• Support for SCOT Analysis can be provided upon data sharing of The area monitoring of overshoot defined as equal split of
Timing Advance measurement and Site Data Base the arc area. If both of the areas have sites, then it's
considered as real overshoot. If only one area have site, then
• From the provided data the recommendation result will be shared it's considered as fake overshoot
01/03/23
07/03/23
13/03/23
19/03/23
25/03/23
31/03/23
06/04/23
12/04/23
18/04/23
24/04/23
30/04/23
06/05/23
12/05/23
18/05/23
24/05/23
30/05/23
05/06/23
11/06/23
01/03/23
07/03/23
13/03/23
19/03/23
25/03/23
31/03/23
06/04/23
12/04/23
18/04/23
24/04/23
30/04/23
06/05/23
12/05/23
18/05/23
24/05/23
30/05/23
05/06/23
11/06/23
Action National Surrounding National Surrounding Action
01/03/23
07/03/23
13/03/23
19/03/23
25/03/23
31/03/23
06/04/23
12/04/23
18/04/23
24/04/23
30/04/23
06/05/23
12/05/23
18/05/23
24/05/23
30/05/23
05/06/23
11/06/23
Physical Optimization
01/03/23
07/03/23
13/03/23
19/03/23
25/03/23
31/03/23
06/04/23
12/04/23
18/04/23
24/04/23
30/04/23
06/05/23
12/05/23
18/05/23
24/05/23
30/05/23
05/06/23
11/06/23
Overshoot Detection to with combining NBR
activity • Limited capability to
functionality. minimize Traffic Traffic vs FB Population
• Hard to detect • detect cell edge area
Tilt recommendation Reduction on Cluster (Azimuth Change
overshoot/undershoot • FBRwas10.45%
differentiated Wise Recommendation Ready) Action National Surrounding Action National Surrounding
with Ncell distance • Estimation fully • Estimation fully
and Theta value to operational at Q3-2023 operational at Q4-2023
accommodate clutter Total Traffic (TB) +1.89%
RRC User
class. +6.84%
• Win Rate ~85% 10000 12
Manual COST 1.0
Millions
8000 10
Physical 2019 H2 SCOT 2.0 SCOT 3.0 6000 8
Tuning SCOTCells
3.949 1.0 2023 H2 2023 H2 4000
6
2023 H1 2000
4
2
0 +3.36% 0 +8.43%
01/03/23
07/03/23
13/03/23
19/03/23
25/03/23
31/03/23
06/04/23
12/04/23
18/04/23
24/04/23
30/04/23
06/05/23
12/05/23
18/05/23
24/05/23
30/05/23
05/06/23
01/03/23
07/03/23
13/03/23
19/03/23
25/03/23
31/03/23
06/04/23
12/04/23
18/04/23
24/04/23
30/04/23
06/05/23
12/05/23
18/05/23
24/05/23
30/05/23
05/06/23
Benefit
• One of competitive operator in Indonesia who utilize disruptive innovation for radio network improvement
program. National Action+Surrounding National Action+Surrounding
Theta < 30
Smaller Gap Theta between scell and ncell, tilt
recommendation more accurate to be execute OPTIM FAKE END SITE
UNDERSHOOT UNDERSHOOT
Theta concept of head-to-head with first tier was enrich RF Engineer to fully minimize with Traffic Loss
and bring the most significant improvement on RF Quality
Copyright © 2023 | Confidential Document 4
Smart Coverage Optimizer Tools – Framework 2.0
Layer 1 Layer 2 Layer 3
ISD
A B C D E F G H I J K L
Layer-1 Dense
Urban / Optional Obligate Obligate Optional Obligate Obligate Obligate Obligate Obligate Obligate Obligate Obligate
D Layer-2 Urban
C Sub Urban
A B
Optional Obligate Obligate Optional Obligate Optional Optional Obligate Obligate Optional Optional Obligate
H Layer-3
/ Rural
G L When we observe some site which performing rollback action due to Total Traffic Cluster
F
E Wise deficit after SCOT Overshoot Action performed, some zone don’t have enough site
Reference of ISD
distribution to cover the previous coverage footprint.
K In this Case SCOT algorithm will be enhanced with zonation & layering check to be
calculated before downtilt action can be performed.
J
ACTION KPI CONDITIONS
I
• (TA90% - DIST_1TIER)/TA90% > 0
• # OF Cell INSIDE Layer 1 => 6 cells (Dense Urban/Urban/Sub Urban/Rural) [3 cells
TA90 minimum per Zone]
• # OF Cell INSIDE Layer 2 => 12 cells (Dense Urban/Urban) [3 cells minimum per Zone]
TA99 Overshooting Resolution • # OF Cell INSIDE Layer 2 => 6 cells (Sub Urban/Rural) [3 cells minimum per Zone]
• # OF Cell INSIDE Layer 3 => 12 cells (Dense Urban/Urban) [3 cells minimum per Zone]
• # OF Cell INSIDE Layer 3 => 6 cells (Sub Urban/Rural) [3 cells minimum per Zone]
Indicate there is site under the defined zone • Final Score > Max Value
Man-Hour Required:
4 weeks deployment (est. 17 August 2023)
Copyright © 2023 | Confidential Document 5
Smart Coverage Optimizer Tools – Framework 3.0
Total Traffic: 23.42 GB
ACTION KPI CONDITIONS
Man-Hour Required:
10 weeks deployment (est. 26 September 2023)