This document contains construction schedules for two projects: 1) Construction of a 2-storied office, training center, and officer's quarters building with a 4-storied foundation at a duck hatchery farm in Sirajganj. 2) Construction of a 4-storied dormitory building with 8 units and a 4-storied foundation also at the Sirajganj duck hatchery farm. Both schedules list 20 items of work and their planned durations across 7 months, with a gap of 6 days between each period.

Uploaded by

Masum
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
105 views2 pages

Construction Overview for Duck Hatchery

This document contains construction schedules for two projects: 1) Construction of a 2-storied office, training center, and officer's quarters building with a 4-storied foundation at a duck hatchery farm in Sirajganj. 2) Construction of a 4-storied dormitory building with 8 units and a 4-storied foundation also at the Sirajganj duck hatchery farm. Both schedules list 20 items of work and their planned durations across 7 months, with a gap of 6 days between each period.

Uploaded by

Masum
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

NAME OF WORK : CONSTRUCTION OF 2-STORIED OFFICE, TRAINING CENTER CUM OFFICER'S QUARTERS (2-UNIT) WITH 4-STORIED FOUNDATION) DUCK

HATCHERY FARM AT SIRAJGONJ, Package: 34, Lot No: 01

Legend =
1 Gap = 6 days

Period (Months)
Sl.
Description of Item Remarks
No.
1 2 3 4 5 6 7

01 Preparation of site including layout

02 Boring including cast-in-situ pile in all respect

03 Earth work in excavation


04 Sand filling
05 Brick flat soling
06 Mass concrete in all respect
07 Brick work in all respect
08 R.C.C. wall in respect
09 MS Rod
10 Plaster work in all respect
11 MS Door frame and door shutter
12 Aluminium Slaiding Door & Window
13 Flooring work including tiles
14 Water proofing work/lime terracing work
15 Drain & apron
16 Sanitary and plumbing work in all respect
17 Electrical work in all respect
18 Painting work in all respect
19 Site cleaning
20 Hand over and taken over
NAME OF WORK : CONSTRUCTION OF 4-STORIED DORMITORY BUILDING (8-UNIT) WITH 4-STORIED FOUNDATION) DUCK HATCHERY FARM AT SIRAJGONJ,
Package: 34, Lot No: 02

Legend =
1 Gap = 6 days

Period (Months)
Sl.
Description of Item Remarks
No.
1 2 3 4 5 6 7

01 Preparation of site including layout

02 Boring including cast-in-situ pile in all respect

03 Earth work in excavation


04 Sand filling
05 Brick flat soling
06 Mass concrete in all respect
07 Brick work in all respect
08 R.C.C. wall in respect
09 MS Rod
10 Plaster work in all respect
11 MS Door frame and door shutter
12 Aluminium Slaiding Door & Window
13 Flooring work including tiles
14 Water proofing work/lime terracing work
15 Drain & apron
16 Sanitary and plumbing work in all respect
17 Electrical work in all respect
18 Painting work in all respect
19 Site cleaning
20 Hand over and taken over