Khopta 60-40 Ratio in Redevelopment Regulations
Khopta 60-40 Ratio in Redevelopment Regulations
RECONSTRUCTION/REDEVELOPMENT
(Disclaimer: This Presentation cannot be used for legal purpose and it is for Public information)
1
A P P L I C A B I L I T Y O F T H E R E G U L AT I O N :
3
CRITERIA FOR APPLICABILITY:
4
CRITERIA FOR APPLICABILITY::
5
COMPONENTS OF PERMISSIBLE AREA:
CLAUSE-2: FOLLOWING COMPONENTS ADD TO PERMISSIBLE
AREA FOR REDEVELOPMENT: (If not done by CIDCO)
A. Rehabilitation Entitlement Area:
The entitlement of Rehabilitation Area for existing residential
tenement shall be sum of :
a) Basic Entitlement Area
b) Additional Entitlement Area
B. Incentive F.S.I.:
Shall be admissible against F.S.I. required for Rehabilitation
based on Basic Ratio
C. Balance F.S.I.:
The F.S.I. remaining balance after providing for Rehabilitation
and Incentive components. 6
COMPONENTS OF PERMISSIBLE AREA:
CLAUSE-2:
A. REHABILITATION ENTITLEMENT AREA: Sum of the following:
a) Basic Entitlement Area: Shall be equivalent to the carpet
area of existing tenement + 35% thereof. (subject to
Minimum carpet area of 300 [Link].)
b) Additional Entitlement Area: Shall be governed by size of
Plot under Redevelopment as follows:
TABLE - B
Area of Plot under Redevelopment Additional Entitlement (As % of the
Carpet area of Existing Tenement)
Upto 4000.0 sq.m. NIL
Above 4000.0 sq.m. to 2.0 Ha. 10%
Above 2.0 Ha. to 5.0 Ha. 15%
Above 5.0 Ha. To 10.0 Ha. 20%
7
COMPONENTS OF PERMISSIBLE AREA:
CLAUSE-2:
A. REHABILITATION ENTITLEMENT AREA:
Plot under Redevelopment shall be total area of land on
which Redevelopment of Dangerous/ Dilapidated buildings
is to be undertaken.
Maximum Entitlement Area shall not exceed maximum limit
of carpet area prescribed for MIG Category by the Govt., as
applicable on the date of approval of Redevelopment Project.
The Entitlement of Rehabilitation Area shall be exclusive of
area of Balcony.
The Entitlement of Rehabilitation Area for any existing
authorized commercial unit / amenity unit in Residential
Scheme shall be equal to Carpet area of existing unit + 20%
thereof.
8
COMPONENTS OF PERMISSIBLE AREA:
CLAUSE-2:
B. INCENTIVE F.S.I.:
Shall be admissible against F.S.I. required for Rehabilitation
based on Basic Ratio – Ratio of Land Rate in Rs./sq.m. (L.R.)
and the Rate of Construction (R.C.) in Rs./sq.m. as per Annual
schedule of Rates (A.S.R.) as follows:
TABLE - C
Basic Ratio (LR/RC) Incentive
(As % of Admissible Rehabilitation Area)
Above 3.00 70%
Above 2.00 and up to 3.00 80%
Above 1.00 and up to 2.00 90%
Up to 1.00 100%
9
COMPONENTS OF PERMISSIBLE AREA:
CLAUSE-2:
B. INCENTIVE F.S.I.:
Shall be subject to availability of F.S.I. on the Plot under
Redevelopment and its distribution by NMMC, with prior
approval of CIDCO
If more than one land rate is applicable to different parts of
the Plot under Redevelopment, a weighed average shall be
considered for computing the Average Land rate and Basic
Ratio
The Land Rate and Rate of Construction shall be considered
of the year in which the Redevelopment Project is approved
10
COMPONENTS OF PERMISSIBLE AREA:
CLAUSE-2:
C. SHARING OF BALANCE F.S.I.:
The F.S.I. remaining after providing for Rehabilitation and
Incentive Components shall be shared between existing/
proposed C.H.S/Apartment Ownership Association and
CIDCO in the form of Built up area as follows:
Table – D
Sharing of Balance F.S.I.
