STP Design and Layout Details

The document details the design specifications for the volume of tanks in a sewage treatment plant. It includes the effective area and volume for an equalization chamber, digestive chamber, three leaching chambers, a lift station chamber, chlorine contact tank, oil digester tank, oil interceptor tank. The total volume designed for the STP tanks is approximately 17,000 cubic meters.

Uploaded by

Justin Pabilonia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
1K views6 pages

STP Design and Layout Details

The document details the design specifications for the volume of tanks in a sewage treatment plant. It includes the effective area and volume for an equalization chamber, digestive chamber, three leaching chambers, a lift station chamber, chlorine contact tank, oil digester tank, oil interceptor tank. The total volume designed for the STP tanks is approximately 17,000 cubic meters.

Uploaded by

Justin Pabilonia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Overview of Plant Layout
  • Architectural Details
  • Equipment Arrangement and Specifications
  • Process Flow Diagram
  • Item Description and Plant Flow
  • Load Schedule and Configuration

17000

250 3000 250 3000 250 3000 250 3000 250 3500 250
DESIGN STP TANK VOLUME

250

250
PROCESS DESCRIPTION EFF. AREA EFF. VOLUME

1000

1000

1000
EQUALIZATION CHAMBER (eff. Depth=2.10M) 19.50 SQ.M. 40.95 CU.M.
STP
A
DIGESTIVE CHAMBER (eff. Depth=2.10M) 19.50 SQ.M. 40.95 CU.M.

3000
LEACHING
150ØMM BAFFLE 150ØMM BAFFLE 150ØMM BOTTOM CHAMBER 3
PIPE TRANSFER PIPE TRANSFER PIPE TRANSFER LEACHING CHAMBER 1 (eff. Depth=2.10M) 19.50 SQ.M. 40.95 CU.M.

EQUALIZATION DIGESTIVE LEACHING LEACHING LEACHING CHAMBER 2 (eff. Depth=2.10M) 19.50 SQ.M. 40.95 CU.M.
CHAMBER CHAMBER CHAMBER 1 CHAMBER 2

250
150ØMM L.S. LEACHING CHAMBER 3 (eff. Depth=2.10M) 10.50 SQ.M. 22.05 CU.M.
7000
6500

7000
SAFETY OVERFLOW

(75ØMM,4-38ØMM)
AOP MACHINE INFLUENT LIFT STATION CHAMBER (eff. Depth=2.10M) 7.00 SQ.M. 14.70 CU.M.
75ØMM AOP
MACHINE EFFLUENT

2000
LIFT STATION
CCT EFFLUENT CHLORINE CONTACT TANK(eff. Depth=2.20M) 2.45 SQ.M. 5.39 CU.M.
(to NEAREST
CHAMBER
150ØMM BAFFLE
100ØMM OIL PIPE TRANSFER DRAINAGE LINE)
INTERCEPTOR EFFLUENT
OIL DIGESTER TANK(eff. Depth=2.30M) 0.80 SQ.M. 1.84 CU.M.
150ØMM RAW WASTE
50ØMM GAS VENT. 50ØMM GAS VENT.

250
WATER INFLUENT
STP F.O.G. OIL INTERCEPTOR TANK(eff. Depth=1.50M) 3.90 SQ.M. 5.00 CU.M.
B CHLORINE
TANK
1000

1000
CONTACT
TANK TOTAL VOLUME 212.78 CU.M.
250

250
800 250 2450 STP SEPTIC TANK VOLUME DETAIL
STP
C
STP SEPTIC TANK DETAIL PLAN

500
150

300

200

200

200

200
550

550

550

550

3000
2600

1550

1550

1550

1550
3000

LEACHING
2300

2050

2050

2050

2050
CHAMBER 3
CHLORINE
LEACHING LIFT STATION CONTACT
850 900 900 850
CHAMBER 3 CHAMBER

300
TANK
EQUALIZATION DIGESTIVE LEACHING LEACHING
500

500

500

500

300
CHAMBER CHAMBER CHAMBER 1 CHAMBER 2
250

STP SEPTIC TANK SECTION THRU C

STP SEPTIC TANK SECTION THRU A


3300
STAINLESS STEEL 100ØMM BAFFLE
1000 1000 1000 MANHOLE COVER
150

C.O C.O TRANSFER PIPE


100 600 300 100 600 300 100 600 300
300

300
200

200

200

200
550

550

550

550

VARIES
150

VARIES
2600

1550

1550

1550

1550
3000

1100

950
950
1300
1000
2300

1500
MH MH MH
2050

2050

2050

2050

INFLUENT
(FROM
CANTEEN)

