Section I
GENERAL
A. CONSTRUCTION RULES
~All works shall comply with the existing government regulations. National
Building Code, Philippine Electrical Code and Fire Code.
- The Owner/Occupant shall provide their own temporary power and other
temporary facilities during fitting out period: corresponding charges shall be
for the Owner/Occupant's expense. Building manager shall be the one to
assign respective tapping points.
~The Owner/Occupant shall coordinate with the utility contractor of the building
prior to the preparation of proposed design and prior to its implementation.
- The Owner/Occupant contractor shall secure
permit duly signed by the utility contractor before any activity in their leased
premises takes place.
- Transport of heavy loads shall be coordinated with the Building Manager. The
Owner/Occupant Contractor may use the service elevator for a maximum
load of 800kgs. Loads shall not in any case touch the walls and ceiling of
elevator to prevent damage on the property.
delivered at any floor of the b
9.
- The Building Manager with prior written notice to the Owner/Occupant shall
initiate clean up of leased premise if the Owner/Tenant is not properly
‘maintaining a clean work area at its discretion. All charges associated with
the clean up shall be accounted for Owner/Tenant's Contractor.
- The Building Manager shall suspend work already in progress if the
Owner/Occupant's Contractor resists to follow rules and regulation stated in
the Renovation Guidelines and deviates from the approved plan.
- Security costs for all overtime works shall be for the Owner/Occupant's
account.
1. Application for Renovation and Improvement Permit
1.1 The Discovery Centre Condominium Corporation once organized
through the Building Manager shall strictly implement The Discovery
‘Discover corre TCentre Guidelines for Renovation and Improvement of Units in
compliance with its instruction and requirements.
1.2 The Owner / Occupant intending to perform interior works prior to
tion or any other improvements on their Units shall
m the Declarant or Condominium
Cone tion or its duly authorized officer as the case aay be.
1.3 Prior to the preparation of any preliminary interior work plans, the
Owner/Occupant and Contractor is required to visit its Office Floor to
verify actual space conditions. The Building Manager should be
informed at least one (1) day in advance of the inspection schedule. The
Owner/Occupant shall use as basis for design the Unit As-built Drawings
which may be available upon request, only the initial set of which shall
be provided free of charge. These As-built Drawings include floor plans,
sections, ceiling plans, utility plans, electrical load schedule, etc.
1.4 All renovation works shall be performed in accordance with the National
Building Code (P.D. No. 1096).
15 of the
Architectural, Structural, Electrical, Sanitary/Plumbing, Mechanical and
Fire Protection Plans, Contré Lease and Authority from the Unit
wher and a Detailed Renovation Schedule of the Owner's ed
renovations, when appli in_referré as the
“Proposed Interior Plans’ The Prot
Interior Plans shall be reviewed by the Condominium Corporation or its
duly appointed Consultants (herein referred to as the “Consultant’).
jould _plans _require review _and approval __of _ Propel
Designers/Consultants, the Owner/Occupant shall pay the Condominium
Corporation for review fees (herein referred to as "Review Fees’) that
may be incurred by the Condominium Corporation.
1.6 The Building Manager encourages the Owner/Tenant to fully comply
with these Design Plan criteria:
A. Architectural Plans shall include in their sheet contents the following:
* Lay-out /Floor plan
+ Front Elevation : Finish materials and colors
* Cross section plan and Longitudinal plan
* Elevation Plans
* Reflected Ceiling Plan
aeoveny eename zB.
Electrical Plans shall include in their sheet contents the following
* Load Schedule
* Riser Diagram
* Power Layout
+ Lighting and Auxiliary layout /Smoke Detector
* General Notes and legends
* Details of lighting fixture installation
* Other standard details
* Specifications / Brands
Mechanical Plans shall include in their sheet contents the following :
* Air conditioning piping system layout
* Air conditioning duct layout
+ Exhaust system layout
+ Equipment layout and schedule
* General Notes and Legends / Standard Details
Sanitary Plans
* Water plumbing plans
* Drainage and Sewer plumbing layout
* Isometric:
* General Notes and Legends
* Plumbing component specification/Brand
Fire Protection Plans
‘Fire Sprinkler layout
* Pipe support and sway braces detail and schedule
* General Notes and Legends
Mechanical Plans shall include in their sheet contents the following
* Air conditioning piping system layout
* Air conditioning duct layout
+ Exhaust system layout
+ Equipment layout and schedule
* General Notes and Legends / Standard Details
1.7 The proposed renovations must not violate any restriction, and must not
substantially interfere with or diminish the enjoyment and use by other
unit Owners or the common areas.
1.8 The proposed renovations shall not result in any change in the area of
the
unit or the subdivision into smaller units.1.9 The proposed renovations will not be allowed if it will endanger, alert or
destroy the structural integrity, fire safety standards or the original design
on the exterior outline of the building.
1.10 After review and comments on Prog
ner/Occupant may be required to modify its Proy Interior Plan by
the Condominium Corporation. The Owner/Occupant shall submit five
(5) sets of the Proposed Plan. If approved, the Proposed Interior Plan
shall thereafter_be referred to_as the Approved Interior Plans Th
Renovation Permit shall be issued by the Condominium Cor noni
it the Interior Plans comply with the Building Systems, Building
Standards and other criteria set in the Master Deed, these Guidelines
and the House Rules. No renovation work may be performed if it is not
covered by Approved Itemized Plans.
ait
interior Plans,
licies on Comprehensive General Liabil and Contractor's All-
Risk (CAR) from a reputable insurance company approved or accredited
by the Condominium Corporation for the protection of the Condominium
Corporation, the Owner/Occupant and the Contractor. Insurance policy
roposed renovation or PHP500, 000.00. ever is
jer as may be
determined _or appraised _by the Condominium Corporation. Such
insurance should have a minimum of 90 days coverage, subject for
renewal _as_needed and required. Failure to comply shall result to
temporary work stoppage.
. Only Contractors duly accredited by the Building Manager
shall be allowed to perform Interior Works.
1 *87The OunerOscipant shal be responsible for sacrng all equ
Building, St Jumbing, Mechanical and Fire
Protection Copies of the above permits
should be submitted to Building Manager. No Renovation Permit shall
be given without prior submission to the Building Manager of these
permits. Said Permits shall be posted by the unit Owner on a space
board within the Unit from its issuance until the completion of the
Renovation Works.
‘Bscoveny cenrne a1.14 The Owner/Occupant shall be responsible for the damages caused by
their contractor to the common areas, equipment, and structure including
accessories and the unit directly below them during construction stage.
All costs to be charged by the aggrieved party shall be for the account of
the Owner/Occupant.
2. RENOVATION PERMIT
A Renovation Permit may be issued upon completion of the procedure
outlined in Section 1 above.
21 The Owner/Occupant shall be required to deposit a ‘Const Bond”
based on the amount of PHP100,000.00, which will serve as a security
for the strict compliance of Sec.A.2.2 herein and as a security against
damages that may occur during the performance of the Interior Works._It
is expressly understood that the damage that may be claimed again:
is expressly understood that the damage that may be claimed against
the Owner/Occupant is not limited to the amount of said Construction,
which will serve as security against damages that may occur during the
performance of the Interior Works.
