100%(2)100% found this document useful (2 votes) 7K views22 pagesWinter 22 Model Answer Paper Nit Polytechnic Nagpur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here.
Available Formats
Download as PDF or read online on Scribd
ER- 2022 EX AMINATION
The model answer
The language erors such as grammatical, spell
subject Enghish and Communication Skills
1) (Mts assess figures examer may tv te fr prncpa on
by candidate and modsl answer may vary The even
5) Credits may he w
there may be onc
0s should not he elven mone Importance (Not applicable for
nents indicate i the Figure. The figures drawn
Ne credit for any equi alent fh
me eases the assumed const
“cute caulate"vanancts al Runiconeaey
‘teat may be given by ju
drawn
values may vary and
lin case of some questions
end
fgement on part of examiner of relevant answer haised oa
=, credit may be piven toa
arastra State Government
first year of AICTE diplon
and second semesters) wt
the same and asses
8) AS per the policy decision ot
na Programme from academic yeat 2021-2022, Hence if
te answers in Marathi or bilmgual language (English
5 the answer based on matching of concepts wth todel
@ Marking
No Scheme
T ‘Attempt any FIVE ofthe following 10M
4) | Define the testing terminology IM
i) Error
Fault
i) Defect
Bug
‘Ans [i) Error: An ertor isa human acon that produces the mncorieer TSoalr "EM Tor each
definition |
ti) Fault: State of software caused by an error
Ui pefecE A defet isan eror ora bus. inthe aplication whichis reat. prostanuny |
ihe designing and tiling the software can make mistakes or enor Thesemean
etrors mean that there ate Maws inthe software. These ae called deloets
iv) Bug: The presence of error at the mie of evecution of the software \
b) | List the levels of te IM
‘Aas | Following are the Tevels of testing aM toreach ]
level
a) Unit test
) Integration test
Page No 1 | 22BCs
ey System tet
) Acceptance test
©) | Stateany four needs to prepare a tat plan,
a
Ans
sed oF teat plan TIM for
each need
© Test Plan Ensures all Functional
I and Design Requirements are implemented as
specified in the documentation.
‘Test plan gives detail aspects such as test scope, test estimation, stateyy, ete
‘Test plan determines the time, cost, and effort.
Whelps in determining the quality of software applications
+ Provide a schedule for testing activities
‘+ Test Plan Document can be used for
‘+ Ihelps to understand the test details,
lar projects
4) | Give the defect classification and its meaning, 7M 4
Ans | RequirementSpecification Defects:
Requirement-related defects arise in a
customer requires.
These defects may be due to the customer gap,
requirements.
Producer gap,
EM for each
Product when one fails to understand what the | classification
‘and meaning
where the customer is unable to define his
‘where the developing team isnot able to make product as per requirements
Design Defect
Design defects occur when system components, interactions between system components,
interactions between the outside software/hardware, or users are incomectly designed
Design defects yenerally refer to the way of design ereat
product
ion or its usage while creating a
Coding Defects:
‘This defect arises when variables are not initialized propetly or variables are not declared
correctly or database is not created properly
Coding also needs adequate commenting to make it readable and maintainable in future
‘Testing Defects:
These would encompass incorres
procedures
|. incomplete, missing inappropriate test cases and test
Page No: 2 | 22cove
walk
| Methods used in veriiealion are reviews,
checking
: SOMEONE TAHT HMRI HEM aE
validation
# documents, design,
inclines testing and validating the ach
-. anal programs nena
product
ation 1S the slate testing
Methods used in validation are Black Boy
throughs, inspections, and desk | Testing, White Bow Testing
Functional testing,
spe
checks whether the software conforms to
Teehecks whether the sofware meeis the
requirements and expectations of a
customer or not
fications oF nol,
Qual
ity assurance team does verification, | Validation is execuled on soflware code
With the help of testing team,
‘Automated tests performs the same steps precisely every time they are executed and
never foryet to record detailed results.
