0% found this document useful (0 votes)
82 views5 pages

Accomodation Block

The document contains draft conceptual architectural drawings for a proposed accommodation block at the Yumbe project, including a ground floor plan, first floor plan, elevations, and section X-X. The ground floor plan shows the layout of the building, including verandas, wardrobes, windows and dimensions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views5 pages

Accomodation Block

The document contains draft conceptual architectural drawings for a proposed accommodation block at the Yumbe project, including a ground floor plan, first floor plan, elevations, and section X-X. The ground floor plan shows the layout of the building, including verandas, wardrobes, windows and dimensions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PROPOSED YUMBE PROJECT

DRAFT CONCEPTUAL ARCHITECTURAL


DRAWINGS

ACCOMODATION BLOCK CONTENTS

Ground Floor Plan……………………………………………………………….…………………1


First Floor Plan……..…………………………...…………………………………………..…..2
Elevations………..………………………………………………………………..………………...3
Section X-X……………………………………………………………………..………….………..4
PROPOSED ACCOMODATION BLOCK - GROUND FLOOR PLAN
L[--]02

43.949

4.550 1.675 4.175 4.175 1.675 1.675 4.175 4.175 1.675 1.675 4.175 4.175 1.675 2.600
0.200 0.200 0.200
1.500 0.200 4.350 0.200 1.500 0.150 4.000 0.200 4.000 0.150 1.500 1.500 0.150 4.000 0.200 4.000 0.150 1.500 1.500 0.150 4.000 0.200 4.000 0.150 1.500 2.400 0.200
0.700 0.900 0.900 0.700 0.950 0.550 0.900 0.700 0.950 0.550 0.900 0.700
1.000 0.950 0.550 0.550 0.950 0.700 0.900 0.550 0.950 0.700 0.900 0.550 0.950
4.850 1.200 1.200 1.300 1.200 1.800 1.200 1.300 1.200 1.800 1.200 1.300 1.200 1.450 1.500 0.650

1.500

1.500
VERANDA VERANDA VERANDA VERANDA VERANDA VERANDA
6.00m2 6.00m2 6.00m2 6.00m2 6.00m2 6.00m2
W2 W3 W2 W2 W3 W3 W2 W2 W3 W3 W2 W2 W3 W4