The Owner/Occupant shall be required to replenish the said deposit if
art_or_all_of it is consumed by any damage charged against the
Owner/Oceupant,
2.2 The Renovation Deposit, net of any amount for all repairs that may have
to be performed by the Building Manager due to damage or violation by
the Owner/Occupant or its workers, shall be refunded to the
Owner/Occupant only after:
(a) completion of the Interior Works
(b) inspection of the Office Unit by the Building Manager
(0) issuance of Certificate of Compliance by the Building Manager
(d) submission to the Building Manager of three (3) copies
of the as-built plans of interior works by the Owner/Occupant within
30 days from occupancy of tenant
(e) submission of Final Occupancy Permit, Building Permits,
Electrical, Sanitary, Mechanical, and Fire Inspection Certificate
(f) all excess construction materials and debris on any area of the
Discovery Centre has been removed
23 The Owner/Occupant shall be required to deposit a “Utility Bond”
amounting to PHP20,000.00 per unit, which shall be refundable upon th
issuance of clearance by the Building Manager, which will be issued
after complete settlement of all utility costs (electrical and water) incurred
during the fit-out process.
‘Dscoveny conn 3The Owner/Occupant shall be required to replenish the said deposit if
part or all of it is consumed,
24 The Owner/Occupant shall be required to pay a (Php150. jer day
Administrative Fee from the date of commencement to the terminal date
of the of the fit-out process as prescribed in the Lease Contract. The
Owner/Occupant shall pay accordingly should they not be able to comply
with the agreed completion date.
3. EFFECTIVITY OF PERMIT
3.1 Renovation Permits shall be valid only for the period specified therein,
which shall not be more than sixty (60) days from the date of issue.
However, extensions of up to thirty (30) days per extension may be
granted upon written request, the submission of additional requirements,
‘and payment of the proper fees.
3.2. Renovation Permits and other governmental or administrative permits
shall be conspicuously posted at the work area in the Office Unit. No
renovation works will be allowed without a valid permit from the Building
Manager.
3.3. The Building Manager or his representative shall have access to the
Office UnitFloor to verify compliance with the approved plans and
permits,
B. DELIVERY OF MATERIALS
1. Deliveries of construction materials shall be as follows:
Monday to Saturday 7:00 pm - 11:00 pm
Sunday 7:00 am - 11:00 pm
A 24-hour advance notice (Lifting Permit) of such delivery should be given
to the Bullding Manager. Lifting Permits should be submitted for approval
before 12:00NN, releasing shall be at 3:00PM. Schedules other than the ones
stated herein can be allowed under written arrangement with the Building
Manager.
2. All deliveries shall be through the temporary loading dock located at the 1
Basement parking. Delivery Vehicle should be “Open Type Elf Truck”. ani
other type of vehicle larger than the specified cannot be given access to the
parking facility.
3. Deliveries shall be forwarded directly to the Unit intended to accept delivery;
and no materials shall be allowed unattended in Common Areas. Delivered
‘Bscoveny cane 6items or vehicles shall not stand for longer than thirty (30) minutes on the
loading deck; all carts or moving aids to be used shall first be approved by the
Building Manager and must have rubberized wheels. No work or materials
shall obstruct the hallways and corridors. The premises shall be kept free
from any construction debris during the renovation work. Construction debris.
or other excess material shall be hauled or removed and disposed of
everyday during the renovation or more frequently as the Building Manager
may direct under a coordinated schedule between the Owner/Occupant and
the Building Administration, especially with respect to inflammable materials.
Highly inflammable materials such as paints and thinners will not be
allowed to be stored in the Units.
Construction Materials may only be lifted on the designated Service Entrance.
‘The total load of the service elevator in lifting the construction materials shall
be indicated and limited to 1364 kg per use. When using the elevator, the
floor and walls shall be adequately covered by the Owner/Occupant or the
Corporation at the option of the Corporation at cost charged to the Unit
Owner/Occupant. The use of the service elevator for lifting the construction
materials shall be coordinated in advance with the Building Manager.
Damages caused by deliveries will be assessed by the Building Manager and
a notice will be sent to the Owner/Occupant for settlement.
- In order to preserve the finishes of hallways, corridors and public areas, the
use of any devices for moving materials or equipment that tend to or may
damage any part of facility of the Discovery Centre will be strictly prohibited.
Service Elevator Fee amounting to P200/trip shall be charged to the General
Contractor payable in a weekly basis.
. RENOVATION WORKERS
The Owner/Occupant shall submit Bio-Data with 1x1 pictures (2pes) of all the
Workers, which will perform the Interior Works in its Office Unit/Floor. The
Building Manager may, for cause, prohibit certain workers from being allowed
inside the premises,
The Building Manager shall issue identification cards ("IDs") to all workers,
the cost of which shall be charged to the Unit Owner/Occupant to perform
Interior Works. These IDs, which must include a 1 x 1 photo, must be worn by
workers at all times within the premises, Workers without valid IDs shall be
denied entry in the premises.
‘OVERY GENRE 73. No worker shail be allowed to enter or remain within the Premises before 7:00
A
M. or after 5:00 P.M. except in case of emergency or under special written
arrangement (re: overtime) with the Building Manager,
4. A list of workers authorized by the Owner/Tenant for any period shall be
submitted to the guard. Only such authorized workers will be allowed to
enter.
5. All workers must present themselves to the guard-on-duty upon entering and
leaving the premises at the Service Entrance.
6. All workers shall go directly to their working place as soon as they enter the
premises and shall be confined only to those places while in the premises.
7. Workers must be made to observe silence when in the premises and shall
observe proper and appropriate worker behavior and conduct at all times
while within the premises of the Discovery Centre.
8. All workers must wear a designated company uniform (with contractor name
and logo) at all times. Slippers, sleeveless shirts, short pants, and the likes
shall not be allowed within the premises.
9. Workers shall not be allowed to indulge in gambling, drinking or cooking
within the premises. Workers shall eat only in areas designated by the
Condominium Corporation.
[Link] shall use the Owner/Tenant electrical facilities only for purposes
related to the Approved Renovation Works.
[Link] in the common comfort rooms or anywhere within the premises is
strictly prohibited
[Link] shall not be allowed to stay-in unless there is a special written
arrangement with the Building Manager.
13. The Owner/Occupant shall be responsible for the conduct of its workers while
inside the premises.
[Link] who do not abide with these Guidelines and other rules and
regulations shall be asked to leave and shall be denied entry, without
prejudice to other penalties that may be imposed by the Building Manager.
[Link] Construction workers including Foremen and Leadmen shall not access
the service elevators at all times. Only during emergency situation that all
construction workers are allowed to use elevator facilities.
ny Cane ¥D. SAFETY RULES
1, Adequate Fire-fighting equipment shall_be made available by
Owner/Occupant at its premises prior to the start of Interior Works. At the
least, a 10-pound abe type fire extinguisher shall be installed for every 150
square meters of floor area or any increment thereof and shall be placed at a
distance of not less than 12 meters from any point.