150

300

300

300
EQUALIZATION DIGESTIVE LEACHING LEACHING F.O.G.
500

500

500

500

CHLORINE
CHAMBER CHAMBER CHAMBER 1 CHAMBER 2 TANK CONTACT TANK
PLAN INFLUENT
(FROM CANTEEN)
EFFLUENT (TO STP
EQUALIZATION CHAMBER)
SECTION
250

STP SEPTIC TANK SECTION THRU B OIL INTERCEPTOR TANK DETAIL

PROJECT TITLE: OWNER: SHEET CONTENT: SCALE: SHEET NO.:

STP WASTEWATER AS SHOWN


PROPOSED SOLID AMBIENT PROJECT
E
CONSTRUCTION SERVICES
S SEWAGE TREATMENT PLANT
HOLDING TANK PLAN DETAIL
STP - 01
187 CUBIC METER PER DAY
LOCATION: CALAMBA, LAGUNA SEWAGE TREATMENT PLANT APPROVED BY
400 8500 400 8500
3200
400 550 1500 500 1120 1245 2505 630 400

760
FD FD

890

890

406
MMF ARF

COARSE FINE
OZONE REACTOR FILTER FILTER CLARIFIER PRE-PAINTED METAL PLAIN GI
GEN. TANK TANK TANK TANK ROOFING SHEETS CORRUGATED

400

400
(RIB TYPE) ROOFING
SHEET

3200
1680
BOOSTER

CLW
PUMP
75ØMM PVC 75ØMM PVC
CLW

3400
DOWNSPOUT

3400
DOWNSPOUT
280MM X 200MM
STP EQUIPMENT ROOM CONCRETE LOUVER

1600

1600
280MM X 200MM
BLOCKS 8 LAYERS CONCRETE LOUVER

2100
BLOCKS 8 LAYERS
5'' THK CHB WALL

760
FD PLASTERED 5'' THK CHB WALL
HB
FINISH, PLASTERED
MD
ELASTOMERIC FINISH,
PAINT FINISH ELASTOMERIC

500

500
400
CLW CLW (EXTERIOR) PAINT FINISH
LINE OF ROOF ABOVE (EXTERIOR)

HOLLOW METAL FLUSH DOOR


550 1500 500 1120 1245 2520 815

DETAILED FLOOR PLAN: STP AOP ROOM FRONT ELEVATION: STP AOP ROOM RIGHT SIDE ELEV.: STP AOP ROOM

2"X4"
2"X4" THK CEETHK CEE PURLINS
PURLINS SPACEDSPACED @ O.C
@ 0.70m 0.70m O.C (TYPICAL)
(TYPICAL)
400 8500 400 400 8500 400
400 8500 400
2000 2000 2000 2000 2500 3000 2500

900
280MM X
200MM
CONCRETE
LOUVER
BLOCKS
TRUSS - 01
TRUSS - 01
TRUSS - 01

TRUSS - 01

TRUSS - 01

8 LAYERS

3000
3200

5'' THK CHB


WALL 2X15W SEALED TYPE LIGHT 2X15W SEALED TYPE LIGHT
SLOPE
2500
PLASTERED
FINISH,
ELASTOMERIC
PAINT FINISH

LEVELED
CEMENT
FINISH

400
400

LINE OF ROOF ABOVE


1
2" THK FACIA BOARD
PAINTED FINISH

DETAILED ROOF PLAN: STP AOP ROOM DETAILED SECTION: STP AOP ROOM DETAILED RCP: STP AOP ROOM

2"X4" THK CEE PURLINS


150 SPACED AT SHOWN
150 150 L/4 TOP BAR L/4 L/4 L/4 50
STIFFENER BAR GA 26 G.I 1" x1 1" x 3 " THK. ANGLE WITH 2 21" TEKSCREW
CORRUGATED 2-1 2 2 16 121" x 14" THK. ANGULAR
4-12MMØ 2-12MMØ SHEET PRE-PAINTED BAR AS TOP CHORD BAR CLEAT
TOP BARS TOP BARS
700
700 STP SLAB 2 1
200