1) | State the need of automated testing ook IN
‘Ans [© An automated testing tol can playback pre-recorded and predefined actions, | V2 M Tor
e ayback pe C
§ compare the results 10 the expected behavior and report the success or failure of | each need
these toa test engi
arene (any 4 should
# Once automated tests are created, they can easily be repeated, and they can be | We)
extended to perform tasks impossible with manual testing
Automated Software Testing Saves Time and Money
+ Software ests smite repeated often during development eyeles to ensure quay
Every time source code is modified software tests should be repeated
‘© Foreach release ofthe softwar, it may be tested on al supported operat systems
and hardware configurations, Manually repeating these tests eosly and tine
consuming |
+ Once erated, automited tests canbe rn repeatedly a ion eos and he |
are much faster than anual tests
Testing improves Accuracy. Even the most conscientious tester will make mistakes
during monotonous manual testing
Page Wo 3122~
MMM SIEHTEN SHE nO
aon
2 They
sonication ant sce oro |
Aulomated sofiware testing ean look inside
contents, data tables, file contents, and infernal peogram states to determin
product is behaving as expecte
~ 2M
i 2) | Give the objectives of software testing,
- [Je [>To Find any deers or bugs thar may have been eieaed when The otis aa
encamamagd (any 2 points
4 4 Totncrease continent quale othe software severe |
Serena ores
|
+ Tocensure that end product meets customer requirements as well as specifications
8 with a quality product and increase their confidence in the
To provide custom
aM
|
|
| 2M
3) Sate he Entry and Ext creas fr he stare Wig : |
IM ferent
ar Eas
ee
4. te stains, estes or te tin A
Entry criteria are the condition or
order to star a process criteria
Feies tt conditions oF situations, which may be seen as an entry criterion for the
Initiation of testing activities
+ Requirements should be clearly defined and approved
+ Test Design and documentation plan is ready
sanity Of he tt environment supporting necessary hardware, sofware, network
And tools for the purpose of test execution
eSources are available
| z Aviemptany THREE of the followings
‘configuration, settin
+ Testers are trained, and necessary.
{ Aailability of proper and adequate test data (ike test eases)
* It depends upon which software development model is asad
Ester
ft Cea ofenvevedaa sleet codigo ice png
SUSI conto or stations wh ay be ena et ete
| ~ Testing Deane
| + Compan teste execution |
Compton onto a soe cover aces pi
Page No: 4 | 22Mattress:
RA STATEHOMED OF TECHNIC
(bees ALEDUC AHO
case a3 Ce
+ Bug rates fall bo i
* Bu Fates TT Wstow a conan and wo
Management decision Wah priority bugs are Wenatied —
vy) State and descril |
escribe top-down approach of integration testing wi di |
rs a With gram
Ans | Topalown integration 2 TH |
> Modules ae ine
integrated by moving downware TM for
atthe ag teatated by moving dosnvard hough he cont here. eximsng | astm
> Ietakes help of
Kes help of dummy progam called stu for testing 3M for
> Subordinate modules are incorporated ‘ explanation
tec at EOE era depres en
Depth First Method: All 7
1: All modules ona major con
+ Breadth First methods Allanee ajor control path are integrated,
‘dues directly subordinate at cach level are integrated
|
Fig-Top-down integeation
Incremental approach Top-lown integration procedure
1 Main contral module used as a test driver and stubs are substitutes for components
directly subordinate to it
Subordinate stubs ae replaced one at a tine with real components. (Following the dep
sor breadth-first approach) \
3 Tests are conducted as each components integrated |
+. On completion of each set of tests and other stub is replaced with areal component) |
5. Regression testing may be used to ensure that new errors not introduced | |
|
—— |
@ | Deseribe the "Test Infrastructure’ components with diagram. | mM |
é a
Taw} Testing requires a robust infrastructare to be planned upfront | Compan
This infrastructure is made up of three essental elements | Diagramet
| Explat
jo 3M
Page No.5 | 22Mam evsinteasey
¢ Components of Test Infrastructure
1
A test case datah;
information about
(TCDD): A test case database captures all the relevant
he test cases in an of
‘wanization, Some of the entities and the
attributes are given in the following table
St. No. | Test Case Purpose Autributes
1 Test case Records all static information | 1yTest ease fd 2)
about tess, ‘Test case name (File
name) 3) Test ease
owner 4) Associated
files for test case.