11

0.750
D1 D1 D1 D1 D1 D1

0.200

0.200
Wardrobe

Wardrobe

Wardrobe

Wardrobe

Wardrobe

Wardrobe
1.200
BATH/ WC BATH/ WC BATH/ WC BATH/ WC BATH/ WC BATH/ WC 10
11
W2

Dressing

Dressing

Dressing

Dressing

Dressing

Dressing
VERANDA ROOM 09 ROOM 10 ROOM 11 ROOM 12 ROOM 13 ROOM 14 ROOM 15
9
12

4.175

4.175
4.000
0.550
4.80m2 4.80m2 4.80m2 4.80m2 4.80m2 4.80m2

4.750
13
8

4.550
6.00m2 19.00m2 19.00m2 19.00m2 19.00m2 19.00m2 19.00m2 19.00m2 7
14

0.900

19G x 0.300
20R x 0.150
15
6

D2 D2 D2 D2 D2 D2 5
16

4
17

0.150
0.950
18
3

Wardrobe Dressing 2
19

10 1
20
D2

0.700
UP DOWN

1.500 BATH/ WC D1 D1
1.775

1.775
W3 D1 D1 D1 D1 D1

1.500
W1 W1 W1 W1 W1 W1

4.80m2
0.200

1.800

12.200
9 CLEANERS ROOM
1.500

D1
0.700

W3 4.80m2
0.900
0.150

7.450

7.450
5.750

5.750
1.500

W2 W2 1.775 33.024 2.900


4.000

LAUNDRY
17.40m2
1.950
0.200

D1

0.200
8

1.500 1.200
3.200

3.000

3.000

3.200
3.100
0.200

0.800
0.950

0.200
10.00 % 8.00 % 10.00 %
L[--]03

L[--]04
0.800
36.199

20.700
3.200

3.000

1.500

4.000

1.800

3.200

8.800
SERVER ROOM

0.900
13.00m2

0.200
D1
10.00 % 8.00 % 10.00 %
0.950

0.900
0.200

1.200 1.500

3.100
3.200

3.000

3.000

3.200
19.250

0.200
0.750
0.200

1.200

W2
4.175

4.175
4.000
0.550

VERANDA ROOM 08
6.00m2 19.00m2
0.900

X D1
X

7.450

7.450
0.150
0.950

Wardrobe Dressing

4 D2
0.700

BATH/ WC
1.575

1.575
1.500

W3

D1

12.200
4.80m2
3
0.200

1.800

1.500

BATH/ WC
1.775

1.775
1.500
0.700

W1 W1 W1 W1 W1 W1
W3 4.80m2 D1 D1 D1 D1 D1 D1 D1

2
UP DOWN
0.950

D2 1
20
0.150

Wardrobe Dressing 2
19
3
18
0.900

4
17

19G x 0.300
20R x 0.150
D2 D2 D2 D2 D2 D2
5
16
D1

4.550
4.750
6
15
0.550
4.000
4.175

4.175
Dressing

Dressing

Dressing

Dressing

Dressing

Dressing
VERANDA ROOM 07 ROOM 06 ROOM 05 ROOM 04 ROOM 03 ROOM 02 ROOM 01
7
14

BATH/ WC BATH/ WC BATH/ WC BATH/ WC BATH/ WC BATH/ WC 8


13
6.00m2 19.00m2 19.00m2 19.00m2 19.00m2 19.00m2 19.00m2 19.00m2 9
12
1.200

10
11
W2
4.80m2 4.80m2 4.80m2 4.80m2 4.80m2 4.80m2
Wardrobe

Wardrobe

Wardrobe

Wardrobe

Wardrobe

Wardrobe
0.200

0.750

1 D1 D1 D1 D1 D1 D1

0.200
W2 W3 W2 W2 W3 W3 W2 W2 W3 W3 W2 W2 W3
1.500

1.500

W4
VERANDA VERANDA VERANDA VERANDA VERANDA VERANDA
6.00m2 6.00m2 6.00m2 6.00m2 6.00m2 6.00m2

0.700 0.900 0.900 0.700 0.950 0.550 0.900 0.700 0.950 0.550 0.900 0.700
1.000 0.950 0.550 0.550 0.950 0.700 0.900 0.550 0.950 0.700 0.900 0.550 0.950
4.850 1.200 1.200 1.300 1.200 1.800 1.200 1.300 1.200 1.800 1.200 1.300 1.200 1.450 1.500 0.650
0.200 0.200 0.200
1.500 0.200 4.350 0.200 1.500 0.150 4.000 0.200 4.000 0.150 1.500 1.500 0.150 4.000 0.200 4.000 0.150 1.500 1.500 0.150 4.000 0.200 4.000 0.150 1.500 2.400 0.200

4.550 1.675 4.175 4.175 1.675 1.675 4.175 4.175 1.675 1.675 4.175 4.175 1.675 2.600

43.949

A B C D E F G H I J K L M N O P

L[--]01
P R O P O S E D G R O U N D F L O O R P L A N
PROPOSED ACCOMODATION BLOCK
Scale 1: 120
001

DATE Scale
PROJECT TITLE DRAWING TITLE WORK STAGE
[Link] REV. Checked by
JULY 1:120

YUMBE PROJECT PROPOSED DRAFT 2 2 2022


ON A1 PAPER Drawn by

ACCOMODATION BLOCK

GSPublisherVersion [Link]
PROPOSED ACCOMODATION BLOCK - FIRST FLOOR PLAN
L[--]02

43.949
0.200 0.200
1.500 0.200 4.350 0.200 1.500 0.150 4.000 0.200 4.000 0.150 3.200 0.150 4.000 0.200 4.000 0.150 1.500 1.500 0.150 4.000 0.200 4.000 0.150 1.500 2.400 0.200

0.700 0.900 0.900 0.700 0.950 0.550 0.900 0.700 0.950 0.550 0.900 0.700
1.000 0.950 0.550 0.550 0.950 0.700 0.900 0.550 0.950 0.700 0.900 0.550 0.950
4.850 1.200 1.200 1.300 1.200 1.800 1.200 1.300 1.200 1.800 1.200 1.300 1.200 1.450 1.500 0.650

1.500

1.500

1.500

1.500
VERANDA VERANDA VERANDA VERANDA VERANDA VERANDA
6.00m2 6.00m2 6.00m2 6.00m2 6.00m2 6.00m2
W2 W3 W2 W2 W3 W3 W2 W2 W3 W3 W2 W2 W3 W4

