0% found this document useful (0 votes)
77 views6 pages

Smart Coverage Optimizer Tools

Uploaded by

cuncun cunandar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views6 pages

Smart Coverage Optimizer Tools

Uploaded by

cuncun cunandar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Smart Coverage Optimizer Tools (SCOT)

How it Works ?

SCOT Data Process

Input SCOT Output-1 Output-2


MapInfo, Tableau Prep SCOT Value and Classification Tilting Recommendation

• Timing Advance Measurement • Generate TA Coverage Percentile 90% & • Overshoot


For Overshoot and Undershoot
• Site Data Base 99% • Undershoot
Cells
• Mapinfo Visualization (arc coverage) • Optimum
• Grab the neighbor cells inside arc coverage • Fake Overshoot*
• Weighted of 1st tier neighbors (within arc • Fake Undershoot*
coverage) Tableau Prep. The main beam • End Site
neighbors will have highest weighted.
• Calculate SCOT Value based on the highest
weighted neighbor

01 02 03
Note: (*) Fake overshoot = Partial overshoot
• Support for SCOT Analysis can be provided upon data sharing of The area monitoring of overshoot defined as equal split of
Timing Advance measurement and Site Data Base the arc area. If both of the areas have sites, then it's
considered as real overshoot. If only one area have site, then
• From the provided data the recommendation result will be shared it's considered as fake overshoot

Copyright © 2023 | Confidential Document 1


Smart Coverage Optimizer Tools (SCOT)
CQI DL SE
Pain Point: 9.9
+0.50%
1.55
+2.75%
1.3
Limited SF Bandwidth ownership required high spectrum efficiency, key point to improve SE was 9.8 1.5 1.25
physical tuning activity. Disrupted innovation required to reduce time and reduce Opex on driveless 9.7
9.6
1.45
1.2
optimization. 9.5
1.4
1.15
9.4 +3.73% 1.35
+3.72%
9.3 1.3 1.1
Milestone of Solution

01/03/23
07/03/23
13/03/23
19/03/23
25/03/23
31/03/23
06/04/23
12/04/23
18/04/23
24/04/23
30/04/23
06/05/23
12/05/23
18/05/23
24/05/23
30/05/23
05/06/23
11/06/23

01/03/23
07/03/23
13/03/23
19/03/23
25/03/23
31/03/23
06/04/23
12/04/23
18/04/23
24/04/23
30/04/23
06/05/23
12/05/23
18/05/23
24/05/23
30/05/23
05/06/23
11/06/23
Action National Surrounding National Surrounding Action

User DL Throughput UL Throughput +2.82%


8.5 +14.49% 1050
•1’st Gen. of Network 7.5 1000
• Un-Balance Skill • 1’st Gen. of Network
Orchestration Agile, • 2’nd Gen. of Network • 3’rd Gen. of Network 6.5 950
Resource Distribution in Orchestration
and Smart compare Orchestration Concept. Orchestration Concept. 5.5 900
Region • Distributed balance
w/ prev. Manual • Layering and Zonation • Scanning Detection of 4.5 850 +8.16%
• Time Consume for improvement
Activity. result for functionality for High Potential Traffic 3.5 +25.86% 800
• allEnhance
region with Theta

01/03/23
07/03/23
13/03/23
19/03/23
25/03/23
31/03/23
06/04/23
12/04/23
18/04/23
24/04/23
30/04/23
06/05/23
12/05/23
18/05/23
24/05/23
30/05/23
05/06/23
11/06/23
Physical Optimization

01/03/23
07/03/23
13/03/23
19/03/23
25/03/23
31/03/23
06/04/23
12/04/23
18/04/23
24/04/23
30/04/23
06/05/23
12/05/23
18/05/23
24/05/23
30/05/23
05/06/23
11/06/23
Overshoot Detection to with combining NBR
activity • Limited capability to
functionality. minimize Traffic Traffic vs FB Population
• Hard to detect • detect cell edge area
Tilt recommendation Reduction on Cluster (Azimuth Change
overshoot/undershoot • FBRwas10.45%
differentiated Wise Recommendation Ready) Action National Surrounding Action National Surrounding
with Ncell distance • Estimation fully • Estimation fully
and Theta value to operational at Q3-2023 operational at Q4-2023
accommodate clutter Total Traffic (TB) +1.89%
RRC User
class. +6.84%
• Win Rate ~85% 10000 12
Manual COST 1.0

Millions
8000 10
Physical 2019 H2 SCOT 2.0 SCOT 3.0 6000 8
Tuning SCOTCells
3.949 1.0 2023 H2 2023 H2 4000
6

2023 H1 2000
4
2
0 +3.36% 0 +8.43%

01/03/23
07/03/23
13/03/23
19/03/23
25/03/23
31/03/23
06/04/23
12/04/23
18/04/23
24/04/23
30/04/23
06/05/23
12/05/23
18/05/23
24/05/23
30/05/23
05/06/23

01/03/23
07/03/23
13/03/23
19/03/23
25/03/23
31/03/23
06/04/23
12/04/23
18/04/23
24/04/23
30/04/23
06/05/23
12/05/23
18/05/23
24/05/23
30/05/23
05/06/23
Benefit
• One of competitive operator in Indonesia who utilize disruptive innovation for radio network improvement
program. National Action+Surrounding National Action+Surrounding

• Capex reducing on New Site Infill / HUC Capacity Expansion.

