APPENDIX 1
FIXED DAY RATE HIRE QUOTATION
Customer: Wester Isles Date: 25 March 2009
This quotation details the hire of a Velocity Patcher on the basis shown by the above named
Customer, between the following dates;
Hire Start Date: To be confirmed
Hire set up fee —_£1645.00 this includes return travel to, and from your depot for
the Velocity Patcher and our operator / technician & driver.
Trainer Supplied: [Yes Driver Supplied: [No
Hire Rate: [£995.00 _ | Per day (up to 10 hours) & per hour thereafter.
Hire Rate Weekend & Bank Holidays: [7.5% _] Loading.
‘Aggregate Supplied: [No ‘Aggregate Rate: per Tonne,
Emulsion Supplied: [Yes Emulsion Rate: [106.36 _] per Drum (200 kg).
Velocity™ will supply a hire machine complete with Trainer including accornmodation and
‘subsistence consumables for the duration of your programme.
Alll adgitional ferry charges will be invoiced and included in initial set up fee.
This agreement is subject to a minimum fixed day rate charge of 5 days (mon-fri) per week.
Please Read Carefully also the Terms and Conditions detailed on the following pages)
41. Uniess otherwise agreed, in writing, the Hier is responsible for the Velocity Patching unt forthe replacement value of
££195,000.00, in aocordarice wth cause 9 of Velocty™ Tes and Conditions.
2. Completion of this form or acceptance ofthe plant on site implies acceptance ofall terms and conditions stated on this
form unless otherwise agreed n writing.
3. Allrates quoted are net, and wil be subject to VAT atthe prescribed rate at ime of invcicing,
4 Our Stancard trading terms and conciion require that al accounts are paid in fl within 30 Gays, we reserve the right
charge interest at 2 % abave the base lending rate plus an acministraton fee fo ll over due aovounts
5. The cost of materials (aggregate, emulsion, sand etc) may increase during the hire period, eny increases willbe passed on
tothe Hier.
6. Adational charges as per our “Hire ~ Additional Rates”, and our Quotation, willbe applied
7. “in accordance with current UK Health and Safely Legislation it will be necessary to restric the number of hours worked on
the last day of his hie, or the end of weeks where there is ro weekend work fo be caried out, fo ensure adequate
traveling time is afforded to our employees to return the vehicle to base’. you have eny questions or preference about
this can you plesse contact your sales representative t your earliest convenience before the hire stats
Fixes day rate quote Revision V2 Jan 2008oe
Hire-Additional Rates
Any additional plant, material, labour and services will be invoiced at the following rates:
MPH maximum spees,
‘Description Price
Red or White Diesel ‘Atour east
Role / Vibrators ‘Atour east
-JCB's / Telescopic Loaders ‘At our cost
‘Mecharical Sweepers ‘Atour cost
‘Traffic Management ‘Atour cost
Van & Trailer Hire ‘At our cost
‘Drum and Tank Sunding ‘Clients Responeiiy
Waste Kerosene Diepoeal ‘At our cost e
Ferry & Adcitonal Travel Costs ‘At our cost
Dry Sand ‘Atour cost
‘Aggregate rematring w depot at end of hire | Atour cost
Emulsion Hauisge (less than 20 crums) ‘At cur cost
Kerb Protectors. £25.00 each
Tax Fares At cur cost
Express Colleaion of Emply Drums ‘At our ost 7
Oiner Products and Services notinduded Tat our ost
‘above
‘Gass 2 Reflecive Loose Chipping Signs =20 | 515.09 each
‘Consumables (where applicable)
£24 per Gay, for Tran, £31, 00 per day for man
Operator rate where applicable),
EXB.O0 per hour weekdays, minimum 40 hours
Saturdays £39 por hour, mirimum 8 hours,
‘Sundays and Bank Holidays £61.00 per hour minimum 8 hours
Driver rate (where applicable)
£26.00 per hour weekdays, minimum 40 hous.
Saturdays £39 pe: hour, minimum 8 hours,
Sundays and Bank Holidays £51.00 per hour minimum 8 hours.
