Manufacturing Questions
Manufacturing Questions
1Z0-1075-20
Oracle Manufacturing and Maintenance 2020
Implementation Essentials
[Link]
Question #:1
Your customer is a light assembly manufacturing company that doesn’t require shop floor control. A
manufacturing engineer wants to generate a work definition automatically for some items, and wants to
eliminate the explicit maintenance of work definitions.
Which three steps must be completed and verified in the Work Definition area?
B. Select a resource that is to be used in automatic work definition by enabling the attribute Default for
automatic work definition.
C. Select a standard operation that is to be used in automatic work definition by enabling the attribute
Default for automatic work definition.
E. Ensure there is only one default standard operation at a given point in time.
Answer: A C D
Question #:2
Identify the three sources from which supply chain orchestration (SCO) can create the work orders.
A. Order Management
B. Quality
D. Procurement
E. Planning
Answer: A D E
Question #:3
You can generate and manage work order exceptions in Oracle Manufacturing Cloud. Which users can report
production exception and who gets notified after an exception is raised?
A. The Production Operator can report and exception and the application generates a notification that is
sent to all users who have access to the manufacturing plant.
B.
[Link]
B. The Production Operator can report an exception and the application generates a notification that is sent
to all users with the role of production supervisor who have access to the manufacturing plant.
C. The Production Operator or Manufacturing Engineer can report an exception and notifies the production
supervisor using Oracle Social Network since there is no system generated notification.
D. The Production Operator can report an exception and notifies the production supervisor using Oracle
Social Network since there is no system-generated notification.
Answer: B
Question #:4
Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM)
and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order,
for a nonstocked item.
A. Set the nonstocked item to be back-to-back enabled in Product Information Management (PIM).
B. Set the global sourcing rule in GOP to determine supply creation option as Make.
C. Set a local sourcing rule in GOP to determine supply creation option as Make.
D. Create Supply Order Orchestration Defaulting and Enrichment Rule for the nonstocked item.
E. Create Supply Chain Orchestration Supply Execution Document Creation Rule for the nonstocked item.
Answer: A B
Question #:5
A user wants to transfer the work order status updates and resource transaction data for costed resources to
Cost Management.
Answer: A
[Link]
Question #:6
Identify an option that needs to be set for oracle Fusion Planning Central to plan back-to-back item
components and resources.
A. Select the Used in Planning check box in the new Work Definition.
B. Select the Used in Planning check box in the Work Definition Names.
Answer: B
Question #:7
A Production Operator needs to load Work Order Transactions from an external system into Manufacturing
Cloud.
A. Load Data to Fusion repository> Export File to UCM server > Process Import Operations Transactions>
Load file from UCM to Interface table.
B. Export File to UCM server> Load Data to Fusion repository> Process Import Operations Transactions>
Load file from UCM to Interface table.
C. Load Data to Fusion repository> Export File to UCM server > Load file from UCM to Interface table
>Process Import Operations Transactions.
D. Load Data to Fusion repository> Load File from UCM to Interface table> Export File to UCM server>
Process Import Operations Transactions.
Answer: B
Question #:8
While creating an item in Product Information Management (PIM), the following two item templates are
selected in sequence and applied.
[Link]
Identify the Item Attribute values in the application.
Answer: C
Question #:9
In a manufacturing plant, the work definition and rate plans of Material, Resource, and Overhead of an
assembly have been defined as required.
A cost accountant created different scenarios to represent different manufacturing and cost assumptions and
compare the results. When the cost assumptions are finalized, the cost accountant is expected to publish the
cost scenario to cost accounting.
Identify three process steps that the cost accountant has to perform to transfer the assembly to cost accounting
in frozen type.
E. Define a cost planning scenario with Material, Resource, Overhead cost plans, and work definition.
Answer: C E F
Question #:10
One of the key execution capabilities that Oracle Manufacturing Cloud offers is that you can generate and
manage work order exceptions.
Which option shows the production exception types that can be reported by the production operator?
B.
[Link]
B. Work Center and Resources
Answer: C
Question #:11
A Production Supervisor queries a Work Order (WO-1025) from the manage Work Orders page. On the
Entering Edit Work Order: WO-1025 page, he finds General Information, Operations and History tab, but not
the Reservations tab.
