In-Process Inspection Report For Infant Incubator Parts

The inspection report details dimensional and visual inspections of light guide plate parts for an infant incubator from a manufacturing company. It includes inspection standards, results from sampling parts from different cavities for dimension and appearance checks, and spaces to note any production issues and corrective actions taken. The dimensions and visual quality of the sampled parts are assessed against standards and defects are noted.

Uploaded by

Hilario Alinabon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
109 views1 page

In-Process Inspection Report For Infant Incubator Parts

The inspection report details dimensional and visual inspections of light guide plate parts for an infant incubator from a manufacturing company. It includes inspection standards, results from sampling parts from different cavities for dimension and appearance checks, and spaces to note any production issues and corrective actions taken. The dimensions and visual quality of the sampled parts are assessed against standards and defects are noted.

Uploaded by

Hilario Alinabon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

In-process Inspection Report for Infant Incubator Parts (8)

Part code C6513330 MIS No.

Part name Light Guide Plate Machine No.

Material Name Material Lot No.

Company name Atomed Cebu Inc. Approval Name Hilario Aliñabon

Inspection item Appearance Inspection & Dimension Inspection

Inspection Standard
Dimension Standard Visual Standard
Color - (Refer to Master Sample)
Gate Burr - - 0.2mm ~ 0mm
1
0.
- Contamination: (Refer to Defect Dimension Guide for judgment)
Black mark / Stainmark - < 0.3mm2 (for level 1)
/
0
+ - < 0.5mm2 (for level 2 & 3)
Note: if distance is over 200mm then within limit - OK
5
7.
if distance is under 200mm then sum is within limit - OK
=
A
Silver Streak - refer to defect sample limit
Short mold - refer to defect sample limit
Shrinkage - refer to defect sample limit
Scratch - refer to defect sample limit
Crack / broken - No Good
Flow Mark - refer to defect sample limit
B = 2.0 ± 0.1 Deformation - refer to defect sample limit
Discoloration - refer to defect sample limit
Measuring Equipment = Caliper
Inspection Result

Dimension Inspection Result: (Sampling Qty. & Frequency = 3 pcs./cavity every start-up then end-time)

Production Date/Start-up time: __________________ Production Date/End time: __________________


Cavity 1 Cavity 2 Cavity 3 Cavity 4 Cavity 1 Cavity 2 Cavity 3 Cavity 4
n=3 Remarks Remarks
A B A B A B A B A B A B A B A B
1

Inspected by: ______________ Inspected by: ______________

Visual Inspection Result: (Sampling Qty & Frequency = 5 pcs./cavity start-up then every 2 hours)
Productio
n Date
Part Name Cavity 1 Cavity 2 Cavity 3 Cavity 4 Cavity 1 Cavity 2 Cavity 3 Cavity 4
Remarks Remarks
Lotting OK NG OK NG OK NG OK NG OK NG OK NG OK NG OK NG
6-8

8-10

10-12

12-2

2-4

4-6

Inspected by: ______________ Inspected by: ______________

Date / Time Problem Lot Affected Action Taken Disposition Remarks

Checked by: /

Section Leader / Supervisor


ACI-QA-F-453-00 Effectivity date: January 04, 2013