0% found this document useful (0 votes)
686 views3 pages

Lapu-Lapu City Mechanical Permit Application

The document is an application for a mechanical permit from the Office of the Building Official of Lapu-Lapu City. It contains forms for applicants to provide details about a proposed mechanical installation, including the owner's information, project description, equipment details, and certifications required from mechanical engineers. Building officials review the application and can approve the permit with conditions like conforming to building codes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
686 views3 pages

Lapu-Lapu City Mechanical Permit Application

The document is an application for a mechanical permit from the Office of the Building Official of Lapu-Lapu City. It contains forms for applicants to provide details about a proposed mechanical installation, including the owner's information, project description, equipment details, and certifications required from mechanical engineers. Building officials review the application and can approve the permit with conditions like conforming to building codes.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

DPWTC FORM NO.

77-001-M

REPUBLIC OF THE PHILIPPINES


OFFICE OF THE BUILDING OFFICIAL
CITY ENGINEER’S OFFICE
LAPU-LAPU CIY

APPLICATION NO. PERMIT NO.

_________________________ MECHANICAL PERMIT _________________________

DATE OF APPLICATION DATE ISSUED


BOX 1 ( TO BE ACCOMPLISHED BY PROFESSIONAL MECHANICAL ENGINEER IN PRINT )
NAME OF: OWNER/APPLICATION LAST NAME, FIRST NAME, M.I TAX IDENTICATION NO.

ADDRESS NO., STREET, BARANGAY, CITY/ MUNICIPALITY TELEPHONE NO.

LOCATION OF INSTALLATION NO., STREET, BARANGAY, CITY/ MUNICIPALITY

SCOPE OF WORK ADDITION OF ___________________ BUILDING PERMIT NO.


NEW INSTALLATION REMOVAL OF ___________________ _____________________
OTHERS (SPECIFY) ______________ CERTIFICATE OF ACCUPANCY NO.
______________________________

USE OR TYPE OF OCCUPANCY

RESIDENTIAL AGRICULTURAL
COMMERCIAL . LANDSCAPING
INDUSTRIAL OTHERS (SPECIFY)
. INSTITUTIONAL ____________________________

INSTALLATION AND OPERATION OF

BOILER . CENTRAL AIR-CONDITIONING DUMBWATER


PRESSURE VESSELS MECHANICAL VENTILATION PUMPS
INTERNAL COMBUSTION ENGINE ESCALATOR COMPRESSED AIR, VACUUM
REFREGERATION & ICE MAKING MOVING SIDEWALK INSTITUTION and/or INDUS
WINDOW TYPE AIR-CONDITIONING FREIGHT ELEVATOR TRIAL GAS
PACKAGE AIR-CONDITIONING UNIT PASSENGER ELEVATOR PNEUMATIC TUBE,
CONVEYORS and/ or MONORAILS

✔ OTHER (SPECIFY) ________________________________________________________________________________

PROPOSED DATE EXPECTED DATE


OF INSTALLATION__________________________________ OF COMPLETION___________________________
TOTAL INSTALLATION COST ________________________ PREPARED BY ____________________________

BOX ( TO BE ACCOMPLISHED BY THE BUILDING OFFICIAL )


ACTION TAKEN:

PERMIT IS HEREBY GRANTED TO INSTALL THE MECHANICAL


EQUIPMENT ENUMERATED HEREIN SUBJECT TO THE FOLLOWING
CONDITIONS.

