Final Control Document For Checklist (Elite Engineering) Update. 08-10-2..
Final Control Document For Checklist (Elite Engineering) Update. 08-10-2..
Dated: 09-APR-2020
Terminal
Project
Type Modal
Reg/Serial No Make/ Brand
Date of Examination Inspection Status PASS Attention required
20 Vehicle speed meter, temperature and fuel gauges are in working condition
Vehicle head lights, indicators, brake lights and reversing light & horn working
21 properly
23 Driver has valid license, defensive driving training and medically screened
Comments
Verify by:
Inspected by:
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-02
Dated: 09-APR-2020
Terminal Contractor
Project Machine #
Location PTW No.
19 Are the soap solution bottle at the cylinder for testing of any leakage
20 Fire Blanket or Shield In Use (If required)
Verify by:
Inspected by:
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-03
Dated: 09-APR-2020
Terminal
Project
Modal
Reg/Serial No Make/ Brand
Date of Examination Inspection Status PASS Attention required
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-04
Dated: 09-APR-2020
Terminal
Project
Equip / Serial # Color coding
Date of Examination Inspection Status PASS Attention required
2 Are electrical cables & extension boards inspected & colour coded by
competent person?
3 Are electrical cables double insulated?
4 Power cords and extension cords are not run through doorways, windows,
or unprotected openings or holes in walls.
6 Are All electrical cable must be hanged properly and above the ground to
avoid trip hazards and electric shock from muddy/watery area.
9 Has insulate, Elevate and Guard safety required for cables to avoid
damage.
10 Are damaged extension cords reported and removed from service? Does
the log maintained.
Comments
Dated: 09-APR-2020
Terminal
Project
Make/Brand
Reg/Serial No Modal
Date of Examination Inspection Status PASS Attention required
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-05
Dated: 09-APR-2020
Terminal
Project
Make/Brand 3rd Party
Reg/Serial No Modal
Date of Examination Inspection Status PASS Attention required
Not
Sr. # Description Good good N/A Comments
1 Vehicle's Driver's Particular
2 Year of Manufacture
3 FTW & Police verification
4 Driver license if required Operator Assessment certificate.
5 Trained on relevant IOGP-CSSS Trainings.
6 Vehicle's Condition
7 Tires condition
8 Track condition
9 Door/Latches/Locks
10 Seat belts
11 Fire extinguisher
12 Mirror
13 Signal Lights (traficator, foot brake, hand brake)
14 Reverse Light with audio buzzer
15 Lamps (Dim Light, High Light)
16 Wind Screen
17 Wiper/ Washer
18 Horn
19 Exhaust System/ Flame Arrestor
20 Related Tools kit
21 Fuel & Oil Leakage
22 Untidy Wiring
23 Machine guard are in place and good condition
24 Foot/ Hand Brake
25 Fire Extinguisher
26 All moving parts are properly guarded?
27 Battery is properly secured
28 Operator cabin is it tidy?
29 Any lifting hook welded on the bucket?
30 Bucket locking pin in good condition
31 Any trace of oil leak at the pistons?
32 Condition of the seals?
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-08
Dated: 09-APR-2020
Terminal
Loose
Sr. # Type of Tool Damage Bend Corrosive Gun/Handle Tag Comments
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Comments
Dated: 09-APR-2020
Terminal
Project
Make/Brand 3rd Party
Reg/Serial No Color coding
Date of Examination Inspection Status PASS Attention required
Not
Sr. # Description Good Good N/A Comments
2 Cable Condition
3 Joint condition
4 Socket (receptacle type)
5 Plug (receptacle type)
6 Safe Guards
7 Abnormal Sound
8 On/off Switch
9 Motor condition (EX rated)
10 Fan Condition
11 Farthing Provided (Extended Pipe)
Comments
Dated: 09-APR-2020
Terminal
Project
1 Cable Condition
2 Joint condition
5 Safe Guards
6 Abnormal Sound
7 On/off Switch
8 Visual Conditon
9 Spanner/Key
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-11
Dated: 09-APR-2020
Terminal
Project
Make/Brand 3rd Party
Reg/Serial No Color coding
Date of Examination Inspection Status PASS Attention required
Not
Sr. # Description Good Good N/A Comments
2 Cable Condition
3 Joint condition
5 On/Off Switch
6 Safe Guards
7 Abnormal Sound
8 Covered Amature
9 Earthing Provided
10 Overall condition
11 Excessive Vibaration
12 Other
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-12
Dated: 09-APR-2020
Terminal
Project
Make/Brand
Reg/Serial No Modal
Date of Examination Inspection Status PASS Attention required
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-13
Dated: 09-APR-2020
Terminal
Project
Make/Brand
Reg/Serial No Model
Date of Examination Inspection Status PASS Attention required
Not
Sr. # Description Good good N/A Comments
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-14
Dated: 09-APR-2020
Terminal
Project
Area Supervisor Activity
Date of Examination Inspection Status PASS Attention required
Not
Sr. # Description Good good N/A Comments
4 Are the workers wearing other additional PPEs as per their job
requirement?
