Tactical data link processors:
Link 22 implementation
RISE IN THE DATA AND INFORMATION VOLUME
Like never before, today military Both second generation data links were
Is your planning, decision-making and command and created to solve the limitations of the first
command control requires high and growing volumes of generation data links. For example, Link 22
data. To improve situational awareness and was designed to replace Link 11. Among
and control support more and more complex military other changes, it enables Beyond Line of
system ready operations, national security organizations Sight communication capabilities. It has
for the roll have to improve ability to rapidly exchange and been designed to work in more connected
quickly use huge amounts of information. settings, thus is complementary to Link 16
out of Link Moreover, this information is often collected and enhances C4ISR capabilities.
22? from geographically dispersed devices. While the original requirements have been
To support complex data exchange for laid out in the late 1980s, Link 22 is only
military actions, tactical data links were starting to be rolled out in the US in 2018.
designed according to specific standards. The Other NATO member nations are expected
newest and most advanced tactical data link to follow soon after.
networks are Link 16 and Link 22.
Baltupio 14, LT-08303 Vilnius, Lithuania Tel. +370 5 268 8188 elsispro@[Link] [Link]
LINK 22 ROLL OUT BRINGS SOME ABOUT ELSIS PRO
CHANGES TO EXISTING TECHNOLOGIES
Link 11 is expected to remain in use until approx 2023 and even after Elsis was es tablished in 19 91
that same tactical radios can remain in use as Link 22 can employ the and ha s o ver the pas t 26
same ones. However, Link 22 will require a new Data Link Processor years gro wn to be a lea ding
(DLP) to generate nad receive Link 22 messages, and System player in the Baltic region
wit hin infor ma tion tech nolog y
Network Controller (SNC). While the latter one exists in a single
and co m mu nication s ( I CT)
implementation, used by NILE Project Management Office, there are
and intelligent engineering
a few implementations of Link 22 DLP. sys te ms.
We cr eate innov ative decisi on
Elsis PRO Link 22 DLP is the most lightweight customized suppor t s oft ware and cu sto m -
implementation. It is a software based formatter/deformatter plug-in made integr ative solu tions
with or without tactical user interface, dedicated for C2/C3/C4 and com bining our exp erience
wit h ne wes t techn ologies a nd
other variations of command and control systems.
non-st andard thin king.
Baltupio 14, LT-08303 Vilnius, Lithuania Tel. +370 5 268 8188 elsispro@[Link] [Link]