Basic Ratio (LR/RC)
Society/ Association Share CIDCO Share
Above 3.00 30% 70%
Above 2.00 and up to 3.00 40% 60%
Above 1.00 and up to 2.00 50% 50%
Up to 1.00 60% 40%
Out of the share of CIDCO, 20% shall be handed over to
NMMC in the form of tenements. 11
COMPONENTS OF PERMISSIBLE AREA:
WHEN REDEVELOPMENT IS UNDERTAKEN BY CIDCO DIRECTLY
OR JOINTLY ALONGWITH C.H.S./ASSOCIATION/OCCUPIERS,
COMPONENTS OF PERMISSIBLE AREA SHALL BE AS FOLLOWS:
A. Rehabilitation Entitlement Area:
Shall be increased by 15% of the existing carpet area, over and
above the Rehabilitation Area Entitlement calculated in (A) of
Clause-2 above, subject to maximum size of MIG (prescribed
by Govt. Housing dept.)
B. Incentive F.S.I.:
Shall be same as earlier (if developed by C.H.S./ Association/
Lessee)
C. Balance F.S.I.:
The Balance F.S.I. shall be entirely available to CIDCO for
implementing Affordable Housing Project. 12
O T H E R C R I T E R I A F O R R E D E V E LO P M E N T :
For the purpose of calculating F.S.I., entire area of Layout, including
widening of existing Roads and internal Roads, but excluding land
earmarked for Public Amenities shall be considered.
Subdivision / Amalgamation of more than one Apartment Owners’
Association/ C.H.S./Residents’ Association shall be permissible.
After amalgamation, the amalgamated Plot shall be in the name of
the applicant C.H.S. with legal ownership Title.
Consent of at least 70% Leaseholders / Occupants who intend to
amalgamate such condominium shall be necessary.
In a Condominium/Plot, area for widening of Existing Road as per the
Regular Line of Street prescribed by Commissioner, NMMC or
widening of Road providing Vehicular Access to the Condominium
Plot as per Table - A, shall be permissible for reconstruction/
redevelopment, after handing over free of cost, required stretch of
land under Road to NMMC with storm water drains and footpath.13
O T H E R C R I T E R I A F O R R E D E V E LO P M E N T :
Where there are a number of dangerous / dilapidated buildings on a
plot, equivalent Land Component shall be worked out and Incentive
F.S.I. shall be based on such Land component.
The permissible Tenement Density may be allowed to be exceeded in
multiples of F.S.I. permissible.
The existing Residential premises (other than R+C premises) shall be
permitted to be redeveloped for residential user only.
No Change of Use from Residential to R + C shall be permissible.
However, if area of Plot is more than 1000 sq.m. and is fronting a
road having width of 20.0 m or more, Convenience Shopping to the
extent of 5% of the Plot area shall be permissible.
If area of Plot is more than 1000 sq.m. and is fronting a road having
width of 30.0 m or more, Convenience Shopping to the extent of 10%
of the Plot area shall be permissible.
14
O T H E R C R I T E R I A F O R R E D E V E LO P M E N T :
It is mandatory to keep minimum 10% or 15% Recreational Open
Space on Ground, clearly open to sky, in addition to Podium Garden,
for Redevelopment Plots having area between 2500 sq.m. to 4000
sq.m. or more than 4000 sq.m., respectively.
5% of Plot area under Redevelopment/ Reconstruction Project shall
be surrendered to NMMC, free of cost, towards Essential Amenity
area if Plot Area is more than 2500 sq.m.
The F.S.I. of Amenity area shall be permissible on the Balance plot
area and the entire area of such Amenity space shall be considered
for Computation of F.S.I without deducting this area from the Gross
Plot area. However, F.S.I. equal to 1.00 out of amenity space F.S.I.
shall be deducted from the Total permissible F.S.I.
Alternatively, Carpet area equivalent to 5% of the Plot under
redevelopment can be constructed within the scheme with separate
access and handed over to NMMC free of cost as Social Amenity. 15
O T H E R C R I T E R I A F O R R E D E V E LO P M E N T :
The Layout of entire condominium/ Residential/ residential
and commercial Premises duly signed by the Apartment
Owners’ Association or C.H.S. shall be submitted at the time of
commencement certificate to ascertain the feasibility of the
entire condominium for redevelopment. This will ensure
proper redevelopment of other buildings in the condominium
or residential premises in future, if redevelopment is
undertaken in Phased manner.
For the purpose of deciding the authenticity of the age of the
structure, if the approved plans of such existing structure are
not available, the Municipal Commissioner shall consider other
evidence such as Assessment Record, or city survey record or
sanad.