1. THAT THE PROPOSED INSTALLATION SHALL BE IN ACCORDANCE WITH


APPROVED PLANS, FILED WITH THIS OFFICE AND IN CONFORMITY
WITH THE “NATIONAL BUILDING CODE”
2. THAT A DULY LICENSED PROFESSIONAL MECHANICAL ENGINEER BE
ENGAGED TO UNDERTAKE THE INSTALLATION/COMSTRUCTION.
3. THAT A CERTIFICATION OF COMPLETION DUTY SIGNED BY A PROFES-
SIONAL MECHANICAL ENGINEER IN-CHARGE OF INSTALLATION SHALL
BE SUBMITTED NOT LATER THAN SEVEN (7) DAYS AFTER COMPLETION __________________________________
OF THE INSTALLATION. BUILDING OFFICIAL
4. THAT A CERTIFICATE OF FINAL INSPECTION AND A CERTIFICATE OF OCCU-
PANCY BE SECURED PRIOR TO THE ACTUAL OCCUPANCE OF THE BUILDING.
5. THAT AN ANNUAL CERTIFICATE OF INSPECTION SHALL BE SECURED FOR ________________________________
THE CONTINOUS OPERATION OF THE MECHANICAL EQUIPMENT INSTALLER. DATE

NOTE:
THIS PERMIT MAY BE CANCELLED OR REVOKED PURSUANT TO SECTION 305 & 306 OF THE “ NATIONAL BUILDING
CODE”
BOX 3 ( TO BE ACCOMPLISHED BY THE RECEIVING AND RECORDING SECTION )

BUILDING DOCUMENTS
(FIVE (5) SETS EACH)
MECHANICAL PLANS & SPECIFICATIONS BILL OF MATERIALS
COST ESTIMATES OTHERS (SPECIFY)

BOX 4 ( TO BE ACCOMPLISHED BY THE DIVISION/SECTIION CONCERNED )

ASSESSED FEE

AMOUNT ASSESSED BY O.R NUMBER DATE PAID

MECHANICAL

REVIEWED :

CHIEF PROCESSING DIV./SEC.

BOX 5 ( ( TO BE ACCOMPLISHED BY THE DIVISION/SECTIION CONCERNED )


PROGRESS FLOW
NOTED: IN OUT ACTION/REMARKS PROCESSED BY
CHIEF PROCESSING
DIVISION/ SECTION DATE TIME DATE TIME

RECEIVING AND
RECORDING

MECHANICAL

WERE HEREBY AFFIX OUR HANDS SGNFYING OUR CONFORMITY TO THE INFORMATION HEREIN ABOVE SETFORTH

BOX 6 BOX 8
PROF. MECH. ENGINEER PRC. REG. NO. SIGNATURE
SIGNED AND SEALED PLANS & SPECIFICATION
PRINT NAME
APPLICANT
ADDRESS
RES. CERT. NO DATE ISSUED PLACE ISSUED
P.T.R. NO. DATE ISSUED PLACE ISSUED

SIGNATURE TIN

BOX 7

PROF. MECH. ENGINEER PRC. REG. NO.


IN-CHARGE OF INSTALLATION
PRINT NAME

ADDRESS

P.T.R. NO. DATE ISSUED PLACE ISSUED

SIGNATURE
Republic of the Philippines
Office of the Building Official
Lapu- lapu City

MECHANICAL WORKSHEET
MECHANICAL SECTION

Name of User/Establishment:____________________________________________________
Owner/Manager:_______________________________________________________________
Location:_____________________________________________________________________

QTY EQUIPMENT/ MACHINERY RATING


Floor Mounted Airconditioners TR
Split type Airconditioners TR
Cassette type Airconditioners TR
Window Type Airconditioners TR
Exhaust fans KW
Internal Combustion Engine KW
Boiler (Firetube, Watertube) KW
Elevetor (Passenger,Freight,Dumbwaiter) STOPS
Escalator/ Moving Walk KW
Water Heater KW
Water pump,Sum pump, Sewage pump KW
Sprinkler System (Pendent, Upright, Sidewall) HEADS
Compressed Air. Vacuum, Industrial Gases OUTLETS
Power Piping for Gas/Steam etc. METER
Conveyor, Monorials, Overhead Crane M3
Other Machinery KW

Remarks: ______________________________________________________________________________
I hereby CERTIFY that the above data and information are connect to the best of my knowledge and
belief.

Prepared by: Must be signed & Sealed by Noted by:


Professional Mechanical Engineer

_____________________________ __________________________
Signature over Printed Name Signature over Printed Name

PRC ID ______________________
Expire Date __________________
PTR No. _____________________
Date Issued __________________

You might also like