0.750
D1 D1 D1 D1 D1 D1

0.200

0.200
Wardrobe

Wardrobe

Wardrobe

Wardrobe

Wardrobe

Wardrobe
1.200
BATH/ WC BATH/ WC BATH/ WC BATH/ WC BATH/ WC BATH/ WC
W2

Dressing

Dressing

Dressing

Dressing

Dressing

Dressing
VERANDA ROOM 24 ROOM 25 ROOM 26 ROOM 27 ROOM 28 ROOM 29 ROOM 30

4.000

0.550
4.80m2 4.80m2 4.80m2 4.80m2 4.80m2 4.80m2

4.550
6.00m2 19.00m2 19.00m2 19.00m2 19.00m2 19.00m2 19.00m2 19.00m2

0.900
D2 D2 D2 D2 D2 D2

0.150

0.950
Wardrobe Dressing
D2

0.700
BATH/ WC

1.500
W3 D1 D1
D1 D1 D1 D1 D1

1.500
W1 W1 W1 W1 W1 W1

4.80m2

0.200

1.800
CLEANERS ROOM

1.500
D1

0.700
W3 4.80m2

0.900
0.150

1.500
W2 W2
4.000
LAUNDRY
17.40m2

1.950
0.200

D1
3.000

3.000
0.200

0.950

2.000
L[--]03

Concrete Ramp

L[--]04
33.199

20.700

36.199
3.000

1.500

SWITCH ROOM
13.00m2

2.000
D1
Concrete Ramp
0.950
0.200
3.000

3.000

19.192
0.750
0.200

1.200

W2
4.000

0.550

VERANDA ROOM 23
6.00m2 19.00m2
0.900

X D1
X
0.150

0.950

Wardrobe Dressing
D2
0.700

BATH/ WC
1.500

W3

D1
4.80m2
0.200

1.800

1.500
BATH/ WC
1.500

0.700

W1 W1 W1 W1 W1 W1
W3 4.80m2 D1 D1 D1 D1 D1 D1 D1
0.950

D2
0.150

Wardrobe Dressing
0.900

D1 D2 D2 D2 D2 D2 D2

4.750
0.550
4.000

Dressing

Dressing

Dressing

Dressing

Dressing

Dressing
VERANDA ROOM 22 ROOM 21 ROOM 20 ROOM 19 ROOM 18 ROOM 17 ROOM 16
BATH/ WC BATH/ WC BATH/ WC BATH/ WC BATH/ WC BATH/ WC
6.00m2 19.00m2 19.00m2 19.00m2 19.00m2 19.00m2 19.00m2 19.00m2
1.200

W2
4.80m2 4.80m2 4.80m2 4.80m2 4.80m2 4.80m2
Wardrobe

Wardrobe

Wardrobe

Wardrobe

Wardrobe

Wardrobe
0.200

0.750

D1 D1 D1 D1 D1 D1

W2 W3 W2 W2 W3 W3 W2 W2 W3 W3 W2 W2 W3
1.500

1.500

1.500

1.500
W4
VERANDA VERANDA VERANDA VERANDA VERANDA VERANDA
6.00m2 6.00m2 6.00m2 6.00m2 6.00m2 6.00m2

0.700 0.900 0.900 0.700 0.950 0.550 0.900 0.700 0.950 0.550 0.900 0.700
1.000 0.950 0.550 0.550 0.950 0.700 0.900 0.550 0.950 0.700 0.900 0.550 0.950
4.850 1.200 1.200 1.300 1.200 1.800 1.200 1.300 1.200 1.800 1.200 1.300 1.200 1.450 1.500 0.650
0.200 0.200
1.500 0.200 4.350 0.200 1.500 0.150 4.000 0.200 4.000 0.150 3.200 0.150 4.000 0.200 4.000 0.150 1.500 1.500 0.150 4.000 0.200 4.000 0.150 1.500 2.400 0.200

43.949

L[--]01
P R O P O S E D F I R S T F L O O R P L A N
PROPOSED ACCOMODATION BLOCK
Scale 1: 120
002

DATE Scale
PROJECT TITLE DRAWING TITLE WORK STAGE
[Link] REV. Checked by
JULY 1:120

YUMBE PROJECT PROPOSED DRAFT 2 2 2022


ON A1 PAPER Drawn by

ACCOMODATION BLOCK

GSPublisherVersion [Link]
PROPOSED ACCOMODATION BLOCK - ELEVATIONS

A B C D E F G H I J K L M N O P
4.550 1.675 4.175 4.175 1.675 1.675 4.175 4.175 1.675 1.675 4.175 4.175 1.675 2.600 4.300