Identify the two reasons that can cause the Reservations tab not to be displayed.
Answer: A C
Question #:12
In what three ways can you set the overcompletion tolerance for a subcomponent yield, so the job order can
report the excess production completion?
Answer: B D E
[Link]
Question #:13
An order entry specialist creates a Back-to-Back order for product item with an intention of fulfilling by
in-house manufacturing. The fulfillment line is scheduled and Supply Chain Orchestration (SCO) has initiated
creation of a Supply Order rather than Work Order.
A. Sourcing rules for the product item are defined as Make as well as Transfer.
B. Sourcing rule for the product item is defined as Make, but Work Definition is not defined.
C. Sourcing rules for the product item are defined as Buy as well as Transfer.
Answer: A B
Question #:14
In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a
product. The cost of the assembly is calculated by using the standard costing method. The work definition and
resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing
estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up
costs, the extended costs of purchase components are not included in a rolled-up scenario.
A. Purchase components P1 and P2 are not associated with Material cost plan of the cost planning scenario.
B. Costs for purchase components P1 and P2 are not defined in cost accounting.
Answer: D
Question #:15
Identify three types of Item Quantities displayed in the Work Order History tab.
A. Scrapped Quantity
[Link]
B. In Process Quantity
C. Remaining Quantity
D. Total Quantity
E. Completed Quantity
Answer: A C E
Question #:16
A production Supervisor has noticed that Work Orders created manually are overwritten by the plan runs
executed by Planning Central. After discussing this issue with the Planner, two actions are recommended to
prevent the Work Orders from being overwritten by plan runs.
B. Update Firm flag in the Details region of the Edit Work Definition page.
C. Update Firm flag in the Details region of the Edit Work Definition Names page.
D. Update Firm flag in the Details region of the Edit Work Order page.
Answer: A D
Question #:17
Your customer runs two daily shifts in her plant: Morning Shift and Evening Shift. A resource LATHE is
assigned to the work center W1. There are five units of LATHE available, of which three units are available
for the Morning Shift and the remaining units are available for the Evening Shits.
Which two actions must you perform to associate LATHE with W1?
A. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 3 against
the resource LATHE in the Morning Shift column.
B. Select the Available 24 Hours check box and in the Resource Availability region, enter 3 against the
resource LATHE in the Morning Shift column.
C. Select the Available 24 Hours check box and in the Resource Availability region, enter 2 against the
resource LATHE in the Evening Shift column.
D. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 2 against
the resource LATHE in the Evening Shift column.
[Link]
E. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 60%
against the resource LATHE in the Morning Shift column.
F. Do not select the Available 24 Hours check box and in the Resource Availability region, enter 40%
against the resource LATHE in the Evening Shift column.
Answer: B E
Question #:18
The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, has scheduled
the Process Item Structure Changes to Work Definitions program. However, after the execution of the program
the engineer did not receive a notification with the details of the Item Structure changes.
C. The engineer does not have Data access to Manufacturing plant in which the Item Structure change was
performed.
E. The engineer does not have the Manage Work Definitions function privilege.
Answer: C E
Question #:19
A Production operator in your company is required to report production activities, such as completing or
scrapping production units, by referencing a work definition without creating work orders.
Identify the manufacturing transaction that a production operator can perform for reporting such activities.
A. Orderless Transactions
B. Operation Transactions
C. Resource Transactions
D. Movement request
E. Material Transactions
[Link]
Answer: A
Question #:20
The Plant Manager informs you that they have bought several machines for their manufacturing plant ABC.
The plant has been set up with a separate cost element set ABC in Manufacturing Cloud. You are requested to
configure these machines in such a way that those are costed to the work order for which operations are
performed on these machines.
Identify the correct setup that you will advise to the Plant Manager.
A. Set up the machines as cost element type of “Resource” by selecting Cost Element set ABC.
B. Set up the machines as cost element type of “Overhead” by selecting Cost Element set ABC.
C. Set up the machines as cost element type of “Overhead” by selecting Cost Element set Common.
D. Set up the machines as cost element type of “Resource” by selecting Cost Element set Common.
Answer: D
Question #:21
The Cost Accountant has reported to the Production Supervisor that the Work Order transactions are not
getting transferred to Costing.