2, No welding, burning, cutting works shall be allowed unless a
hot/works/welding permit shall have been issued by the Building Manager,
and all safety requirements have been complied with, like posting of a fire
watcher and the installation of a dedicated fire extinguisher. Welding Permits,
which shall be obtained separately from the Renovation Permit, shall be valid
for only two days from issuance may contain designated hours for the
prosecution of the work covered by the Welding Permit. (Refer to Section J
for penalties)
3. A first-aid_cabinet_shall_be made available at the work site also by the
Owner/Occupant during construction. (Refer to section J for penalties)
4. When conducting varnishing/painting works Contractor shall provide proper
ventilation (Intake-Exhaust Blower) inside the office space. Blower shall be
situated inside the machine room. (Refer to Section J for Penalties)
E, LEASED/OWNED UNITS
The Building Manager or Developer shall not be liable for losses or damages to
construction material or equipment left in the leased area and/or the premises of
Discovery Centre
F. CONTRACTOR ACCREDITATION
Only accredited contractors shalll be allowed to work within the Discovery Centre.
The following shall be submitted to facilitate accreditation:
1. True copies of:
|. Articles of Incorporation filed with the SEC
Il, DTI Certificate of Registration
lil. Business Permit
Iv. Contractor's License
2. Company Organization including a list of Technical Personnel
3. Company equipment and facilities
DiscovERY conn 54. Detailed list of completed and on-going projects
5. Latest audited financial statements duly certified by a Public Accountant.
6. Certificate of Acceptance for clients whose projects were completed in the
last two years,
G. HOUSEKEEPING
1. Occupant shall ensure that sufficient garbage sack for the proper storage of
trash and debris from construction are available at all times.
2, Occupant shall on its own arrange to have trash and debris removed from a
designated point in the work area on a daily basis for proper disposal outside
of the Discovery Centre. The cost of collection and disposal shall be for the
account of Lessee.
3. Owner or Occupant, at its discretion shall initiate a clean up of the leased
premises if it is not satisfied that the Lessee is maintaining a clean work area
Any cost associated with such clean up measure shall be for the account of
the Lessee.
4. Contractor and its workers shall be strictly prohibited to perform any of the
following acts within the leased premises or anywhere within the premises of
Discovery Centre: (Refer to Section D)
* Bathing, washing, or hanging of clothes:
* Bringing of pets and animals;
* Carrying of deadly weapons:
* Cooking:
* Consumption of alcoholic beverages:
* Creating of public disturbances:
* Horse playing, gambling, or any card playing:
* Indecent exposure or any form of nudity:
* Loitering, shouting, or any boisterous behavior:
* Smoking
* Vending
Workers shall strictly observe the General housekeeping provisions imposed
by the Condominium Corporation or the Building Manager.
5. A copy of the approved plans and permits relating to any works shall be
posted conspicuously on site.
scovERY cena i0H. WORK INSPECTION
1, Owner/Lessor or Building Manager without prior appointment shall inspect
works whenever it feels it is necessary
2. Building Manager at its discretion shall immediately suspend work on the area
of the leased space if:
* The Lessee's contractor does not comply with the rules and regulations
described in this document;
* The lessee's construction deviates from approved plans.
3. Lessee's contractor shall fil up the Request for Inspection Form prior to any
of the following activities:
Application of Fire Retardant Testing of Mechanical Systems
Testing of waterproofing Testing of PACU
Testing of Plumbing Fixture Tapping of Telephone Lines
Testing of Electrical Systems Activation/Deactivation of Fire
Testing of Fire Detection Systems and Water line
All testing procedures and results done without proper representation from
The Building Administration and Engineering Department shall be considered
Null and Void.
|. POST-RENOVATION
1. The Owner/Occupant shall inform the Building Manager in writing, of the
completion of the renovation works. This, in effect, shall also be the written
request for a final inspection by the Building Manager.
2. The submission of three sets of as-built plans shall include all revisions
executed during the course of the renovation phase.
3. Copies of the Occupancy Permit, Business permit, Certificate of Final
Electrical Inspection, and Fire Safety Inspection Certificate shall be submitted
to the Building Manager.
J. PENALTIES AND VIOLATIONS
1. The Building Manager as determined by the Condominium Corporation may
impose fines for violation of the Guidelines. Until revised, the fines shall be
as follows:Violation Fine/Day
a. Using the common areas as
storage of construction materials 1,000.00
b. Using hallways as work area P1,000.00
¢. _Loitering of workers 1,000.00
d. —_Non-wearing of IDs in the premises P 200.00/person
. —_Littered surroundings during and
after construction P1,000.00
f Using comfort rooms as bathrooms 1,000.00
g. Using electric power from Common
Areas (actual usage x 2)
h. Working while the fire exit door is
open P1,000.00
i. Non-wearing of company uniform P200.00/person
i. Failure to comply with Fire Extinguishers
Requirements 1,000.00
k, Conducting hot works without necessary
Permits P 10,000.00
|. Painting/\Varnishing without proper
Ventilation 5,000.00
m. Violation of Housekeeping Rules
and Regulations as stated under
Section G item number 4 500.00
Other violations will be penalized in accordance with their gravity analogously
to the ones enumerated above.
2. For the common interest and protection of the other Owners/Occupants the
Building Administration prohibit entry of any worker and/or may stop the work
anytime due to violation of the conditions here forth stated and any violation
that would endanger the occupants and other properties.
DsoveRy cenrme 23. The Condominium Corporation may also require a Unit Owner to rectify actual
damages at the Unit Owner's expense under the supervision and control of
the Corporation if said actual damages are attributable to Unit Owner or its
agents.
K. IMPLIED GUIDELINES
All other measures which are logically, necessarily, or desirable for consistency
with these Guidelines are by implication part of these Guidelines even if not
explicitly set forth herein.
L. AUTHORITY TO ISSUE PERMITS AND APPROVALS
The authorization, permits or approvals to be issued pursuant to these
Guidelines are to be issued in the sole discretion of the Declarant, Condominium
Corporation or designated Building Manager as the case may be. The use of the
term Building Manager herein shall mean the authorized agent of the Declarant
or Condominium Corporation as the case may be.
Consistent with the Master Deed, until the Condominium Corporation is
organized, the Declarant shall exercise all of the powers of management and
control over the Discovery Centre.
M. WAIVER
The Building Manager or the Condominium Corporation, as the case may be,
reserves the right to waive any one or more of the rules in this document for a
definite period, for the benefit of any particular lessee. No such waiver by the
Building Manager shall prevent the enforcement at anytime thereafter such
waived rules and guidelines as may be appropriate.
The Lessor reserves the rights to add, cancel, and/or revise any and all
provisions contained in these Guidelines,
The Lessor shall not be liable for losses or damages to construction material or
equipment left in the leased area
SECTION II
ARCHITECTURAL
This Section shall be the Owner/Occupant's guidelines for the design and
execution of all architectural works on its Units/Floor at The Discovery Centre.
A. DRY WALLS AND DOORS1. Interior partitions shall be non-combustible and lightweight and must be
approved by the Building Manager prior to installation.
2. Anchoring method of partitions on floor slabs shall be submitted for approval
3. Partitions shall align with the vertical mullion of the exterior window (curtain
wall). At no instance shall the mullion or any part of the curtain wall be
subjected to pressure. A resilient material, e.g. rubber gasket, must be used
abut to the mullion/baseboard surface. Attachment details of partitions to
curtain wall vertical mullions shall be submitted for approval. (REFER TO
ANNEX)
4. Workmanship shall be of the same quality as the base building standard
finishes.