5 Are all the PPEs in good condition?
6 Are all the PPEs are Safe to use?
7 Are all the PPEs are of approved standard?
8 Are workers familiar with T&S PPEs policy?
9 Are workers using the PPEs in correct way?
10 Other
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-15
Dated: 09-APR-2020
Terminal
Project
Area Activity
Area Supervisor Inspection Status PASS Attention required
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-16
Dated: 09-APR-2020
Terminal
Project
Area Activity
Area Supervisor Inspection Status PASS Attention required
6 Every open side or opening into or through which a person may fall is covered
or guarded by an effective barrier to prevent falls.
7 Where covers are used for openings, are these covers securely fixed to prevent
accidental displacement?
8 Have all the openings been covered with hole covers or guarded with top rail
& mid rails?
Full body harness with double lanyard and shock absorber with (SALA /
9 Suspension Trauma prevention Device) shall be used and attached to the
designated anchor point on the platform
10 Are the scaffolding used for working at height inspected as per tag system?
11 Are the full body harnesses used by workers inspected?
12 Is sufficient and secured anchorage provided and inspected?
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-17
Dated: 09-APR-2020
Terminal
Project
Brand / Make Model
Registration / Serial # Inspection Status PASS Attention required
Not Comments
Sr. # Description Good Good N/A
1 Vehicle’s & Driver’s Particular
2 Year of Manufacture
3 FTW & Police verification
4 Driver license if required Operator Assessment
certificate.
5 Trained on relevant IOGP-CSSS Trainings.
6 Vehicle’s Condition
7 Tires Condition
8 Tread Condition
9 Door/ Latches/ Locks
10 Seat/ Seat Belt
11 Mirror
12 Signal Lights (Traficator, Foot Brake, Hand Brake)
13 Reverse Light with audio buzzer
14 Lamps (Dim Light, High Light)
15 Wind Screen
16 Wiper / Washer
17 Horn
18 Exhaust System / Flame Arrestor
19 Foot / Hand Brake
20 Vehicle Handling (rooad test)
21 Spare tire & ralated tools
22 Body Panels / paint work
23 Fuel & Oil Leakage
24 Untidy Wiring
25 Machine Guard are in place ad good condition
26 Fire Extinguisher
27 Operator cabin is tidy
28 All moving parts are properly guarded?
29 Body is free from any damages?
30 Battery is properly secured
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-18
Dated: 09-APR-2020
Terminal
Project
Brand / Make Model
Registration / Serial # Inspection Status PASS Attention required
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-19
Dated: 09-APR-2020
Terminal
Project Registration #
Location Activity
Date of Examination Inspection Status PASS Attention required
3 No sign of cracked welds on MEWP body parts, fuel & hydraulic leak and
damaged control cables.
4 Tire & wheels are in good working condition, with adequate air pressure
if pneumatic.
7 Slewing assembly of the plant, in particular its slewing bolts are in good
condition.
8 Reverse alarm is fitted and functionally tested
11 Drive controls function properly & accurately labelled (up, down, right,
left, forward, back) and functionally tested.
12 Safety signage is in place and readable
13 Control panel is clean & all buttons/ switches are clearly visible (no paint
over spray, etc.)
