Doc.
Ref HM/MY06PH3/HSE/FRM/009
HUASHI (MALAYSIA) SDN BHD Rev. No. 0
GENERATOR INSPECTION Issued Date 28 November 2022
CHECKLIST Page No. Page 1 of 1
MY06PH3 PROJECT BUTTERFLY
DESIGN AND BUILD CSA MAIN CONTRACT FOR THE DETAILED DESIGN, AUTHORITY SUBMISSIONS,SUPPLY, DELIVERY, INSTALLATION,
TESTING AND COMMISSIONING, OBTAIN CERTIFICATE OF COMPLETION & COMPLIANCE, SUPPORT DURING DEFECTS LIABILITY PERIOD AND
MAINTENANCE OF PROJECT BUTTERFLY 03 - A NEW 40MW IT, GREENFIELD CENTRE (PHASE 3) FOR BRIDGE DATA CENTRE MALAYSIA III
SDN BHD ON HS (D) 78142 PTD 32674
OWNER EQUIPMENT NO. DATE INSPECTION
MAKE SERIAL NO. LOCATION
MODEL TYPE INSPECTED BY
NO MOBILE PLANT / EQUIPMENT N/A OK FAIL REMARK
1 Silencer/Exhaust Noise/Fumes
2 Fuel Leakage
3 Lubrication Leakage
4 Spill containment tray installed
5 Provide fire extinguisher and barricades
Controls access secured. Area Fenced and
6
have shelter with roof
Access limitation and safety warning signs
7
installed
Rotating component protected by
8
screen/guard
Connector Terminal Covered/Access
9
Secured
Distribution cables protected/location
10
marked
AC Power Outlet Individual Switch/Breaker
11
protected
Power Outlet Individual Switch/Breaker
12
protected
13 Battery Cables connection clean/secure
14 ELR / OCR calibrated
Grounding cable. Cable for earthing
15
minimum size 25mm
16 Doors close and secure in open position
Comments:
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
Inspected by Acknowledge by Result
SIGNATURE : SIGNATURE : Acceptable
NAME : NAME : Acceptable with comments
DATE : DATE : Not Acceptable
Competent person will inspect, operate and maintain any machinery/tools requiring certificate