Bosphorus Railway Tunnel Project Overview

The document summarizes a railway tunnel project under the Bosphorus Strait in Istanbul, Turkey called the Marmaray Project. The key aspects of the project include: 1) Construction of a 1,387 meter long immersed tunnel with 13 sections to connect the rail lines between Europe and Asia under the Bosphorus Strait. 2) Use of tunnel boring machines (TBMs) and the New Austrian Tunnelling Method (NATM) to excavate the land tunnels on either side of the strait with a total length of over 10 kilometers. 3) Challenges include the depth of the immersed tunnel at up to 60 meters below sea level, strong bi-directional currents

Uploaded by

demirmesut7575
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views29 pages

Bosphorus Railway Tunnel Project Overview

The document summarizes a railway tunnel project under the Bosphorus Strait in Istanbul, Turkey called the Marmaray Project. The key aspects of the project include: 1) Construction of a 1,387 meter long immersed tunnel with 13 sections to connect the rail lines between Europe and Asia under the Bosphorus Strait. 2) Use of tunnel boring machines (TBMs) and the New Austrian Tunnelling Method (NATM) to excavate the land tunnels on either side of the strait with a total length of over 10 kilometers. 3) Challenges include the depth of the immersed tunnel at up to 60 meters below sea level, strong bi-directional currents

Uploaded by

demirmesut7575
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Contract BC1

Railway Bosphorus Tube Crossing


Tunnels and Stations
(Marmaray)

Optional legal copy goes here OR [Link]


Bosphorus Strait
Black Sea

B
o
s
p
•European Side h Asian Side
o
r
u
s

Marmara Sea

Business 2
Project Location

2nd Bridge

1st Bridge

Railway Bosphorus Tube


Crossing, Tunnels and
Stations

Business 3
Longitudinal Section

Business 4
Particular Design Conditions

¾ Design Basis Earthquake : Mw = 7.5


¾ Countermeasure to Liquefaction
¾ Huge Water Pressure : Max. 60m
¾ Rapid Current
Upper Layer (N to S) : Max. 5 knots
(2.5m/sec)
Bottom Layer (S to N) : 1 ~ 1.5 knots
¾ Fire Resistance : 100 Mw Fire
Train with Petrol Fire

Business 5
IMMERSE TUNNEL
Construction Vehicle
Structure
Escape Gauge Squeeze
Way Way

Business 6
IMMERSE TUNNEL
Construction

Business 7
Bird View Istanbul Strait Crossing

Business 8
Immersion Procedure

European Side

Placing Barge

Tunnel
Element

Access shaft

Asian Side TBM


Tunnel Boring Machine
Business 9
Tunnel Cross and Longitudinal Section

Armor Protection Tunnel Armor Protection Anchor Release Band


アジア側
ヨーロッパ側

General Backfill

Selected Locking Fill


Foundation

(m) Immerse Tube (1387m)


0
-10 Sea Bed
-20
-30 Armor Protection
E10 E11
-40 E7 E8 E9
-50 E4 E5 E6
E1 E2 E3
-60
Seismic Joint
Seismic Joint
Business 10
Typical Cross Section of
Immersed Tunnel Element
1000 6350 600 6350 1000

Vehicle
Structure
Escape Gauge Squeeze
Way Way

Business 11
Business
Depth of Tube Bottom (m)

0
10
20
30
40
50
60
70
60

Bosphorus
41

BART
Hampton roads
2nd Hampton
Roads
37 37 36

Interstate
Baytown
Baltimore
Channel
Parana
Fort McHenry
Thimble Shoal
33 32 32 31 31

Channel
30

Tama Tunnel
Comparison Major Tube in the World

12
Tuzla Dry Dock TUBE Fabrication

Business 13
Immersion Procedure

Before Immersion (Anchoring Completion)

Marmara Sea Side Black Sea Side

Business 14
Slurry Type TBM TUNNEL
Construction

Business 15
TBM Excavation Route

European Side Asian Side


Kazlicesme Bosphorus Strait

Yedikule
Yenikapi Airilikcesme
Uskudar
Sirkeci

2170m 3343m 4620m

TBM TBM Immerse TBM


EPB Slurry Tunnel Slurry

Business 16
TBM(Slurry Type) φ=7,640mm、L=11,000mm

Business 17
Tunnel Inside (Asian Side – Sept.07)

Business 18
Tunnel Inside (Asian Side – Uskudar Station
Breakthrough – July 09)

Business 19
NATM TUNNEL
Construction

Business 20
NATM Works Location

Track CROSS OVER

SIRKECI Deep Station

Track CROSS OVER

USKUDAR
Station

Emergency CROSS PASSAGE Drain Pit


(44 Places 200m Interval)

Business 21
Uskudar Cross Over Tunnel Model

Business 22
Uskudar Cross Over Tunnel Excavation

Business 23
Lining Concrete

Business 24
Bird View around Sirkeci Station
North Entrance

East Ventilation Shaft

West Ventilation Shaft

South Entrance

Business 25
Sirkeci Station NATM Works

Business 26
Bird View of Uskudar Station Area

Immersed Tunnel

Uskudar Sta.

Business 27
Station Excavation

Business 28
U/W Concerns

ƒ Project of almost prototypical nature – deepest ever submerged

ƒ “atypical” connection sea-land tunnels

ƒ Strong bi-directional current in the Bosphorus straight

ƒ Heavy ship traffic with “reckless” ship owners at times

ƒ Due to deep tunnels high water pressure and hence water


tightness issues
ƒ An overseas contractor moving in unknown cultural environment

ƒ Land tunneling under densely built up (historic) areas