ROOF LEVEL
+6.000m

FIRST FLOOR LEVEL


+3.000m

GROUND FLOOR LEVEL


+/-0.000m

F R O N T V I E W L [ - - ] 0 1
PROPOSED ACCOMODATION BLOCK
Scale 1: 100

P O N M L K J I H G F E D C B A
4.300 2.600 1.675 4.175 4.175 1.675 1.675 4.175 4.175 1.675 1.675 4.175 4.175 1.675 4.550

ROOF LEVEL
+6.000m

FIRST FLOOR LEVEL


+3.000m

GROUND FLOOR LEVEL


+/-0.000m

R E A R V I E W L [ - - ] 0 2
PROPOSED ACCOMODATION BLOCK
Scale 1: 100

11 10 9 8 7 6 5 4 3 2 1

4.175 1.775 5.750 3.200 3.200 3.200 4.175 1.575 1.775 4.175

ROOF LEVEL
+6.000m

FIRST FLOOR LEVEL


+3.000m

GROUND FLOOR LEVEL


+/-0.000m

S I D E V I E W L [ - - ] 0 3
PROPOSED ACCOMODATION BLOCK
Scale 1: 100

1 2 3 4 5 6 7 8 9 10 11
4.175 1.775 1.575 4.175 3.200 3.200 3.200 5.750 1.775 4.175

ROOF LEVEL
+6.000m

FIRST FLOOR LEVEL


+3.000m

GROUND FLOOR LEVEL


+/-0.000m

S I D E V I E W L [ - - ] 0 4
PROPOSED ACCOMODATION BLOCK
Scale 1: 100

003

DATE Scale
PROJECT TITLE DRAWING TITLE WORK STAGE
[Link] REV. Checked by
JULY VARIOUS

YUMBE PROJECT PROPOSED DRAFT 2 1 2022


ON A1 PAPER Drawn by

ACCOMODATION BLOCK

GSPublisherVersion [Link]
PROPOSED ACCOMODATION BLOCK - SECTION X-X

Roof Construction Notes Roof Construction Notes


Roof pitched at 25˚, Roof pitched at 25˚,
G28 precoated sheets on, G28 precoated sheets on,
100x50mm timber purlins on, 100x50mm timber purlins on,
100x50mm common rafters with, 100x50mm common rafters with,
100x50mm timber ties and struts on, 100x50mm timber ties and struts on,
150x50mm timber tie beams resting on, 150x50mm timber tie beams resting on,
100x75mm timber wall plates secured on 100x75mm timber wall plates secured on
walls by hoop iron walls by hoop iron
250x25mm fascia and berge boards. 250x25mm fascia and berge boards.
Ceiling Notes Ceiling Notes
Metal lathe plastered ceiling fixed onto Metal lathe plastered ceiling fixed onto
100x50mm ceiling joists and 50x50mm 100x50mm ceiling joists and 50x50mm
branderings. branderings.

A B C D E F G H I J K L M N O P

4.550 1.675 4.175 4.175 1.675 1.675 4.175 4.175 1.675 1.675 4.175 4.175 1.675 2.600 4.300

ROOF LEVEL
+6.000m

1.500 0.200 4.350 0.200 1.475 0.200


3.000

ROOM 23 0.200 2.400 0.200

FIRST FLOOR LEVEL


+3.000m
0.200

ROOM 08
2.800

GROUND FLOOR LEVEL


+/-0.000m

Floor Notes
Foundation Notes 85mm high skirting to march floor finish
230mm thick plinth wall on Porcelain tiles floor finish on
690X230mm thick plain concrete 50mm thick cement sand 1:4 screed on
strip foundation mix [Link] atleast
1000mm deep
100mm thick plain concrete slab [Link] on
Recommended hardcore on
S E C T I O N X - X
Consolidated marrum

PROPOSED ACCOMODATION BLOCK


Scale 1: 75

004

DATE Scale
PROJECT TITLE DRAWING TITLE WORK STAGE
[Link] REV. Checked by
JULY 1:75

YUMBE PROJECT PROPOSED DRAFT 2 2 2022


ON A1 PAPER Drawn by

ACCOMODATION BLOCK

GSPublisherVersion [Link]