14 Braking devise are working properly during the test.
15 Inspect the battery and hydraulic equipment.
16 Emergency lowering function operates properly.
17 All guardrails are sound and in place, including gate door.
Any Other:
Comments:
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-20
LORRY TRUCK, TRAILER, CONCRETE MIXER AND PICK UP TRUCK INSPECTION REVISION: 1
Dated: 09-APR-2020
Terminal
Project
Brand / Make Model
Reg / Serial # Inspection Status PASS Attention required
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-21
Dated: 09-APR-2020
Terminal
Project
Make/Brand Type
Reg/Serial No Modal
Date of Examination Inspection Status PASS Attention required
17 Main and auxiliary wire ropes are well lubricated and that there are no
visible defects such as broken wires, kinks, excess wear, crushing etc.
18 Correct size of wire rope
19 Boom sections are free from cracks or dents
20 Winches, pulleys and wire ropes are in good working condition
21 Engines and Electrical Connection
22 Oil (Engine & transmission)
23 Water
24 Electrical wiring- No visual sign of damage
25 Safety and Operational Devices
26 Load radius indicator and warning alarm installed
27 An effective hoist and derricking braking mechanism are maintained
28 Boom angle indicator
29 Warning gauges and buzzer
30 A swing lock capable of preventing unintended rotation
31 Limit switch to prevent over hoisting of the hook is functional
Comments
Position Position
Company Company
Date Date
SPL-HSSE-CL-22
Dated: 09-APR-2020
Terminal
Project
Brand / Make Model
Reg / Serial # Inspection Status PASS Attention required
Comments:
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-23
Dated: 09-APR-2020
Terminal
Project
Brand / Make Model
Reg / Serial # Inspection Status PASS Attention required
Operator’s Name:
Comments:
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-24
Dated: 09-APR-2020
Terminal
Project
Brand / Make Model
Reg / Serial # Inspection Status PASS Attention required
Comments:
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-25
Dated: 09-APR-2020
Terminal
Project Date and Time
Date of Examination Inspection Status PASS Attention required
10
11
12
13
Comments
Dated: 09-APR-2020
Terminal Project
Contractor Make / Brand
Length Color Code
Date of Exam Inspection Status PASS Attention required
Comments:
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-27
Dated: 09-APR-2020
Terminal
Project
Brand / Make Capacity 3rd Party
Reg / Serial # Inspection Status PASS Attention required
Not Comments
Sr. # Description Good Good N/A
b Identification number
c Safe working load limit (SWL)
f Certificates of test, inspections, and examinations.
Due dates for previous and next periodic inspection or
g periodicity of inspections
h Maintenance log
Are daily or pre shift visual inspections conducted on all pre
2 slung or general lift wire rope slings being utilized?
Are all pre slung wire rope sling assemblies equipped with a
5 certification tag containing:
a Sling manufacturer?
b Safe working load limit?
c Proof test certification number?
d Sling length and diameter?
Rated load for the type of hitch(es) and the angle upon which it
e is based?
Comments:
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-28
Dated: 09-APR-2020
Terminal Project
Brand / Make Capacity 3rd Party
Reg / Serial # Inspection Status PASS Attention required
Comments
Sr. # Description Good Not Good N/A
II. The latch should seat into the nose w/o binding & should not be
distorted or obstructed
III. Keeper/Latch must prevent from opening when closed
b Thimbles
I. Must be seated firmly in the eye of the Splice
II. Splice should have no loose or cut strands
III. Edges must be free of sharp edges, distortion or cracks
c Shock Absorber Pack
I. Outer portion of the pack should be examined for burn holes & tears
II. Stitching on areas where pack is sewn to D-rings, or lanyards should be
examined for loose strands, rips & deterioration
Are Sala Devices available and correctly attached to harness?
Are Sala Devices 3rd party certified?
Comments:
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-30
Dated: 09-APR-2020
Terminal
Project
Brand / Make Capacity 3rd Party
Reg / Serial # Inspection Status PASS Attention required
1 Shell Plate
a Are welded lugs on shell plate suitable for securing jacking equipment?
b Is jack post vertical after installation?
c Is adequate supports in-place to prevent the shell from toppling?
e Is there possibility of contact with sharp objects from the shell plate?
