CONTRACT VALUE 1,000,000.00
ITEM QUANTITY RATE AMOUNT % OF CONTRACT
1.0 Mobilization & site preperation
Mobilization & site
1.0 0.00
preperation
Total 0.00 0.00%
2.0 Sub Structure
2.1 Villa
2.1.1 . 0.00
2.1.2 . 0.00
2.2 Service block
2.2.1 . 0.00
2.2.2 . 0.00
Total 0.00 0.00%
3.0 Super structure
3.1 Villa
3.1.1 Basement 0.00
3.1.2 Ground floor 0.00
3.1.3 First floor 0.00
3.1.4 Roof floor + Parapet 0.00
3.2 Service Block
3.2.1 Ground floor 0.00
3.2.2 Parapet 0.00
Total 0.00 0.00%
4.0 Block work
4.1 Villa
4.1.1 Solid block 0.00
4.1.2 Ground floor 0.00
4.1.3 First floor 0.00
4.1.4 Roof floor 0.00
4.2 Service block
4.2.1 . 0.00
Total 0.00 0.00%
5.0 Plaster
5.1 Villa
5.1.1 Int. plaster 0.00
5.1.2 Ext. plaster / betomin 0.00
5.2 Service block
5.2.1 Int. plaster 0.00
5.2.2 Ext. plaster / betomin 0.00
Total 0.00 0.00%
Owner: Contractor:
Location: Constultant:
6.0 Water proofing
6.1 Villa + Service block
substructure water
6.1.1 0.00
proofing
6.1.2 Wet area 0.00
6.1.3 Roof water proofing 0.00
Total 0.00 0.00%
7.0 Finishing
7.1 Villa
7.1.1 . 0.00
7.1.2 . 0.00
7.2 Service block
7.2.1 . 0.00
7.2.2 . 0.00
Total 0.00 0.00%
8.0 Joinery Works
8.1 Villa
8.1.1 . 0.00
8.1.2 . 0.00
8.2 Service block
8.2.1 . 0.00
8.2.2 . 0.00
Total 0.00 0.00%
9.0 Electrical works
9.1 Villa
9.1.1 . 0.00
9.1.2 . 0.00
9.2 Service block
9.2.1 . 0.00
9.2.2 . 0.00
Total 0.00 0.00%
10.0 Plumping works
10.1 Villa
10.1.1 . 0.00
10.1.2 . 0.00
10.2 Service block
10.2.1 . 0.00
10.2.2 . 0.00
Owner: Contractor:
Location: Constultant:
10.3 External 0.00
Total 0.00 0.00%
11.0 HVAC & mechanical works
11.1 Villa
11.1.1 AC works 0.00
11.2 Service block
11.2.1 AC works 0.00
Total 0.00 0.00%
12.0 Aluminum & glazing works
12.1 Villa
12.1.1 . 0.00
12.2 Service block
12.2.1 . 0.00
Total 0.00 0.00%
13.0 External works & boundary wall works
13.1 . 0.00
13.2 . 0.00
13.3 . 0.00
Total 0.00 0.00%
TOTAL PROJECT COST 0.00 0.00%