Ground Floor Water Line Layout Ground Floor Sewer & Drainage Line Layout

The document appears to be a diagram or schematic showing the layout of fuel storage and mechanical equipment rooms on a ship. It labels various fuel tanks storing diesel, gasoline, and lubricants. It also labels locations of sinks, lockers, mechanical equipment rooms, toilets and corridors.

Uploaded by

Casmir Tayag
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
105 views1 page

Ground Floor Water Line Layout Ground Floor Sewer & Drainage Line Layout

The document appears to be a diagram or schematic showing the layout of fuel storage and mechanical equipment rooms on a ship. It labels various fuel tanks storing diesel, gasoline, and lubricants. It also labels locations of sinks, lockers, mechanical equipment rooms, toilets and corridors.

Uploaded by

Casmir Tayag
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

CB

bp
[Link]

[Link]
fd

LUBES

fd

LUBES
M.E. ROOM

M.E. ROOM
EXTREME U EXTREME 95/97 EXTREME U EXTREME 95/97

CB
EXCEED DIESEL EXCEED DIESEL

CABINET

CABINET
LOCKER
4,000 GALS UGT

LOCKER
4,000 GALS UGT

MDP

MDP
2,000 GALS 4,000 GALS 2,000 GALS 4,000 GALS
LC LC DC

CORRIDOR

CORRIDOR
SERVICE
TOILET

SERVICE
TOILET
TOILET
COMMON

TOILET
COMMON

CB
OFFICE

OFFICE
CABINET

CABINET

CB
F F

CB

CB
100Ø DS 100Ø DS

150mm GUTTER
100Ø DS
OWS

OWS
F

CB
ca
ca

CV 25MMØ WATER LINE 150mmØ SEWER LINE 150mmØ STORM DRAINAGE LINE
150mmØ STORM DRAINAGE LINE CONNECT TO NEAREST CONNECT TO NEAREST
CONNECT TO NEAREST CONNECT TO NEAREST EXISTING MAIN LINE
WM EXISTING COLD WATER EXISTING MAIN LINE
EXISTING MAIN LINE
(VERIFY AT SITE) (VERIFY AT SITE)
GV (VERIFY AT SITE)
MAIN LINE(VERIFY AT SITE)

GROUND FLOOR GROUND FLOOR


P WATER LINE LAYOUT P SEWER & DRAINAGE LINE LAYOUT
2 SCALE 1:200mts.
2 SCALE 1:200mts.

APPROVED BY: PROJECT: APPROVED BY: NOTED BY: SHEET CONTENT: SHEET NO.

ericson c. joson SEAOIL PHILIPPINES, INCORPORATED RETAIL ENGINEERING DEPARTMENT


SEAOIL PHILIPPINES, INCORPORATED sanitary engineer SEAOIL FILLING STATION AS SHOWN P 02
22/f The Taipan Place,[Link] Ave.,
Ortigas Center, Pasig City reg. no.:0002542 issued on:01-03-2022 LOCATION: FRANCIS GLENN YU ENGR. MICHAEL RENEE M. LUCAS
ptr no.: 0154698 issued at:manila MOLO, ILO-ILO CHIEF EXECUTIVE OFFICER RENG MANAGER
CAD/DRAWN BY:
DESIGNED BY:
REVISED BY:
DATE:
4

You might also like