TOKYU–MAX JOINT VENTURE
Dhaka MRT Development Project (Line-1) CP01
Transmittal (TRA)
Date: 27 February 2023
Ref.: TRA/L1CP01/SK/23-031
To:
Attention: Mr. Raja Sockalingam (Team Leader) (MRT Line-1 CS Consultant)
Address: MRT Line-1 CS Consultant Office, House7, Road 80, Gulshan2,
Dhaka1212, Bangladesh,
Telephone: Tel: 01409963217 Facsimile number: N/A Fax of sender: N/A
Electronic mail address: a-sockalingam-rj@[Link]
From:
Attention: Mr. Mitsuaki OKUDA (Contractor’s Representative) (Tokyu-MAX JV)
Address: Dhaka Branch Office, 4th Floor, ANZ, Huq Eleven Square Plot1, Block H,
Road 11, Banani, Dhaka1212, Bangladesh
Telephone: +880-13-2387-8835 Facsimile number: N/A Fax of sender: N/A
Electronic mail address: Representative e-mail: dhakamrt-line1-cp01@[Link]
Personal e-mail: [Link]@[Link]
Subject:
Primary Transmittal Type (to be single mark):
Tittle: Method Statement for Concrete Batching Plant Installation
Ref: N/A
[ ] Letter, [ ] Notice, [✓ ] Approval, [ ] Engineer’s Response, [ ] Request, [ ] Proposal, [ ] Instruction,
[ ] Certification, [ ] Determination, [ ] Other (describe it, as applicable)
Secondary Transmittal Type (single mark to be preferable):
[ ] Delegation, [ ] Programme, [ ] Design, [ ] Drawing, [ ] MP, [ ✓ ] MS, [ ] MA, [ ] ITP, [ ] Materials, [ ] Plant,
[ ] Contractor’s Equipment, [ ] RFI, [ ] Test Report , [ ] Register, [ ] Payment, [ ] FMS, [ ] Interfacing,
[ ] Other (describe it, as applicable)
Required Notification in the Attention’s Organization:
[ ] Management, [ ✓ ] Civil, [ ] Building, [ ] E&M, [ ] Rolling Stock, [ ] Systems, [ ] Section, [ ✓ ] Site,
[ ] Administration, [ ] Procurement, [ ] Account, [ ] Safety, [ ] Environment, [ ] QA/QC,
[ ] Other (describe it, as applicable)
Remarks:
Arranged by (Koshi SEKI/ Sign: / Date:9 February 2023):
Enclosure:
1. Submission Review Request (SRR)
2. Method Statement for Survey Setting Out
CC:
1. Project Director, Dhaka Mass Rapid Transit Development Project (Line-1), Dhaka Mass Transit Company
Limited (DMTCL)
2. Deputy Project Director (Depot-Civil), MRT Line-1 Project.
3. Office Copy
Acknowledge Receipt (on duplicate copy):
Recipient Imprint Seal
Print Name:
Tittle:
Department:
Signature:
Date: