0% found this document useful (0 votes)
119 views3 pages

Construction Cost Breakdown Document

This document appears to be a construction contract for building a villa and service block with a total contract value of $1,000,000. It lists 13 items of work including substructure, superstructure, blockwork, plastering, waterproofing, finishing, joinery works, electrical works, plumbing works, HVAC, aluminum and glazing works, and external works. However, the quantities, rates and amounts for each item are all listed as $0.00, so the percentages and total project cost are also $0.00, indicating this is an incomplete contract requiring further details on the scope and pricing of each work item.

Uploaded by

AHMED ALSHEHHI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
119 views3 pages

Construction Cost Breakdown Document

This document appears to be a construction contract for building a villa and service block with a total contract value of $1,000,000. It lists 13 items of work including substructure, superstructure, blockwork, plastering, waterproofing, finishing, joinery works, electrical works, plumbing works, HVAC, aluminum and glazing works, and external works. However, the quantities, rates and amounts for each item are all listed as $0.00, so the percentages and total project cost are also $0.00, indicating this is an incomplete contract requiring further details on the scope and pricing of each work item.

Uploaded by

AHMED ALSHEHHI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Owner: Contractor:

Location: Constultant:
CONTRACT VALUE 1,000,000.00

ITEM QUANTITY RATE AMOUNT % OF CONTRACT


1.0 Mobilization & site preperation
Mobilization & site
1.0 0.00
preperation
Total 0.00 0.00%

2.0 Sub Structure


2.1 Villa
2.1.1 . 0.00
2.1.2 . 0.00
2.2 Service block
2.2.1 . 0.00
2.2.2 . 0.00
Total 0.00 0.00%

3.0 Super structure


3.1 Villa
3.1.1 Basement 0.00
3.1.2 Ground floor 0.00
3.1.3 First floor 0.00
3.1.4 Roof floor + Parapet 0.00
3.2 Service Block
3.2.1 Ground floor 0.00
3.2.2 Parapet 0.00
Total 0.00 0.00%

4.0 Block work


4.1 Villa
4.1.1 Solid block 0.00
4.1.2 Ground floor 0.00
4.1.3 First floor 0.00
4.1.4 Roof floor 0.00
4.2 Service block
4.2.1 . 0.00
Total 0.00 0.00%

5.0 Plaster
5.1 Villa
5.1.1 Int. plaster 0.00
5.1.2 Ext. plaster / betomin 0.00
5.2 Service block
5.2.1 Int. plaster 0.00
5.2.2 Ext. plaster / betomin 0.00
Total 0.00 0.00%
Owner: Contractor:
Location: Constultant:

6.0 Water proofing


6.1 Villa + Service block
substructure water
6.1.1 0.00
proofing
6.1.2 Wet area 0.00
6.1.3 Roof water proofing 0.00
Total 0.00 0.00%

7.0 Finishing
7.1 Villa
7.1.1 . 0.00
7.1.2 . 0.00
7.2 Service block
7.2.1 . 0.00
7.2.2 . 0.00
Total 0.00 0.00%

8.0 Joinery Works


8.1 Villa
8.1.1 . 0.00
8.1.2 . 0.00
8.2 Service block
8.2.1 . 0.00
8.2.2 . 0.00
Total 0.00 0.00%

9.0 Electrical works


9.1 Villa
9.1.1 . 0.00
9.1.2 . 0.00
9.2 Service block
9.2.1 . 0.00
9.2.2 . 0.00
Total 0.00 0.00%

10.0 Plumping works


10.1 Villa
10.1.1 . 0.00
10.1.2 . 0.00
10.2 Service block
10.2.1 . 0.00
10.2.2 . 0.00
Owner: Contractor:
Location: Constultant:
10.3 External 0.00
Total 0.00 0.00%

11.0 HVAC & mechanical works

11.1 Villa
11.1.1 AC works 0.00
11.2 Service block
11.2.1 AC works 0.00
Total 0.00 0.00%

12.0 Aluminum & glazing works


12.1 Villa

12.1.1 . 0.00

12.2 Service block


12.2.1 . 0.00
Total 0.00 0.00%

13.0 External works & boundary wall works

13.1 . 0.00

13.2 . 0.00

13.3 . 0.00
Total 0.00 0.00%
TOTAL PROJECT COST 0.00 0.00%

You might also like