100% found this document useful (2 votes)
7K views22 pages

Winter 22 Model Answer Paper Nit Polytechnic Nagpur

Uploaded by

HARSH PATLE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
100% found this document useful (2 votes)
7K views22 pages

Winter 22 Model Answer Paper Nit Polytechnic Nagpur

Uploaded by

HARSH PATLE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 22
ER- 2022 EX AMINATION The model answer The language erors such as grammatical, spell subject Enghish and Communication Skills 1) (Mts assess figures examer may tv te fr prncpa on by candidate and modsl answer may vary The even 5) Credits may he w there may be onc 0s should not he elven mone Importance (Not applicable for nents indicate i the Figure. The figures drawn Ne credit for any equi alent fh me eases the assumed const “cute caulate"vanancts al Runiconeaey ‘teat may be given by ju drawn values may vary and lin case of some questions end fgement on part of examiner of relevant answer haised oa =, credit may be piven toa arastra State Government first year of AICTE diplon and second semesters) wt the same and asses 8) AS per the policy decision ot na Programme from academic yeat 2021-2022, Hence if te answers in Marathi or bilmgual language (English 5 the answer based on matching of concepts wth todel @ Marking No Scheme T ‘Attempt any FIVE ofthe following 10M 4) | Define the testing terminology IM i) Error Fault i) Defect Bug ‘Ans [i) Error: An ertor isa human acon that produces the mncorieer TSoalr "EM Tor each definition | ti) Fault: State of software caused by an error Ui pefecE A defet isan eror ora bus. inthe aplication whichis reat. prostanuny | ihe designing and tiling the software can make mistakes or enor Thesemean etrors mean that there ate Maws inthe software. These ae called deloets iv) Bug: The presence of error at the mie of evecution of the software \ b) | List the levels of te IM ‘Aas | Following are the Tevels of testing aM toreach ] level a) Unit test ) Integration test Page No 1 | 22 BCs ey System tet ) Acceptance test ©) | Stateany four needs to prepare a tat plan, a Ans sed oF teat plan TIM for each need © Test Plan Ensures all Functional I and Design Requirements are implemented as specified in the documentation. ‘Test plan gives detail aspects such as test scope, test estimation, stateyy, ete ‘Test plan determines the time, cost, and effort. Whelps in determining the quality of software applications + Provide a schedule for testing activities ‘+ Test Plan Document can be used for ‘+ Ihelps to understand the test details, lar projects 4) | Give the defect classification and its meaning, 7M 4 Ans | RequirementSpecification Defects: Requirement-related defects arise in a customer requires. These defects may be due to the customer gap, requirements. Producer gap, EM for each Product when one fails to understand what the | classification ‘and meaning where the customer is unable to define his ‘where the developing team isnot able to make product as per requirements Design Defect Design defects occur when system components, interactions between system components, interactions between the outside software/hardware, or users are incomectly designed Design defects yenerally refer to the way of design ereat product ion or its usage while creating a Coding Defects: ‘This defect arises when variables are not initialized propetly or variables are not declared correctly or database is not created properly Coding also needs adequate commenting to make it readable and maintainable in future ‘Testing Defects: These would encompass incorres procedures |. incomplete, missing inappropriate test cases and test Page No: 2 | 22 cove walk | Methods used in veriiealion are reviews, checking : SOMEONE TAHT HMRI HEM aE validation # documents, design, inclines testing and validating the ach -. anal programs nena product ation 1S the slate testing Methods used in validation are Black Boy throughs, inspections, and desk | Testing, White Bow Testing Functional testing, spe checks whether the software conforms to Teehecks whether the sofware meeis the requirements and expectations of a customer or not fications oF nol, Qual ity assurance team does verification, | Validation is execuled on soflware code With the help of testing team, ‘Automated tests performs the same steps precisely every time they are executed and never foryet to record detailed results. 