2 Jacking Equipment
a Are the equipment (LG) been inspected with valid certification?
b Is the equipment a restricted use/operate item?
d Are the bolt and nuts serviced/fastened to prevent oil leak during
operation?
e Will anyone come into contact with hydraulic oil when equipment is under
pressure or due to equipment failure or misuse?
Are adequate measures taken to prevent equipment falling-off from its
f
housing during installation?
3 Power Pack- Electrical
a Will anyone using the equipment suffer injury due to exposure to noise?
a
Are hoses and connections been fitted properly and are they
protected against damage?
Are the hose and connections tested/inspected
b
for oil leak?
Comments:
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-30
Dated: 09-APR-2020
Terminal Project
Location
Type Inspection Status PASS Attention required
Comments:
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-31
Dated: 09-APR-2020
Terminal
Project 3rd Party
Make / Brand Serial #
Capacity Inspection Status PASS Attention required
1 General condition of unit- clean, free of grit, free from damage and
defects.
2 Are all required guards fitted, secure and undamaged?
3 Rotating bits securely fastened and in safe condition.
6 Is the tool’s body and handle in good condition with no cracks, damage
or wear?
7 Is the tool being oiled daily?
9 Hose and hose fittings shall have pressure ratings not less than the
supply source.
Hose connections shall have a positive-locking action or the connecting
10 sections shall have a safety whip to restrain any whipping action if the
sections become disconnected.
11 Hose connection to tool in good condition- proper hose clamps used
(not wire)
12 Hose joints properly connected- proper hose clamps used (not wire)
Comments:
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-32
Dated: 09-APR-2020
Terminal
Project
Location Activity
A. Pre-Entry Planning
1 All entries into confined spaces are controlled with a Confined Space CS Entry permit through the Permit to Work (PTW) system.
2 Each permit (PTW) applies to a single confined space entry only.
3 Is there adequate warning signage, label, ERP flow passage and escape arrow to exhibit the direction to safe assembly area?
4 Has simultaneous operations relating to the CS entry identified and addressed?
5 Isolation requirements are verified through Permit to Work and Lock-out Tag-out procedures.
6 Line walk conducted to confirm the CS is under positive isolation, double block & blind, de-energization, lock-out and isolation of all other energy
sources which may be external to but still capable of affecting the confined space.
7 When atmospheric oxygen content differs from normal (20%-21.5%) the risks properly assessed and necessary measures is addressed with adequate
control.
8 Ventilation and air extraction system (forced ventilation) are used when natural
ventilation is not adequate, i.e. storage tanks, vessels, oil interceptors, excavation pit, trench etc.
9 A ventilation plan is prepared and is available at site e.g. for storage tank internal activity.
10 The ventilation set-up, air extraction arrangement complies with the ventilation plan
11 Low voltage 110V /or ground fault protected equipment are used for work inside the CS?
12 Is lighting adequate to cater for all work area visibility inside the CS?
13 The equipment and tools to be used are checked prior to use. (check record displayed, tags)
Pre-entry meetings, attended by all personnel involved in confined space entries, are held in order to review the Job Hazard Analysis and the confined
14 space entry permit to ensure that all measures are implemented, isolation points in place and gas detection done prior to authorizing the work to start
and entry.
15 All required supporting documents i.e. TBT form, HITS card, CS checklist are filled up and attached with PTW.
B. Roles & Responsibility & Competence Check
15 In case Entry Supervisor need to leave site, is there equivalent competent replacement assigned during his absence? Who?
Note: CS work must stop if NO Entry Supervisor present at CS site.
16 Is there Site Safety Supervisor assigned for the CS activity? Who?
17 All personnel with roles and responsibilities in the planning, approval, execution, and monitoring of entry into confined spaces are trained in a language
they understand. If there is foreign workers involved, a translator can be used.
18 All Entrants have attended NIOSH approved AESP training. Pre-entry competence checked and verified the following personnel (per item 21 below).
a. Entry Supervisors
f. First Aider
g. Fire Watcher
20 Has CS personnel signed their Health Declaration form every day during the CS
activity?
