Contract BC1
Railway Bosphorus Tube Crossing
Tunnels and Stations
(Marmaray)
Optional legal copy goes here OR [Link]
Bosphorus Strait
Black Sea
B
o
s
p
•European Side h Asian Side
o
r
u
s
Marmara Sea
Business 2
Project Location
2nd Bridge
1st Bridge
Railway Bosphorus Tube
Crossing, Tunnels and
Stations
Business 3
Longitudinal Section
Business 4
Particular Design Conditions
¾ Design Basis Earthquake : Mw = 7.5
¾ Countermeasure to Liquefaction
¾ Huge Water Pressure : Max. 60m
¾ Rapid Current
Upper Layer (N to S) : Max. 5 knots
(2.5m/sec)
Bottom Layer (S to N) : 1 ~ 1.5 knots
¾ Fire Resistance : 100 Mw Fire
Train with Petrol Fire
Business 5
IMMERSE TUNNEL
Construction Vehicle
Structure
Escape Gauge Squeeze
Way Way
Business 6
IMMERSE TUNNEL
Construction
Business 7
Bird View Istanbul Strait Crossing
Business 8
Immersion Procedure
European Side
Placing Barge
Tunnel
Element
Access shaft
Asian Side TBM
Tunnel Boring Machine
Business 9
Tunnel Cross and Longitudinal Section
Armor Protection Tunnel Armor Protection Anchor Release Band
アジア側
ヨーロッパ側
General Backfill
Selected Locking Fill
Foundation
(m) Immerse Tube (1387m)
0
-10 Sea Bed
-20
-30 Armor Protection
E10 E11
-40 E7 E8 E9
-50 E4 E5 E6
E1 E2 E3
-60
Seismic Joint
Seismic Joint
Business 10
Typical Cross Section of
Immersed Tunnel Element
1000 6350 600 6350 1000
Vehicle
Structure
Escape Gauge Squeeze
Way Way
Business 11
Business
Depth of Tube Bottom (m)
0
10
20
30
40
50
60
70
60
Bosphorus
41
BART
Hampton roads
2nd Hampton
Roads
37 37 36
Interstate
Baytown
Baltimore
Channel
Parana
Fort McHenry
Thimble Shoal
33 32 32 31 31
Channel
30
Tama Tunnel
Comparison Major Tube in the World
12
Tuzla Dry Dock TUBE Fabrication
Business 13
Immersion Procedure
Before Immersion (Anchoring Completion)
Marmara Sea Side Black Sea Side
Business 14
Slurry Type TBM TUNNEL
Construction
Business 15
TBM Excavation Route
European Side Asian Side
Kazlicesme Bosphorus Strait
Yedikule
Yenikapi Airilikcesme
Uskudar
Sirkeci
2170m 3343m 4620m
TBM TBM Immerse TBM
EPB Slurry Tunnel Slurry
Business 16
TBM(Slurry Type) φ=7,640mm、L=11,000mm
Business 17
Tunnel Inside (Asian Side – Sept.07)
Business 18
Tunnel Inside (Asian Side – Uskudar Station
Breakthrough – July 09)
Business 19
NATM TUNNEL
Construction
Business 20
NATM Works Location
Track CROSS OVER
SIRKECI Deep Station
Track CROSS OVER
USKUDAR
Station
Emergency CROSS PASSAGE Drain Pit
(44 Places 200m Interval)
Business 21
Uskudar Cross Over Tunnel Model
Business 22
Uskudar Cross Over Tunnel Excavation
Business 23
Lining Concrete
Business 24
Bird View around Sirkeci Station
North Entrance
East Ventilation Shaft
West Ventilation Shaft
South Entrance
Business 25
Sirkeci Station NATM Works
Business 26
Bird View of Uskudar Station Area
Immersed Tunnel
Uskudar Sta.
Business 27
Station Excavation
Business 28
U/W Concerns
Project of almost prototypical nature – deepest ever submerged
“atypical” connection sea-land tunnels
Strong bi-directional current in the Bosphorus straight
Heavy ship traffic with “reckless” ship owners at times
Due to deep tunnels high water pressure and hence water
tightness issues
An overseas contractor moving in unknown cultural environment
Land tunneling under densely built up (historic) areas
Business 29