Republic of the Philippines Annex A
Municipality of Baliwag
Province of Bulacan
OFFICE OF THE BUILDING OFFICIAL
DOCUMENTARY REQUIREMENTS FOR BUILDING PERMIT APPLICATION
(Single Dwelling Residential / Commercial / Industrial / Others)
Date:_____________________
Name of Applicant: ___________________________________________ Project Description: ________________________________
Location of Project: ______________________________________________________ Contact Number: _______________________
CHECKLIST OF REQUIREMENTS
☐ Five (5) copies of filed up Application Form for Building Permit, Sanitary Permit, Electrical Permit, Mechanical Permit, etc
☐ Filled-up Application form for Locational Clearance
☐ Two (2) copies of Transfer Certificate of Title (TCT), or Deed of Absolute Sale or Contract of Lease (if lessee)
☐ Two (2) copies of Tax Declaration of Real Property
☐ One (1) photocopy of Community Tax Certificate (Cedula)
☐ Updated Official Receipt of Real Property Tax
☐ Five (5) sets of Survey Plans, design plans and other documents as follows:
☐ A) Architectural Documents
☐ B) Civil/Structural Documents
☐ C) Electrical Documents
☐ D) Mechanical Documents
☐ E) Sanitary/Plumbing Documents
☐ F) Electronics Documents
☐ G) Geodetic Documents
☐ H) Fire Protection Plan (if applicable)
☐ Soft copy of design plans on readable CD
☐ Three (3) photocopies of Valid Licenses (PRC I.D.) of all involved professionals
☐ Three copies of signed and sealed Bill of Materials
☐ Specifications
☐ Structural Analysis for 2-storey and above
☐ Soil Test for 3-storey and above (if applicable)
REMARKS:
☐ Complete Documents
☐ Incomplete Documents (Please comply documents with unchecked boxes.)
Name of Receiving Officer : __________________________
Date & Time Returned : __________________________
Signature of Applicant : __________________________
NOTES:
All application forms are available in the Office of the Building Official and/or on the website.
All the fully accomplished forms and requirements must be fastened in a LONG FOLDER except for the Drawing Plans and reports. ONLY COMPLETE
AND COMPLIANT APPLICATION WILL BE ACCEPTED.
Bring this Checklist with detachable Claim Stub when submitting your application.
Keep your CLAIM STUB at all times; “NO CLAIM STUB, NO RELEASE”
CLAIM STUB
Application No. : _______________________________________________________________
Time & Date Applied/Submitted : _______________________________________________________________
Return Date : _______________________________________________________________
Receiving Officer : _______________________________________________________________
(Signature over Printed Name)
Name of Applicant/Owner : ________________________________________________________________
Location of Project : ________________________________________________________________
Project Title : ________________________________________________________________
*For updates and inquiries, please call OBO/MEO at 798-0391 loc 3647 or email at [email protected] within 4 working days.
NOTE: Bring this claim stub upon claiming the Order of Payment/Building Permit, FSEC & other documents.