DOMESTIC COLD WATER CONSUMPTION
i. Hotel Guest = 450 Litres/person/day, 1.5 people per guestroom
= 251 Room x 1.5 x 450 Litres x 0.22
= 37,274 Gallons
ii. Hotel Staff = 150 Litres/person/day, 1.0 people per guestroom
= 251 Room x 150 Litres x 0.22
= 8283 Gallons
iii. Restaurant Customer = 20 Litres/person/day
Restaurant 1 =168 Person x 20 Litres x 0.22
= 739 Gallons
Restaurant 2 = 180 Person x 20 Litres x 0.22
= 792 Gallons
iv. Restaurant Staff = 180 Litres/person/day
Restaurant 1 = 17 Person x 180 Litres x 0.22
= 673 Gallons
Restaurant 2 = 18 Person x 180 Litres x 0.22
= 713 Gallons
v. Banquet Hall Customer = 20 Litres/person/day
= 960 Person x 20 Litres x 0.22
= 4224 Gallons
vi. Banquet Hall Staff = 160 Litres/person/day
= 96 Person x 160 Litres x 0.22
= 3379 Gallons
vii. Fitness Centre Customer = 60 Litres/person/day, 2 People per day
= 75 Person x 2 x 60 Litres x 0.22
= 1980 Gallons
viii. Fitness Centre Staff = 150 Litres/person/day
= 15 Person x 150 Litres x 0.22
= 495 Gallons
ix. Laundry = 100 Litres/guestroom/day
= 251 Room x 100 Litres x 0.22
= 5522 Gallons
x. Car Cleaning = Not Required
xi. Irrigation = Under Rainwater Haversting
xii. Contingency = 10% of total daily consumption
xiii. Total = 64,074 Gallons x 1.10
= 70,481 Gallons
xiv. Take 90% as Diversity Factor = 63,433 Gallons
xv. Proposed Tank Size = 1 nos. of 42,900 Gallons FRP Water Storage Tank
13m(L) x 6m(W) x 2.5m(H)
= 1 nos. of 26,400 Gallons FRP Water Storage Tank
8m(L) x 6m(W) x 2.5m(H
DOMESTIC HOT WATER CONSUMPTION
i. Hotel Guest = 180 Litres/person/day
= 251 Room x 180 Litres x 0.22
= 9940 Gallons
ii. Hotel Staff = 50 Litres/person/day, 1.0 people per guestroom
= 251 Room x 50 Litres x 0.22
= 2761 Gallons
iii. Restaurant Customer = 7 Litres/person/day
Restaurant 1 =168 Person x 7 Litres x 0.22
= 259 Gallons
Restaurant 2 = 180 Person x 7 Litres x 0.22
= 277 Gallons
iv. Restaurant Staff = 50 Litres/person/day
Restaurant 1 = 17 Person x 50 Litres x 0.22
= 187 Gallons
Restaurant 2 = 18 Person x 50 Litres x 0.22
= 198 Gallons
v. Fitness Centre Customer = 50 Litres/person/day
= 75 Person x 50 Litres x 0.22
= 825 Gallons
vi. Fitness Centre Staff = 40 Litres/person/day
= 15 Person x 40 Litres x 0.22
= 132 Gallons
vii. Contingency = 10% of total daily consumption
viii. Total = 14,579 Gallons x 1.10
= 16,037 Gallons
ix. Take 90% as Diversity Factor = 14,433 Gallons
x. Proposed Tank Size = 1 nos. of 16,500 Gallons FRP Water Storage Tank
6m(L) x 5m(W) x 2.5m(H)
COLD WATER CONSUMPTION FOR AIR-CON MAKE-UP
i. Chiller Capacity = 500 TRC x 3 nos.
ii. Calculated Water Make-up On Peak Hour = 16 Hours (6:00am – 10:00pm)
Cooling Tower Evaporation Loss & Drift= 1%
Duty Load = 500 TRC x 2 nos.
1 Ton = 3 usgpm
= ( 500 TRC x 2 nos. ) 3 x 1%
= 30 usgpm
= 25 igpm
Water Make-up For 16 Hours = ( 25 igpm x 60 min ) 16 Hours
= 24,400 iGallons
iii. Calculated Water Make-up On Non-Peak Hour = 8 Hours (10:00pm – 6:00am)
Cooling Tower Evaporation Loss & Drift = 1%
Duty Load = 500 TRC x 1 no.