Identify the reason for work order transactions not getting transferred to Costing.
C. The item was made inactive after the Work Order transaction.
Answer: D
Question #:22
Your customer has defined the work definitions. They have created and saved a new version for the work
definition and want to edit that work definition.
Which two attributes cannot be updated using the Edit Work Definition Details action?
A.
[Link]
A. State Date
B. Costing Priority
C. Version
D. Production Priority
Answer: A C
Question #:23
You want to use a predefined Standard Operation in a Work Definition, but you also want to change the usage
of the Standard Operation resource. Identify the setup required.
A. Deselect the Referenced check box while adding the standard operation to the work definition and
change the usage manually.
B. Select the Referenced check box while adding the standard operation to the work definition and change
the usage manually.
C. Use the Transfer and Edit Standard Operation functionality to edit the resource usage.
D. Use a Resource exception for the resource and alter its usage.
Answer: B
Question #:24
Your customer plans to use Oracle Representational State Transfer (REST) API with Oracle Supply Chain
Management Cloud (Oracle SCM Cloud) to support integration requirements.
Identify four REST resources and the corresponding HTTP action available with Manufacturing Cloud.
Answer: A B D E
[Link]
Question #:25
A Production operator in your company is required to report production activities, such as completing or
scrapping production units, by referencing a work definition without creating work orders.
Identify the manufacturing transaction that a production operator can perform for reporting such activities.
A. Orderless Transactions
B. Operation Transactions
C. Resource Transactions
D. Movement request
E. Material Transactions
Answer: A
Question #:26
A plant operates three continuous daily shifts of eight hours each for five days in a week. One unit of the
resource R1 within the plant is assigned for two shifts to work area W1. On a particular day in a given week,
due to unscheduled maintenance that needed to be performed on the resource R1, it was not available for two
hours during each of the assigned shifts.
A. 78 hours
B. 76 hours
C. 60 hours
D. 70 hours
Answer: A
Question #:27
Your customer has multiple distribution centers and a few manufacturing plants. Plants make different items
with some overlap between them in terms of products manufactured. The distribution centers stock parts from
all plants. A Corporate Engineering team is responsible for centrally defining items and catalogues. This team
defines the items and sets the attributes for most parameters. The respective distribution centers and
manufacturing plants are allowed to change some attributes locally.
[Link]
A. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate
Engineering organization as Inventory Organization.
C. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering
organization as Item Organization
D. Set up Plants and Distribution Centers as Inventory organizations and Corporate Engineering
organization as Inventory Organization.
E. Set up Plants as Inventory Organizations, Distribution Centers as Item Organizations, and Corporate
Engineering organization as Item Organization.
Answer: B C
Question #:28
Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item AS1000), where
actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days.
Answer: D
Question #:29
Identify two reports that provide work order cost-related information to the costing user.
[Link]
Answer: A D
Question #:30
Work order costs are computed based on material and resource transactions reported and the cost method of
the product. In a manufacturing plant, the production operator has completed a work order WO-001 ensuring
proper materials and resource transactions. The materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of
the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.
A. Create accounting
Answer: B
Question #:31
A plant runs 24x7 daily using three continuous shifts of 8 hours each. One unit of an equipment resource R1 is
assigned to each of the three shifts. On a specific work order, the resource R1 is required to work for 2 hours.
The resource is set up with an efficiency of 50% and utilization of 100%. R1 is scheduled to start on the given
work order at noon.
What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?
A. 8:00 PM
B. 12:30 PM
C. 2:00 PM
D. 4:00 PM
E. 1:00 PM
Answer: D
[Link]
Question #:32
An employee is responsible for dealing with different manufacturing practices and processes, machines, tools
and equipment that turn raw material into a product.
A. Manufacturing Engineer
B. Production Engineer
C. Production Operator
D. Manufacturing Supervisor
E. Production Supervisor
Answer: A
Question #:33
Identify three entities that must be set up in Oracle Manufacturing Cloud to create a Work Definition for an
item that will be manufactured in-house.
