PROJECT: PROPOSED 4 BEDROOM RESIDENCE AND OUTHOUSE DATE: 31/03/2022
CLIENT: MR. ANKOMAH
AMOUNT
ITEM DESCRIPTION QUANTITY UNIT RATE
(USD)
EXTERNAL WORKS
SWIMMING POOL CONCRETE WORKS
D: GROUND WORK
D20: EXCAVATING AND EARTHWORKS
EXCAVATING
Starting from ground or reduced level
A Excavate pits not exceeding; 1.50 metres deep commencing
at strip level. 50 M3 8.33 416.50
B Return, fill in and well ram selected excavated materials
around foundations. 3 M3 4.91 14.73
Working Space Allowance to Excavations
D Pits 55 M2 5.00 274.89
DISPOSAL
E Excavated materials; off site 47 M3 5.55 260.85
SURFACE TREATMENTS
F Spray site with "Aidrex 40" anti-termite
treatment to surfaces of excavations before concreting 55 M2 3.33 183.15
D: GROUND WORK 1,150.12
TO SUMMARY
AMOUNT
ITEM DESCRIPTION QUANTITY UNIT RATE
(USD)
E: IN-SITU CONCRETE / LARGE PRECAST CONCRETE
E10: IN-SITU CONCRETE
PLAIN IN-SITU CONCRETE
Plain In-situ Concrete ([Link]-38mm aggregate)
B Blinding Beds; thickness not exceeding 150mm 2 M3 110.51 221.02
REINFORCED IN-SITU CONCRETE
Reinforced In-situ Vibrated Concrete (Grade 35)
G Swimming Pool Beds; thickness not exceeding 250mm 10 M3 125.36 1,253.60
E Ditto; Walls 10 M3 125.36 1,253.60
E20: FORMWORK
Sawn formwork as described to:
H Vertical sides of walls 92 M2 12.09 1,112.28
J Edge of beds; n.e height 250 28 M 12.09 338.52
K Edges of walls 7 M 6.05 42.35
E30: REINFORCEMENT
High yield bar to BS4466; cutting; bending and securing
with tying wire, distance blocks and ordinary spacers
A 12mm Diameter in Pool Base 1.15 T 1.16 1.33
B Ditto; in Walls 0.67 T 1.16 0.78
E: IN-SITU CONCRETE / LARGE PRECAST CONCRETE
TO SUMMARY 4,223.48
AMOUNT
ITEM DESCRIPTION QUANTITY UNIT RATE
(USD)
J: WATERPROOFING
J40: FLEXIBLE SHEET TANKING/DAMP PROOF
MEMBRANES
A Flexible sheet tanking; 500 micron damp proof membrane
to receive floor bed and walls 93 M2 3.42 318.06
B Liquid applied damproof membrane; two coats approved
Dura Proof Hydrokote pool water proofing compound; applied to 50 M2 30.04 1,502.00
slabs and walls or equal in impernuece primer with neuce seal
with fiber glass mesh 160 gr/m2
J:WATERPROOFING
TO SUMMARY 1,820.06
AMOUNT
ITEM DESCRIPTION QUANTITY UNIT RATE
(USD)
M: SURFACE FINISHING
M10: SAND CEMENT SCREEDS/FLOORING
A Cement and sand (1:4) beds and backings to block or
concrete base
41mm Screeded bed to receive Swimming Pool tiles 32 M2 8.72 279.04
M20: RENDERED COATINGS
20mm Cement and sand (1:4) rendering to block or
concrete base
Work to walls 59 M2 8.91 525.69
POOL SUNDRIES
Supply and Install plumbing fittings and accessories
Skimmers 2 nr 320.00 640.00
M: SURFACE FINISHING
TO SUMMARY 1,444.73
AMOUNT
ITEM DESCRIPTION QUANTITY UNIT RATE
(USD)
SUMMARY
PAGE
D: GROUND WORK 1,150.12
E: IN-SITU CONCRETE / LARGE PRECAST CONCRETE 4,223.48
J WATERPROOFING 1,820.06
M SURFACE FINISHING 1,444.73
BILL NO.2 - SWIMMING POOL WORKS $ 8,638.39
TOTAL FOR SWIMMING POOL WORKS
B2/5
SUMMARY