5. All wood finishes shall have a minimum Class-1 flame-spread rating or have a
fire retardant treatment.
6. The Developer shall supply main-door, made of 12.7mm-thick tempered clear
glass with stainless steel door handle in hairline finished and an anodized
finish aluminum top and bottom railing. Hardware/accessories and installation
shall be for Owner/Occupant's account.
7. Tenant can extend glass, one panel at each side of the glass door,
specifications of which must comply with the design (REFER TO ANNEX).
‘Tenant_shall_be required to_submit_a_shop drawing and_construction
methodology, _which_shall_be subject for Building Manager's approval.
Likewise, relocation of door location can be done with the approval of the
Building Manager and the existing tenant across. Tenant /Contractorshall be
required to submit a shop drawing and construction methodology, which shall
be subject for Building Manager's approval, Restoration of coomon area wall
affected by relocation/extension shall be done by Fuller O Brien,
B. CEILING
1. Material shall be non-combustible preferably, lightweight, sound absorbent
and non-toxic. Wood or any combustible material shall not be allowed.
2, Ceiling height shall not go beyond the minimum height of 2.4 meters.
Adjustments of all utilities shall be for the account of the Tenant. All tenants
along the curved curtain walls (UNITS 4 and 5) should submit their respective
ceiling plans for approval of the Building Manager and/or our lighting
consultants. This is to control the lighting layout as it affects the exterior
fagade at night. Adjustments of all utilities shall be for the account of Tenant.
Decovenrcenrae 4The ceiling module, inclusive of lighting fixtures within a 2.4-meter distance
from the curtain wal, shall be uniform in direction and dimension. For units 4
and 5 (typical) tenant shall provide 2400mm wide flat ceiling measured from
the edge of the curtain cove. Flat ceiling shall be made of 12.7mm thick
gypsum board on standard metal furring system in paint finish, preferably
white in color (PLEASE SEE ANNEX). For lighting fixture size and spacing,
refer to Electrical Standard. Lighting fixtures may have air troffers for air
supply/return complimented with linear diffusers at curtain wall perimeter.
600mm X 600mm or 600mm x 1200mm Ceiling grid shall be designed for a
maximum allowable loading of 8 psf.
Ceiling grid system shall withstand Zone-4 seismic forces and shall be
adequately supported to prevent sagging or bowing of carrying channels and
tiles.
No ceiling support lines shall be connected to the existing sprinkler devices
and other utility lines.
Sun barrier to be used shall only be in form of roller blinds, color and material
shall be prescribed by the Building Manager. Mechanism shall be integrated
into the ceiling system, having a unified design along the curtain perimeter.
Ceiling for all toilet areas shall be acoustic boards.
Prior to closing of ceiling, an inspection shall be made by the Building
Administration to ensure that absolute safety has been done and no
provisions stated in the Renovation Guidelines have been violated.
. FLOOR
- Floor topping or wall/column plaster may be chipped off ata maximum of
50mm including finish; structural concrete shall not be altered in any way.
Scarring and boring shall not be allowed except for drainpipe penetration for
an additional toilet if permitted by the Condominium Corporation,
Finishing materials shall be non-combustible, lightweight and non-toxic and
shall be fixed to the floor concrete surface with adhesive. No other fixing is
allowable except at additional toilet(s).
'f required by the Building Manager, Self Leveling Topping or Dry Pack
Conerete Topping Method or Flexi-bond Coating shall be mandatory prior to
any wet works, if any. Material to be used shail be subject to Building
Manager's/Fit-out Engineer's approval.6. To further prevent leaks from occurring, mixing boards and plastic canvass
shall be used in all wet works/cement works.
D. OPTIONAL TOILETS AS DESIGNATED
1. Walls, Masonry units shall _be located as allowed in sanitary standard
Fequirement. Units shall be hollow, non-load bearing, made with lightweight
or normal aggregates, 100mm or 4 inches thick. Portland cement shall
conform to ASTM C150, equal to Union, Dragon or Island Cement. Sand shall
conform to ASTM C35. Steel reinforcement shall be 10mm diameter bars at
400 mm o.c. vertical and 600 0.c. horizontal. All pipelines shall be tested for
leaks. Occupant has the option to finish interior walls with ceramic tiles and
plain cement plaster at the exterior. In any case the use of waterproof caulk
will be required.
2, Waterproofing for additional toilet floors should be done by Fuller 0’ Brien.
Slabs shall be tested for leaks and MUST be approved by the Building
Manager prior to laying of final finish. The use by owner/occupant of material
other than what is recommended may not be resorted to without prior
approval of the Condominium Corporation.
3. All utility lines (for e.g., exhaust duct and drain/sewer pipes) shall be
connected to existing provision and tested accordingly.
E, RELATED WORKS
1. Curtain Wall - No punch windows or vents shall be allowed. The interior
surfaces should be protected from damage or paint over spills from adjacent
drywall construction. Sun barrier design shall be uniform on all floors as may
be designated or approved by the Condominium Corporation
2. Elevator Lobbies - Owner/Occupant shall not install signage in the lobbies
whether these are freestanding or wall-mounted. Owner/Occupant's ceiling
shall be aligned with and independent from the existing lobby ceiling
Separated by a 20-mm reveal. Occupants of entire floor will not be allowed to
utilize or use the elevator lobby to form part of their office units and/or
premises.
3. Pipe Chase — Lessees’ Contractor shall seal all pipe chase within their leased
premises,
F. “AS-BUILT” DRAWINGS.
1. “As-Built” Drawings shall be submitted to the Building Manager after all
installation, construction, balancing and testing works have been completed,
Construction Drawings shall be approved by the Architect prior to preparation
RY CORE 6of “As-built” Drawings. The final submittal shall be in reproducible originals
and three sets of prints of “As-built” Drawings duly signed and sealed by a
registered Architect. These approved drawings shall become the property of
the Condominium Corporation.
Section Ill
STRUCTURAL
This section shall be the Owner/Occupant’s guidelines for the design and
execution of all structural works on its Units / Floor at The Discovery Centre.
A. DESIGN LIVELOADS
The structural floor is designed to carry a liveload of 50 psf. No mezzanine floors
within the units may be constructed. Use of granite or marble stone for floor
finishing will not be allowed. Only homogeneous tiles like granite tiles, wood,
carpet and vinyl shall be allowed. Materials other than the specified shall be
Subject to the approval of the Building Manager. Maximum tapping of 25mm shall
be allowed
B. PARTITION
Only lightweight partitions shall be allowed within the office area, except at the
Private toilet areas where CHB partitions may be allowed.
C. DRILLING THROUGH SLAB
Coring, drilling or cutting of the structural slab by the Owner/Occupant will not be
allowed,
D. SLAB SOFFIT
Drilling of expansion bolts or any hanger for any light utilities shall be allowed
Provided that the floor load limitations is satisfied. Large loads such as heavy
Chandeliers over a large assemblage of people shall be bolted through slabs
Any chipping-off of any structural member by the Owner/Occupant shall not be
allowed
E. VAULT
Only vault with weight not exceeding 50 kilograms will be allowed. This can be
situated anywhere within the leased premises. However it is advisable that this
be placed along the structural beams.
