PPM 2017 2.0 LV System (Weekly)

1) The document is a preventive maintenance checklist for electrical systems in Block E4/5 of a government complex in Putrajaya, Malaysia for the years 2017 to 2020. 2) It details the weekly inspection and maintenance tasks to be performed for the low voltage systems, main switchboards, sub-switchboards, and feeder pillars. 3) The checklist includes inspection of equipment condition, electrical readings, cleaning, and recording results in a log book.

Uploaded by

Nazlie Nasir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
113 views3 pages

PPM 2017 2.0 LV System (Weekly)

1) The document is a preventive maintenance checklist for electrical systems in Block E4/5 of a government complex in Putrajaya, Malaysia for the years 2017 to 2020. 2) It details the weekly inspection and maintenance tasks to be performed for the low voltage systems, main switchboards, sub-switchboards, and feeder pillars. 3) The checklist includes inspection of equipment condition, electrical readings, cleaning, and recording results in a log book.

Uploaded by

Nazlie Nasir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

PLAN PREVENTIVE MAINTENANCE

PENGURUSAN FASILITI BAGI


BLOK E 4/5, KOMPLEKS E, PUTRAJAYA
TAHUN 2017 - 2020
JKR WP PUTRAJAYA
PREVENTIVE MAINTENANCE CHECKLIST LOCATION/LEVEL
WORK TRADE ELECTRICAL
LV ROOM/RISER ROOM
MONTH :
THURSINAR DETAILS WEEK : DATE
CORPORATION FREQ : WEEKLY
SDN BHD

PPM Details
Group: ELECTRICAL Location: TNB LV ROOM, RISER ROOM
Category: LOW VOLTAGE SYSTEM Level: LEVEL B2, B1, 1, 2, 3, 4, 5, 6, 7
Item No: 2.0 Specification: Riser Room E4, Riser Room E5 (certain level)
RISER ROOM LOG STATUS
NO LEVEL GW GE GP GU GC GS BOOK (All Unit)
1 B2 N/A N/A N/A N/A
2 B1 N/A N/A N/A N/A
3 L1 N/A N/A
4 L2, E4 N/A N/A
5 L2, E5 N/A N/A
6 L3, E4 N/A N/A
7 L3, E5 N/A N/A
8 L4, E4 N/A N/A
9 L4, E5 N/A
10 L5, E4 N/A
11 L5, E5 N/A
12 L6, E4 N/A
13 L6, E5 N/A
14 L7, E4 N/A N/A N/A N/A N/A
15 L7, E5 N/A N/A N/A N/A N/A
Task Description
No Description Freq Pass Fail N/A Remark
2.1 Switch Room Including Riser Room
a Cleaning of switch room & riser rooms of dust and cobwebs W
b Cleaning of cable trench/condition of cable trench W
f Ensure no moisture below rubber mate in front of the main switch board. W
g Ensure quantity of all electrical spare are sufficient 40% and in order W
h Ensure anti-vermin wire mesh is in good condition - repair if damaged W
i Ensure the roof/floor above no leakage/damage- repair if damaged W
j Ensure no water flowing into switch room/ riser room - repair if damaged W
k Ensure wiring and electrical fittings, power points, light fittings, and exhaust fans W
are working properly. replace if damaged
n Record all activities and readings in the relevant room's log book W
2.2 Main Switch Board (MSB) / Sub-Switch Boards (SSB)
b Ensure p.f. reading is better than 0.85 lagging - repair/replace if faulty W
c Verify and retighten all screws, contactor, termination etc. W
d Inspect and verify the condition of cables for burn marks, insulation leakage and W
other abnormal conditions
e Record readings for maximum current, voltage, power factor, etc into the logbook W
i Check copper bus bars for discoloration / corrosion and ensure that in good W
condition -repair/replace if damaged
k Ensure capacitor bank is in good condition and working properly - replace if W
damaged
l Ensure MCCB, contactor, capacitors and power factor are working properly - W
replace if faulty
2.9. Feeder Pillars
5
a Measure and record incoming supply voltage and operation current. W
b Check the functionality of circuit breaker, time switch, contactor fuse, MCB, MCCB, W
bypass auto/manual selector, etc. – replace if faulty
c Check anti-vermin/insect netting and repair if necessary W
Inspection Report / Remarks

GOOD NEED RECTIFICATION NEED REPLACEMENT OTHERS

Serviced By: Check By: Verified By:

________________ ________________ ________________


(A4 Chargeman) (Electrical Engineer) (Verifier)
Name: Name: Name:
Date: Date: Date: