Package: Supply,Installation,Testing
and Commissioning of Firefighting
Works
BOQ
Project : EVER CLUB HOUSE SEP-2023 Rev 1
[Link] DESCRIPTION UNIT QTY Unit Total
DIVISION 21 : FIRE SUPPRESSION
Section 211313 - Wet-Pipe Sprinkler Systems
1 Automatic Sprinkler Head
1.1 Supplying, installing, connecting and testing of quick response concealed No 353 -
pendent sprinklers, 15mm NPT K-5.6 Chrome plated Glass Bulb sprinkler
heads, Bronze or brass, UL/ FM all Materials Required for Complete Installation,
Operation and to complete the work as per drawings, general specification
Supplying, installing, connecting and testing of closed upright sprinkler, 15mm No 95 -
NPT K-5.6 chrome plated Glass Bulb sprinkler heads, Bronze or brass, UL/ FM
1.2 all Materials Required for Complete Installation, Operation and to complete the
work as per drawings, general specification
Spare sprinklers cabinets .
1.3 Spare cabinet for 6 upright sprinklers. No 1 -
1.4 Spare cabinet for 6 pendent concealed sprinklers. No 1 -
Fire pipe network
2 Black Seamless Steel Pipes
Supplying, installing, connecting and testing of black seamless steel schedule 40
fire protection pipe including pipes fittings, transit piece, flexible joint absorber,
supports, hangers, sleeves, inspector test connections, flushing connectionsand to
complete the work as per drawings, general specification
2.1 25 mm. m 1230 -
2.2 32 mm. m 250 -
2.3 40 mm. m 320 -
2.4 50 mm. m 205 -
2.5 65 mm. m 115 -
2.6 80 mm. m 45 -
2.7 100 mm. m 100 -
2.8 150 mm. m 35 -
Total 01
3 Galvanized Pipes
Supplying, installing, connecting and testing sprinkler drainage galvanized
seamless steel piping system complete, including fittings, supports, hangers,
sleeves, inserts and all other accessoris as per A.S.T.M. A-53 schedule 40, all as
specified and as shown on drawings.
3.1 50 mm. m 25 -
4 Valves
4.1 Zone Control Station
Supplying, installing, connecting and testing of Zone control station-UL & FM
approved consists of (OS&Y) gate valve with tamper flow switch wired to fire
alarm panel, pressure gauge, water flow switch (WFS), non return valve and
25mm inspector test, drain and union with corrosion resistance orfice assembly
with sight glass) complete with all fittings and as NFPA requirements.
100 mm. No 3 -
150 mm. No 1 -
4.2 Fire Department Connections
Supplying , installing , connecting and testing of siamese Connection complete No 1 -
with 100mm check valve UL listed & FM approved , two bronze inlets 65 mm
BS 336 instantaneous coupling outlets provided with blank plug and brass chains,
inlet as per specs
4.3 (OS&Y) gate valve
Supplying, Installing, Testing & Commissioning of (OS&Y) gate valve with
tamper flow switch wired to fire alarm panel and water flow switch UL/FM
ANSI Class 150, C/W Supervision , flanged and all Materials Required for
Complete Installation and Operation as Specified and as Indicated on The
Drawings.
100 mm. No 2 -
4.4 Air Release Valve
Supplying, Installing, Testing & Commissioning of Automatic Air Release Valve
with ball valve and all Materials Required for Complete Installation and
Operation as Specified and as Indicated on The Drawings.
100 mm. No 2 -
Total 02
Fire Protection - DIVISION 21 PAGE 1 of 3 FIRE PROTECTION WORKS B.O.Q
Section 213000 - Fire Pump
Section 213113 - Electric Drive Pump
5 Supply, lift into position, install, test, set to work, and commission UL & FM Ls 1 -
Horizontal split case Electric Driven fire pump, the item include the following:
1-1000 gpm @ 11 bar. UL & FM Horizontal split case Electric Driven fire
pump with Motor
2- Control panel, UL & FM
3-All required valves (UL&FM) as per NFPA requirement and drawings
4- All pipes inside the room (suction and discharge pipes and headers) and pipnig
to the tie point
5- All pump accessories, fittings, sensing line,
6-Tamper switchs for OS&Y GV wired with fire alarm
7-All required accessories as per drawings, specifications and NFPA
requirements.