‘Operator accommodation subsistence rate
(ere applicable) See
‘river accommodation subsistence ate
(where applicable) See
Velocity trainer {ESTE per Gay (for Waining up © 3 persons]
Velocity trsiner accomadation
subsistence rate. Eel sates
Velocity teiner return read Wave TESB,O0 por hour as
‘All other travel, plane, tain, ec: ‘At our cost
Vehicle Damage
Downtime for machine When Caused by Ares
employes
‘Charged at hie rate shown on front page,
Technigan Travel time charges
TESe per hour ora Wan 6 VaR,
“Technician Charges for Vehicie Ropar
‘E47 per hour, plus any parts required at cost plus 25%
“Technician Accommodation & Subsistence
£91 per day
Hire Cancoleton Fes
00% of Purchase Order Vaue™
At Veloaiy™ discretionVelocity -- The Hole Solution -- Benefits of Jetpatcher
rear
Page 1 of 2
rome “Tre le Soaion Pomc Paclage Peace
Trainee
Powe
| Benefits
Velocity offers complete solution to road maintenance through providing specialist Velocty Patching equipment which has revolutionized road repair
techniques.
“The Velocity Repair process isa fast and economic alternative to conventional road repair
‘The Velocity Patching benefts include:
‘Speed & Efficiency
Cost Effective
Long Lasting Repairs
Immediate Trafficking
Lower Manpower
Types of Repair
‘The Velocty Repair Process can be used in urban and rural areas on all dassification of road from motorways to unclassified roads footway and
cycleways. Our innovative process can be used on 2 varity of common defects suchas:
Potholes
‘Cracking and Crazing
Fretting
Pre-surface dressing patching
Edge deterioration
Haunching
Repair of micro surfacing treatments
Depressions
Wheel track rutting
Repair of utility trenches
Sealing and repair of worn repairs
‘Areas of stripped surface dressing
The Key
‘Velocity has revolutonised the road repair industry. Velocity’ hole solution to road
‘maintenance is achieved through the use of Velocity Repairs process providing a fast
‘and economic alternative to conventional road repar.
‘A major factor inthe success, effectiveness and durabilty of Velocity Repairs is the
‘method by which the new materal is keyed into the voids ofthe existing defect surface.
‘The new material bonds withthe existing surface effectwaly keying the new material in
place.
‘The speed of operation results in increased productivity on ste ess disruption to road
users and improved safety for operatives. Velocity’s right frst me approach benefits
ents, road users and the environment in a single rept
[Link] [Link]/[Link]
12/05/09rage 1 or 1
Home Contact Us_—Gallery
The Benefits
Cost Benefits
‘© High quality durable cost effective repair.
‘© Reduced insurance claims.
© Reduced waste.
© Number of operatives reduced by up to 60%.
«= A larger proportion ofthe local authority budget could be directed for complete
resurfacing where required.
Operational Benefits
«© Improved response time,
‘© Daily ablity to operate over a large ares.
© Low risk to operator.
‘© Tralfic management reduced.
Night work operation,
pnal Benefits
'* Fload reusable immectately.
‘+ Enhanced public satisfaction
‘© Reduced carbon footprint.
12/05/09
[Link] [Link]/index php option=com_content&view=articlegCrack Repair Page 1 of 2
bh
Home ContactUs. Gallery
Crack Repair
1. Cleaning by
compressed
pair
It the erack
© contains debris
“iis cleaned by
‘compressed
ai
During cleening
the main
nozzle is close
to the crack.
[Link]
coating
Before filing,
| the erack
should be tack-
coated
3. Filing
The cracks
filled with
nozzle. At the
same time,
© cover it with
aggregate
through the
‘main jet unt
the bitumen fit
is well
protected,
[Link] 12/05/09Pothole Repair
be 41. Clesning
Loose
materia!
euch es dit,
leaves, wood |
ate,.aswell | i
{as loose or
broken
edges, ic
cleard away
with a bast
of
compressed
a tet
i
mote
‘the road I
wat
3. Filing ci
The hole is
fied wit he
mintue of
aggregate
and bitumen
emuision
unite eve |
issiignty jf
above the
surrounding
curace,
4. Covering
Finally, tho
‘covered with
a thin ayer
of pure
aggregate
Including he
trp
surounding
the hole