2 Test case Provide mapping berween the | Test ease ld Module
Product cross | tests and the corresponding | 1d
reference product features, enables
Identification of test cases for
given feature,
Gives the history of when the
3 Test case run | test case was run and what was | 1) Test case ld
history result, provided inputs on 2) Run date 3)Time
selection of test for regression | taken 4) Run status
runs (Success! Failure)
Gives details of test cases 1) Test case Id
4 Test ease defect | introduced to test certain 2) Defect reference
ross reference | specific defects detected in the
product, provides inputs on the
selection of test for regression
2. Defect Repository: It captures relevant details of defects
It is a tool of
nication. Defects matrices are derived from detect repository
Configuration management repository and tools: They keep track of change
control ofall the files/entities that make up a software product. They keep track of
version con
‘ol of all files/emities that makeup a software product
Page No:6 | 22“Write any |
imitations for |
im |
TBM
Differentiate between white box testing and black bor testing (any four points a
Ans
Any 4 Poin
Re | Black Box Testing White Box Testing Sea
t
1 | ltsavay ofsoftwaretestngin whch | 1s a vay of testing the softwar i
Ung neal structure or the program or | which he ster bas nowede soot
the code is hidden, and nothing is | the intemal stuctute or tieerte ae
known about it rogram of the software
J —
2. | Tean be referred toas outeror extemal | I isthe inner or he intemal software
sofiware testing testing
3_| Hise fetinat test ofthe sotware | tsa rust sof the sofware
4. | This testing can be initiated based on | This wpe of test
the requirement — specifications | started aller a detated des
document document
5 |W is the behavior testmg of the | Wisthetogie sing ofthe sovare, |
software |
ie Ins i : sled ear es |
6 | Itisalso called closed testing | Wis also called clear bo test |
tH :
Page No 7|22a and methods
tested =
TM
“Saas ne Tnrents of Test Summary Repos” used in fest report _
[2 pec
aan af ahvevng communication trou Te resting xe ores
Can be done by: trial-and-error ways
east RA SEALE HOARD OF HECUSIEME FTICAHON
asonr an 3003 Ceri)
Data domains along with
be better
intemal boundaries aN
Ang | Test reporting isa
1. Test Summary Ré
2 Description: Identify the
3 Variances: Menti
4 Summary of resul
their solutions.
py rear 2006
| eatin eon
Dtexgderepon
3, Test summary report
2. Final test summa
‘Summary report should be presented
5 Comprehensive assessm
release assessment and recommendation of
fa
ofa
sa spina pls scone ie sel
m yt js the test summary
Test summary Report The
Tesi Tor rease’ A reer tht summarizes the result of 165 cycle
report
L “There are two types of test summary report:
1 pase wise test summary, which s produced atthe end Fever PINS
wg done by all phases: A
ry report, which has all the details of testing
feport Identifier
test items being reported inthis report with test id
ion any deviation from test plans, test procedures, if any
ts: All the results are mention
nent and recommendation for release should include: Fit fo
telease
.ed here with the resolved incidents and
hn
aM
<5 —f Bepars aie report aor eseuing WT ese Tr any To
Sc ERGO Sate Tsing Te UGCA Bus TounT a TesOTTAE | Forel
application defect report
Follow is Defect report after executing test cases for Emz log in for oM
[iD muir ima
Name oginforn - Unable 1 fgin Ema
poner Person's ame (2)
suit Date osvr2033
[summary When put ny maid and password, Fam unable to
Page No.8 | 22te atest sist woo HUNGARY
{NOME “TUT 3H Cetien)
oun white login eredentialsare nahn
URL. ww grail com
Screenshot ps: accounts google eomsigniay
Platform JAngularss,
Operating System [OSX to120
Browser [Chrome 33
[Severity Major
Assigned to 0
[Priority High
Description