200

700
300

700
1" x1 1" x 3 "
1-1 2
3

890
2 16
2-12MMØ 4-12MMØ THK. ANGLE
BOT. BARS BOT. BARS
BAR AS WEB 1 GRATE

300
300
MEMBERS 2 DRAINAGE SLOPE
REBARS:4-12MMØ @SUPPORT @MIDSPAN BOTTOM BAR 200 700 700 700 700 3 SEDIMENT BUCKET
TIES:10MMØ - 1@50MM L/5 L/5 L/5 L/5 4 P-TRAP
5 7

3@100MM,5@300MM STIRRUPS:10MMØ SPACED, - 1@50MM 0.2x0.3m CONCRETE ROOF 5 CLEANOUT PLUG


REST@400MM 1" x1 1" x 3 " THK. ANGLE
2-1 2
6

3@100MM, 5@300MM, REST@200MM L1 L2 BEAM 2 16 6 WATER DRAIN


BAR AS BOTTOM CHORD

COLUMN DETAIL ROOF BEAM DETAIL TYPICAL BEAM DETAIL TRUSSES DETAIL FLOOR DRAIN DETAIL

PROJECT TITLE: OWNER: SHEET CONTENT: SCALE: SHEET NO.:

AS SHOWN
STP EQUIPMENT ROOM
PROPOSED SOLID AMBIENT PROJECT
E
CONSTRUCTION SERVICES
S SEWAGE TREATMENT PLANT STP - 02
187 CUBIC METER PER DAY
LOCATION: CALAMBA, LAGUNA SEWAGE TREATMENT PLANT APPROVED BY
8500
ITEM DESCRIPTION SPECIFICATIONS
1480 1000 300 1000 300 1000 300 900 300 500 650
1. OZONE GENERATOR
Frame-304 Ss w/ PVC 6mm cover 1u-0.5x1.0x1.7
Ozone generator - 2 elements/box 7
Air pump 200 watts 14
2. REACTOR TANK
1800

Tank - 304 Ss w/PVC 6mm (LxWxH) 0.9x1.0x1.7


Reactor tube 2
3. COARSE FILTER TANK
3500

Tank - 304 Ss w/PVC 6mm (LxWxH) 0.9x1.0x1.5


Coarse filter set 4
4. FINE FILTER TANK
1200

Tank - 304 Ss w/PVC 6mm (LxWxH) 0.9x1.0x1.5


Fine filter set 4
5. CLARIFIER TANK 0.9x1.0x1.5
500

Ozone diffuser 1
6. BOOSTER PUMP
STP AOP EQUIPMENT PERSPECTIVE 2 units alternating with 304 Ss skid
PROPOSED STP AOP EQUIPMENT LAYOUT CLD-10 (0.75Hp)
1.25"Ø
mount in/out connection
500 300 900 300 1000 300 1000 300 1000 1010 700 80 700 7. MULTI-MEDIA FILTER
Flowrate Tons per hour 10
Flowrate gpm (Lpm) 44 (166)
FRP tank with Manual Backwash Head 30x72
9. AMMONIA REMOVER FILTER
FRP tank with Manual Backwash Head 30x72

2030
11. LIFT PUMP

2065
1400

1700
Submersible sewage pump 1Hp - 2"Ø
1700

1500
12. CONTROL PANEL
Splash proof box - 0.6 x 0.6 x 0.2cm 1
13. EFFLUENT METER 2"Ø - TC
300

STP EQUIPMENT SPECIFICATION

STP AOP EQUIPMENT FRONT ELEVATION STP EQUIPMENT LEFT SIDE ELEV. SELF EFFECTIVE
ITEM DESCRIPTION SPECIFICATIONS
WEIGHT WEIGHT

1. OZONE GENERATOR

1200 Frame-304 Ss w/ PVC 6mm cover(u-unit -LxWxH) 1u-0.5x1.0x1.7 200 KG 200 KG


1480 1000 300 1000 300 1000 300 900 300 500
1000 2. REACTOR TANK
Tank - 304 Ss w/PVC 6mm (LxWxH) 0.9x1.0x1.7 300 KG 1000 KG

