0% found this document useful (0 votes)
178 views3 pages

Double Bull PPC Cement Test Results

Uploaded by

digital life
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
178 views3 pages

Double Bull PPC Cement Test Results

Uploaded by

digital life
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

DOUBLE BULL

PORTLAND POZZOLANA CEMENT (PPC)

Double Bull Portland Pozzolana Cement (PPC) ensures two-stage hydration process involving clinker and
pozzolanic material resulting in denser gel formation. Usage of high quality fly ash has a supplementary
advantage of high workability, high strength with durability and performance advantages for those who build
and occupy structures of all kinds.

APPLICATIONS:
• Perfect for all residential constructions like houses, high-rise
buildings and infrastructure and projects involving roads,
highways, flyovers, bridges, culverts, etc.
• Mass concrete projects like dams and foundations
• Sewage and effluent treatment plants
• It’s more cohesive, durable and suited for RCC work of any type

ADVANTAGES:

Resistant to More durable Improved strength


Chemical Attacks and viscosity

Water-resistant Lower Permeability Better cohesiveness


and workability
MAZBOOTI
UMMEED SE ZYADA
BIS Requirement Double Bull Test Finding

COMPRESSIVE STRENGTH:
The maximum load the cement mortar can sustain without fracture.

MPA
60
55
50 49
45
40 36
35 33
30 26
25 22
20 16
15
3 Days 7 Days 28 Days

Compressive strength mein 60% behtar.

SETTING TIME:
The period in which the cement goes from fluid to solid.
Min
600
600
500
400
300
245
200 170
100 30
0
IST (min) FST (max)

Setting time mein behtar workability.


IS 1489 (Part 1) 2015 NU VISTA LIMITED
(Formerly Emami Cement Limited)
PANAGARH CEMENT WORKS
An ISO 9001:2015,14001:2015 & 18001:2007 Certified Unit
CM/L 5710035910 Address :- Plot No-B5A,B6,B8 & B5B/A Panagarh Industrial Park of WBIDC
Block – Aushgram II, Village Kota Dist: Purba Bardhaman, West Bengal 713148

TEST CERTIFICATE
Date of Issue : 9th July 2020
Sample Description : W22 M05 Y2020 Despatch Period : 27th May 2020 to 02nd June 2020
Requirement as Per
S.No. Test Carried Out Result Obtained
IS: 1489 (Part-1)- 2015

CHEMICAL TESTING
Total Loss on Ignition (% by mass) 5.0 % Max 1.96
Magnesia ( % by mass) 6.0 % Max 2.58
Sulphuric Anhydride ( % by mass) 3.50 % Max 3.23
Chloride (% by mass) 0.10 % Max 0.002
Maxmium
1 X + (4.0 (100-X) / 100 )
Minmium 0.6X
Insoluble Residue ( % by mass ) Where “X” is the declared % of Fly 35.70
Ash in given Portland Pozzolana
Cement.

PHYSICAL TESTING
Fineness
2
Specific Surface ( m2 / Kg ) Minimum 300 370
3 Normal Consistency (%) - 32.00
Setting Time (minutes)
4 a) Initial Minimum 30 170
b) Final Maximum 600 230
Soundness
5 a) Le-Chatlier Expansion (mm) Maximum 10 0.50
b) Autoclave Expansion (%) Maximum 0.8 0.03
Compressive Strength (Mpa)
a. 24.0 hr. ( 1 day) NA 16.1
6 b. 72 +/- 1 hr. ( 3 days) Minimum 16 32.3
c. 168 +/- 2 hr.( 7 days) Minimum 22 39.8
d. 672 +/- 4hr. ( 28 days) Minimum 33 55.80
7 Drying Shrinkage (%) Maximum 0.15 0.03
Minimum15 % and
8 Fly Ash in Cement (%) 35.0
Maximum 35 %
Environment condition during test , Temperature =27+2oC and RH >65%
The above cement complies with the requirements of IS 1489 (Part-1) : 2015 for Portland Pozzolana Cement (Flyash Based)

Prepared by Authorised Signatory


Regd. Office : Acropolis, 15th Floor, 1858/1, Rajdanga Main Road, Kasba, Kolkata – 700107, West Bengal, India. Tel: (033) 6627 1301
Corporate Office: 687 Anandapur, E.M. Bypass, Kolkata - 700107. Tel: (033) 66136264 CIN: U26940WB2007PLC116503

www.nuvoco.com
[email protected]

1800 1022 008

You might also like