1) | State the need of automated testing ook IN ‘Ans [© An automated testing tol can playback pre-recorded and predefined actions, | V2 M Tor e ayback pe C § compare the results 10 the expected behavior and report the success or failure of | each need these toa test engi arene (any 4 should # Once automated tests are created, they can easily be repeated, and they can be | We) extended to perform tasks impossible with manual testing Automated Software Testing Saves Time and Money + Software ests smite repeated often during development eyeles to ensure quay Every time source code is modified software tests should be repeated ‘© Foreach release ofthe softwar, it may be tested on al supported operat systems and hardware configurations, Manually repeating these tests eosly and tine consuming | + Once erated, automited tests canbe rn repeatedly a ion eos and he | are much faster than anual tests Testing improves Accuracy. Even the most conscientious tester will make mistakes during monotonous manual testing Page Wo 3122 ~ MMM SIEHTEN SHE nO aon 2 They sonication ant sce oro | Aulomated sofiware testing ean look inside contents, data tables, file contents, and infernal peogram states to determin product is behaving as expecte ~ 2M i 2) | Give the objectives of software testing, - [Je [>To Find any deers or bugs thar may have been eieaed when The otis aa encamamagd (any 2 points 4 4 Totncrease continent quale othe software severe | Serena ores | + Tocensure that end product meets customer requirements as well as specifications 8 with a quality product and increase their confidence in the To provide custom aM | | | 2M 3) Sate he Entry and Ext creas fr he stare Wig : | IM ferent ar Eas ee 4. te stains, estes or te tin A Entry criteria are the condition or order to star a process criteria Feies tt conditions oF situations, which may be seen as an entry criterion for the Initiation of testing activities + Requirements should be clearly defined and approved + Test Design and documentation plan is ready sanity Of he tt environment supporting necessary hardware, sofware, network And tools for the purpose of test execution eSources are available | z Aviemptany THREE of the followings ‘configuration, settin + Testers are trained, and necessary. { Aailability of proper and adequate test data (ike test eases) * It depends upon which software development model is asad Ester ft Cea ofenvevedaa sleet codigo ice png SUSI conto or stations wh ay be ena et ete | ~ Testing Deane | + Compan teste execution | Compton onto a soe cover aces pi Page No: 4 | 22 Mattress: RA STATEHOMED OF TECHNIC (bees ALEDUC AHO case a3 Ce + Bug rates fall bo i * Bu Fates TT Wstow a conan and wo Management decision Wah priority bugs are Wenatied — vy) State and descril | escribe top-down approach of integration testing wi di | rs a With gram Ans | Topalown integration 2 TH | > Modules ae ine integrated by moving downware TM for atthe ag teatated by moving dosnvard hough he cont here. eximsng | astm > Ietakes help of Kes help of dummy progam called stu for testing 3M for > Subordinate modules are incorporated ‘ explanation tec at EOE era depres en Depth First Method: All 7 1: All modules ona major con + Breadth First methods Allanee ajor control path are integrated, ‘dues directly subordinate at cach level are integrated | Fig-Top-down integeation Incremental approach Top-lown integration procedure 1 Main contral module used as a test driver and stubs are substitutes for components directly subordinate to it Subordinate stubs ae replaced one at a tine with real components. (Following the dep sor breadth-first approach) \ 3 Tests are conducted as each components integrated | +. On completion of each set of tests and other stub is replaced with areal component) | 5. Regression testing may be used to ensure that new errors not introduced | | | —— | @ | Deseribe the "Test Infrastructure’ components with diagram. | mM | é a Taw} Testing requires a robust infrastructare to be planned upfront | Compan This infrastructure is made up of three essental elements | Diagramet | Explat jo 3M Page No.5 | 22 Mam evsinteasey ¢ Components of Test Infrastructure 1 A test case datah; information about (TCDD): A test case database captures all the relevant he test cases in an of ‘wanization, Some of the entities and the attributes are given in the following table St. No. | Test Case Purpose Autributes 1 Test case Records all static information | 1yTest ease fd 2) about tess, ‘Test case name (File name) 3) Test ease owner 4) Associated files for test case. 2 Test case Provide mapping berween the | Test ease ld Module Product cross | tests and the corresponding | 1d reference product features, enables Identification