Haryana Consent to Establish for Evogreen

The document grants consent to establish to M/s Evogreen Decoratives Private Limited for establishing a plywood manufacturing facility in Ambala, Haryana. It outlines the project details, effluent discharge limits, emission standards, and 26 terms and conditions the company must comply with during establishment and operation. The consent is valid for 5 years from the date of issue or until trial production starts, whichever is earlier.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Topics covered

  • Fuel Types,
  • Water Pollution,
  • Industrial Development,
  • Construction Compliance,
  • Regulatory Compliance,
  • Environmental Laws,
  • Regulatory Framework,
  • Inspection Rights,
  • Boiler Capacity,
  • Hazardous Waste Management
0% found this document useful (0 votes)
225 views4 pages

Haryana Consent to Establish for Evogreen

The document grants consent to establish to M/s Evogreen Decoratives Private Limited for establishing a plywood manufacturing facility in Ambala, Haryana. It outlines the project details, effluent discharge limits, emission standards, and 26 terms and conditions the company must comply with during establishment and operation. The consent is valid for 5 years from the date of issue or until trial production starts, whichever is earlier.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Topics covered

  • Fuel Types,
  • Water Pollution,
  • Industrial Development,
  • Construction Compliance,
  • Regulatory Compliance,
  • Environmental Laws,
  • Regulatory Framework,
  • Inspection Rights,
  • Boiler Capacity,
  • Hazardous Waste Management

HARYANA STATE POLLUTION CONTROL

BOARD
Near the Orion Banquet, Naraingarh Road, Baldev
Nagar, Ambala. Email:- [email protected]
Website: www.hrocmms.nic.in E-Mail - [email protected]

______________________ Telephone No.: 0172-2577870-73

No. HSPCB/Consent/ : 313127020AMBCTE7466645 Dated:06/04/2020

To.
M/s : Evogreen Decoratives Private Limited
Village Sountli Shahjadpur District Ambala
AMBALA
134202

Sub. : Grant of consent to Establish to M/s Evogreen Decoratives Private


Limited
Please refer to your application no. 7466645 received on dated 2020-03-18 in
regional office Ambala.
With reference to your above application for consent to establish,M/s Evogreen Decoratives
Private Limited is here by granted consent as per following specification/Terms and conditions.

Consent Under AIR/WATER


Period of consent 06/04/2020 - 05/04/2025
Industry Type Ply wood manufacturing( including Veneer and laminate) using the fuel
such as wood or coal or any other authorized fuel with or without resin
plant.
Category ORANGE
Investment(In Lakh) 975.0
Total Land Area (Sq. 15175.0
meter)
Total Builtup Area (Sq. 8000.0
meter)
Quantity of effluent
1.Trade 0.0 KL/Day
2.Domestic 1.0 KL/Day
Number of outlets 1.0
Mode of discharge
1.Domestic septic tank
2.Trade
Permissible Domestic Effluent Parameters
1. NA
Permissible Trade Effluent Parameters
1. NA mg/l
Number of stacks 2
Height of stack
1. Stack 32 m
2. Stack 33 m
Permissible Emission parameters
1. Boiler SPM 800 mg/m3
2. TFH SPM 150 mg/m3
Capacity of boiler
1. Boiler 4 Ton/hr
Type of Furnace
1. TFH 1500000 Kcal/hr
Type of Fuel
1. Coal . KG/day
2. Wood . KG/day

NITIN MEHTA Digitally signed by NITIN MEHTA


Date: 2020.04.06 16:17:10 +05'30'