Section 213116 - Diesel Drive Pump
6 Supply, lift into position, install, test, set to work, and commission UL & FM
Horizontal split case Diesel engine drive fire pump, the item include the
following:
1-1000 gpm @ 11 bar. UL & FM Horizontal split case Diesel engine drive fire
pump with Engine
2- Control panel, UL & FM
3-Diesel fuel tanks of capacity as per NFPA requirement
4-Dike for Diesel Fuel Tank
5-All required valves (UL&FM) as per NFPA requirement and drawings
6-All pipes inside the room (suction and discharge pipes and headers) and pipnig
to the tie point with the main external fire loop
7- All pump accessories, fittings, sensing line,
8-Alarm check valve of diameter as shown in plans
9-Tamper switchs for OS&Y GV wired with fire alarm
10-All required accessories as per drawings, specifications and NFPA
requirements.
11-Soft Starter
Section 213400 - Pressure-Maintenance Pumps - Jockey Pump
7 Supply, lift into position, install, test, set to work, and commission UL & FM
Jockey pump, the item include the following:
1-50 gpm @ 12 bar. Jockey pump with Motor
2- Control panel, UL & FM
3-All required valves (UL&FM) as per NFPA requirement and drawings
4-All pipes inside the room (suction and discharge pipes and headers)
5-All pump accessories, fittings, sensing line,
6-Tamper switchs for OS&Y GV wired with fire alarm
7-All required accessories as per drawings, specifications and NFPA
requirements.
Total 03
Fire Protection - DIVISION 21 PAGE 2 of 3 FIRE PROTECTION WORKS B.O.Q
Section 212100 - Carbon Dioxide Fire Extinguishing System
8 Installing, connecting, testing and commissioning carbon dioxide suppression
system complete including cylinders, manifolds, nozzles, piping work, detectors,
alarm horns, flashing devices, switches, batteries, enunciators, manual pull
stations, control panels, all necessary accessories and ancillary works required for
connection with fire detection system to complete the work as specified and as
shown on drawings, All equipments shall be UL listed & FM approved and shall
be executed in accordance to NFPA.
8.1 CO2 cylinder filled with 45 kg. for ELEC Room at BASEMENT Floor L.S 1 -
8.2 CO2 cylinder filled with 45 kg. for ELEC Room at GROUND Floor L.S 1 -
8.3 CO2 cylinder filled with 45 kg. for TELE Room at GROUND Floor L.S 1 -
8.4 CO2 cylinder filled with 45 kg. for SERVICE Room at FIRST Floor L.S 1 -
8.5 CO2 cylinder filled with 45 kg. for TELE Room at FIRST Floor L.S 1 -
8.6 CO2 cylinder filled with 45 kg. for ELEC Room at SECOND Floor L.S 1 -
8.7 CO2 cylinder filled with 45 kg. for TELE Room at SECOND Floor L.S 1 -
Section 212200 - Clean-Agent Fire Extinguishing Systems
9 Installing, connecting, testing and commissioning clean agent (FM200)
suppression system complete including cylinders, manifolds, nozzles, piping
work, detectors, alarm horns, flashing devices, switches, batteries, enunciators,
manual pull stations, control panels, all necessary accessories and ancillary works
required for connection with fire detection system to complete the work as
specified and as shown on drawings, All equipments shall be UL listed & FM
approved and shall be executed in accordance to NFPA
9.1 FM 200 cylinder filled with 45 kg. for TELE ROOM at BASEMENT Floor L.S 1 -
9.1 FM 200 cylinder filled with 45 kg. for LV ROOM at BASEMENT Floor L.S 1 -
Section 211200 - Fire Suppression Standpipes
10 Fire Hose cabinets
10.1 Supplying , installing , connecting and testing of fire hose cabinet (FHC-3) No. 8 -
Consists of 65 mm pressure restricting type fire hose valve and 65 mm x 30
meters fire hose with couplings and fog nozzle and Fire Hose Reels 25 mm X 30
m with Pressure reducing valve and pressure gauge and one 6 Kg dry powder fire
extinguisher and all adapters and fitting required for the complete assembl.
11 Portable Fire Extinguishers
11.1 Supplying , installing multi purpose portable fire extinguisher of dry chemical No. 12 -
powder suitable for ABC classes 6 kg weight complete with gauge, fire
extinguisher cabinet, bracket ...etc and any other required accessories to be
installed in puplic [Link] FE1.
Supplying , installing CO2 portable fire extinguisher 6 KG weight complete with No. 12 -
11.2 gauge, fire extinguisher cabinet, bracket ...etc and any other required accessories
to be installed inelectrical hazard [Link] FE2
Total 04
Fire Protection - DIVISION 21 PAGE 3 of 3 FIRE PROTECTION WORKS B.O.Q