of test cases for given feature, Gives the history of when the 3 Test case run | test case was run and what was | 1) Test case ld history result, provided inputs on 2) Run date 3)Time selection of test for regression | taken 4) Run status runs (Success! Failure) Gives details of test cases 1) Test case Id 4 Test ease defect | introduced to test certain 2) Defect reference ross reference | specific defects detected in the product, provides inputs on the selection of test for regression 2. Defect Repository: It captures relevant details of defects It is a tool of nication. Defects matrices are derived from detect repository Configuration management repository and tools: They keep track of change control ofall the files/entities that make up a software product. They keep track of version con ‘ol of all files/emities that makeup a software product Page No:6 | 22 “Write any | imitations for | im | TBM Differentiate between white box testing and black bor testing (any four points a Ans Any 4 Poin Re | Black Box Testing White Box Testing Sea t 1 | ltsavay ofsoftwaretestngin whch | 1s a vay of testing the softwar i Ung neal structure or the program or | which he ster bas nowede soot the code is hidden, and nothing is | the intemal stuctute or tieerte ae known about it rogram of the software J — 2. | Tean be referred toas outeror extemal | I isthe inner or he intemal software sofiware testing testing 3_| Hise fetinat test ofthe sotware | tsa rust sof the sofware 4. | This testing can be initiated based on | This wpe of test the requirement — specifications | started aller a detated des document document 5 |W is the behavior testmg of the | Wisthetogie sing ofthe sovare, | software | ie Ins i : sled ear es | 6 | Itisalso called closed testing | Wis also called clear bo test | tH : Page No 7|22 a and methods tested = TM “Saas ne Tnrents of Test Summary Repos” used in fest report _ [2 pec aan af ahvevng communication trou Te resting xe ores Can be done by: trial-and-error ways east RA SEALE HOARD OF HECUSIEME FTICAHON asonr an 3003 Ceri) Data domains along with be better intemal boundaries aN Ang | Test reporting isa 1. Test Summary Ré 2 Description: Identify the 3 Variances: Menti 4 Summary of resul their solutions. py rear 2006 | eatin eon Dtexgderepon 3, Test summary report 2. Final test summa ‘Summary report should be presented 5 Comprehensive assessm release assessment and recommendation of fa ofa sa spina pls scone ie sel m yt js the test summary Test summary Report The Tesi Tor rease’ A reer tht summarizes the result of 165 cycle report L “There are two types of test summary report: 1 pase wise test summary, which s produced atthe end Fever PINS wg done by all phases: A ry report, which has all the details of testing feport Identifier test items being reported inthis report with test id ion any deviation from test plans, test procedures, if any ts: All the results are mention nent and recommendation for release should include: Fit fo telease .ed here with the resolved incidents and hn aM <5 —f Bepars aie report aor eseuing WT ese Tr any To Sc ERGO Sate Tsing Te UGCA Bus TounT a TesOTTAE | Forel application defect report Follow is Defect report after executing test cases for Emz log in for oM [iD muir ima Name oginforn - Unable 1 fgin Ema poner Person's ame (2) suit Date osvr2033 [summary When put ny maid and password, Fam unable to Page No.8 | 22 te atest sist woo HUNGARY {NOME “TUT 3H Cetien) oun white login eredentialsare nahn URL. ww grail com Screenshot ps: accounts google eomsigniay Platform JAngularss, Operating System [OSX to120 Browser [Chrome 33 [Severity Major Assigned to 0 [Priority High Description ‘When I put mait id and password, lam unable to login while login credentials are right Steps to reproduce > go to the www.gmail.com Deseription-2 M > Click on login button > Put Right mail id and password and click next > and take Screenshot Expected result ‘The mail account should logged in after putting the right mal id and password ‘The mail account is not logging mn aer putting the right details | Enlist the factors considered for selecting a teting tool for tot automation. aT “Ans | The folowing factors are unportait during al selection i, Assessment of the organization’s maturity (e.3.readiness or cha ty Identification of the improve testing processes tut Evaluation of tools against clear requirements and objective etterta concept 1 see whet ments and objectives defined for it ¥ Evaluation of the vendor (train source network of support support and other comm ral aspects) or