0% found this document useful (0 votes)
83 views1 page

MSTL

The document is a master submittal tracking log for a construction project. It lists 13 items with details like submission and approval dates, references in project specs, and remarks. It tracks progress and status of structural works submittals for the project.

Uploaded by

Gervie Palattao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views1 page

MSTL

The document is a master submittal tracking log for a construction project. It lists 13 items with details like submission and approval dates, references in project specs, and remarks. It tracks progress and status of structural works submittals for the project.

Uploaded by

Gervie Palattao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project: Likha Residences Alabang-CP-01 (Structural Works With Roughing-ins)

Contractor: F.L. Ramos Construction Co., Inc.


Subject: Master Submittal Tracking Log (MSTL)
as of: APRIL 18, 2024

SUBMISSION DATE SUBMITTAL REQUIREMENTS APPROVAL DATE


ITEM REFERENCE ACTION DATE OF
SUBMITTAL NO. DESCRIPTION SHOP CATALOG/ TEST REMARKS
NO. PLAN ACTUAL SPECS OTHERS PLAN ACTUAL CODE INSTALLATION
DRAWINGS BROCHURES DATA

1.0 SRF - LRA - FLRCCI - ST - 001 3/19/2024 Rebar Cutting List for Columns (C1, C2, C3) APPROVED
2.0 SRF - LRA - FLRCCI - ST - 002 4/3/2024 Footing Lay-out Based on FCD-Arch. Plan APPROVED
3.0 SRF - LRA - FLRCCI - ST - 003 4/16/2024 Footing Main Rebar Cutting List
4.0 SRF - LRA - FLRCCI - ST - 004 4/18/2024 Rebar Cutting List for FTB1, CFTB1 (per Grid Lines)
Electrical Conduit Pipes & Fittings Sample for
5.0 4/24/2024
SRF - LRA - FLRCCI - ST - 005 Approval
6.0 SRF - LRA - FLRCCI - ST - 006 4/24/2024 Sanitary Pipes and Fittings Sample for Approval
Main Rebar & Stirrups Cutting List for Second Floor
7.0 4/24/2024 5/7/2024
SRF - LRA - FLRCCI - ST - 007 Beams
Elevations (per Grid Lines) and Sections - Of
8.0 5/6/2024
SRF - LRA - FLRCCI - ST - 008 Structural Components
Main Rebar & Stirrups Cutting List for Third Floor
9.0 4/30/2024 6/4/2024
SRF - LRA - FLRCCI - ST - 009 Beams
10.0 SRF - LRA - FLRCCI - ST - 010 5/6/2024 Main Rebar & Stirrups Cutting List for Roof Beam 6/25/2024
11.0 SRF - LRA - FLRCCI - ST - 011 6/8/2024 CHB Wall Lay-out & Sample for Approval 6/22/2024
12.0 SRF - LRA - FLRCCI - ST - 012 6/8/2024 Portland Cement Sample for Approval 6/22/2024
13.0 SRF - LRA - FLRCCI - ST - 013 6/15/2024 Vapor Barrier Sample for Approval 6/22/2024
15.0 SRF - LRA - FLRCCI - ST - 015 6/20/2024 Roof Framing Details 7/11/2024
14.0 SRF - LRA - FLRCCI - ST - 014 6/29/2024 Septic Vault For Approval 6/27/2024

Prepared by: Noted by: Approved by: Received by:

GERVIE C. PALATTAO ENGR. BENJIE R. BANGALAN KATRINA PAULA GARCIA


F.L. Ramos Construction Co., Inc. F.P. MORGEN CONSTRUKT COR. PHINMA PRISM PROPERTY DEVELOPMENT CORPORATION F.P. MORGEN CONSTRUKT COR.