Construction Cost Breakdown

This document is a detailed cost breakdown for a construction project. It includes: - The total amount of the main tender, contractor details, site possession and completion dates. - A brief description of the buildings being constructed including their structural elements. - Line item costs for preliminaries, piling/foundations, building construction, internal services, external works, variation of prices, contribution fees, miscellaneous costs, supervision, and professional fees. - Notes for calculating certain costs and a reference to supplementary notes. The document provides a comprehensive listing and costing of all elements of the construction project for accounting and cost analysis purposes.

Uploaded by

Iqbal Saleh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
112 views2 pages

Construction Cost Breakdown

This document is a detailed cost breakdown for a construction project. It includes: - The total amount of the main tender, contractor details, site possession and completion dates. - A brief description of the buildings being constructed including their structural elements. - Line item costs for preliminaries, piling/foundations, building construction, internal services, external works, variation of prices, contribution fees, miscellaneous costs, supervision, and professional fees. - Notes for calculating certain costs and a reference to supplementary notes. The document provides a comprehensive listing and costing of all elements of the construction project for accounting and cost analysis purposes.

Uploaded by

Iqbal Saleh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

LAMPIRAN 4E

(PWD 142C - Rev.`91)

JABATAN KERJA RAYA


AS COMPLETED DETAILED ABSTRACT FOR Total Amount of Main Tender: RM
Contractor for Main Works Class

Date of Possession of Site Actual Date of Completion

Original Contract Period

Extension of Time (if any)

Head Sub/Head Year Total Prov. RM Amount of L&A Damages (if any)
Prov. for Const. RM

BRIEF DESCRIPTION OF BUILDINGS

BUILDING Frame Wall Roof Floor Ceiling Window Standard

b
c
d
e
f

PRIME COST AND PROVISIONAL SUMS

ITEM ALLOWED RM ACTUAL RM


a
b
c
d
e
f
g
h

BREAKDOWN OF COST COST RM

1 PRELIMINARIES Being % of Remainder of Main Tender


2 PILING/SPECIAL FOUNDATION Unit Quantity Unit Cost
Type and Size -
a
b
c
Floor 0
3 BUILDING - Drawing No. Area m2 Cost/m2 Vol.m3* Cost/m3*
a
b
c
d
e
f
g
SUBTOTAL
carried forward -
*Refer to Note 8.2 (b)

47
LAMPIRAN 4E (samb.)

BREAKDOWN OF COST (CONT'D) COST RM

SUBTOTAL brought forward -


4 INTERNAL SERVICES * Building Cost % of
Served /m2 Bldg.
Ref. No. Floor Area Served RM Cost
a Plumbing Installation
b Sanitary Appliances
c Electrical Installation
d Fire Protection Installation
e Air Conditioning Installation
f Lift & Conveyor Installation
5 EXTERNAL WORKS Appropriate Unit Quantity Unit Cost
a i) Site Preparation i) Hectares
ii) Earthwork (I.f. = %)** ii) Cu. m moved (m3)
b Roads, Hardstanding, Surface Area (m2)
Footpaths & Paving
c Fencing & Gates Perimeter (m)
d Turfing & Soft Landscaping Turfed Area (m2)
(S.t. = %)
e Surface Drainage Tot. length of drn. & pipes (m)
f Sewerage No. of occupants served
g External Electrical Installation No. of KVA required
h External Water Supply Installation No. of occupants served
i External Telephone Installation No. of Tel. points served

6 VARIATION OF PRICES ALL IN UNIT RATE (of Total Items 1 to 9)


7 CONTRIBUTION FEE TO LOCAL Total Floor Area m2 : Cost/m2 :
AND UTILITY AUTHORITY Quantity Surveyor/
a TNB & JBA Superintending Officer's Representative
b Telekoms
8 MISCELLANEOUS
a Advertisement & Documentation
b Soil Investigation Date :
Superintending Officer/
TOTAL (Items 1 to 9) State Director of Works
10 SUPERVISION
11 PROFESSIONAL FEES
a Architect
b Civil & Structural Engineer
c Mechanical Engineer Date :
d Electrical Engineer Portfolio Branch Director of Works
e Quantity Surveyor
f

TOTAL COST OF PROJECT


Date :
* Refer to Note 7.1 (b) & 8.2
** Refer to Supplementary Note 2.2 (b)

48