Discovery canrme 7F. “AS-BUILT” DRAWING
“As-built” Drawings shall be submitted to the Building Manager after all
installation, construction, balancing and testing works have been completed,
Construction Drawings shall be approved by the Consultant for Structural
Engineering prior to preparation of “As-built” Drawings. The final submittal shall
be in reproducible originals and three sets of prints of “As-built” Drawings duly
Signed and sealed by a registered Structural Engineer. These approved
drawings shall become the property of Condominium Corporation.
G. WELDING CONNECTIONS
No welding connections shall be allowed on structural reinforcing bars, columns,
beams and shear walls.
Section IV
MECHANICAL
This Section shall serve, as Owner/Occupant's standard for the air-conditioning
and ventilating system of its Units/Floor at the Discovery Centre.
A. The inside-room conditions of areas provided with air conditioning is 24°C
(75°F) and 50% +/-5% relative humidity (RH) against an ambient temperature
of 35°C (95°F) dry bulb (BD) and 26.7°C wet bulb (WB). May not be prudent
to include this because it may constitute a warranty being made by Declarant.
B. Air-conditioning supply ducts shall be of plain G.|. sheets fabricated as per
SMACNA standards for low and medium construction systems as required,
C. Air-conditioning supply ducts shall be of the low-pressure system.
D. Insulation of ductwork shall be 25-mm thick fiberglass insulation with a
density of 48 kgim3.
E. Overlapping of A/C ducts and lighting fixtures shall not be allowed. Ductwork
shall be constructed so as to meet the required floor to ceiling heights set by
the Building Manager.
F, Owner/Occupant shall install a ceiling-mounted type exhaust fan and all
Necessary exhaust ducts up to the assigned exhaust chase should they
decide to construct and additional toilet, Maximum capacity of exhaust fan
shall be limited to 100 CFM with an electrical characteristic of 230 volts, 1-
phase, 60Hz,
‘BScoveny cane <G. Balancing of the air distribution system to accommodate interior partitions
shall be performed by the Building Administration's accredited contractor at
the expense of the Owner/Occupant.
H. Each Unit shall follow the proposed layout of air distribution ducts as shown in
the Building Mechanical Plans (Sheets M-15, M-16 and M-17 with Drawing
Nos. CS-30447, CS-30448 and CS-30449 respectively),
|. In case of deviations from the abovementioned proposed layouts, the
Owner/Occupant shall submit shop drawings indicating the
™odifications/revisions made for approval prior to the implementation of work.
J. Air-conditioning system shall conform to the schedule of equipment shown on
‘Sheet M-1 with Drawing No. CS-30433 of the Building Mechanical Plans.
K. AHU Room shall not be used as storage room. Building Manager shall have
the right to inspect AHU rooms anytime even without prior notice.
L. The Lessee’s Mechanical Consultants shall be held liable in the execution of
their mechanical design and shall be the one to coordinate with the supplier
and shall be responsible to include in their design criteria and specifications
all equipment provided by the Developer. Alll revisions on the existing duct
layout at the machine side to guarantee the optimum performance of the unit
shall be on the account of the lessee’s Contractor.
M. “As-built” Drawings shall be submitted to the Building Manager after all
installation, construction, balancing and testing works have been completed.
Construction Drawings shall be approved by the Consultant for Mechar lI
Engineering prior to preparation of “As-built” Drawings. The final submittal
shall be in reproducible originals and three sets of prints of *As-built”
Drawings duly signed and sealed by a registered Professional Mechanical
Engineer. These approved drawings shall become the property of the
Condominium Corporation.
Section V
ELECTRICAL
This section shall be Owner/Occupant's standard for compliance for any
electrical installation proposed for its Units/Floor at The Discovery Centre.
A. POWER AND LIGHTING SYSTEM
1. All wirings shall be done in PVC conduits, Phelps Dodge brand. Wires shall
be color-coded in PVC conduits as follows (Phelps Dodge brand)
* 230 Volts, 3 Phase Phase A BlackPhase B Red
Phase C Blue
Ground Green
* 460Volts,3Phase PhaseA : Brown
PhaseB Orange
PhaseC : Yellow
Ground Green
BX Wires are not allowed
2. Maximum capacity of supplied circuit breakers _is as follows:
24" to 36" Floor: UNIT 1 ~ 150 AT
UNIT 2-100 AT
UNIT 3-150 AT
UNIT 4-175 AT
UNIT 5-175 AT
37™ To 4157: UNIT 1-150 AT
UNIT 2-100 AT
UNIT 3-150 AT
3. Ceiling conduits roughing-in shall be directly fastened on the concrete slab
adequately supported in the entire conduit length. Metallic flexible conduit
Shall be used for conduit extension to ceiling fixtures. Poke-thru slab
installation is not allowed.
4. All office space lighting levels shall be calculated at 500 lux. Lighting fixtures
shall be as follows:
a) Units 01, 02, and 03 — Lighting fixtures shall be 200mm x 1200mm
fecessed mounted with 1 - 40watt or 1 - 36watt fluorescent fixture, high
Power factor ballast and aluminum parabolic diffuser properly supported
from the ceiling concrete slab.
b) Units 04 and 05 — Lighting fixture shall be 600mm x 1200mm, recessed-
mounted with 2 - 40 watt or 2 - 36 watt fluorescent fixture, high power
factor ballast and aluminum parabolic diffuser properly supported from the
ceiling concrete slab.
“(REFER TO ANNEX FOR STANDARD SPACING OF LIGHTING FIXTURES)
5. All single-phase loads shall be balanced to the 3-phase power supply.
‘scoveRy cenrne 206. All circuit breakers shall be of the same brand as the existing circuit breakers.
Coordinate with the Building Manager for proper rating of circuit breakers.
7. Use Wire nuts in all wire splicing with sizes 5.5mm2 and below. For Wire size
8.0mm2 and above shall be connected by solder less connector.
8. Lessee's contractor shall provide the feeder wires, breakers and all
accessories to complete the system for all additional aircon units.
B, TELEPHONE SYSTEM
1. Allhorizontal wiring for the telephone system shall be done in PVC. its
directly fastened on ceiling concrete slab shall be adequately supported in the
entire conduit length.
2. All telephone wirings and cables shall be compatible with the base building
structures cabling installation (CAT 5).
3. All pipes used for data and voice lines shall either be Kross Unbreakable High
Impact, Neltex Power Guide Emerald 2000 or Atlantic Permaline brands.
C. FIRE ALARM SYSTEM
1. All wirings for the fire alarm system shall be done in IMC. Conduits directly
fastened on ceiling slab shall be adequately supported in the entire conduit
length.
2. All fire alarm photoelectric smoke detectors and manual pull stations shall be
addressable type.
3. Wiring shall be multi-plexed system. Use #18 TF wire (solid) red and black
4. All wirings, fire alarm equipment and accessories shall be compatible with the
base building fire alarm and detection system subject to the Building Manager
final confirmation
5. All enclosed rooms within a leased unit shall be protected by smoke
detector. Only accredited contractor shall be allowed to do the roughing-ins
and installation of smoke detectors and other fire alarm devices
6. Maximum number of addressable smoke detectors for each unit,
23" to 36” Floor: UNIT 1-6 points
UNIT 2-6 points
UNIT 3-6 points
UNIT 4-7 points
‘iscoven cone FyUNIT 5-8 points
37™ To 4157; UNIT 1-7 points
UNIT 2-7 points
UNIT 3-9 points
D. TEST RESULTS
All electrical systems shall be tested prior to turnover of units. The
Owner/Occupant through their Unit Contractor shall submit test results as part
of turnover documents to the Building Administration
D. SUBMITTAL
“As-built Drawings shall be submitted to the Building Manager after all
installation, construction, balancing and testing works have been completed.