Copyright © 2023 | Confidential Document 2


Smart Coverage Optimizer Tools – Framework 1.0
SQM SME CX-Improvement & NPS RAN Strategic Program

Contain minimum 3 cells in Left and Right TA


Arcs Score Bearing : 50
Final Weight =
Score Bearing / S2S
ACTION KPI CONDITIONS
distance
Left Zone • (TA90% - DIST_1TIER)/TA90% > 0
Overshooting • # OF Cell INSIDE Left Zone TA Arc Beamwidth => 5
Resolution • # OF Cell INSIDE Right Zone TA Arc Beamwidth => 5
• Final Score > Max Value

Score Bearing will


have value 100 if Site
A in the center of
beam width Traffic loss can be minimized by deploy Radar
Score bearing will be Score Bearing : 100
function on calculate first tier.
50 if neighbor site
approaching the edge
of beam width Each site under TA Arcs will have unique
Right Zone weight to be consider as First Tier.
Consider as 1’st Tier
Once optimum target first tier was defined,
Number of Relation
Score Bearing : 50 the COST values will be setting accordingly to
Score Bearing is 50 minimize fake overshoot issue.

Copyright © 2023 | Confidential Document 3


Smart Coverage Optimizer Tools – Framework 1.0
SQM SME CX-Improvement & NPS RAN Strategic Program

KEEP/ OPTIM FAKE


OPTIMAL OVERSHOOT OVERSHOOT

Theta < 30
Smaller Gap Theta between scell and ncell, tilt
recommendation more accurate to be execute OPTIM FAKE END SITE
UNDERSHOOT UNDERSHOOT

Arc (Left x Right) Overshoot COST


Clutter Distance (meter) Theta
x = logic 0 >30 >45 >50 >60 >65 >80 >100 >150 >200
Urban <2000 N/A N/A KEEP +1 +2 +2 +3 +3 +4 +4 +4 +4
2000~5000 T<30 AND ; >5 KEEP +1 +2 +2 +3 +3 +4 +4 +4 +4
Sub-Urban
2000~5000 T>30 AND ; >5 Tilt. Recommendation KEEP KEEP +1 +1 +2 +2 +3 +4 +4 +4
>5000 T<30 AND ; >5 KEEP KEEP KEEP +1 +1 +2 +3 +4 +4 +4
Rural
Theta > 30 >5000 T>30 AND ; >5 KEEP KEEP KEEP KEEP +1 +1 +2 +3 +4 +4

Bigger Gap Theta between scell and ncell,


tilt recommendation shifted to higher range Arc (Left x Right) Undershoot COST
Clutter Distance (meter) Theta
of COST x = logic <-200 <-150 <-100 <-80 <-65 <-60 <-50 <-45 <-30 <0
N/A N/A N/A N/A Tilt. Recommendation -3 -3 -2 -2 -1 -1 KEEP

Theta concept of head-to-head with first tier was enrich RF Engineer to fully minimize with Traffic Loss
and bring the most significant improvement on RF Quality
Copyright © 2023 | Confidential Document 4
Smart Coverage Optimizer Tools – Framework 2.0
Layer 1 Layer 2 Layer 3
ISD
A B C D E F G H I J K L
Layer-1 Dense
Urban / Optional Obligate Obligate Optional Obligate Obligate Obligate Obligate Obligate Obligate Obligate Obligate
D Layer-2 Urban
C Sub Urban
A B
Optional Obligate Obligate Optional Obligate Optional Optional Obligate Obligate Optional Optional Obligate
H Layer-3
/ Rural

G L When we observe some site which performing rollback action due to Total Traffic Cluster
F
E Wise deficit after SCOT Overshoot Action performed, some zone don’t have enough site
Reference of ISD
distribution to cover the previous coverage footprint.

K In this Case SCOT algorithm will be enhanced with zonation & layering check to be
calculated before downtilt action can be performed.
J
ACTION KPI CONDITIONS
I
• (TA90% - DIST_1TIER)/TA90% > 0
• # OF Cell INSIDE Layer 1 => 6 cells (Dense Urban/Urban/Sub Urban/Rural) [3 cells
TA90 minimum per Zone]
• # OF Cell INSIDE Layer 2 => 12 cells (Dense Urban/Urban) [3 cells minimum per Zone]
TA99 Overshooting Resolution • # OF Cell INSIDE Layer 2 => 6 cells (Sub Urban/Rural) [3 cells minimum per Zone]
• # OF Cell INSIDE Layer 3 => 12 cells (Dense Urban/Urban) [3 cells minimum per Zone]
• # OF Cell INSIDE Layer 3 => 6 cells (Sub Urban/Rural) [3 cells minimum per Zone]
Indicate there is site under the defined zone • Final Score > Max Value

Indicate there is no site under the defined zone

Man-Hour Required:
4 weeks deployment (est. 17 August 2023)
Copyright © 2023 | Confidential Document 5
Smart Coverage Optimizer Tools – Framework 3.0
Total Traffic: 23.42 GB
ACTION KPI CONDITIONS

• Identify Sector with Low Utilization (Traffic/DL PRB)


and No TX Issue
Azimuth will average multiple Extended Virtual Beam • Sector selected must don’t have any
hotspot location and can be Overshoot/Undershoot state
rotate inside extended Virtual
• Extended Virtual Beam multiplier constant 1.4 (Actual
Beam
Beam 65*Constant 1.4 => Virtual Beam 90 Degree)
Azimuth Changing • SUM of FB Population comparison from Baseline vs
Recommendation Azimuth should maintain or bigger
• Bearing among multiple site surrounding should
Extended Virtual Beam consider the average bearing which can bring highest
traffic sharring
• Zonation and Layering functionality is necessary to be
deployed in SCOT 2.0 to support SCOT 3.0

SCOT 3.0 will help company to boost more revenue by


identify Hotspot Traffic direction based on site
surrounding and combine with FB Population.

ODU shouldn’t change entire cluster azimuth massively.

Man-Hour Required:
10 weeks deployment (est. 26 September 2023)
Copyright © 2023 | Confidential Document 6

You might also like