BASE PLATE FOR COLUMNS
MARK: BP-1 [Link] length
=D*12
122.5 105 122.5 350
70
105 + +
210
105
+ + 307.34
70
+ +
350
254
summary
[Link] A. bolts
C B t D L no of bolts
mm mm mm mm mm pcs
350 350 20 20 500 6
1
COMPOSITE SLABS
PROJECT
LOCATION
SCHEDULE OF COMPOSITE SLABS:
DIMENSIONS(mm) BARS-mm NOTE:
MARK TYPE BAR Ø(mm)
L W T BOTHWAYS SHEET THK=0.8mm TO 1mm
DECK-1 COMP. VARIES VARIES 100 10 305
1
COMPOSITE SLABS
SCHEDULE OF COMPOSITE SLABS:
2
COMPOSITE SLABS
10Ø AT 305mm
10Ø AT 305mm
10Ø AT 305mm
10Ø AT 305mm
3
DESIGN OF HALF TURN STAIRS
x-axis mm w conc. 23.5 kn/m^3
x1 2000 H 3 m
x2 1000 b(step wd) 1000 mm
3000 y3
y2=gap
y- axis mm y1
y1 1000
y2 200 x1 x2
y3 1000
2200
RUNS ht level
flights pcs mm mm [Link]
f1 8 2000 1500 mm
f2 8 2000 1500 187.5
checking 16 3000
SUMMARY
[Link] tread D step wd m. barØ s d. barØ s
mm mm mm mm mm mm mm mm
187.5 250 150 1000 12 150 12 300
1
SCHEDULE OF COLUMNS FTGS-5
PROJECT
LOCATION note:
clear conc. cover=40mm
SCHEDULE OF COLUMNS
MARK DIMENSIONS(mm)
HT. LEVEL BAR Ø(mm) SECTION (pcs) SPACING OF LAT. TIES(10mmØ)
B D
BASE
TO PED 500 500 20 8 1 at .050m, . Rest at .20m o c.
PED
BASE
TO PED2 400 400 16 8 1 at .050m, . Rest at .20m o c.
PED2
ACI CODE NOTE:more than 4 pcs main bars,please provide additional ties
NOTE: USE 8mm Ø as additional link to column rebars
note:
clear conc. cover=75mm SCHEDULE OF FOOTINGS:
DIMENSIONS(mm) BARS(pcs)
MARK TYPE BAR Ø(mm)
L W D t BOTHWAYS
F1 ISOLATED 2500 2500 2000 400 20 16
F2 ISOLATED 2900 2900 2000 400 20 20
NOTE: DEPTH OF EXCAVATION SHALL BE BASED ON NATURAL GRADE LINE (NGL).
1
SCHEDULE OF COLUMNS FTGS-5
SCHEDULE OF MAT FOOTINGS
DIMENSIONS(mm) <-------REQUIRED DETAILING-------->
MARK TYPE
L W D t ***TOP FIBER*** ***BOTTOM FIBER***
F2 COMB 5060 5000 2000 500 REBARS REBARS
// to L // to W // to L // to W
note: 16Ø AT 200 16Ø AT 200 16Ø AT 200 16Ø AT 200
clear conc. cover=80mm
2.0 M
TOP FIBER
CHAIR BAR DIMENSION BOTTOM FIBER
t COVER bar Ǿ A B C SPACING PCS CHAIR bar Ǿ
mm mm mm mm mm mm m 1SQ MT COVER mm
500 75 16 500 286 600 1.0 1.0 8
2
SCHEDULE OF BEAMS-4
PROJECT
LOCATION note:
clear conc. cover=40mm
SCHEDULE OF BEAMS
DIMENSIONS(mm) REBARS DETAILS
MARK BAR Ø(mm) SPACING OF 10mmØ STIRRURS
B H AT SUPPORT(pcs) AT MIDSPAN(pcs)
3 2 CRITICAL SEGMENT BALANCE SEGMENT
FTB1 300 500 20
2 3 at .15 m c/c at .20 m c/c
4 2 CRITICAL SEGMENT BALANCE SEGMENT
FTB2/GB1 300 500 20
2 4 at .15 m c/c at .20 m c/c
Nominal Grades of Concrete
Concrete Grade Mix Ratio Compressive Strength Water-Cement-Ratio
MPa (N/mm^2 ) psi liters/40kg-cement
M20 1:1.[Link].50 20 3000 20
1
SCHEDULE OF BEAMS-4
NOTE:location of
vertical stirrups in beams
spacers are nothing but the small piece
of steel bar put between two layers
LAPPING LENGTH (ACI CODE 318-14)
FOR TENSION MEMBER (RCC BEAM)
48D
FOR COMPRESSION MEMBER (RCC COLUMN)
60D
WHERE D -DIAMETER OF BAR
2
SCHEDULE OF BEAMS-4
note:
at least 2 bars should go
full length of beam
CURTAILMENT OF BARS IN BEAMS
(ACI 318-14)
3
SCHEDULES OF STEEL BEAMS COLUMNS-4
conversion
inches mm
1 25.4
HORIZONTAL MEMBERS
ASSIGNMENT SECTION NAME DEPTH WIDTH FLANGE WEB WT WT
MARK mm mm mm mm LB/FT KG/M
SB1 W 14 × 34 355.1 171.3 11.6 7.2 34 50.75
(WF 14"X 7")
SB2/SRB1 W 12 × 26 310.4 164.8 9.7 5.8 26 38.82
(WF 12"X 6.5")
SRB2 W 14 × 132 373.4 373.4 26.26 16.38 132 196.9
(WF 14"X 14")
1
SCHEDULES OF STEEL BEAMS COLUMNS-4
VERTICAL MEMBERS
conversion
HT. LEVEL ASSIGNMENT SECTION NAME DEPTH WIDTH FLANGE WEB WT WT inches mm
MARK mm mm mm mm LB/FT KG/M 1 25.4
PEDESTAL SC1 W12X53 307.34 254 14.6 8.76 53 79.16
TO (WF 12"X 10")
ROOF BEAM
2
DETAILING OF ELEVATOR WALL
note:
clear conc. cover=25mm
WALL THK=250mm
TOP VIEW
LAYER 1
1-MT STRIP WALL
LAYER 2
12barØ AT 250mm
ELEVATION VIEW OF WALL
note:
adopt 8mmØ clips placed @ mid height of wall