Construction Drawings shall be approved by the Consultant for Electrical
Engineering prior to preparation of “As-built” Drawings. The final submittal
shall be in reproducible originals and three sets of prints of “As-built”
Drawings duly signed and sealed by a registered Professional Electrical
Engineer. These approved drawings shall become the property of the
Condominium Corporation.
Section VI
SANITARY
This Section shall be Owner/Occupant's guidelines for sanitary finishing works
for its Units/Floor at The Discovery Centre.
A. RELATED WORK
An additional private toilet composed of (a) water closet flush-valve type, (b)
lavatory and (c) one floor drain may be constructed by the Owner/Occupant in
the designated private toilet area. All design and cost for such additional toilets
shall be for the Tenants’ account.
B. EQUIPMENT
1. All water closets for additional private toilets shall be equipped with flush-
valve type similar to Saniwares, Carmella PF-3531-FV and lavatories similar
to Sabrina PF-1005 wall-mounted. Fittings for fixtures shall be as follows:
Iter Brand
a. Water Closet Sloan, Chrome Finish
Decovenr cone 2Bb. Lavatory Price Pfister, Single Control
Faucet, Commervcial Type
These fittings must be submitted to the Building Manager for approval.
2. For the additional private toilet, the following roughing-ins are provided (a)
branch line where the toilet may connect, (b) waterline to supply water for the
above fixtures, and (c) vent lines where individual vents of the fixtures may be
connected. Waterline to be used shall be 32mm in diameter.
C, LOCATION
For flexibility, the exact location of the additional private toilet has been specified.
Plumbing stub-outs should be accessible for maintenance and a manhole should
be provided by Unit Owner of such installation inside the ceiling.
D. MATERIALS
1. Cast-iron and fittings to be used by Owner/Occupant shall be Filipino pipe
brand or equal or similar to the original installed pipe where connection will be
installed.
2. G.l. pipe for water supply shall be Goodyear or Little Giant brand, Schedule
40 confirming to ASTM A-53, provided with gate valves, check valves and
union patent to complete the toilets.
3. All waterline tapping shall be provided with isolating gate valves capable of
withstanding the test pressure of 150 psi. and the cast iron pipe shall be
tested with a pressure equivalent to one floor height.
4. All pipes shall be properly supported with acceptable pipe hangers; or
approved equal to the existing ones
5. Floor drain wainscoating and elevation of toilet floor, including waterproofing,
shall be consulted with the Architect,
6. All toilets shall have a floor clean out. If there are no existing clean outs or the
existing clean out is ceiling mounted , provision and relocation shall be done
by the unit contractor with proper coordination with the Fit-Out Engineer
regarding their location.
E. INCONVENIENCES
When the Owner/Occupant completes the design of his ceiling ahead of the
Owner/Occupant directly above him, there is presumed inconvenience on the
ascoveRv cenrae 3Bpart of the lower Owner/Occupant when the future toilet of the upper
Owner/Occupant is to be installed. The upper Owner/Occupant must
coordinate with the lower Owner/Occupant on the dismantling and reconstruction
of the ceiling of the lower floor Owner/Occupant to give way for the upper floor
Owner/Occupant to complete the installation of this toilet
Upper Occupant can only do works after office hours. Overtime to be rendered
the representative of the lower occupant shall be for the acco ‘occupant
joing we
Cost implications shall be arranged and settled by both parties prior to the
commencement of any works.
1. All adjustment on existing utility pipes such, as sanitary, electrical, fire
Protection line, ducting etc. shall be on the account of the Fit-Out Contractor if
necessary.
2. All toilets shall have a floor clean out for maintenance purposes; if existing
clean outs are ceiling mounted, the Fit-Out Contractor shall convert this into
floor or wall clean outs.
3. All existing vent shafts and pipe chases shall have access for
maintenance and trouble shooting purposes.
F. “AS-BUILT” DRAWINGS
“As-built” Drawings shall be submitted to the Building Manager after all
installation, construction, balancing and testing works have been completed.
Construction Drawings shall be approved by the Consultant for Sanitary
Engineering prior to preparation of “As-built” Drawings. The final submittal shall
be in reproducible originals and three sets of prints of “As-built” Drawings duly
signed and sealed by a registered Professional Sanitary Engineer. These
approved drawings shall become the property of the Condominium Corporation.
Section VII
FIRE PROTECTION
This Section shall be Owner/Occupant's guidelines in the installation of the
automatic sprinkler fire protection systems at its Office Unit/Floor at The
Discovery Centre.
A. The design of the Discovery Centre sprinkler system is based on non-
combustible ceiling materials only. The ceiling materials that can be used for
the ceiling are limited to the following:
* Acoustic tiles on aluminum t-runner
‘DISCOVERY ceNTE m4* Gypsum board
* Other similar materials that are non-combustible
B. Partitions from floor to ceiling must be positioned in such a way that the
spacing shall not exceed more than 7% ft. from any sprinkler head. If partition
falls on the same location of the sprinklers, then the sprinkler heads will be
relocated on one side of the partition and additional sprinkler heads will be
provided on the other side of the partition
C. The sprinkler heads installed is rated at 165°F or 74°C for ordinary room
temperature. The sprinkler heads are recessed type chrome plated with 14"
standard orifice. Should the Owner/Occupant wish to replace them with an
attractive one of their choice, such sprinkler sample and/or brochure shall be
approved first by the Fire Protection Consultant
D. Sprinkler head shall not be used for hanging any material
E. Lighting fixtures and air duct diffusers shall be installed away from the
sprinkler heads. The minimum distance permitted will be one (1) foot away
from light to sprinkler.
F. Sprinkler heads must not be painted.
G. If there will be revisions to be done on the sprinkler systems, only the
authorized sprinkler Contractor authorized by the Condominium Corporation
will be allowed to perform such work required.
H. Before any interruption of service in the sprinkler system, the Building
Manager must be notified so that the corresponding Maintenance Engineer
can prepare the requirement prior to the shutting-off and opening of the
sprinkler control valve affected by the interruption.
|. Near the entrances of two fire stairwell on every floor level, Fire Hose
Cabinets are provided with 1%” x 100 ft. fire hose, nozzle and control valve,
hose accessories and in each cabinet, one unit of 10 Ibs. Capacity Carbon
Dioxide portable fire extinguisher for Class BC fire use are also provided
Examples of Class BC fire are the following:
* Class B - Fire from combustible liquid such as gasoline, oil,
thinner, paint and etc,
* Class C - Electrical fires.
However, it is also required by the Fire Code that in addition to the above, the
Occupants must provide additional extinguishers for their occupied areas.
These additional extinguishers can only be determined later on when final
‘iscoveny cen 3Partitioning and furniture layout has been established. For offices (light
hazard occupancies), the Fire Code requires that the maximum travel to an
approved type of extinguisher must not exceed 22 meters.
