Rebar Productivity and Labor Rates

The document provides productivity rates for various activities involving reinforcing bar including beams, columns, slabs, footings and walls. It also provides rates for handling, doweling, and splicing rebar with different sizes and methods.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views4 pages

Rebar Productivity and Labor Rates

The document provides productivity rates for various activities involving reinforcing bar including beams, columns, slabs, footings and walls. It also provides rates for handling, doweling, and splicing rebar with different sizes and methods.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

REBAR PRODUCTIVITY RATE

REINFORCING BAR

ITEM ACTIVITY / SIZE / UNIT TEAM COMPONENTS AVE. OUTPUT – HOURS / UNIT
NO. DESCRIPTION DIMENSION

LABO EQUIPMEN UNIT


R T

1 Beams & Girders 10 mm to 25 mm Metric 0.25 Foreman 45.50 8.75 Hrs / Metric
Ton 4.00 Steelman Ton
2.00 Laborer / Helper
2 Beams & Girders 25 mm to 40 mm Metric Equipment 30.00 9.00 Hrs / Metric
Ton 0.25 Operator Ton
Power Tools
1.00 Crane Low Bed
3 Columns 10 mm to 25 mm Metric 0.125 Truck 42.00 12.60 Hrs / Metric
Ton 0.125 Ton

4 Columns 25 mm to 40 mm Metric 35.00 10.50 Hrs / Metric


Ton Ton

5 Spirals 10 mm to Metric 35.00 10.50 Hrs / Metric


350mm Ton Ton

6 Elevated Slabs 10 mm to 25 mm Metric 23.33 7.00 Hrs / Metric


Ton Ton

7 Footings 10 mm to 25 mm Metric 30.00 9.00 Hrs / Metric


Ton Ton

8 Footings 25 mm to 40 mm Metric 23.33 7.00 Hrs / Metric


ITEM ACTIVITY / SIZE / UNIT TEAM COMPONENTS AVE. OUTPUT – HOURS / UNIT
NO. DESCRIPTION DIMENSION

Ton Ton

9 Slab on Grade 10 mm to 25 mm Metric 26.25 7.88 Hrs / Metric


Ton Ton

10 Walls 10 mm to 25 mm Metric 23.33 7.00 Hrs / Metric


Ton Ton

11 Walls 25 mm to 40 mm Metric 19.09 5.73 Hrs / Metric


Ton Ton

12 Typical in Place 10 MT (Ave.) Metric 38.18 11.45 Hrs / Metric


Ton Ton

13 Typical in Place 45 MT (Ave.) Metric 30.00 9.00 Hrs / Metric


Ton Ton

HANDLING OF REBAR

ITEM ACTIVITY / DESCRIPTION UNIT TEAM COMPONENTS AVE. OUTPUT – HOURS /


NO. UNIT

14 Unloading, handling, & sorting steel Metric 0.25 Foreman 0.76 0.11 Hr / Metric
reinforcement Ton 4.00 Steelman Ton
2.00 Laborer / Helper
0.50 Equipment Operator
Eqpt. Op. Oiler
0.50 Crane
0.50 Low Bed Truck
0.50
STEEL DOWELS

ITEM ACTIVITY / SIZE / UNIT TEAM AVE. OUTPUT – HOURS /


NO. DESCRIPTION DIMENSION COMPONENTS UNIT

15 Steel Dowels, 600mm Long 10 mm Piece 0.125 Foreman 0.07 0.00 Hr / Piece
2.00 Steelman
16 Steel Dowels, 600mm Long 15 mm Piece 1.00 Laborer / 0.09 0.00 Hr / Piece
Helper
17 Dowels, Steel, 600mm Long 20 mm Piece 0.10 0.00 Hr / Piece

18 Steel Dowels, more than > 20mm Kilogram 0.09 0.00 Hr / Kilogram
600mm

19 Smooth dowels, 300mm long 10 mm Piece 0.26 0.00 Hr / Piece

20 Smooth dowels, 300mm long 16 mm Piece 0.31 0.00 Hr / Piece

21 Dowel caps, 125mm long 20 mm Piece 0.34 0.00 Hr / Piece

22 Dowel caps, 125mm long 32 mm Piece 0.04 0.00 Hr / Piece

SPLICING OF REBAR

ITEM ACTIVITY / DESCRIPTION SIZE / UNI TEAM AVE. OUTPUT – HOURS /


NO. DIMENSION T COMPONENTS UNIT

23 Buttweld column bar splice 35 mm Piece 1.0 Foreman 0.84 0.24 Hr / Piece
4.00 Steelman
24 Column splice clamp, sleeve/wedge 35 mm Piece 2.00 Laborer / 0.49 0.14 Hr / Piece
ITEM ACTIVITY / DESCRIPTION SIZE / UNI TEAM AVE. OUTPUT – HOURS /
NO. DIMENSION T COMPONENTS UNIT

25 Mechanical splice sleeve type 35 mm Pc 1.07 0.31 Hr / Piece

26 Splicing Straight Rebar, mechanical 35 mm Piece 0.98 0.28 Hr / Piece


threading

27 Splicing Straight Rebar, mechanical 40 mm Piece 1.31 0.37 Hr / Piece


threading

28 Splicing Bent Rebar, mechanical 40 mm Pc 1.63 0.47 Hr / Piece


threading