A 10-Apr-23 30-Jun-23
.
DELIVERY SCHEDULE OF MAIN EQUIPMENTS / MATERIALS LEGEND REPORTED ON : 12-Oct-22
REV : 00
d A M F D I
PROJECT : PT. PGC CENTRAL JAVA INDUSTRIAL PEKALONGAN FACTORY REPORTED BY : PT. Kajima Indonesia
SYSTEM : MECHANICAL WORKS (FIRE PROTECTION)
DRAWING & CATALOGUE APPROVED MANUFACTURING FACTORY INSPECTION DELIVERY ON SITE INSTALLATION PARTIAL PT. KAJIMA INDONESIA
POWER ON HANDOVER
Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 DATE OF PROGRESS (FINISHING DATE OF EACH ACTIVITY)
MANUFACTURE COUNTRY OF MANUFACTURING
ITEM EQUIPMENT NAME REMARKS
(AGEN / DEALER) MANUFACTURE DAYS
7 14 21 30 7 14 21 28 7 14 21 30 7 14 21 31 7 14 21 31 7 14 21 30 7 14 21 31 7 14 21 28 7 14 21 31 7 14 21 30 7 14 21 31 7 14 21 31 7 14 21 31 7 14 21 31 7 14 21 30 d A M F D I
A D
RELIABLE PLAN 100 DAYS d M I 31-Oct-22 21-Nov-22 28-Feb-23 NA 31-Mar-23 30-Jun-23
A D
HD FIRE PLAN 120 DAYS d M I F/D/I 30-Nov-22 31-Dec-22 30-Apr-23 NA 7-Jun-23 31-Aug-23
OCT '22 NOV '22 DEC '22 JAN '23 FEB '23 MAR '23 APR '23 MAY '23 JUN '23 JUL '23 AUG '23 SEP '23 DATE OF PROGRESS (FINISHING DATE OF EACH ACTIVITY)
MANUFACTURE COUNTRY OF MANUFACTURING
ITEM EQUIPMENT NAME DAYS
REMARKS
(AGEN / DEALER) MANUFACTURE
7 14 21 30 7 14 21 30 7 14 21 31 7 14 21 31 7 14 21 28 7 14 21 31 7 14 21 30 7 14 21 31 7 14 21 30 7 14 21 31 7 14 21 31 7 14 21 30 d A M F D I
POWER ON
d A M D I
L
SUMI INDO PLAN 90 DAYS
E 31-Oct-22 30-Nov-22 28-Feb-23 N.A 7-Mar-23 31-May-23
d A D I
H
BOSS PLAN 30 DAYS M
O 30-Nov-22 15-Dec-22 15-Jan-23 N.A 14-Feb-23 31-May-23
d A M D I
SPINDO PLAN 30 DAYS 30-Nov-22 15-Dec-22 15-Jan-23 N.A 14-Feb-23 30-Jun-23
d A D
I
OPPLE PLAN 90 DAYS M 30-Nov-22 31-Dec-22 31-Mar-23 N.A 7-Apr-23 30-Jun-23
A D
VRYTYCH PLAN 90 DAYS d I 30-Nov-22 31-Dec-22 31-Mar-23 N.A 7-Apr-23 30-Jun-23
M
A D
RAYCHEM PLAN 90 DAYS d M I 31-Oct-22 30-Nov-22 28-Feb-23 N.A 31-Mar-23 30-Jun-23
A
TOA PLAN 90 DAYS d M D 30-Nov-22 31-Dec-22 31-Mar-23 N.A 7-Apr-23 30-Jun-23
I
E09 SOUND SYSTEM INDONESIA
A D
NITTAN PLAN 60 DAYS d M I 30-Nov-22 31-Dec-22 28-Feb-23 N.A 31-Mar-23 15-Jul-23
F/D/I
A D
REYEE - RUJIE PLAN 180 DAYS d M I 31-Oct-22 30-Nov-22 31-May-23 N.A 30-Jun-23 15-Aug-23