‘When I put mait id and password, lam unable to login while login credentials are right
Steps to reproduce
> go to the www.gmail.com
Deseription-2
M
> Click on login button
> Put Right mail id and password and click next
> and take Screenshot
Expected result
‘The mail account should logged in after putting the right mal id and password
‘The mail account is not logging mn aer putting the right details
| Enlist the factors considered for selecting a teting tool for tot automation. aT
“Ans | The folowing factors are unportait during al selection
i, Assessment of the organization’s maturity (e.3.readiness or cha
ty Identification of the
improve testing processes
tut Evaluation of tools against clear requirements and objective etterta
concept 1 see whet
ments and objectives defined for it
¥ Evaluation of the vendor (train
source network of support
support and other comm
ral aspects) or op
feas within the organization where Wool support wll help. 40
Factors: 1M
| cach
er the product works as desired and meets the
Page No.9 | 22Ak
faces for a computer application,
There are 1wo types of
Command Line Interface 1s where you type text and the computer responds to that
command,
GUI stands for Graphical User interface where you interact with the computer using:
Imayes rather than text
GUT testing isthe process of testing the system a
Application Under Test. GUI testing involves ehecking the sereens with the contcols
ce"menus, buttons, icons, and all types of bars ~ toolbar, menu bar, dialog boxes and
ndows, ete
{GUL is what the user sees. A user does not see he source code. The interface is visible
fo the user. Especially the focus 1s on the design structure, images that they are
working properly oF not
GUI Testing Guidelines
(Cheek Sereen Validations
2. Verify All Navigations
3. Check usability Conditions
4 Verify Data Integrity
5. Verify the objet
Wd and Numerie Field Fomsats
6 Verity the date
tages of GUI Testing:
Jd GUI inyproves the feel and lok of the application, & psychologically aecepis
the appheanon by te user
Got represents a presentation layer of an application Good GUI hetps an apphcation |
due to better experience of the users.
Consistency of the screen laywatsand desiins mnproves usability of an application,
c
Pape No: 10122SMTIAIASIITIEA STALE HOARD OF TECHNIC
ALEDUCA HON,
1) Test Deliverables are the artifac
a
Project during the sotiw:
fakeholders ofa soitware
‘There are different test
vent lifecycle. Some test
1 are provided du
‘are development lifecycle,
Of the software developm
ore the testing phase, som
he testing cycle is over.
deliverables at every. pha
deliverables are provided bef
testing phase and some after t
The different types of Test deliverables are:
Test cases Documents
Test Plan
Testing Strategy
Test Scripts
Test Data
Test Traceability Matrix
‘Test Results/reports
‘Test summary report
Installiconfig guides
Defect Reports
Release notes
2) The test plan describes the overall method to be used to verify that the software
meets the product specification and the customer's needs, It includes the quality
objectives, resource needs, schedules, assignments, methods, and so forth,
‘Test cases list the specific items that will be tested and describe the detailed steps
that will be followed to verify the software
‘Buy reports describe the problems found as the test cases ate followed. These could
be done on paper but are often tracked in a database
Test tools and automation are listed and described which are used to test the
software. If the team is using automated methods to test software, the tools usec
her purchased or wniten in-house, must be documented,
3)
4)
5)
6). Metrics, statistics, and summaries convey the progress being made as the test work
progresses. They take the form of graphs, et
s, and written reports
io
IM
Types: M
any other 4
points - 2M
5 | a
Describe l
testi
cT siress testing with suitable example.