J. “As-built” Drawings shall be submitted to the Building Manager after all
installation, construction, balancing and testing works have been completed.
Construction Drawings shall be approved by the Consultant for Structural
Engineering prior to preparation of “As-built” Drawings. The final submittal
shall be in reproducible originals and three sets of prints of *As-built”
Drawings duly signed and sealed by a registered Fire Protection Engineer.
These approved drawings shall become the property of the Condominium
Corporation
Section VIII
HOUSE RULES
A. RESTRICTIONS ON USE
1. The Premises shall be used strictly and solely for office use only, in
accordance with the provisions of the Master Deed, these House Rules and
other rules that may be passed by the Building Manager, as well as the
stipulations on the conveying of title or other rights to the Units.
2. The Spaces shall be used at all times in a proper and peaceful manner
consistent with the specific nature of the space and the requirements of all
laws, ordinances, and regulations.
3. No Space shall be used as employment bureau or recruitment agency,
embassy, consulate, public storage or other purposes, which (as determined
by the Building Manager) will materially increase the number of persons
coming to the Premises,
4. No Space shall be used for a purpose, which will require the
Owner/Ocoupants to stay in the Premises overnight on a more or less
permanent or regular basis.
5. No Space shall be used for manufacturing or similar industrial purpose, or
primarily for storage of merchandise.
6. No Space shall be used as goods or service retail store or outlet for any other
similar commercial purpose.
7. No Space shall be used as a restaurant, luncheonette, cafeteria or canteen
for the sale or service of food and beverage, other than those Units
designated for this purpose or those approved by the Building Manager.
coven conrme 68. No Space shall be used in a manner which will cause the overloading of any
area or interference with the enjoyment of any Common Area by other
Owner/Occupants.
8. All parts of the Premises shall be kept in a clean and sanitary conditions, and
no rubbish, refuse or garbage shall be allowed to accumulate, nor any fire
hazard allowed to exist.
[Link] shall be done or kept in any Space, which will result in the
cancellation of the insurance policy thereon, or except by prior written consent
of the Building Manager, to increase the rate of insurance thereon.
[Link] Space shall be used in a manner which is improper, offensive or annoying
to the senses of the other Owner/Occupants, or which interferes with their
Peaceful possession, or which will otherwise constitute as a nuisance.
[Link] Space shall be otherwise used for an illegal or immoral purpose, or for
other purposes, which will destroy the character of the Premises as an
exclusive office or commercial building.
B. COMMON PASSAGES
1. The driveways, sidewalks, entrances, lobbies, vestibules, elevators,
stairways, fire escapes, and other common passage areas of the Premises
shall not be obstructed nor used for any purpose other than for ingress to and
egress from Premises and the Units, and shall be subject to such rules
regulating the use of common passages and storage as may be promulgated
by the Building Manager.
2. The Building Manager shall determine the floors, which will be served by the
elevators. No Owner/Occupant shall tamper with the controls of the
elevators.
3. The Building Manager may pass rules confining smoking and the carrying of
lighted cigarette butts or cigars to certain portions of common passages and
areas only.
C. OTHER WALLS, DOORS AND WINDOWS,
1. The doors, skylights and windows that reflect or admit light into passageways
or into any place in the Premises shall not be covered or obstructed.
2. Materials visible from outside the Premises will not be permitted except for
window coverings of the make and color prescribed by Building Manager. No
curtains, draperies, blinds, shutters, shades, screens, partitions or other
coverings or decorations shall be attached to, placed in, or used in connection
ay cane a7with any window of the Premises without prior written consent of the Building
Manager,
3. No awnings or other projections shall be attached to the outside walls of the
Premises.
4. No carpets, rugs, or other articles shall be hung or shaken out of any window
of the Premises,
D. NAMES
1. No sign, placard, name, advertisement or notice visible from the exterior of
any Unit shall be placed, inscribed, painted, affixed or otherwise displayed on
any part of the Premises except upon prior written consent of the Building
Manager using accredited contractors and subject to the general guidelines
relating to signs approved by the Building Manager.
2. Addirectory in the Ground Floor Office Lobby of the building may be installed
by the Building Manager for the display of names and locations of the
Owner/Occupant. The Building Manager must, first approve any change or
additional name that an Owner/Occupant may desire to place
E. MOVEMENT OF OBJECTS
1. The Building Manager retains the right to regulate the entry, movement and
exit of all persons making deliveries to the Premises, including the right to
determine the hours when the deliveries can be made, to allocate certain
elevators for delivery service, and to designate which entrances shall be used
for such deliveries.
2. The Building Manager retains the right to prescribe the weight, size, position
and manner of freighting, and to regulate the time and manner of the
Movement of furniture, equipment and other bulky or heavy objects into and
within the Premises. Heavy or voluminous object shall not be transported
using the elevator unless previously cleared with the Building Manager.
3. The Owner/Occupant shall not place a load upon any floor of the Premises
exceeding the floor load per square foot area, which such floor was
designated to carry, and which is allowed by law.
4. All injuries to the Premises or fixtures caused by the placing or moving of the
property of the Owner/Occupants in and out of, as well as within the Premises
shall be repaired by the Owner/Ocoupant using contractors and mechanics
named or approved by the Building Manager.
F. SECURITY
DSCOVERY CENTRE 2- Security services for the Units shall be provided only by a security agency
approved by the Building Manager, which shall ensure that the security
arrangements of the other Owner/Occupants and the Premises will not be
adversely affected
The Building Manager reserves the right to exclude from the Premises
between hours of 9:00 p.m. and 6:00 a.m. on weekdays and Saturdays and at
all hours on Sundays and legal holidays, all persons who do not present a
ass issued by the Building Manager. Building Manager will furnish passes to
Persons for whom any Owner/Occupant request in writing. Each
Owner/Occupant shall be responsible for all persons for whom he requests
such pass and shall be liable to the Building Manager for all acts of such
person. The Building Manager may require all such persons to sign and
register upon entering and leaving the Premises.
. The Building Manager shall be in no way responsible to any Owner/Occupant
for any loss of property from the Premises however occurring, or for any
damage done to the furniture or other effects of any Owner/Occupant.
Installation of Security Systems may be allowed provided that the Building
Manager shall approve the equipment and manner of installation.
. ALTERATIONS AND IMPROVEMENTS
Nothing shall be done in any Space, which will impair the Building Systems,
Building Standards, as well as aesthetic integrity of the Premises.
Any construction, improvement, alteration, reconstruction or similar works in
the Units or other part of the Premises, shall (a) be subject to and shall strictly
comply with the Building Standards to be promulgated by the Building
Manager, (b) in no case impair the integrity of the Building Systems (as
determined by the Building Manager), (c) be based on such architectural and
engineering plans by the appointed Consultants and reviewed and approved
by Building Manager, and (d) be effected only by the original Contractors of
the system, cost of which shall be for the account of the Owner/Occupant.
All maintenance and repair works on any Space which may affect the Building
standards shall be performed only by such contractors or workers pre-
qualified by the Building Manager.
All security services as well as housekeeping services (including janitorial,
est control and other services) to be rendered only by such contractors pre-
qualified by the Building Manager.