A. Operation Items
B. Resources
C. Production Line
D. Operations
Answer: A B D
Question #:34
You are monitoring the production status on your shop floor. The production operator informs you that a
particular resource that was not functioning for the past week is now back in operation.
Which option shows the steps to quickly release the work orders affected by this operation, which were put on
hold using the mobile application?
A. Select the infotile On Hold> Select a work order you want to release> Select the work order operation
on hold > Swipe left on the work order name> Tap or click the Release action, and click OK
B.
[Link]
B. Select the infotile On Hold> Select a work order you want to release> Swipe left on the work order
name> Tap or click the Release action, and click OK
C. Select the infotile Unreleased> Select a work order you want to release>Swipe left on the work order
name> Tap or click the Release action, and click OK
D. Select the infertile Dispatch List> Select a work order operation you want to release> Swipe left on the
work order name> Tap or click the Release action, and click OK
Answer: D
Question #:35
Which two steps should you use to create a new Oracle Transactional Business Intelligence report in the
Manufacturing Cloud?
C. Use the Manufacturing subject area to select the report columns and create the report.
D. Use Business Intelligence publisher to create a template and use that template to create the report.
Answer: B D
Explanation
You can use Oracle Transactional Business Intelligence to create analysis and Oracle Business Intelligence
Publisher to create reports.
Question #:36
Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional
Operation.
Answer: B E
[Link]
Question #:37
Your customer has the following business requirement. There are two work definitions created in the
application. One Work Definition for Engine Finished Good and other Work Definition for Pallet Finished
Good. The Engine Finished Good item should have Pallet Finished Goods as one of its component.
Identify the way to establish the relationship between Pallet and Engine Work Definitions.
A. Create a Subinventory that could be the completion Subinventory for yielding the pallet and then the
same Subinventory can serve as the supply Subinventory of the pallet in the Work Definition created for
Engine.
B. Assign a higher priority to the Work Definition created for Engine and a lower one for the Work
Definition for Pallet.
C. The two Work Definitions can be tied through Project or Seiban numbers.
D. The Work Definition versions can be used to tie the Work Orders.
Answer: D
Question #:38
During a Manufacturing Cloud implementation, the Production Supervisor wants to close the work orders for
last month and wants to make sure that the work orders include the correct cost.
A. The Production Supervisor need not include cost variances while costing last month’s work orders
because those can be applied directly in subledger accounting.
B. The Production Supervisor needs to include all costs and variances in last month’s work orders and
close them; however, the work orders where updates are expected, should not be closed.
C. The Production Supervisor should make sure that all costs are included while closing last month’s work
orders; however, variances can be included after closing the work orders.
D. Work order costs can be updated anytime regardless of the status of the work order.
Answer: B
Question #:39
In a manufacturing cloud implementation, production operators want to perform work order updates using
Dispatch List.
[Link]
Identify two tasks that the Dispatch List allows the production users to perform.
C. Report Receipts
Answer: B D
Question #:40
In a manufacturing plant, a production operator in a given shift completes a car assembly and reports this using
orderless completion by referencing a Work Definition.
Identify the two purposes of the referenced Work Definition in Orderless reporting.
A. Material usage
B. Resource usage
C. Processing steps
D. Scrap material
E. Return material
Answer: A B
Question #:41
A manufacturing cloud user wants to print information available in the work order in PDF.
Identify the three reports that the user can print directly from the work order screen using the Print PDF action.
B. Resource List
C. Print Labels
E.
[Link]
E. Bill of material
Answer: A C D
Question #:42
Your Customer has implemented Oracle Cloud Manufacturing and the Manufacturing user is in the process of
defining Work Definition and Operations. However, this user is unable to assign an ad hoc item, Grease, to an
operation.
A. The user doesn’t have Override Item Structure Components in the Work Definition privileges.
Answer: B
Question #:43
The Manufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and Night Shift. You
associate four units each for resources R1, R2, R3, and R4 to the work center WC1. The customer wants to
assign all units of resource R2 available for Day and Night Shift.