1 Ton = 3 usgpm
= 500 TRC 3 x 1%
= 15 usgpm
= 13 igpm
Water Make-up For 8 Hours = ( 13 igpm x 60 min ) x 8 Hours
= 6240 iGallons
iv. Total Water Make-up For One Day Storage = ( 24,400 + 6,240 ) iGallons
= 30,640 iGallons
v. Contingency = 5%
vi. Total = 30,640 iGallons x 1.05
= 32,172 iGallons
vii. Proposed Tank Size = 4 nos. of 10,000 iGallons HDPE
Water Storage Tank
COLD WATER PUMP-1 (5th FLOOR TO 7th FLOOR)
i. Pump Flow Rate
Water Closet 126 x 0.2 = 25.2 L/S
Basin 126 x 0.1 = 12.6 L/S
Shower 120 x 0.2 = 24.0 L/S
Urinal 3 x 0.1 = 0.3 L/S
Sink 12 x 0.1 = 1.2 L/S
Tap Head 6 X 0.1 = 0.6 L/S
Total = 63.90 L/S
Take 30% as diversity factor, hence the required flow rate
= 63.90 L/S x 0.3
= 19.17 L/S
= 253 igpm
ii. Pump Head
Residual Pressure = 2.5 bar @ 25.5m
Static Head = 8.1m
Friction Loss Through Pipe & Fittings
Total Pipe Length = Total Pipe Length + Total Equivalent
Length (Allow 20% due to elbow, tee,
bent,
etc)
= 210m + 42m
= 252m
Total Friction Loss Of Pipe = 252m x 5% (Take 5% as friction loss)
= 12.6m
Total Head Required =25.5m + 8.1m + 12.6
= 46.2m
iii. Selection Of Pump
Pump Type : Variable Speed Booster System (3 Duty 1 Standby)
System Flow Rate : 269 igpm
System Head : 50m
Power Consumption : 4 x 11kw
Phase : 3 phase
COLD WATER PUMP-2 (1st FLOOR TO 4th FLOOR)
i. Pump Flow Rate
Water Closet 150 x 0.2 = 30.0 L/S
Basin 150 x 0.1 = 15.0 L/S
Shower 126 x 0.2 = 25.2 L/S
Urinal 12 x 0.1 = 1.2 L/S
Sink 7 x 0.1 = 0.7 L/S
Tap Head 9 X 0.1 = 0.9 L/S
Total = 73.0 L/S
Take 30% as diversity factor, hence the required flow rate
= 73.0 L/S x 0.3
= 21.9 L/S
= 289 igpm
ii. Pump Head
Residual Pressure = 2.5 bar @ 25.5m
Static Head =-
Friction Loss Through Pipe & Fittings
Total Pipe Length = Total Pipe Length + Total Equivalent
Length (Allow 20% due to elbow, tee,
bent,
etc)
= 198m + 40m
= 238m
Total Friction Loss Of Pipe = 238m x 5% (Take 5% as friction loss)
= 12m
Total Head Required =25.5m + 12m
= 37.5m
iii. Selection Of Pump
Pump Type : Variable Speed Booster System (3 Duty 1 Standby)
System Flow Rate : 290 igpm
System Head : 40m
Power Consumption : 4 x 11kw
Phase : 3 phase
COLD WATER PUMP-3 (LG FLOOR TO 2nd FLOOR)
i. Pump Flow Rate
Water Closet 62 x 0.2 = 12.4 L/S
Basin 58 x 0.1 = 5.8 L/S
Shower 10 x 0.2 = 2.0 L/S
Urinal 11 x 0.1 = 1.1 L/S
Tap Head 44 X 0.1 = 4.4 L/S
Kitchen Basin 32 x 0.1 = 3.2 L/S
Total = 28.9 L/S
Take 30% as diversity factor, hence the required flow rate
= 28.9 L/S x 0.3
= 8.67 L/S
= 114 igpm
ii. Pump Head
Residual Pressure = 1.5 bar @ 15.3m
Static Head =-
Friction Loss Through Pipe & Fittings
Total Pipe Length = Total Pipe Length + Total Equivalent
Length (Allow 20% due to elbow, tee,
bent,
etc)
= 170m + 33.8m
= 204m
Total Friction Loss Of Pipe = 204m x 5% (Take 5% as friction loss)
= 10.2m
Total Head Required =15.3m + 10.2
= 25.5m
iii. Selection Of Pump
Pump Type : Variable Speed Booster System (2 Duty 1 Standby)
System Flow Rate : 120 igpm
System Head : 30m
Power Consumption : 3 x 4kw
Phase : 3 phase
HOT WATER PUMP-1 (5th FLOOR TO 7th FLOOR)
i. Pump Flow Rate
Basin 126 x 0.1 = 12.6 L/S
Shower 120 x 0.2 = 24.0 L/S
Total = 36.6 L/S
Take 30% as diversity factor, hence the required flow rate
= 36.6 L/S x 0.3
= 10.98 L/S
= 145 igpm
ii. Pump Head
Residual Pressure = 2.5 bar @ 25.5m
Static Head = 41.4m
Friction Loss Through Pipe & Fittings
Total Pipe Length = Total Pipe Length + Total Equivalent