16
O T H E R C R I T E R I A F O R R E D E V E LO P M E N T :
If, for Redevelopment undertaken by C.H.S./ Apartment
Owners’ Association/Developer, duly appointed, NOC from
CIDCO has been obtained, securing additional Balance F.S.I.
with the consent of 70% of the members, and made provision
for alternative accommodation in proposed building (incl.
Transit accommodation), then it shall be obligatory for all
occupiers to participate in Redevelopment Scheme and vacate
existing tenement. In case of Apartment Owners’ Association,
consent as per concerned Act shall be required.
For Redevelopment by CIDCO, consent of C.H.S. in the form of
valid Resolution as per the Co-op. Society’s Act, 1960 shall be
sufficient, whereas in Apartment Owners’ Association, consent
as per concerned Act shall be required.
17
O T H E R C R I T E R I A F O R R E D E V E LO P M E N T :
Infrastructure charges shall be levied by N.M.M.C., for the extra F.S.I.
granted, over and above Basic Zonal F.S.I.,@10% of land rate as per
Annual Schedule of Rates. The same may be deposited in proportion
to the area under partial redevelopment when done in phases.
A Corpus Fund, as may be decided by Municipal Commissioner, shall
be created by Developer, which shall remain with the concerned
C.H.S./Apartment Owners’ Association for maintenance of new
building constructed under Rehabilitation Component.
For the purpose of this Regulation, the Carpet areas for EWS, LIG or
MIG tenements shall be as determined by the Govt. in the Housing
Dept. from time to time.
Any Redevelopment Proposal which had obtained Commencement
certificate prior to the Regulation coming into force shall also be
entitled to convert to Redevelopment Project as per this Regulation.
18
REQUIREMENT OF DOCUMENTS:
DRAWINGS REQUIRED:
Key Plan or Location Plan, Site plan of the area, Detailed building
plans showing all required plans, sections and elevations. (As
per D.C.R. for NMMC)
Layout of the entire Condominium, showing Rehabilitation
buildings, Sale buildings, Open spaces, Amenity spaces,
Widening of Roads, internal Roads approved and signed by
Authorized Signatories of the Association/Society in original. (As
per D.C.R. for NMMC)
Structural Engineer’s R.C.C. drawings
23
P R O P O S A L F O R M AT :
(Disclaimer: This Presentation cannot be used for legal purpose and it is for Public information)
1. Entire Area of Layout under Redevelopment _______ SQ.M. As per CIDCO Plan
2. Deductions for
6. Proposed Area for Recreational Ground _______ SQ.M As per Rule 3 (vi)
7. Proposed Area for Social Amenity _______ SQ.M As per Rule 3 (vii)
____ _______
26
P R O P O S A L F O R M AT :
(Disclaimer: This Presentation cannot be used for legal purpose and it is for Public information)
AS PER ANNUAL SCHEDULE OF RATES FOR YEAR 2015 IN RUPEES/SQ.M. FOR BUILT UP AREA
____________________ ____________
28
P R O P O S A L F O R M AT :
(Disclaimer: This Presentation cannot be used for legal purpose and it is for Public information)
30
CASE STUDY : SECTOR-8, NERUL
(Disclaimer: This Presentation cannot be used for legal purpose and it is for Public information)
31
CASE STUDY : SECTOR-8, NERUL
(Disclaimer: This Presentation cannot be used for legal purpose and it is for Public information)
32
CASE STUDY : SECTOR-8, NERUL
(Disclaimer: This Presentation is for the purpose of Public Information and shall not be used for any legal purpose)
1. Entire Area of Layout under Redevelopment 4607.40 SQ.M. As per CIDCO Plan
2. Deductions for
6. Proposed Area for Recreational Ground (15%) 691.11 SQ.M As per Rule 3 (vi)
7. Proposed Area for Social Amenity (5%) 230.37 SQ.M As per Rule 3 (vii)
150 4696.890
34
CASE STUDY : SECTOR-8, NERUL
(Disclaimer: This Presentation is for the purpose of Public Information and shall not be used for any legal purpose)
AS PER ANNUAL SCHEDULE OF RATES FOR YEAR 2015 IN RUPEES/SQ.M. FOR BUILT UP AREA
36
CASE STUDY : SECTOR-8, NERUL
(Disclaimer: This Presentation is for the purpose of Public Information and shall not be used for any legal purpose)
ABOVE 1.00 AND UPTO 2.00 50% 0.000 40% 0.000 10% 0.000
37