0% found this document useful (0 votes)
291 views4 pages

BQ Class F Earthwork

This document contains a bill of quantities for earthwork and landscaping items for a civil engineering project. It lists item codes, descriptions, units, quantities, rates, and amounts for excavation, filling, and landscaping work. The excavation work involves cutting earth material from the original ground level to form an embankment, and cutting and disposing of earth material from 100m to 95m. The filling work includes using suitable excavated material for grading. The landscaping work includes close turfing, planting various types of trees and plants, and establishing vegetation.

Uploaded by

LIM
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
291 views4 pages

BQ Class F Earthwork

This document contains a bill of quantities for earthwork and landscaping items for a civil engineering project. It lists item codes, descriptions, units, quantities, rates, and amounts for excavation, filling, and landscaping work. The excavation work involves cutting earth material from the original ground level to form an embankment, and cutting and disposing of earth material from 100m to 95m. The filling work includes using suitable excavated material for grading. The landscaping work includes close turfing, planting various types of trees and plants, and establishing vegetation.

Uploaded by

LIM
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

MOHD FARIDZUAN BIN MOHD NASIR

CQ502- CIVIL ENGINEERING WORK MEASUREMENT 03DUB10F1029

CLASS F
Earthwork

ITEM CODE NO. DESCRIPTION UNIT QTY RATE AMOUNT (RM)

F100 EXCAVATION

Cut to Fill

Excavation in cut shall be deemed to


include trimming and preparation of
excavated surface and transportation
from source to place of fill or disposal.

Excavate in earth material from original m3 1177.94


A F121 ground level [to form embankment].

Cut and Dispose

Excavation in cut shall be deemed to


include trimming and preparation of
excavated surface and transportation
from source to place of fill or disposal.

Excavate in earth material commencing m3 91.29


from [100 m] to [95 m] to disposal site
B F131 approved by the Engineer/S.O./P.D.

F300 FILLING

The following items for filling shall


include compaction, and additional
filling necessitated by settlement or
penetration into underlying material as
applicable.

General

Using suitable excavated material to m3 1177.94


C F311 grading limits as per Specification.

Page BQ/F/1
MOHD FARIDZUAN BIN MOHD NASIR
CQ502- CIVIL ENGINEERING WORK MEASUREMENT 03DUB10F1029

CLASS F
Earthwork

ITEM CODE NO. DESCRIPTION UNIT QTY RATE AMOUNT (RM)

Page Carried To Summary of Class F : Earthwork

F500 LANDSCAPING

Items for landscaping shall be deemed to


include digging, planting media,
bedding, stalking, protection, watering,
weeding, required fertilising, and
replacement of dead item until the
vegetation is established.

A F510 Close turfing to flat areas. m2 342.69

Alpina Purpurata [0.91m high] (in group m 10.25


B 540.1 of 2 rows).

Calathea Lutea [0.91m high] (in group of m 10.98


C 540.2 3 rows).

Philodendron Xanadu [0.76m high] (in m 12.24


D 540.3 group of 2 rows).

Zephyrantes Candida [0.41m high] (in 1 m 1.22


E 540.4 row).

Trees of the Wcoyetia Bifurcata species nr 16


F 550.1 with minimum girth of [500 mm] and
[4.67 m] tall.

Trees of the Plumeria Rubra species with nr 5


G 550.2 minimum girth of [400 mm] and [2.74
m] tall.

Trees of the Livistona Chinesis species nr 11


H 550.3 with minimum girth of [500 mm] and
[4.67 m] tall.

Page BQ/F/2
MOHD FARIDZUAN BIN MOHD NASIR
CQ502- CIVIL ENGINEERING WORK MEASUREMENT 03DUB10F1029

CLASS F
Earthwork

ITEM CODE NO. DESCRIPTION UNIT QTY RATE AMOUNT (RM)


Trees of the Ravenala Madagascariensis nr 5
species with minimum girth of [500 mm]
J 550.4 and [3.41 m] tall.

Page Carried To Summary of Class F : Earthwork

Summary of Class f : Earthwork

A Page BQ/F/1

B Page BQ/F/2

Page BQ/F/3
MOHD FARIDZUAN BIN MOHD NASIR
CQ502- CIVIL ENGINEERING WORK MEASUREMENT 03DUB10F1029

CLASS F
Earthwork

ITEM CODE NO. DESCRIPTION UNIT QTY RATE AMOUNT (RM)

Page Carried To Summary of Class F : Earthwork

Page BQ/F/4

You might also like