21 Is there a copy of valid Fitness To Work (FTW) at site for Entry Supervisor,
Authorized Entrants, Standby Person, First Aider, AGT, Fire Watcher & ER Team & relevant Entrants?
C. Hazard & Risk Control
23 If CS work becomes absolutely necessary, all the potential hazards and acceptable entry criteria have been identified and recorded on the pre-entry
plan, Job Method Statement, Job Hazard Analysis and permit and the controls to safely enter and exit CS are in place.
24 Risk analysis and necessary measures taken when atmospheric oxygen content
differs from normal (20%- 21.5%)
Hazardous atmosphere, dust, fume, gas, vapor.
Snags, entanglement.
Congestion.
Physical hazard.
Electrical hazard.
Line of Fire hazard.
26 Is there a clear segregation between simultaneous activity-SIMOP?(if any)
27 Are hoses & cables lined-up into CS via separate entry from the Entry/Exit point?
Gas monitoring/atmospheric testing is in place during work activities in accordance with the Job Hazard Analysis and at least after every break, after
31 lunch and at the beginning of a new work shift, or if the atmosphere inside the confined space is expected to change during work activities (e.g. during
welding operations)
32 During Painting & Blasting, is the supplied air from internal combustion engine has CO gas detector provided to the air supply filter system?
33 Is the CO detector located near and visible to the Standby Person/ Watchman?
37 Is location of generators/ equipment with engine exhaust not facing air intake of CS?
38 Safe location of inert/ hazardous gas sources (bottles/ packs) determined, if they are used.
39 The location of inert or hazardous gas sources (bottles or packs) away from CS air intake.
40 The location of generators or equipment with engine exhaust away from CS air intake.
41 Has proper control provided to extract and collect airborne dust from blasting activity?
42 Has proper control provided to contain airborne midst in case of spray painting for tank external?
43 Has proper control provided to extract welding fumes such as localized exhaust vent from accumulating inside CS?
The CS is attended by a trained and competent Standby Person/ Watchman with no other duties, typically one per entry point.
45 (Note: One Standby Person/ Watchman on two or more confined spaces is possible if all confined space entry points they are responsible for are visible
from one standing point of the watchman, and the watchman is able to perform their
responsibilities for all confined spaces they are responsible for.)
46 All CS personnel signed off a health declaration form daily prior to entry into CS.
49 Is there a warning sign posted at the entry/exit point which specify “Danger!” “Confine Space” “Enter By Permit Only”?
50 The equipment and tools to be used are checked prior to use. (check record displayed, tags)
51 Is there physical barrier at point of entry to prevent unauthorized entry during work break or at the end of each shift?
53 Emergency response/ escape plan prepared and copy of the ERP attached to PTW.
55 Has ERP drill conducted to verify the plan is adequate for the entry activity?
56 Are all the ERP equipment properly kept, protected, the breathing apparatus not contaminated and ready in case of
Rescue Rope
60 The Emergency team trained, equipped and available for rescue and First Aid assistance?
61 The required firefighting equipment adequate, readily and in good working condition?
62 Is there clear communications (established/agreed/understood) and tested between workers and the Standby Person/ Watchman. e.g. voice, radio,
pre- agreed signals and whistles?
63 Communications walkie talkie adequate and tested between Entrants, Entry Supervisor, Standby Person/ Watchman and on-duty TOS?
65 Is Personal Protective Equipment evaluation and its use relevant for the work being done?
67 Is there protective clothes e.g. disposable tyvex for irritant, dust, or product contaminant?
68 Is hearing protection worn when work generates noise above regulatory action level?
70 Is there SDS available at site for reference to substance in use for PPE requirement?
72 Housekeeping is done before PTW suspension or at the end of each work shift?
73 Standby Person/ Watchman and Entry Supervisor check headcount prior to closing CS.
74 Utility lines (e.g. oxygen and gas hoses) are disconnected or removed when not in use – this is verified by Entry Supervisor and double checked by the
Standby Person/ Watchman.
75 Is lighting adequate to cater for all work area visibility inside the CS?
76 Reinstate manhole cover for physical barrier to prevent unauthorized entry into CS.
77 The equipment and tools to be used are checked prior to use. (check record displayed, tags)
Note: If the answer is No, please provide action taken to rectify this issue at action column.