Length (Allow 20% due to elbow, tee,
bent,
etc)
= 210m + 42m
= 252m
Total Friction Loss Of Pipe = 252m x 5% (Take 5% as friction loss)
= 12.6m
Total Head Required =25.5m + 41.4m + 12.6
= 79.5m
iii. Selection Of Pump
Pump Type : Variable Speed Booster System (3 Duty 1 Standby)
System Flow Rate : 150 igpm
System Head : 80m
Power Consumption : 4 x 11kw
Phase : 3 phase
HOT WATER PUMP-2 (2nd FLOOR TO 4th FLOOR)
i. Pump Flow Rate
Basin 150 x 0.1 = 15.0 L/S
Shower 126 x 0.2 = 25.2 L/S
Total = 40.2 L/S
Take 30% as diversity factor, hence the required flow rate
= 40.2 L/S x 0.3
= 12.06 L/S
= 159 igpm
ii. Pump Head
Residual Pressure = 2.5 bar @ 25.5m
Static Head = 29.7m
Friction Loss Through Pipe & Fittings
Total Pipe Length = Total Pipe Length + Total Equivalent
Length (Allow 20% due to elbow, tee,
bent,
etc)
= 198m + 40m
= 238m
Total Friction Loss Of Pipe = 238m x 5% (Take 5% as friction loss)
= 12m
Total Head Required =25.5m + 29.7m + 12
= 67.2m
iii. Selection Of Pump
Pump Type : Variable Speed Booster System (3 Duty 1 Standby)
System Flow Rate : 170 igpm
System Head : 70m
Power Consumption : 4 x 11kw
Phase : 3 phase
AIR-CON MAKE-UP WATER PUMP
i. Pump Flow Rate
Assumption Date:
The Capacity Of Storage Tank = 40,000 iGallons
Evaporation Rate = 1.67% of Total Flow Rate
Static Head = 8m
Total Pipe Length = 67m
Taking 5% of tank capacity being used up, i.e. 2000 gallons and refilling time of 30
minutes. Thus the pump capacity is 66.66 usgpm or 56 igpm
ii. Pump Head
And the pump discharge pressure required = 8m + Hf
= (8 + 1.76) x 1.25 (take 25% as
safety factor)
= 12.2m + 2m
= 14m
iii. Selection Of Pump
Pump Type : Hydropheumatic System (1 Duty 1 Standby)
System Flow Rate : 60 igpm
System Head : 20m
Power Consumption : 2 x 2.2kw
Phase : 3 phase
COLD WATER BOOSTER PUMP
i. Pump Flow Rate
Assumption Date:
The Capacity Of Storage Tank = 46,200 iGallons
Total Pipe Length = 330m
Taking 5% of tank capacity being used up, i.e. 2310 gallons and refilling time of 30
minutes. Thus the pump capacity is 77 usgpm
ii. Pump Head
Residual Pressure = 1.5 bar @ 15.3m
Static Head = 36.9m
Friction Loss Through Pipe & Fittings
Total Pipe Length = Total Pipe Length + Total Equivalent
Length (Allow 20% due to elbow, tee,
bent,
etc)
= 330m + 99m
= 429m
Total Friction Loss Of Pipe = 429m x 5% (Take 5% as friction loss)
= 21.4m
Total Head Required =15.3m + 36.9m + 21.4m
= 73.6m
iii. Selection Of Pump
Pump Type : Variable Speed Booster System (1 Duty 1 Standby)
System Flow Rate : 77 usgpm
System Head : 75m
Power Consumption : 2 x 11kw
Phase : 3 phase
AIR-CON COLLECTOR CONDENSATE WATER PUMP
i. Pump Flow Rate
Assumption Date:
The Capacity Of Storage Tank = 100 iGallons
Total Pipe Length = 30m
Taking 70% of tank capacity to be pumping, i.e. 70 gallons and pumping time of 5
minutes. Thus the pump capacity is 14 usgpm
ii. Pump Head
Residual Pressure = 1.0 bar @ 10.2m
Static Head = 8m
Friction Loss Through Pipe & Fittings
Total Pipe Length = Total Pipe Length + Total Equivalent
Length (Allow 20% due to elbow, tee,
bent,
etc)
= 30m + 6m
= 36m
Total Friction Loss Of Pipe = 36m x 5% (Take 5% as friction loss)
= 1.8m
Total Head Required =10.2m + 8m + 1.8m
= 20m
iii. Selection Of Pump
Pump Type : Variable Speed Booster System (1 Duty 1 Standby)
System Flow Rate : 20 usgpm
System Head : 20m
Power Consumption : 2 x 11kw
Phase : 3 phase