Regional Officer, Ambala


Haryana State Pollution Control Board.
Terms and conditions

1. The industry has declared that the quantity of effluent shall be 1 KL/Day i.e
0KL/Day for Trade Effluent, 0 KL/Day for Cooling, 1 KL/Day for Domestic and the
same should not exceed .
2. The above 'Consent to Establish' is valid for 60 months from the date of its issue to be
extended for another one year at the discretion of the Board or till the time the unit
starts its trial production whichever is earlier. The unit will have to set up the plant
and obtain consent during this period.
3. The officer/official of the Board shall have the right to access and inspection of the
industry in connection with the various processes and the treatment facilities being
provided simultaneously with the construction of building/machinery. The effluent
should conform the effluent standards as applicable
4. That necessary arrangement shall be made by the industry for the control of Air
Pollution before commissioning the plant. The emitted pollutants will meet the
emission and other standards as laid/will be prescribed by the Board from time to time.
5. The applicant will obtain consent under section 25/26 of the Water (Prevention &
Control of Pollution) Act, 1974 and under section 21/22 of the Air (Prevention &
Control of Pollution) Act,1981 as amended to-date-even before starting trial
production
6. The above Consent to Establish is further subject to the conditions that the unit
complies with all the laws/rules/decisions and competent directions of the
Board/Government and its functionaries in all respects before commissioning of the
operation and during its actual working strictly.
7. No in-process or post-process objectionable emission or the effluent will be allowed, if
the scheme furnished by the unit turns out to be defective in any actual experience
8. The Electricity Department will give only temporary connection and permanent
connection to the unit will be given after verifying the consent granted by the Board,
both under Water Act and Air Act.
9. Unit will raise the stack height of DG Set/Boiler as per Board's norms.
10. Unit will maintain proper logbook of Water meter/sub meter before/after
commissioning.
11. That in the case of an industry or any other process the activity is located in an area
approved and that in case the activity is sited in an residential or institutional or
commercial or agricultural area, the necessary permission for siting such industry and
process in an residential or institutional or commercial or agricultural area or
controlled area under Town and Country Planning laws CLU or Municipal laws has to
be obtained from the competent Authority in law permitting this deviation and be
submitted in original with the request for consent to operate.
12. That there is no discharge directly or indirectly from the unit or the process into any
interstate river or Yamuna River or River Ghaggar.
13. That the industry or the unit concerned is not sited within any prohibited distances
according to the Environmental Laws and Rules, Notification, Orders and Policies of
Central Pollution control Board and Haryana State Pollution Control Board.
14. That of the unit is discharging its sewage or trade effluent into the public sewer meant
to receive trade effluent from industries etc. then the permission of the Competent
Authority owing and operating such public sewer giving permission letter to his unit
shall be submitted at time of consent to operate.
15. That if at any time, there is adverse report from any adjoining neighbor or any other
aggrieved party or Municipal Committee or Zila Parishad or any other public body
against the unit's pollution; the Consent to Establish so granted shall be revoked.
16. That all the financial dues required under the rules and policies of the
Board have been deposited in full by the unit for this Consent to
Establish.
17. In case of change of name from previous Consent to Establish granted, fresh Consent
to Establish fee shall be levied.
18. Industry should adopt water conservation measures to ensure minimum consumption
of water in their Process. Ground water based proposals of new industries should get
clearance from Central Ground Water Authority for scientific development of previous
resource.
19. That the unit will take all other clearances from concerned agencies, whenever
required.
20. That the unit will not change its process without the prior permission of the Board.
21. That the Consent to Establish so granted will be invalid, if the unit falls in Aravali
Area or non conforming area.
22. That the unit will comply with the Hazardous Waste Management Rules and will also
make the non-leachate pit for storage of Hazardous waste and will undertake not to
dispose off the same except for pit in their own premises or with the authorized
disposal authority.
23. That the unit will submit an undertaking that it will comply with all the specific and
general conditions as imposed in the above Consent to Establish within 30 days failing
which Consent to Establish will be revoked.
24. That unit will obtain EIA from MoEF, if required at any stage.
25. In case of unit does not comply with the above conditions within the stipulated period,
Consent to Establish will be revoked.
26. That unit will obtain consent to operate from the board before the start of product
activity.
Specific Conditions

Other Conditions :
1)The unit will install its plant & machinery before expiry of CTE. 2)The unit will obtain CTO
before starting the operation of the unit and before the expiry of CTE.
3)The unit will not change its proposed manufacturing process during the installation of plant
& machinery.
4)The unit will install Pollution Control measures as proposed.
5)The unit will not generate any trade effluent from the process. 6)In case of any non-
compliance, the performance security submitted by the unit will be forfeited and closure/legal
action will be initiated against the unit as per policy of the Board.

Regional Officer, Ambala


Haryana State Pollution Control Board.