A. Associate Resource R2 with Work Center WC1> Select Available 24 Hours check box> Resource
Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
B. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource
Availability region> Enter 2 in Day Shift Column> Enter 2 in Night Shift Column
C. Associate Resource R2 with Work Center WC1> Select the Available 24 Hours check box> Resource
Availability region> Enter 2 in Day Shift Column > Enter 2 in Night Shift Column.
D. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource
Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
Answer: C
Question #:44
[Link]
Identify three requirements fulfilled by nonstandard work orders.
A. Rescheduling
B. Repair
C. Rework
D. Prototype
Answer: B C D
Question #:45
As a production supervisor, you require immediate access to critical shop floor execution systems to take
action while on the go.
Which four work order related actions can be taken in the Manufacturing Supervisor mobile application?
A. Executing standard work order and updating item and resource usage
Answer: C D E F
Question #:46
You are in the process of defining a Standard Operation for visual inspection. You want the completion of this
standard operation to be reported in all work orders that reference it.
A. Select the Automatically Transact check box while defining the Standard Operation.
B. Deselect the Count Point check box while defining the Standard Operation.
C. Select the Count Point check box while defining the Standard Operation.
D.
[Link]
D. Ensure that the Charge Type of the resource is Automatic.
Answer: C
Question #:47
As part of an implementation project, you have to perform setups related to a Manufacturing plant in
Functional Setup Manager.
What must be set up first in order for you to configure the setup task called Manage Plant Parameters?
Answer: B
Question #:48
Identify two ways of reporting the progress of work order at work order operation level.
D. Quick Complete
Answer: C D
Question #:49
A production operator needs to review the materials issued, resources charged, and operations performed for a
job that was executed in the previous shift.
Identify the task the operator has to select to review all the transactions in a single place for both Work Order
[Link]
and Orderless execution.
Answer: A
Question #:50
Which entity should you use to configure the manufacturing plant in Functional Manager?
A. Legal Entity
B. Plant
C. Organization
D. Business Unit
Answer: B
Question #:51
You are reviewing the production status of your manufacturing plant shop floor as a production supervisor.
Your production manager wants a report on a work order status which is reserved against a particular
customer. The final assembly of the work order is serialized.
Which option shows the steps to complete the task using the mobile application?
A. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode
to open the work order details page > Click Actions and select the E-mail icon> Select required work
orders> Select the e-mail client, enter the recipient’s e-mail, and click Send.
B. Select the infotile Customer to open the work order details page> Click Actions and select the E-mail
icon> Select required work orders>Select the e-mail client, enter the recipient’s e-mail, and click Send.
C. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode
to open the work order details page> Select required work orders> Click Social icon (OSN) > Select
recipient, and click Share.
D. Search the work order by customer name to open the work order details page> Click Actions and select
the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient’s e-mail, and
[Link]
click Send.
Answer: A
Question #:52
A customer has a distribution warehouse (DW) for After Sales and Service and an in-house manufacturing
plant (MP). Sales orders are created and shipped from DW.
Identify the two Sourcing Rules that need to be set for order promising to schedule the order.
A. Define Local sourcing rule for organization MP: Source Type Make At, Source MP
B. Define Local sourcing rule for organization DW: Source Type Make From, Source MP
C. Define Local sourcing rule for organization MP: Source Type Transfer To, Source DW
D. Define Local sourcing rule for organization DW: Source Type Transfer From, Source MP
Answer: A D
Question #:53
Identify the three changes that are allowed to be made to active Work Definition in a Work Center, without
creating a new version.
A. Delete an Operation
B. Costing Priority
C. Production Priority
D. Add an Operation
E. Completion Subinventory
Answer: C D E
Question #:54
During a Manufacturing Cloud implementation, the customer request to develop Oracle Transactional
Business Intelligence reports that are not available out-of- the box.
Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop the reports.
A.
[Link]
A. Oracle Business Intelligence Standard Edition
Answer: B
Question #:55
Your customer wants to mass create and modify Work Definitions and the relevant operation, items, and
resources available in the spreadsheet.
Which two operations are not supported using ADFDI (Oracle Application Development Framework Desktop
Integration)?
Answer: C D
Question #:56
A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center
resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day.
Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar
page.
A. Click Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource
Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units
Availability column.
B. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource
exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units in
Default Availability column.
