Construction Project Bill of Quantity

This document is a bill of quantity for a construction project dated July 17, 2023. It provides a price breakdown for indirect costs, direct costs, and total amount. The indirect costs total 66 million and include items like preparation, transportation, tools/equipment, and safety. The direct costs total over 795 million and include items like stone masonry, steel bridge fabrication, hand rail fabrication, painting, and structural testing. The total project amount is listed as 861 million.

Uploaded by

Surya Shbg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views2 pages

Construction Project Bill of Quantity

This document is a bill of quantity for a construction project dated July 17, 2023. It provides a price breakdown for indirect costs, direct costs, and total amount. The indirect costs total 66 million and include items like preparation, transportation, tools/equipment, and safety. The direct costs total over 795 million and include items like stone masonry, steel bridge fabrication, hand rail fabrication, painting, and structural testing. The total project amount is listed as 861 million.

Uploaded by

Surya Shbg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

18482971

Bill of Quantity
Project date: 17/07/2023
Location
PRICE BREAKDOWN
Price Total Price
No. Item Descriptions Unit Vol. Material Man Power Unit Total Remarks
(Rp) (Rp) (Rp) (Rp)

A INDIRECT COST
1 Preparation works lot 1,00 5.000.000 5.000.000
2 Transportation lot 1,00 15.000.000 15.000.000
3 Tools & equipment lot 1,00 15.000.000 15.000.000
4 Safety & protection lot 1,00 6.000.000 6.000.000
5 Site expence lot 1,00 25.000.000 25.000.000

SUB TOTAL A - 66.000.000

B DIRECT COST
1 Earth works
- Excavation m3 671,58 Exclude
- Disposal m3 182,00 Exclude
- Back fill m3 489,58 Exclude
- Compaction m3 489,58 Exclude
- Finishing road ex. excavation m2 42,00 Exclude
2 Stone masonry m3 182,00 720.000 420.000 1.140.000 207.480.000
3 Concrete base / pedestal m3 5,71 Exclude
- Re-bar D10 & D13 @ 150 kg 701,60
- Form works m2 21,12
- Concrete K-300 m3 5,71
4 Steel bridge fabrication kg 12488,50 33.000 - 33.000 412.120.500
- WF. 500x200x10x16 kg 8600,00
- CNP. 150x65x20x3,2 kg 225,50
- CNP. 100x50x20x3,2 kg 3663,00
- Anchor dia. 1" pcs 32,00
5 Hand rail fabrication kg 640,78 40.200 - 40.200 25.759.356
- Flat bar, 65x12 kg 183,70
- Flat bar, 100x6 kg 226,08
- Round bar dia. 25 kg 231,00
- Bolt, nut, & washer set 36,00
6 Painting kg 13129,28 4.200 - 4.200 55.142.976
7 Loading Undloading Bridge 4 Segmen kg 13129,28 7.200 - 7.200 94.530.816

8 Structural Steelwork Bridge Test for EHS


set 4,00 2.072.000 1.250.000 3.322.000 13.288.000

SUB TOTAL B 795.033.648


Bill of Quantity
Project date: 17/07/2023
Location
PRICE BREAKDOWN
Price Total Price
No. Item Descriptions Unit Vol. Material Man Power Unit Total Remarks
(Rp) (Rp) (Rp) (Rp)
TOTAL AMOUNT (A + B) 861.033.648