3. COARSE FILTER TANK

200
Tank - 304 Ss w/PVC 6mm (LxWxH) 0.9x1.0x1.5 300 KG 1000 KG

4. FINE FILTER TANK


Tank - 304 Ss w/PVC 6mm (LxWxH) 0.9x1.0x1.5 300 KG 1000 KG
2065

1200
1700
5. CLARIFIER TANK

1700
1500
Tank - 304 Ss w/PVC 6mm (LxWxH) 0.9x1.0x1.5 200 KG 900 KG
CLD-5 (0.5Hp)
6. BOOSTER PUMP 10 KG 10 KG
1"Ø
7. MULTI-MEDIA FILTER 30"x72" 70 KG 150 KG

300
9. AMMONIA REMOVER FILTER 30"x72" 70 KG 150 KG

TOTAL EFFECTIVE LOAD 4410 KG

STP AOP EQUIPMENT REAR ELEVATION STP EQUIPMENT RIGHT SIDE ELEV. STP EQUIPMENT LOAD DETAIL

PROJECT TITLE: OWNER: SHEET CONTENT: SCALE: SHEET NO.:

ADVANCE OXIDATION AS SHOWN


PROPOSED SOLID AMBIENT PROJECT
E S
CONSTRUCTION SERVICES SEWAGE TREATMENT PLANT
PROCESS MACHINE LAYOUT
STP - 03
187 CUBIC METER PER DAY
LOCATION: CALAMBA, LAGUNA SEWAGE TREATMENT PLANT APPROVED BY
PROPOSED SEPTIC TANK

LEGEND
ANAEROBIC DIGESTION FLOW
AOP TREATMENT FLOW
AOP MACHINE RETURN
OZONE GAS INJECTION
EXTRACTED SOLID/F.O.G.
CHLORINATOR
AOP CONSUMABLES
EFFLUENT/DISCHARGE
REACTOR COARSE FINE
TANK FILTER FILTER CLARIFIER CHLORINE
TANK TANK TANK 2-1HP
OZONE TANK BOOSTER
GENERATOR PUMP
MULTI- AMMONIA
MEDIA FILTER EFFLUENT
FILTER METER

BRINE TANK

EXTRACTED
FAT/OIL/GREASE INFLUENT
(FROM CANTEEN)

OIL OIL INT. OIL INT. OIL INT.


DIGESTER CHAMBER CHAMBER CHAMBER
3 2 1
HYDRATED LIME

INFLUENT
DOMESTIC
WASTE
WATER EFFLUENT
LIFT CHLORINE TO NEAREST
LEACHING LEACHING LEACHING STATION
EQUALIZATION DIGESTIVE CONTACT DRAINAGE
CHAMBER 1 CHAMBER 2 CHAMBER 3
CHAMBER CHAMBER CHAMBER CHAMBER LINE

SEWAGE TREATMENT PLANT PROCESS FLOW DIAGRAM

PROJECT TITLE: OWNER: SHEET CONTENT: SCALE: SHEET NO.:

AS SHOWN
PROPOSED SOLID AMBIENT PROJECT STP FLOW DIAGRAM
E S
CONSTRUCTION SERVICES SEWAGE TREATMENT PLANT STP - 04
187 CUBIC METER PER DAY
LOCATION: CALAMBA, LAGUNA SEWAGE TREATMENT PLANT APPROVED BY
1 21 "Ø AOP 3"Ø AOP
DRAIN RETURN 2-1 21 "Ø AOP
INFLUENT
ITEM DESCRIPTION SPECIFICATIONS
1 "Ø AOP
EFFLUENT
1. OZONE GENERATOR

3 "Ø AOP
EFFLUENT
Frame-304 Ss w/ PVC 6mm cover 1u-0.5x1.0x1.7
Ozone generator - 2 elements/box 7
Air pump 200 watts 14
FINE COARSE
CLARIFIER
TANK
FILTER FILTER
REACTOR
TANK
OZONE
GENERATOR 2. REACTOR TANK
ARF MMF TANK TANK
Tank - 304 Ss w/PVC 6mm (LxWxH) 0.9x1.0x1.7
Reactor tube 2
3. COARSE FILTER TANK
3
Tank - 304 Ss w/PVC 6mm (LxWxH) 0.9x1.0x1.5
4 "Ø AOP
OZONE
Coarse filter set 4
4. FINE FILTER TANK
PIPING AND INSTRUMENTATION DIAGRAM
Tank - 304 Ss w/PVC 6mm (LxWxH) 0.9x1.0x1.5
Fine filter set 4
5. CLARIFIER TANK 0.9x1.0x1.5