TM
Toad Testing
fcteasing he Tea on he ststem unten eaces ts tesa
check the behavior ofthe sppicton ert
itisnarmally eam ou unmet cond enone ds
sh
cate the sem sprerming wel ener en
he fully executed load testing is only if the specified test eases are executed
Uo
The success
Js text
x the software under eustomer expected load
Deseniion of
Thema purpose of load testing 1st monsfor the response tne and staying power of |
each: 1 M
each
Page No: 11 | 22senor
arrests ETE
some
| Operate the sofiware es
ates om peri
¢ software ope
many as you
aegis Ce
nerals such aS
1 connections. do it, With mot
‘Some softsare should beable
portant eariable, Load SNE
ml
tools
testing
nding large JOS
suet for esti
dng data into
ane
pes of load
ers by
wor word
the hare
sly ont
is simul
Continuo
Ronning multiple application
Ra of a serve by cess
testing & syst
S Incase of zero-volume
ee
sufficient like Cl
limit capaci
he current i
Stress Testing
PU,
fe Stress Testingis
hardware resources
nis performed t0
how the system
maximum,
Main parameters (0
“Throughput”
Suess testing is Negative testing where 6 I
re ent user/processes which cae Pe hi
comes, This testing is also known as Fat Bue
sting the sofware under les
memory, 1ow disk space, sl
hat extemal resour
them to a bare mi
performan
sare not
find the upper
performs if 1
. focus during St
load
ssthan ide
Sires testing ist
Software with Low
tr sofware and determine wi
Sires testing is srmpy limiting
soltware
Fore.g. Word pro are runing on your comp
disk space, it wor f the system runs [Ow
potential 0 expect 2b ve values 10 2er0 OF
5 to handle the ti
execule a different pat
wld run without crashing or tosing data
cessor soflw
ks fine. But i
nig. Setting th
as it atternp
wot
tandle thous
rousands of mailboxes
im fed with 2et0 10
esting type to check
ity of the system
‘oad goes well above
tress testing are
randled by the systems hardware
ow CPU, slow modems
ces and dependencies
mum. With stress test
a
NIC, ano |x
~ _ ed
e ez
is
ir all tha
printer, or commicain ons
ands of simultaneous
n over long periods
‘So, Time acts aS
ion
frit to run
wing restarted
ne help of auton
Example of
each: 1M
each
processor
rd disk.
the server.
the stability of software when
‘mory, disk space ete
‘and also to determine
he expected
mer
“Response Time” and
the software with large number of
testing.
al conditions. So, subject your
‘and so on. Look at
it has.
sting you starve the
suter with all available memory and
fon resources, you have a greater |
near zero will make the software
rastaint Ideally the software
at cor
y aM
izes and disudvantages of using (ol
| State the advantai
tools:
“Ans [ Advantages of usin
Save Time ‘Speed
Due to advanced camputing facilities
the tests Automation saves time as So!
‘automation test tools prevail
‘ware can execute test cases faster th:
n speed of process
an unas
Page No: 12 | 22HOST SEXEE NO SOF TECHIE SE EHC HOS
sone 20 HS Corie
] Reduces the tester's invoh ement in executing fests It relieves the feslews to do some
| other work,
| reneatabtity/Consisteney: The same tests eam be Fe-tun an eet the seme manne
eliminating the sk of human enors such as testers forgetine thet evaet dons
intentional ont steps fom theft eps, missing ou steps rom the est ep al
J of which can test eer defects not being ented orth reporting of unald bus
(hich cam again, be tine consuming for both developers and esters to reproduce
Simulated Testing: Automated tools can create many concurrent virwal usersidata and
effectively test the project in the test environment before releasing the product
Test case desi
Automated tools can be used to design test eases also thror
automation, better coverage can be guaranteed than if done manually
Reusable: The automated tests can be reused on different versions of the sofware, even if
the interface changes.
Avoids human mistakes: Manually executing the test cases may incorporate errors. But
this can be avoided in automation testing
Internal Testing: Testing may require testing for memory leakage or checking the
coverage of testing, Automation can do this easily,
Cost Reduction: If testing time increases, the cost of the software also increases. Due to
testing tools time and therefore cost is reduced,
Disadvantages of using tools:
+ Unrealistic expectation from the tool
+= People always make mistake by understanding time cost and effort for the initial
introduction of the too!