C. Click Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource
Availability tab>Click Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units
Available.
[Link]
D. Click Outside the existing Shift time on a Specific Date> Action Menu> Select Create Resource
exception> Populate Start and Duration Field> Resource Availability and Overrides Region> Populate 4
units in Availability Override column.
Answer: D
Question #:57
A Manufacturing Engineer in a plant is creating an alternative manufacturing process for an item using its
existing Work Definitions. After copying from the existing Work Definition WD1 to the alternative Work
Definition WD2, the engineer finds that the operation items were not copied in the alternative manufacturing
process WD2.
A. The Production Priority was not populated in the new Work Definition WD2 during creation.
B. The Item and Structure Name in the existing Work Definition WD1 were retained in the new Work
Definition WD2 as well during creation.
C. The Item and Structure Name were changed in the new Work Definition WD2 during creation.
D. The Start Data was not populated in the new Work Definition WD2 during creation.
Answer: D
Question #:58
To reduce the subassembly stock with no impact on material planning of child components of the
subassemblies stock, you need to modify the multilevel item structure of a product.
A. Change the Supply Type = Push in Item definition and Work Definition, for subassemblies having high
inventory stock.
B. Change the Supply Type = Phantom in Item definition and Work Definition, for subassemblies having
high inventory stock.
C. Change the Supply Type = Assembly Pull in Item definition and Work Definition, for subassemblies
having high inventory stock.
D. Change the Supply Type = Operation Pull in Item definition and Work Definition, for subassemblies
having high inventory stock.
Answer: C
[Link]
Question #:59
Your customer has completed the required setup steps for automatic work definition. Identify the option that
shows the navigation steps needed to create an automatic work definition.
A. Manufacturing > Work Definition> Manage Work Definitions> Actions> Create automatic work
definition
B. Product Management> Product Information Management> Items> Edit Item > Actions> Create
automatic work definition
C. Manufacturing> Work Definition> Manage Standard Operations> Select default standard operation>
Actions> Create automatic work definition
D. Manufacturing > Work Definition> Manage Standard Operations> Create automatic definition
Answer: C
Question #:60
In your customer’s manufacturing facility, different types of Movement Requests are created. Key
manufacturing components are issued to the work orders form the manufacturing subinventory. The
manufacturing subinventory receives its supplies form the Warehouse subinventory through automatically
created Movement Requests.
Which type of Movement Requests should you use to fill the manufacturing subinventory form the Warehouse
subinventory?
C. Replenishment Requests
Answer: D
Question #:61
You have been asked to set up cost estimates for 10 different purchased items. Which two steps could be used
to accomplish this task?
B.
[Link]
B. Run the ESS process “Update Item Cost Estimate”.
E. Import spreadsheet.
Answer: C E
Question #:62
A Work Center created a month ago is no longer in use now. You want to remove the Work Center; however,
the system is no allowing you to delete it.
Answer: A C E
Question #:63
Identify the two capabilities that the Application Development Framework Desktop Integration (ADFDI)
framework provides for Work Definitions in Manufacturing Cloud.
A. You can mass create and update work definitions and their operations, items, and resources.
B. You can mass create and update work definitions and their operations, items only and cannot add
resources in work definitions.
C. You can mass create and update work definitions and their operations only and cannot add items and
resources in work definitions.
D. You can copy work definitions form one organization to another organization.
Answer: A D
[Link]
Question #:64
A production Operator is executing work order in your plant. After completing move transactions, he notices
that he has performed some incorrect move operations, including incorrect scrap and reject transactions. He is
required to perform a reverse transaction to correct the errors. The operations are not count point enabled and
not auto charged.
E. Reverse at an operation.
Answer: A B C D
Question #:65
In a Manufacturing Cloud post production support environment, a user wants to update some of the operations
in the work orders by using the Midpoint Scheduling feature. However, the user is unable to update any of the
orders.
A. The work order operations do not have operations start or completion date.
B. The scheduled resources are not part of the organization selected by the user.
Answer: C D
Question #:66
Identify four parameters that are considered in the calculation of manufacturing lead time in Oracle
Manufacturing Cloud.
A.
[Link]
A. Resource calendars of the work centers involved
Answer: B C D F