OZONE
Ozone diffuser 1
REACTOR
FINE COARSE GENERATOR
TANK
CLARIFIER
TANK
FILTER
TANK
FILTER
TANK
6. BOOSTER PUMP
ARF MMF
2 units alternating with 304 Ss skid CLD-10 (0.75Hp)
1.25"Ø
mount in/out connection
7. MULTI-MEDIA FILTER
Flowrate Tons per hour 10
Flowrate gpm (Lpm) 44 (166)
FRP tank with Manual Backwash Head 30x72
3 "Ø 3"Ø
MACHINE
2-1 21 "Ø
MACHINE
121"ø 9. AMMONIA REMOVER FILTER
MACHINE OZONE
EFFLUENT RETURN INFLUENT INJECTION
(to CHLORINE (to LIFT (from LIFT (to LIFT STATION
FRP tank with Manual Backwash Head 30x72
CONTACT TANK) STATION CHAMBER) STATION CHAMBER) CHAMBER)

11. LIFT PUMP


Submersible sewage pump 1Hp - 2"Ø
12. CONTROL PANEL
Splash proof box - 0.6 x 0.6 x 0.2cm 1
SEWAGE TREATMENT PLANT - FLOW DIAGRAM 13. EFFLUENT METER 2"Ø - TC

ADVANCE OXIDATION PROCESS SPECIFICATION

PROJECT TITLE: OWNER: SHEET CONTENT: SCALE: SHEET NO.:

AOP PIPING & INSTRUMENTATION AS SHOWN


PROPOSED SOLID AMBIENT PROJECT
E S
CONSTRUCTION SERVICES SEWAGE TREATMENT PLANT
DIAGRAM, AOP FLOW DIAGRAM &,
AOP MACHINE SPECIFICATION
STP - 05
187 CUBIC METER PER DAY
LOCATION: CALAMBA, LAGUNA SEWAGE TREATMENT PLANT APPROVED BY
SCHEDULE OF LOADS
CODE DESCRIPTION OPERATION POWER RATING VOLTS PHASE LOAD CURRENT
TP1 Transfer Pump Set A Alternating/Level Control 1.20KW 220 1 5.12A

TP2 Transfer Pump Set B Alternating/Level Control 1.20KW 220 1 5.12A


OG1 Ozone Generator Set A Alternating 0.75KW 220 1 3.2A
OG2 Ozone Generator Seet B Alternating 0.75KW 220 1 3.2A
AP1 Aerator Pump Set A Alternating 1.0KW 220 1 4.2A
AP2 Aerator Pump Set B Alternating 1.0KW 220 1 4.2A
BP1 Booster Pump Set A Alternating/Level Control 0.75KW 220 1 3.2A
BP2 Booster Pump Set B Alternating/Level Control 0.75KW 220 1 3.2A
TOTAL: 31.44A

STP EQUIPMENT LOAD COMPUTATION

L1 L2

CB 1
(MAIN CB)

CB 2 CB 3 CB 4

K1 K2 K3 K4 K5 K6

M M REACTOR M M
SUBMERSIBLE SUBMERSIBLE OZONE A OZONE B BOOSTER DOSING BOOSTER
PUMP A PUMP PUMP B
PUMP A PUMP B
STP EQUIPMENT SINGLE LINE DIAGRAM

PROJECT TITLE: OWNER: SHEET CONTENT: SCALE: SHEET NO.:

AOP SCHEDULE OF LOADS, AS SHOWN


PROPOSED SOLID AMBIENT PROJECT
E S
CONSTRUCTION SERVICES SEWAGE TREATMENT PLANT
SINGLE LINE DIAGRAM
STP - 06
187 CUBIC METER PER DAY
LOCATION: CALAMBA, LAGUNA SEWAGE TREATMENT PLANT APPROVED BY

You might also like