+ People frequently miscaleulate the time and effort needed to achieve significant and
continuing benefits from the tools
+ Mostly people underestimate the effort required to maintain the test assets generated by
the tool
= People depend on the tol a lot. (Over reliance on the tool)
Disadvantage
s2M
|
|
°
Write the test cases for Notepad application. (any eight test ease)
aM
‘Aas
SS
PROJECT: NOTEPAD
MODULE: FIND AND REPLACE
FUNCTIONAT,
SPECIFICATION
TEST CASE Nt
FIND AND REPLACE
TCR
To Check functionality of
TEST OBJECTIVE: - 1d and Replace” in notepad.
ENVIRONMED
WIN 2k, Notepad.
Page No: 13 | 22Tere Fat [Tet Y expected | Actual =
TCH karin | Condition |Sieps [ata | Resutt _{ Result gion
ona
_ each
te Ea
Creek the men Atersticking | The
avaability Tomine | | enthe find.the | search
tthe Find Seindow should | box
12 Option —_| = popup available_| Pass
Cheek the
navigation After press :
‘trout Gare. | The find
Shoacut Press Should produce | box
aa | keys - [owe ite seareh box _| avaiable. | Pass
hieek the
navigation Anerpressing | The
throwsh Crest, | Replace
Shortcut Press should produce | box
3.0) | keys [Gat | | thereptace box_{ avaiable. | Pass
Glick
edit
from Inthe menu by
Check the meme flicking the edit
navigation bar and Snd then find, | The find
3. | thvoueh then the search box | Box is
©_| mouse -__| Fino Shoutd open. | available, | Pass
Find The ewsor
box should be
The cursor | should present inthe | The
defaun | be pine space | cursoris
4 _| position. | open box Available | Pass
Without opine
Find anything, the
box Find buiton
Should | Press Should not be
Tocheck [be | Find embledand | ttisnot
5s re reet | Spen | Bunion | | fumeonat__| enabled_| Pass
The typed Text
Find inthesearch | tits
Tocheek | box Fiekt should | matching,
the Search| should | Press sate then i
control in [be | Find Sthenwvise | highlights
6 _[ihepase” | open | Button seneratcan [it Pass
Page No: 14 | 227 srortar weal]
|| more si
|| nce then
| [ater
fampeiion
ors
Search th the The find
rereiigeae emt lf SeareivFina | btton
fantom [tow | Bint baton shout | avaiable
Shoutd be | Should | Burton Bembted for | fornext
| Jematie tor | be | Fina themevtsearch | seach
La _|nextaiso’ | Gpen,_| New ts Sin | pass
Find
toe ‘The wer should | The
oeneek | shouts | chick essked betore | message
the Replace | be | on placing any | not
s_[eouot "| open | Reptace |_| Word coming |
By clicking
Find Starch ote | Wie
tox weordoniys | replacing
Should Should vepace | the whole
Replace the | ben | cuek on | — | only heate | word
sa |exactwor | open _| Replace |_| sors only. | Pass
wis
Don replacing
replace Find a find
twhen here | box Dontreplace | Value
iSnorent im | should sthemtherers | with he
fence be [cuickon | — novewin | bank
Se eee rare eure ee cece re
Ghssk Bnd Ac pressing
Canes | bow the cancel
button should Bone | the
be | ctck sade shoul | winder
w_|rneiionasy Lepen | ence nu Sen | pres
‘Attempt any FAO of the following:
yoany ai)
Page No. 15 122™
AIMIIQKASIEERY STATE BOARDOE HE CIMIOE TELCO
wanes s
Tie]