2»a
In case of power failure, all ACCU/FCU to be connected as an additional load
fo the electrical system shall not be included in the existing emergency
system of the building. Thus, the Owner/Occupant's power supply shall be
interrupted and be re-powered only after the normal power restores.
6. The Owner/Occupant shall be responsible for the supply of labor, materials
and other accessories needed to utilize the ACCU/FCU in their unit. Electric
meter shall be installed inside the EE Room as per supervision of the Building
Manager.
H. INSTALLATIONS AND STORAGE
1. Telegraph, telephone, radio receivers, and other wires, antennae and
instruments shall not be introduced into the Premises without prior written
approval of the Building Manager. The electric current so generated shall not
be used for power, unless written permission for such use shall first have
been obtained from the Building Manager.
2. No Owner/Occupant shall install, attach or bring into the Premises any
equipment, instrument, duct, water heater, coffee maker, refrigerator, water
cooler or any other appliance which will require the use of gas, electric
appliance or water without securing the prior written permission of the
Building Manager, which shall determine compliance with safety standards
and insurance requirements. This restriction shall not, however, apply to the
use of customary electric fans, computers, typewrites and small business
machines.
3. Owner/Occupants shall not bring, use or keep in any space in the Premises
any gasoline, kerosene, camphene, burning fluid, or other inflammable,
combustible or explosive fluid, chemical or substance. The Building Manager
may enter a Unit to remove whatever may have been so installed, stored or
brought in, at the expense of the Owner/Occupant concerned.
4. Installation of Genset within the unit is not allowed. The building is equipped
with an emergency power back up that can provide 100% of the building's
power requirement.
|. Foop
1. No Owner/Occupant shall do any cooking or heating of food in any Space
except upon prior written consent from the Building Manager after
consideration of safety, sanitary, insurance and other factors.
2. No Owner/Occupant shall install or permit the installation or use of any
machine dispensing goods for sale, including without limitations foods and
beverages, cigarettes or cigars; or permit the delivery of any food or beverage
BeeoveR’ comme 30to the Premises, except by persons approved and only under regulations
fixed by the Building Manager.
3. No food or beverages shall be carried in any Common Area of the Premises
except in closed containers.
4. Owners/Occupant shall comply with all laws relating to the manufacture,
storage, possession, sale or disposal of beers, wines and intoxicating liquors
and / or prohibited drugs and narcotics.
J. NUISANCES
1, Owner/Occupant shall not make or cause any improper noise, vibration, odor
or disturbance in the Premises, or interfere in any way with other
Owner/Occupants, or those having business with them.
2. Owner/Occupant shall not use or keep, or permit to be used or kept, any foul-
‘smelling or noxious substances in the Premises.
3. No animals or pets shall be kept in or about the Premises.
K. GARBAGE AND MAINTENANCE
Janitorial and other maintenance services for all Units shall be provided only by
contractors approved by the Building Manager.
L. TOILETS
The water closets, wash closets, urinals, and other water apparatus shall not be
used for any purpose other than those for which they were constructed, and no
sweepings, rubbish, rags, ashes, chemicals, refuse from electric batteries, or
other substances shall be thrown therein.
M. PARKING
1. All Parking Units shall be used solely for parking purposes, subject to such
restriction as may be promulgated by the Building Manager, including those
on the number of vehicles per slot and the kind and make of vehicles.
Owner/Occupant shall park their vehicles only on the respective parking
spaces. These parking spaces shall be occupied only by the authorized
owner/occupants.
2. No Parking Unit shall be used in a manner which is improper, offensive or
annoying to other Owner/Occupant, or which obstructs other vehicles or
Constitutes a nuisance. Likewise, no Parking Unit shall be used for an illegal
3or immoral purpose or for other purposes, which will destroy the essential
character of the Premises as an exclusive office building,
3. Drivers of chauffeur-driven vehicles shall station themselves only in the area
provided for them by the Building Manager and shall/nor loiter elsewhere.
Drivers shall not be allowed to sit in the reception areas, stairways, hallways
or plant boxes.
4. Owner! Occupants accepts that no washing or cleaning of vehicles involving
the use of water, soap, or other cleaning agent or chemicals shall be allowed
within the Parking Areas, except the ordinary wiping or rubbing of vehicles
using cleaning cloth. Spillage of water or any cleaning agent or chemicals in
the Parking Units is prohibited. Further repairs of vehicles shall not be
undertaken within the Parking Units.
5. In order to avoid or limit the emission of obnoxious or noxious fumes,
unnecessary or prolonged idling of the engine of vehicles within the Parking
Units is prohibited.
N. EASEMENTS
1, Owner/Occupant shalll allow the enforcement of easements and similar rights
created by virtue of law or the Master Deed to be enforced against their Units
or other spaces.
2. The Building Manager shall be authorized to enter a Unit or any other Space
during an emergency or unusual occurrence, even if such entry may cause
damage to the Unit or Space.
©. INSPECTION RIGHTS
The Building Manager may, with the consent of the Owner/Occupant concerned,
enter any Unit or any other part of the Premises at any reasonable hour for the
Purpose of enforcing these Rules and Regulations for taking such other
measures for the good of the Premises.
P. GENERAL PROVISIONS
1. The Building Manager shall not be responsible for the non-observance or
violation of these Rules and Regulations by any other Owner/Occupant.
2. The Building Manager may waive any one or more of these House Rules for
the benefit of any particular Owner/Occupant, but no such waiver shall be
construed as a waiver of such House Rules in favor of any other
Owner/Occupant nor prevent the Building Manager from thereafter enforcing
‘iscoven GENTE 32any such House Rules against any or all of the Owner/Occupant of the
Premises.
3. The Building Manager reserves the right to rescind or amend any of these
House Rules and to make such other further rules and regulations as, in the
judgment of the Building Manager, may from time to time be needful for the
safety, care and cleanliness of the Premises, and for the preservation of good
order therein.
4. These House Rules shall be considered as part of the enabling vital
documents of The Discovery Centre. However, in case of conflict, these
House Rules shall not be construed to modify or amend in any way, in whole
or in part, the terms and conditions of the Master Deed, the Condominium
Corporation Articles and By Laws, and other enabling document.
SECTION IX
OWNER/TENANT RESPONSIBILITY
1. The Owner/Tenant shall indemnify the Building Manager from any claim for
damages arising from the execution of fitting-out works.
2. The Owner/Tenant shall be responsible for any damage to the Leased Space,
the building or injuries to any third parties of their belongings caused as result
of, or in connection with, the fitting-out works. It includes fire, flooding, injury
and all consequential damages.
3. The Owner/Tenant shaill be responsible for ensuring that the Leased Space is
fitted out exactly in accordance with the plans and specifications approved by
the Building Manager.
4. The Owner/Tenant shall be responsible for displacement of all debris from the
Discovery Center at such times as the Building Manager initiates.
5. The Owner/Tenant shall be responsible for paying all utility charges in respect
of the leased space including all electricity and water utilized during the fitting
out works.
6. The Owner/Tenant shail be responsible for all damages to the leased space
or the building. Cleaning or drain clearance, which arises due to fitting out
works and any cost incurred by the Building Manager incurred in connection
with the works, will be charged to the Owner/Tenant.
Discovery came 3