op feas within the organization where Wool support wll help. 40 Factors: 1M | cach er the product works as desired and meets the Page No.9 | 22 Ak faces for a computer application, There are 1wo types of Command Line Interface 1s where you type text and the computer responds to that command, GUI stands for Graphical User interface where you interact with the computer using: Imayes rather than text GUT testing isthe process of testing the system a Application Under Test. GUI testing involves ehecking the sereens with the contcols ce"menus, buttons, icons, and all types of bars ~ toolbar, menu bar, dialog boxes and ndows, ete {GUL is what the user sees. A user does not see he source code. The interface is visible fo the user. Especially the focus 1s on the design structure, images that they are working properly oF not GUI Testing Guidelines (Cheek Sereen Validations 2. Verify All Navigations 3. Check usability Conditions 4 Verify Data Integrity 5. Verify the objet Wd and Numerie Field Fomsats 6 Verity the date tages of GUI Testing: Jd GUI inyproves the feel and lok of the application, & psychologically aecepis the appheanon by te user Got represents a presentation layer of an application Good GUI hetps an apphcation | due to better experience of the users. Consistency of the screen laywatsand desiins mnproves usability of an application, c Pape No: 10122 SMTIAIASIITIEA STALE HOARD OF TECHNIC ALEDUCA HON, 1) Test Deliverables are the artifac a Project during the sotiw: fakeholders ofa soitware ‘There are different test vent lifecycle. Some test 1 are provided du ‘are development lifecycle, Of the software developm ore the testing phase, som he testing cycle is over. deliverables at every. pha deliverables are provided bef testing phase and some after t The different types of Test deliverables are: Test cases Documents Test Plan Testing Strategy Test Scripts Test Data Test Traceability Matrix ‘Test Results/reports ‘Test summary report Installiconfig guides Defect Reports Release notes 2) The test plan describes the overall method to be used to verify that the software meets the product specification and the customer's needs, It includes the quality objectives, resource needs, schedules, assignments, methods, and so forth, ‘Test cases list the specific items that will be tested and describe the detailed steps that will be followed to verify the software ‘Buy reports describe the problems found as the test cases ate followed. These could be done on paper but are often tracked in a database Test tools and automation are listed and described which are used to test the software. If the team is using automated methods to test software, the tools usec her purchased or wniten in-house, must be documented, 3) 4) 5) 6). Metrics, statistics, and summaries convey the progress being made as the test work progresses. They take the form of graphs, et s, and written reports io IM Types: M any other 4 points - 2M 5 | a Describe l testi cT siress testing with suitable example. TM Toad Testing fcteasing he Tea on he ststem unten eaces ts tesa check the behavior ofthe sppicton ert itisnarmally eam ou unmet cond enone ds sh cate the sem sprerming wel ener en he fully executed load testing is only if the specified test eases are executed Uo The success Js text x the software under eustomer expected load Deseniion of Thema purpose of load testing 1st monsfor the response tne and staying power of | each: 1 M each Page No: 11 | 22 senor arrests ETE some | Operate the sofiware es ates om peri ¢ software ope many as you aegis Ce nerals such aS 1 connections. do it, With mot ‘Some softsare should beable portant eariable, Load SNE ml tools testing nding large JOS suet for esti dng data into ane pes of load ers by wor word the hare sly ont is simul Continuo Ronning multiple application Ra of a serve by cess testing & syst S Incase of zero-volume ee sufficient like Cl limit capaci he current i Stress Testing PU, fe Stress Testingis hardware resources nis performed t0 how the system maximum, Main parameters (0 “Throughput” Suess testing is Negative testing where 6 I re ent user/processes which cae Pe hi comes, This testing is also known as Fat Bue sting the sofware under les memory, 1ow disk space, sl hat extemal resour them to a bare mi performan sare not find the upper performs if 1 . focus during St load ssthan ide Sires testing ist Software with Low tr sofware and determine wi Sires testing is srmpy limiting soltware Fore.g. Word pro are runing on your comp disk space, it wor f the system runs [Ow potential 0 