Comments:
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-33
Dated: 09-APR-2020
Terminal Project
Location Activity
Date of Examination Inspection Status PASS Attention required
c Are all tools utilized at height secured and/or placed in rated bags to
prevent accidental falling from height?
d Are all small materials and/or items (bolts, nuts, gasket, etc.) placed at
secured locations or adequately contained?
e Are loose hand tools (ratchet, spanner, cutter etc.) secured with safety
lanyard?
2 Working on Permanent Platform (i.e. Gratings, checkered plates, etc.)
Is the grating platform checked for openings: between toe plate and
b decking; pipe penetrations provided with collar/sleeves; and floor
openings adequately covered or protected?
Are the storage areas, waste disposal facilities and maintenance stations
c located on grating are boarded or sheeted appropriately to prevent
small/thin items falling through grating?
d Are the storage bins full/ overfilled? Where the material or waste can
potentially become drop object.
Are all tools that are small enough to pass through grating are tethered,
e including small materials contained or secured to prevent from
penetrating through small openings?
Comments:
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-34
Dated: 09-APR-2020
Terminal
Project
Machine 3rd Party Location
No.
Reg/Serial No Activity
Date of Examination Inspection Status PASS Attention required
6 Trained fire watchmen with vest is present at the hot work location at all
time during hot work activity.
7 Gas test is conducted by Terminal Authorized Gas Tester/ Gas Tester before star
8 Personal gas detector and/or area gas detector is being used at hot work
Location
9 Appropriate personal protective equipment provided and used
10 Hot work equipment is in good working condition
11 Ensure welding cables are layout properly to prevent slip, trip and fall.
12 Good housekeeping is maintained at work area.
Supervisor Name and Sign
Comments
Verify by:
Inspected by:
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-35
Dated: 09-APR-2020
Terminal
Project
Make/Brand
Reg/Serial No Modal
Date of Examination Inspection Status PASS Attention required
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-36
Dated: 09-APR-2020
Terminal Contractor
Project
Brand / Make Model
Registration / Serial # Inspection Status PASS Attention required
Not Comments
Sr. # Description Good Good N/A
A Compactor Operator Particular
1 Trained on relevant IOGP-CSSS Trainings.
B Compactor Condition
1 Properly Lubricated and no signs of leakage
Window at rear end of the foot for oil check is clear
2 and visible.
Is vicinity of recoil starter and foot free from dirt and
3 dust?
4 Fuel shut off valve is functioning properly
5 Engine On/ Off switch is functional
Recoil starter handle is free from damage and is not
6 loose
7 Manual choke is available and functional
8 Jack foot is supported by plate for compaction
9 Is throttle lever free from damage
Does opertor know emergency shutdown of
10 compactor by immediately idleing the throttle?
11 Is ramming show hardware properly tightned?
12 Are engine cooling fins cleaned?
13 Clean engine muffler and exhaust port?
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-37
Dated: 09-APR-2020
Terminal Contractor
Project
Brand / Make Model
Registration / Serial # Inspection Status PASS Attention required
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-38
Dated: 09-APR-2020
Terminal Contractor
Project
Brand / Make Model
Registration / Serial # Inspection Status PASS Attention required
Not Comments
Sr. # Description Good Good N/A
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-39
Dated: 09-APR-2020
Terminal Contractor
Project
Brand / Make Model
Registration / Serial # Inspection Status PASS Attention required
Not Comments
Sr. # Description Good Good N/A
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-40
Dated: 09-APR-2020
Terminal Contractor
Project
Brand / Make Model
Registration / Serial # Inspection Status PASS Attention required
Not Comments
Sr. # Description Good Good N/A
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-41
Dated: 09-APR-2020
Terminal Contractor
Project
Brand / Make Model
Registration / Serial # Inspection Status PASS Attention required
Not Comments
Sr. # Description Good Good N/A
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-42
Dated: 09-APR-2020
Terminal Contractor
Project
Brand / Make Model
Registration / Serial # Inspection Status PASS Attention required
Not Comments
Sr. # Description Good Good N/A
Comments
Position Position
Company Company
Date Date
SPL-HSSE-CL-43
Dated: 09-APR-2020
Terminal Contractor
Project
Brand / Make Model
Registration / Serial # Inspection Status PASS Attention required
Not Comments
Sr. # Description Good Good N/A
Equipment Condition
1
Are compressor equipped with pressure gauges
and spring-loaded safety valves?