Fqetcae- | Testeaseovjective | Input | Expected | Actua
» data | Result | Result vahdtest
| | cases shall be
| | considered
| To add wo ine and a6 (4276 | Pass
| display the result on ten-
| | shit calculator
L eleee 1. |
TC To subiract wo integer | 176 | 76 Tope | (tase |
and display the resulton | =
fendigi calculator | 100
l
13 To multiply wo integer | 100% |2000 | 2000 | Pass
and display the result on | 20
Tenigitcaleulator
Tea To divide two integer | 100/5 | 20 20 | Pass
and display the result on
teasigi calculator
Tc To clear the sereen Pass
should — | appears
appear on | on
sereen | screen
16 To delete digits one by One iat |One | Pas | !
one should be | Dig i
deleted | deleted 1
from right | feom i
hhand side | sight
hand
Dy Design test cases Tor Web pages testing of any Web site (lake @ suital |
example). Seal ( table om}
x
Page No: 16 | 2219 |
aun:
wpe say
Se SHEA SEAL
sone
Brest cases of
rest eases for
any web site
OMIM
each. any
other valid
test eases
— us shall be
lest a Expected considered
Cas | Testease pected ey le
ein] objective | POEM | result pe aoe
‘Cheek Click on
cursor position | emaitor | Cursor should
b Placed the
or mobile umber the field a
umber eld Tietd ass | |
Cursor should
Check cursor | Clickon | be placed on | Peed he
ter | positionar | Password | the password | STONY | pace
password field | field field Lae
field
Clickon | Hstould | teredirected
ea | ete, | comtime | fesse tothe
continue button | PAN | password page | password | "SS
page
‘Tryto read | Contents
rea | Readabitiy of | the contents | shouldbe | ¢ :
‘ontent sare
font ontogin | readable .
pave Pass
Teaingor | Check ihe | Losin spelling |” Speting of |
ces] spelling | speling or | shouldbe) Logins
of login ica correct conect_ | Pas | |
should =| ae
change the
: Cursor |
| Hoverthe | cursor and |
ing o changed ant
106 a mmouseon | shouldredivea | “PEI | pace
bypertnk | torespective | ae
| pase |
LL onctiek
Page No 17122iG respected | Acta
-— -esul result Status
CSE) retenscmieetee vesull i
SS crvous | Previons [PASS
k jcafeiher Undo r .
‘undoes "euon | ation
[7] nammene amin, | ae
| ‘the pres jon _|_wndone
| | aa Od Pr Previous Pass
Shacks wheiher the Undo Previous
rea | Cee re eon | a6ton
Cie anlek|
a men does He routs be | 888
soon ation segone | undone
eck weer US a | nde | pas |
TC3 | button in the Edit main Button Button
Mea sabled whe soutdbe | ¥a8
are le not any previous Mente | disabled
Fea} ect weer Udo Tato] Pass
Feat nt contest undo | Button
pena gabled when tron | remained
whee ot any previous stoutdte | disabled
sation! Gisabed
Fee} Chass wher Tay Ne wa}
(crRL2) reapnrveis | eesponse
response when tere 80 Seced
any of
previous ations
hcke whether he Cat
vex | cnt aitnain Seicied | Selested
reo | options in Edit main menu text should | text was
iuts the selected text be cut cut na
Checks whether ihe Cat 7 —l<«>
‘options in Edit Menu is Cut Options ont
TC7 | disabled when ne texts are should be ee
selected disabled as | pass
Disabled
shall be
each, any
id
considered
ESIMHIVESITEIEYSEAEE HO SRD UD EECCA EDLC MON
a isout FH an Cero
Attemprany TWO ofthe following:
|) Tans
|
Write program Tor caleulating even aumbers from Tw 20 And design tt Gus for? 6M
the same,
Program - —
include program 2M,
int ming) sa
form +0,5<20.64+2) conser
printt%dua
retum 0,
Test EV GOT] Test Case “Test progam printstheeven |
Case 1D Description number fiom 11020
Created “ABC Reviewed “PQR | Version ZI
By By
Tester’s [ABC Date Tested [T-] Test Case [Pass
Name Jane | (PassFaivNo
202 | Executed)
3
S# Prerequisites SH. TestData
7 ]Cpmgam |
using or loop |
Tet Verify the
Scenario even
umber
Sicp# Step Expected == Actual Pass/Fail
OH als “Results Rests Natt
_ Suspended
PT Peieck [inal value intial value” [Pass
inital —_| of Forloop | of Fr loop |
condition of | should be 0 | 80.0" |
forloop__| orl
[Check final_| Final al Pass
canition of | condition |
forloop | should be ~
20" or
I =
Page No: 19 | 22arynrsnensttt
HCINIOMLEDUCAION
ume
‘Yoan 2
wc
7] Counters
‘operator
|
tie
| | output
increment
by?
operator
should
increment by
Even number
ed
is Pass
displaying
isd ;
Sean number
Frich is installed on mob!
rT
Prepare test plan for "Cam Seanm
oM
“Fest plan for Cam Seanner:
“Test Plan Identifier
P10
Introduction: The purpose of this document is f0 ereal
ato rabile. The purpose of testing this program ist cl
application installedon mobi, The}
ration ofits functionality, ease OF USE comers
apeation of is fine document Scan document, Ei document, PDF conversion)
Features to he tested .