expect 2b ve values 10 2er0 OF 5 to handle the ti execule a different pat wld run without crashing or tosing data cessor soflw ks fine. But i nig. Setting th as it atternp wot tandle thous rousands of mailboxes im fed with 2et0 10 esting type to check ity of the system ‘oad goes well above tress testing are randled by the systems hardware ow CPU, slow modems ces and dependencies mum. With stress test a NIC, ano |x ~ _ ed e ez is ir all tha printer, or commicain ons ands of simultaneous n over long periods ‘So, Time acts aS ion frit to run wing restarted ne help of auton Example of each: 1M each processor rd disk. the server. the stability of software when ‘mory, disk space ete ‘and also to determine he expected mer “Response Time” and the software with large number of testing. al conditions. So, subject your ‘and so on. Look at it has. sting you starve the suter with all available memory and fon resources, you have a greater | near zero will make the software rastaint Ideally the software at cor y aM izes and disudvantages of using (ol | State the advantai tools: “Ans [ Advantages of usin Save Time ‘Speed Due to advanced camputing facilities the tests Automation saves time as So! ‘automation test tools prevail ‘ware can execute test cases faster th: n speed of process an unas Page No: 12 | 22 HOST SEXEE NO SOF TECHIE SE EHC HOS sone 20 HS Corie ] Reduces the tester's invoh ement in executing fests It relieves the feslews to do some | other work, | reneatabtity/Consisteney: The same tests eam be Fe-tun an eet the seme manne eliminating the sk of human enors such as testers forgetine thet evaet dons intentional ont steps fom theft eps, missing ou steps rom the est ep al J of which can test eer defects not being ented orth reporting of unald bus (hich cam again, be tine consuming for both developers and esters to reproduce Simulated Testing: Automated tools can create many concurrent virwal usersidata and effectively test the project in the test environment before releasing the product Test case desi Automated tools can be used to design test eases also thror automation, better coverage can be guaranteed than if done manually Reusable: The automated tests can be reused on different versions of the sofware, even if the interface changes. Avoids human mistakes: Manually executing the test cases may incorporate errors. But this can be avoided in automation testing Internal Testing: Testing may require testing for memory leakage or checking the coverage of testing, Automation can do this easily, Cost Reduction: If testing time increases, the cost of the software also increases. Due to testing tools time and therefore cost is reduced, Disadvantages of using tools: + Unrealistic expectation from the tool += People always make mistake by understanding time cost and effort for the initial introduction of the too! + People frequently miscaleulate the time and effort needed to achieve significant and continuing benefits from the tools + Mostly people underestimate the effort required to maintain the test assets generated by the tool = People depend on the tol a lot. (Over reliance on the tool) Disadvantage s2M | | ° Write the test cases for Notepad application. (any eight test ease) aM ‘Aas SS PROJECT: NOTEPAD MODULE: FIND AND REPLACE FUNCTIONAT, SPECIFICATION TEST CASE Nt FIND AND REPLACE TCR To Check functionality of TEST OBJECTIVE: - 1d and Replace” in notepad. ENVIRONMED WIN 2k, Notepad. Page No: 13 | 22 Tere Fat [Tet Y expected | Actual = TCH karin | Condition |Sieps [ata | Resutt _{ Result gion ona _ each te Ea Creek the men Atersticking | The avaability Tomine | | enthe find.the | search tthe Find Seindow should | box 12 Option —_| = popup available_| Pass Cheek the navigation After press : ‘trout Gare. | The find Shoacut Press Should produce | box aa | keys - [owe ite seareh box _| avaiable. | Pass hieek the navigation Anerpressing | The throwsh Crest, | Replace Shortcut Press should produce | box 3.0) | keys [Gat | | thereptace box_{ avaiable. | Pass Glick edit from Inthe menu by Check the meme flicking the edit navigation bar and Snd then find, | The find 3. | thvoueh then the search box | Box is ©_| mouse -__| Fino Shoutd open. | available, | Pass Find The ewsor box should be The cursor | should present inthe | The defaun | be pine space | cursoris 4 _| position. | open box Available | Pass Without opine Find anything, the box Find buiton Should | Press Should not be Tocheck [be | Find embledand | ttisnot 5s re reet | Spen | Bunion | | fumeonat__| enabled_| Pass The typed Text Find