2
Are compressor provided with a drain valve and
removal or accumulated oil and water?
3
Observed that the receiver is cutting out at the
correct maximum pressure?
4
Is there any external signs or damage to the
receiver or component parts?
5
Are safety devices on compressor air system
check frequently?
6
Check for leaks on receiver, fittings, delivery lines
and coupling?
7 Are air filter installed on the compressor intake?
8 Are all pulley guards in place and secure?
9 Is the motor pulley and flywheel in line?
10 Check crankcase oil and top up if required?
11 Hoses and fittings have no cracks
12 Hose whip arrestor and safety clip installed
13 Drip tray is provided or not?
14 Drip tray’s condition
15 Earth rod’s condition
16 Earthing cable’s condition
17 Terminal’s condition
18 Are the terminals covered?
19 Electrical switch gear provided and functioned?
20 All moving parts are properly guarded?
21 Spark arrestor installed?
22 Any sign of Fuel & Oil Leakage?
23 Machine guard are in place and good condition
24 Battery is properly secured
25 Battery cable in good condition
26 Dynamo brushes cover fitted
27 240 volts socket
28 Industrial Power cable plug and socket
29 ELCB for 240 VAC supply
30 Trial run conducted?
Comments
Dated: 09-APR-2020
Terminal Contractor
Project
Location Activity
Date of Examination Inspection Status PASS Attention required
1 Has Permit Applicant raises an entry permit and submitted to Permit Issuer/
Lead Permit Issuer for approval?
5 Emergency equipment provided on site (i.e. First aid box, eye wash station)
6 Trained fire watchmen with vest is present at the hot work location at all
time during hot work activity.
Workers understand emergency procedures and are provided with appropriate
7 means of communication. Main and alternative muster points are identified
and briefed.
8 Materials,
use.
equipment using in the confined space checked and verified safe to
9 Are all Confined Space work activity have been followed according to ICOP /
Confined Space Procedure?
2 Mandatory PPE are used (Clear safety glasses, respiratory protection, ear plug/
muff for high noise area)
3 Air purifying respiratory protective device or Supplied-air respirators.
4 Others as required by Shell:---------------------------
C The below have been checked & isolated where required:
1 Pipelines (water, steam, gas, fuel, etc.)
2 Electrical services identified, isolated and danger tagged. Apply LOTO.
3 Harmful materials (dusts / fumes / gases / chemicals)
4 Isolation / warning & danger sign / lock-out tags in place on any plant
Supervisor Name and Sign
Comments
Verify by:
Inspected by:
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-45
Dated: 09-APR-2020
Terminal Contractor
Project Location
Date Inspection Status PASS Attention required
Not Comments
Sr. # Description Good Good N/A
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-46
Dated: 09-APR-2020
Terminal Project
Location 3rd Party
Machine # Activity
Sr # Description 1st Time Result 2nd Time Result 3rd Time Result4th Time Result5th Time Result6th Time Result7th Time Result8th Time Result9th Time Result 10th Time Result
1 Monitoring Location
2 Date of Monitoring
3 Lux meter Make/model, Serial No.
4 Time of Monitoring
Weather conditions e.g (clear, hazy, overcast, partly overcast, with sun,
5 etc.)
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-47
ANEMOMETER MONITORING CHECKLIST REVISION: 1
Dated: 09-APR-2020
Terminal Project
Location 3rd Party
Machine # Activity
Sr # Description 1st Time Result 2nd Time Result 3rd Time Result4th Time Result5th Time Result6th Time Result7th Time Result8th Time Result9th Time Result 10th Time Result
1 Monitoring Location
2 Date of Monitoring
3 Anemometer meter Make/model, Serial No.
4 Time of Monitoring
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-48
GAS DETECTOR LOG SHEET REVISION: 1
Dated: 09-APR-2020
Terminal Serial #
Project 3rd Party
Location Activity
DATED: 17-APR-2020
Terminal Project
Comments:
Name Name
Position Position
Company Company
Date Date
Comments
y:
SPL-HSSE-CL-50
Dated: 28-APR-2020
Terminal Project
Contractor Location
3rd Party Inspection Status PASS Attention required
Not Comments
Sr. # Description Good Good N/A
A Vibrator Operator Particular
1 Trained on relevant IOGP-CSSS Trainings.
2 Is operator asssessed from SPL ?
3 Does opertor know emergency shutdown of vibrator by
immediately idleing the throttle?
