To PLN Substation Kesugihan
To PLN Substation Kesugihan 2
PLTU 2 JATENG - ADIPALA
To PLTU S2P 1
To PLTU S2P 2
45.13 kg/㎠, 569 ℃, 1731 T/h (BMCR) Hot Reheat
500 kV GIS
245.8 kg/㎠ , 566 ℃, 2069 T/h (BMCR)
HP Desuperheater
Bypass Desuperheater
Valve
70 % MCR
Cold Reheat Separator
Vert.
22kV Reheater
LP
Bypass
660 MW Valve
To Switchgear:
P1 BBA Generator Horiz.
Generator UAT LP II Turbine Reheater
Transformer P1 BBB LP I Turbine IP Turbine
HP Turbine Water Final SH Low Superheater
(LSH) Economizer
2 x 43 MVA Strorage 질소산화물
800 MVA Tank 제거설비
Platen
Atm SH Middle
Condenser Shell B Condenser Shell A To BFPT
Condensate
Furnace
Vaccum Pump
LP HTR B Condenser width: 23.7 m
LP HTR A From All Economizer
Water Desalination System 0.0785 barg Flash Boiler
depth: 16.3 m
height: 68.0 m
Water feeding Tank Drain
To Out Fall 90 m3 Ignition
Demin Water To WWTP
Pump Boiler
Sump
Boiler Circulation
Mix Bed Resin Anion Bed Stack
Mix Bed Pump ESP
Trap Resin Trap Condensate (Height 275 M)
( 787.8 T/hr) Dust Content
Pump
Air Heater
공기예열기 < 100 mg/Nm3
Burner
Cation Bed Cation Bed Anion Bed Condensate
Resin Trap Polishing
Second Stage Bottom
Unit ID FAN Gas Flow : 598.5 ㎥/s
SWRO Modul Second Stage Ash
Deaerator (2x50% BMCR)
Catridge Filter Desuperheater
Second Stage Submarged
RO HPP Gland scrapper Chain
HP No.8 HTR
Steam Feed Water Tank Conveyor FD FAN
(2x50% BMCR
Condensate 217.4 m3/s) From WWT
SecondStage Recirc FCV Ash Silo
HP No.7 HTR From EP Ash
Feed Pump
Clinker
Bunker Bay From Bottom
BC#6 A/B 1250 T/h PA FAN
Gland Steam (2x50% BMCR
Exauster Booster Booster Booster Ash
HP No.6 HTR 163.9 m3/s) Wet
2 x 50 % Pump Pump Pump Container Dry Ash ESP Ash
First Stage First Stage First Stage Coal Silo
SWRO HPP SWRO Modul Product To (6 x 560 ton)
To
Water Tank Condenser Condenser
ASH POND
From Cold From Cold Bottom Ash.
Double Sea Water Reheat Reheat
First Stage
Catridge Filter Chamber Pre- BC#5 A/B 1250 T/h
Multi Treatment M Coal Feeder
From Cold (6 x 73.8 T/hr)
LP No.3 HTR BFPM
BFPT Primary Air
(1x35%)
(2x50%) Coal
LP No.4 HTR
Pulverizer Ship
C.W Pump Unloader
(2x50%) (2 x 1600 T/hr)
From Cold
BC#8 700 T/h
Primary Air
BC#4 A/B1250 Stacker/ BC#7 A/B 1600 T/h
Raclamer TT 2
Main Fuel Tank TT 1
Unloading Pump BC#2 1600 BC#1 A/B 1600
50 m3/h Cap: 5000㎥ TT 3
Chlorination
Hindia Ocean Plant BC#3 3200
Chlorination Daily Fuel
Tank Fuel Truck Fuel Pump Pulverizer Sealing Air Fan
(130 kg /hr) Tank Ship
(2 x 100%)
Cap: (35000 DWT)
Underground Hopper