inthesearch | tits Tocheek | box Fiekt should | matching, the Search| should | Press sate then i control in [be | Find Sthenwvise | highlights 6 _[ihepase” | open | Button seneratcan [it Pass Page No: 14 | 22 7 srortar weal] || more si || nce then | [ater fampeiion ors Search th the The find rereiigeae emt lf SeareivFina | btton fantom [tow | Bint baton shout | avaiable Shoutd be | Should | Burton Bembted for | fornext | Jematie tor | be | Fina themevtsearch | seach La _|nextaiso’ | Gpen,_| New ts Sin | pass Find toe ‘The wer should | The oeneek | shouts | chick essked betore | message the Replace | be | on placing any | not s_[eouot "| open | Reptace |_| Word coming | By clicking Find Starch ote | Wie tox weordoniys | replacing Should Should vepace | the whole Replace the | ben | cuek on | — | only heate | word sa |exactwor | open _| Replace |_| sors only. | Pass wis Don replacing replace Find a find twhen here | box Dontreplace | Value iSnorent im | should sthemtherers | with he fence be [cuickon | — novewin | bank Se eee rare eure ee cece re Ghssk Bnd Ac pressing Canes | bow the cancel button should Bone | the be | ctck sade shoul | winder w_|rneiionasy Lepen | ence nu Sen | pres ‘Attempt any FAO of the following: yoany ai) Page No. 15 122 ™ AIMIIQKASIEERY STATE BOARDOE HE CIMIOE TELCO wanes s Tie] Fqetcae- | Testeaseovjective | Input | Expected | Actua » data | Result | Result vahdtest | | cases shall be | | considered | To add wo ine and a6 (4276 | Pass | display the result on ten- | | shit calculator L eleee 1. | TC To subiract wo integer | 176 | 76 Tope | (tase | and display the resulton | = fendigi calculator | 100 l 13 To multiply wo integer | 100% |2000 | 2000 | Pass and display the result on | 20 Tenigitcaleulator Tea To divide two integer | 100/5 | 20 20 | Pass and display the result on teasigi calculator Tc To clear the sereen Pass should — | appears appear on | on sereen | screen 16 To delete digits one by One iat |One | Pas | ! one should be | Dig i deleted | deleted 1 from right | feom i hhand side | sight hand Dy Design test cases Tor Web pages testing of any Web site (lake @ suital | example). Seal ( table om} x Page No: 16 | 22 19 | aun: wpe say Se SHEA SEAL sone Brest cases of rest eases for any web site OMIM each. any other valid test eases — us shall be lest a Expected considered Cas | Testease pected ey le ein] objective | POEM | result pe aoe ‘Cheek Click on cursor position | emaitor | Cursor should b Placed the or mobile umber the field a umber eld Tietd ass | | Cursor should Check cursor | Clickon | be placed on | Peed he ter | positionar | Password | the password | STONY | pace password field | field field Lae field Clickon | Hstould | teredirected ea | ete, | comtime | fesse tothe continue button | PAN | password page | password | "SS page ‘Tryto read | Contents rea | Readabitiy of | the contents | shouldbe | ¢ : ‘ontent sare font ontogin | readable . pave Pass Teaingor | Check ihe | Losin spelling |” Speting of | ces] spelling | speling or | shouldbe) Logins of login ica correct conect_ | Pas | | should =| ae change the : Cursor | | Hoverthe | cursor and | ing o changed ant 106 a mmouseon | shouldredivea | “PEI | pace bypertnk | torespective | ae | pase | LL onctiek Page No 17122 iG respected | Acta -— -esul result Status CSE) retenscmieetee vesull i SS crvous | Previons [PASS k jcafeiher Undo r . ‘undoes "euon | ation [7] nammene amin, | ae | ‘the pres jon _|_wndone | | aa Od Pr Previous Pass Shacks wheiher the Undo Previous rea | Cee re eon | a6ton Cie anlek| a men does He routs be | 888 soon ation segone | undone eck weer US a | nde | pas | TC3 | button in the Edit main Button Button Mea sabled whe soutdbe | ¥a8 are le not any previous Mente | disabled Fea} ect weer Udo Tato] Pass Feat nt contest undo | Button pena gabled when tron | remained whee ot any previous stoutdte | disabled sation! Gisabed Fee} Chass wher Tay Ne wa} (crRL2) reapnrveis | eesponse response when tere 80 Seced any of previous ations hcke whether he Cat vex | cnt aitnain Seicied | Selested reo | options in Edit main menu text should | text was iuts the selected text be cut cut na Checks whether ihe Cat 7 —l<«> ‘options in Edit Menu is Cut Options ont TC7 | disabled when ne texts are should be ee selected disabled as | pass Disabled shall be each, any id considered E SIMHIVESITEIEYSEAEE HO SRD UD EECCA EDLC MON a isout FH an Cero Attemprany TWO ofthe following: |) Tans | Write program Tor caleulating even aumbers from Tw 20 And design tt Gus for? 6M the same, Program - — include program 