B Diesel Engine Condition
1 Any sign of Fuel & Oil Leakage?
2 Are all the rotating parts of vibrator machine guarded /
covered.
3 Body is free from any damages?
4 Clean engine muffler and exhaust port?
5 Earth cable’s condition
C Concrete Vibrator Condition
1 Is concrete vibrator equipment 3rd party certified ?
2 Concrete vibrator work to be performed under the
supervision ?
3 Are all the hot surface are properly covered on vibrator?
4 Engine On/ Off switch is functional
5 Recoil starter handle is free from damage and is not loose
6 Manual choke is available and functional
7 Is throttle lever free from damage
8 Place the main body on flat surface
9 Any crack and deformation
D Head Cap / pokerhead and Hose Condition
1 Vibrator head with valid color code and no sign
of defects (Bent, corrosion, crack)
2 Do not lubricate the pokerhead
3 Is pokerhead clean and free from dirt ?
4 Is center hose joint and shaft jointnd properly fixed with
machine?
5 Trial run conducted?
Comments
Name Name
Position Position
Company Company
Date Date
SPL-HSSE-CL-57
Dated: 09-APR-2020
Terminal Project
Make/Brand Modal
Reg/Serial No 3rd party
Date of Examination Inspection Status PASS Attention required
Not
Sr. # Description Good good N/A Comments
A Equipment's Condition
1 Drip tray is provided or not?
2 Drip tray's condition
3 Polarity marked
4 All moving parts are properly guarded?
5 Welding cable’s condition
6 Welding holder
7 Earth rod’s condition
8 Earthing cable’s condition
9 Terminal’s condition
10 Any sign of Fuel & Oil Leakage?
11 Spark arrestor installed?
12 Battery is properly secured
13 Dynamo brushes cover fitted
14 Any abnormal sound?
15 Excessive vibration?
16 Body is free from any damages?
17 Towing frame
18 Are the terminals covered?
19 Electrical switch gear provided and functioned?
20 Machine guard are in place and good condition
21 Operating volts sockets are available (240 volts)
22 Industrial Power cable plug and socket
23 ELCB available in supply DB.
24 Trial run conducted?
25 Voltmeter/ Ammeter
26 Overall body condition
Comments
Name Name
Position Position
Company Company
Date Date
HSE-CHECKLIST-51
DATED: 28-APR-2020
Terminal Project
A. Facepiece
C. Cylinder
D. Hoses
1 Free of cuts, abrasion, or damage
Comments:
Name Name
Position Position
Company Company
Date Date
HSE-CHECKLIST-51
REVISION: 0
DATED: 28-APR-2020
3rd party
Comments
erify by:
SPL-HSSE-CL-52
Terminal Project
Contractor 3rd Party
Make/Serial # Inspection Status PASS Attention required
Not Comments
Sr. # Description Good Good N/A
Fluid level, leaks, (engine, hydraulic, transmission, coolant,
1 battery, fuel)
Air Cleaner
2 - Check when is the last change of air filter
Seat Belt
3 - In good condition
Light, Horn and Revolving warning light
4 - Tested before use
Brake (Travel, Parking)
5 - Tested before use
Capacity for labels and function
6 - SWL is labelled
Warning label
7 - Reverse alarm
Tire-condition, pressure, lug nut
8 - Tire in good condition
-Fork Crack
Hydraulic pressure
10 - No sign of visible crack, bent or twisted at tip point
Overhead Protection Guard
11 - Installed
Fire Extinguisher
12 - Provided and in good condition
Comments
Name Name
Position Position
Company Company
Date Date