0% found this document useful (0 votes)
17 views6 pages

Graph

This document contains water quality monitoring data from an effluent treatment plant over time. It includes pH levels and chemical oxygen demand (COD) measurements at various points in the treatment process. Some key events summarized are: 1) The ETP plant started full operation on February 22nd, 2022 after one week of initial operation. COD levels dropped significantly after this date. 2) A nanobubble machine was installed at some point, which helped reduce COD levels between the inlet and primary treatment tank, and further between the primary tank and secondary membrane bioreactor tank. 3) Sewage load characteristics changed at times, with less sewage flow observed, which impacted COD levels.

Uploaded by

yzack333
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views6 pages

Graph

This document contains water quality monitoring data from an effluent treatment plant over time. It includes pH levels and chemical oxygen demand (COD) measurements at various points in the treatment process. Some key events summarized are: 1) The ETP plant started full operation on February 22nd, 2022 after one week of initial operation. COD levels dropped significantly after this date. 2) A nanobubble machine was installed at some point, which helped reduce COD levels between the inlet and primary treatment tank, and further between the primary tank and secondary membrane bioreactor tank. 3) Sewage load characteristics changed at times, with less sewage flow observed, which impacted COD levels.

Uploaded by

yzack333
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Percenta

ge
reduction
Inlet Outlet in COD
Sample COD COD from inlet
Calender Sample Date Result Date pH (mg/L) pH (mg/L) to outlet

12/1/2022 12/1/2022 01-13-2022 - - 7.87 80 -


4/2/2022 7.59 56
7/2/2022 7/2/2022 8/2/2022 - - 7.59 56 -

02-14-2022 02-15-2022 02-15-2022 7.6 344 7.85 36 89.53

02-17-2022 02-17-2022 02-17-2022 7.69 352 7.74 98 72.16

02-21-2022 02-21-2022 02-21-2022 7.72 432 7.92 56 87.04


02-24-2022 02-24-2022 02-25-2022 7.76 320 7.83 80 75
4/3/2022 7/3/2022 7/3/2022 7.65 472 7.54 80 83.05
7/3/2022 10/3/2022 10/3/2022 7.34 304 7.5 68 77.63

10/3/2022 03-14-2022 03-15-2022 7.16 304 7.52 104 65.79

03-14-2022 03-21-2022 03-24-2022 7.03 200 7.26 88 56

03-17-2022 03-24-2022 03-25-2022 7.42 304 7.69 80 73.68

03-28-2022 03-29-2022 7.49 152 7.82 24 84.21

03-31-2022 1/4/2022 7.13 240 7.61 20 91.67

04.04.2022 05.04.2022 6.93 280 7.09 208 25.71

JLPL Inlet (Collection)


500 250
450
400 200
350
300 150
250 Inlet
200 100
150
100 50
50
0 0
2 2 2 2 2 2 2 2 2 2 2 2 22 22 22
2 02 202 202 202 202 202 202 202 202 202 202 202 -20 -20 -20 -2
5- 7- 1- 4- /3/ /3/ 14- 21- 24- 28- 31- .04 . 5 7 1 4
-1 2-1 2-2 2-2 -1 -1 -2 -2
0 2 0 0 0
7 10 03- 03- 03- 03- 03- 04 02 02 02 02
Nanobubble machine not installed

Nanobubble Machine installed

Chloride dosing excess was observed on 15.03.2022

changes made : inlet to machine - tube setller, outlet of machine- mbbr 1

sewage load characteristics has been changed(sewage load less)

JLPL OUTLET (Final)


250

200

150
Outlet
100

50

0
22 22 22 22 22 22 22 22 22 22 22 22
-20 -20 -20 -20 /20 /20 -20 -20 -20 -20 -20 .20
5 7 1 4 3 3 4 1 4 8 1 4
-1 -1 -2 -2 7/ 10/ 3-1 3-2 3-2 3-2 3-3 4.0
02 02 02 02 0 0 0 0 0 0
Inlet Nanobubble
Tank from Primary Outlet Nanobubble
Inlet
Chemical Tank to MBBR1
7 Sample Date Result Date Treatment
COD COD COD
pH pH pH
(mg/L) (mg/L) (mg/L)

2/25/2022 2/26/2022 2/28/2022 4.6 8600 6.2 6800 5.87 11040

3/1/2022 3/2/2022 3/2/2022 4.88 5600 7.21 6700 6.39 5800


3/4/2022 3/4/2022 3/5/2022 5.49 2200 6700 5.92 6400
3/8/2022 3/10/2022 3/10/2022 4.74 2600 7.16 2900 6.32 3600
3/11/2022 3/11/2022 3/14/2022 3.07 4200 10.58 5500 5.55 3200

3/15/2022 3/17/2022 3/19/2022 3.08 1200 9.33 3400 5.94 1800

3/18/2022 3/21/2022 3/22/2022 3.82 1000 5.41 1600 5.89 2000


3/22/2022 3/24/2022 3/28/2022 4.58 700 10.73 2640 5.44 2600
3/25/2022 3/30/2022 3/31/2022 4.69 7920 4.11 7600 6.16 3280
3/29/2022 4/1/2022 4/2/2022 4.03 8320 9.86 3440 5.78 4160
4/1/2022 4/5/2022 4/6/2022 3.7 8080 10.34 6160 6.25 3760

Archian food (Inlet) Archian food


10000
Nanobubble
9000
8000
8000
7000
7000
6000 6000
5000 5000
Inlet 4000
4000
3000 3000
2000 2000
1000 1000
0 0
22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22
/20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20
2 3 3 3 3 3 3 3 3 3 3 3 4 2 3 3 3 3 3 4
/0 1/0 4/0 7/0 0/0 3/0 6/0 9/0 2/0 5/0 8/0 1/0 3/0 /0 /0 /0 /0 /0 /0 /0
2 6 0 0 0 1 1 1 1 2 2 2 3 0 26 04 10 16 22 28 03
Archian food (Outlet Nanobubble tank) Archian fo
12000

10000 2500

8000 2000

6000 Outlet Nanobubble Tank to 1500


MBBR1
4000 1000
500
2000
0
0
2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 02 202 202 202 2
2 02 202 202 202 202 202 202 202 202 202 202 202 202 2/ 3/ 3/ 3/ 3/
2/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 4/ 6 /0 2/0 6/0 0/0 4/0 8
6 /0 1/0 4/0 7/0 0/0 3/0 6/0 9/0 2/0 5/0 8/0 1/0 3/0 2 0 0 1 1 1
2 0 0 0 1 1 1 1 2 2 2 3 0
Final Outlet
Comment
COD
pH
(mg/L)
ETP Plant
started
4.39 1800 operation after
one week,
22/02/2022
4.69 2200
2200
4.36 1800
1800
now inlet and
out of machine
is from
1800
anerobic
tank(nano
bubble tank)
4.39 1800
4.78 1100
4.48 1040
4.44 960
4.55 1680

Archian food (Inlet


Nanobubble tank)

Inlet Nanobubble
Tank from Primary
Chemical Treatment

2 2 2 2 2 2
02 02 02 02 02 02
/2 3/2 3/2 3/2 3/2 4/2
/0 /0 /0 /0 /0
10 16 22 28 03
Archian food (Final Nanobubble
tank)
2500
2000
1500 Final Outlet
1000
500
0
2 2 2 2 2 2 2 2 2 2
2 02 202 202 202 202 202 202 202 202 202
2/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 3/ 4/
6 /0 2/0 6/0 0/0 4/0 8/0 2/0 6/0 0/0 3/0
2 0 0 1 1 1 2 2 3 0

You might also like