2M, int ming) sa form +0,5<20.64+2) conser printt%dua retum 0, Test EV GOT] Test Case “Test progam printstheeven | Case 1D Description number fiom 11020 Created “ABC Reviewed “PQR | Version ZI By By Tester’s [ABC Date Tested [T-] Test Case [Pass Name Jane | (PassFaivNo 202 | Executed) 3 S# Prerequisites SH. TestData 7 ]Cpmgam | using or loop | Tet Verify the Scenario even umber Sicp# Step Expected == Actual Pass/Fail OH als “Results Rests Natt _ Suspended PT Peieck [inal value intial value” [Pass inital —_| of Forloop | of Fr loop | condition of | should be 0 | 80.0" | forloop__| orl [Check final_| Final al Pass canition of | condition | forloop | should be ~ 20" or I = Page No: 19 | 22 arynrsnensttt HCINIOMLEDUCAION ume ‘Yoan 2 wc 7] Counters ‘operator | tie | | output increment by? operator should increment by Even number ed is Pass displaying isd ; Sean number Frich is installed on mob! rT Prepare test plan for "Cam Seanm oM “Fest plan for Cam Seanner: “Test Plan Identifier P10 Introduction: The purpose of this document is f0 ereal ato rabile. The purpose of testing this program ist cl application installedon mobi, The} ration ofits functionality, ease OF USE comers apeation of is fine document Scan document, Ei document, PDF conversion) Features to he tested . ‘* Scan Document e test plan for CamScanner Jneck the correct ‘© Edit Document © PDF Conversion Approach © Onthe test object © functional (© non-functional ‘© According to the requirements Le «By degree of preparedness ~ intuitive testing (ad hoc) Item Pass/Fail Criteria: All test cases with high priority are closed with the result ~ pass, The test coverage is checked and sufficient, where the criterion of sufficiency is not less than 99% of the coverage of requirements by tests. The test report was compiled and approved by the team lead and customer. Suspension Criteria and Resumption Requirements Criterion for interrupting testing: The appearance and entering into the bug-tracking Criterion for continuation of testing Closing the blocking bug in the buy tracking system, ‘Test Deliverables: Test plan, test cases, test report Test Tasks Wn © Writing test cases © Development ofent system of blocking buys test plan ia for the success of testin, ion of the results, Conducting the testing and evalu Creating t reports Page No. 20 | 22 SAMMISSIECY SEALE HOMHOLTCIMEAL HDLC Atta Needs = Mobile Phone T CamSeanner Installed Responsil Functionality an Responsibilities Test Enuinger | Test Enginger 3 POF Conversion of Document Staffing and Trai ing Needs To perform the tasks, you need to have the following knowledge ad skills = Knowledge and practical application ofthe camsea * Knowledge and ability to apply in practice the basie * Knowledge of various types of testing including fun Fechniques of test desi rtional and non-functional Schedule | The deadline for completion ofall works and delivery of the projet is 25/01/2023 by 5.00pm Risks and Contingencies Possible risks during testing: ‘* Insufficient human resources for testing the application in deadlines. '* Changing the requirements forthe product Approvals ‘Team Lead Test engineer 1 Test engineer 2 ° Prepare defect report after executing (est cases for withdrawn of amount from ATM machine. ou ‘Ans ‘any valid fect report io EI | elated with Project | Cash Simulator Cash (ATM) emia Product Phpiwnew.mote gov quenldioakivmigraniwonesteh | | funtion -inachine-smulaor an oa Release v10 | | om Male clusion tools, Woe [Tae Pag Our opens “Dig owons "| Detecied | VII Build 1 Version _ — inca wahdaval mmary Lined denomination option n Suman function, restricting cash withdrawal only till an | Deeipion [No option of withdrawing of amoumercessoF 3000 | Stepst0 T Open the website Replicate 2 Select ow prourans sete 3, Progeed to Dial Ineluson ots aa selet esmnulator ATM) _ = [acu sine tig) Page No 21122 MAMARASHTRA ST “AH HOARD OF FECHINICAL EDECA HON [Autonet asonec - 27001-2013 Cert) Saree Tangiage and skip 10 simulator 5, Enter the card 6 Select the account type 1. Go to Other functions and select cash withdrawal Expected Results | TTahould ade more options in denomination’ Jhould take amount in} withdrawal function or it s| the user, put from is in cash tual Results withdrawal option. ‘Attachments Tris displaying Tinted options of denomination Jor ATH) Cash Mahi Si Tauses inconvenience to the user in terms of limited cash Remarks withdrawal options. Defect High Severity Defect High Priority _ Reported By_| Test Engineer! ‘Assigned To XYZ, Status [Assigned | | | | | | !

You might also like