‘* Scan Document
e test plan for CamScanner
Jneck the correct
‘© Edit Document
© PDF Conversion
Approach
© Onthe test object
© functional
(© non-functional
‘© According to the requirements
Le
«By degree of preparedness ~ intuitive testing (ad hoc)
Item Pass/Fail Criteria: All test cases with high priority are closed with the result ~ pass,
The test coverage is checked and sufficient, where the criterion of sufficiency is not less
than 99% of the coverage of requirements by tests. The test report was compiled and
approved by the team lead and customer.
Suspension Criteria and Resumption Requirements
Criterion for interrupting testing:
The appearance and entering into the bug-tracking
Criterion for continuation of testing
Closing the blocking bug in the buy tracking system,
‘Test Deliverables: Test plan, test cases, test report
Test Tasks
Wn
© Writing test cases
© Development ofent
system of blocking buys
test plan
ia for the success of testin,
ion of the results,
Conducting the testing and evalu
Creating t
reports
Page No. 20 | 22SAMMISSIECY SEALE HOMHOLTCIMEAL HDLC Atta
Needs =
Mobile Phone T
CamSeanner Installed
Responsil
Functionality an
Responsibilities
Test Enuinger |
Test Enginger 3
POF Conversion of Document
Staffing and Trai
ing Needs
To perform the tasks, you need to have the following knowledge ad skills
= Knowledge and practical application ofthe camsea
* Knowledge and ability to apply in practice the basie
* Knowledge of various types of testing including fun
Fechniques of test desi
rtional and non-functional
Schedule |
The deadline for completion ofall works and delivery of the projet is 25/01/2023 by
5.00pm
Risks and Contingencies
Possible risks during testing:
‘* Insufficient human resources for testing the application in deadlines.
'* Changing the requirements forthe product
Approvals
‘Team Lead
Test engineer 1
Test engineer 2
°
Prepare defect report after executing (est cases for withdrawn of amount from ATM
machine.
ou
‘Ans
‘any valid
fect report
io EI | elated with
Project | Cash Simulator Cash (ATM) emia
Product Phpiwnew.mote gov quenldioakivmigraniwonesteh | | funtion
-inachine-smulaor an oa
Release v10 | | om
Male clusion tools,
Woe [Tae Pag Our opens “Dig owons "|
Detecied | VII
Build 1
Version _ —
inca wahdaval
mmary Lined denomination option n
Suman function, restricting cash withdrawal only till an |
Deeipion [No option of withdrawing of amoumercessoF 3000 |
Stepst0 T Open the website
Replicate 2 Select ow prourans sete
3, Progeed to Dial Ineluson ots aa selet
esmnulator ATM) _ =
[acu sine tig)
Page No 21122MAMARASHTRA ST
“AH HOARD OF FECHINICAL EDECA HON
[Autonet
asonec - 27001-2013 Cert)
Saree Tangiage and skip 10 simulator
5, Enter the card
6 Select the account type
1. Go to Other functions and select cash withdrawal
Expected
Results
|
TTahould ade more options in denomination’
Jhould take amount in}
withdrawal function or it s|
the user,
put from
is in cash
tual
Results withdrawal option.
‘Attachments
Tris displaying Tinted options of denomination
Jor ATH)
Cash Mahi Si
Tauses inconvenience to the user in terms of limited cash
Remarks
withdrawal options.
Defect High
Severity
Defect High
Priority _
Reported By_| Test Engineer!
‘Assigned To
XYZ,
Status
[Assigned
|
|
|
|
|
|
!