TECHNICAL EVALUATION
PROJECT TITLE: Construction of Mezzanine at Packaging Materials Preparation Area
CONTRACTORS / BIDDERS
ITEM
DESCRIPTION
No.
EDNAVA Construction SSIMC TransTech Albatech
ACCURACY (35%) - closest to Baseline BOM
1 BOM
2 Drawing of Plans
3 Permits
4 Materials Supply
5 Labor Supply
6 Scope of Works
Preliminaries
Demolition and Excavation
Structural Works
Architectural Finishes
Electrical Works
Installation of Exhaust Fans
Relocation of Condensing Units
Installation of ACU
ACCURACY RATING
COST (35%) - lowest compared to baseline cost
BASELINE COST
DIFFERENCE
COST RATING
TIME (35%) - lowest compared to baseline schedule
BASELINE SCHEDULE
DIFFERENCE
TIME RATING
TOTAL RATING
REMARKS REMARKS REMARKS REMARKS
EVALUATION :
PREPARED AND CHECKED BY: APPROVALS:
DATE: MANAGER
Quality of Proposal E&Z
As per Technical Specifications 1
Wrong Quantity/Incomplete Proposal 0.5 0.85
Wrong Methodology 0
Lead Time
Less than or equal to the Required Lead Time 1
5% - 10% More than the Required Lead Time 0.75
10% - 20% More than the Required Lead Time 0.5 0.5
20% - 50% More than the Required Lead Time 0.25
Above 50% more than the Lead Time 0
Previous Performance Rating:
D POOR - could not be improved within short term 50.00%
C AVERAGE - meet minimum requirements 75.00%
1
B ABOVE AVERAGE - meets the standard requirements 80.00%
A OUTSTANDING - meets standard requirements in 100.00%
Due Diligence
P.O & Ongoing Project 50.00%
50.0%
Ongoing/Finished Project Related to the Project Scop 0.5
0.5
Presentation of P.O. or Project Report of Projects 0.3
0.3
Average amount of project costs (the same or more th 0.2
0.2
Facilities and Equipment 30.00%
30.0%
Equipment available related or used for the Project 0.5
0.5
Equipment Visual Inspection (Maintenance & Cleanlin 0.3
0.3
Facility (Office, Warehouse, Motorpool, Fabrication A 0.2
0.2
Permits and Certifications (Completeness) 20.00%
20.0%
Business Permit 0.3
0.3
PCAB License 0.2
0.2
Other Certifications and Licenses 0.2
0.2
Table of Organization 0.3
0.3
TOTAL DUE DILIGENCE SCORE 100.00%
BILL OF MATERIALS
ITEM NO. DESCRIPTION QTY UNIT
1.0 GENERAL REQUIREMENTS
1.1 Mobilization 1 lot
1.2 Demolization 1 lot
1.3 Safety Requirements 1 lot
SUB-TOTAL
2.0 CONCRETE FLOOR PAVEMENT
2.1 Cement (PortLand) 53 bag
2.2 Sand 3.5 cu. m
2.3 Gravel 7 cu. m
2.4 Deformed Bar 10mm 35 lengths
2.5 Tie Wire #16 2 kg
2.6 Plywood (4'x8'x1/2") 2 kg
2.7 Coco Lumber (2" x 2" x 12') 16 lengths
2.9 Consumables 1 lot
SUB-TOTAL
3.0 POWER HOUSE STRUCTURE
3.1 GI Pipe 1" Ø 2 length
3.2 GI Pipe 2" Ø 3 length
3.3 Square Bar 14mm thk x 6m 22 length
3.4 Steel Matting 1/8"Ø X2"X2"X4'X8'MS/A36 22 sheet
GI Roof Sheets (Ribtype) @ 1.15m W x 0.6mm thk
60 lm
x LM
3.5 Angle Bar 2"x2"x1/8" 15 length
3.6 C-Purlins 2"x4"x1/8" 24 length
3.7 Cutting disc 20 pcs
3.8 Grinding disc 10 pcs
3.9 Welding rod 6011 30 kilo
3.10 Cement (PortLand) 17 bag
3.11 Sand 1 cu. m
3.12 Gravel 2 cu. m
3.13 Deformed Bar 12mm Ø 16 lengths
3.14 Deformed Bar 10mm Ø 24 lengths
3.15 Tie Wire #16 5 kg
3.16 Plywood (4'x8'x1/2") 4 kg
3.17 Coco Lumber (2" x 2" x 12') 26 lengths
3.18 Consumables 1 lot
SUB-TOTAL
TOTAL DIRECT COST
No. Man No. of
ITEM NO. DESCRIPTION
power Days
4.0 COMFORT ROOM PROIVISION LABOR WORKS
4.1 Area Preparation 3 2
4.2 Excavation Works (5.36 cu.m) 2 3
4.3 Backfilling (1 cu.m) 2 2
4.4 Concreting Works (Column works, footing) 3 7
4.5 Structural Works 3 7
4.6 Roofing works 3 6
4.7 Formworks Works 2 2
SUB-TOTAL
5.0 OTHERS
5.1 Contractor's Profit
5.2 Contingency
5.3 VAT
SUB-TOTAL
TOTAL COST ₱
IALS
UNIT COST TOTAL
NTS
₱ 5,000.00 ₱ 5,000.00
₱ 5,000.00 ₱ 5,000.00
₱ 5,000.00 ₱ 5,000.00
15,000.00
MENT
₱ 290.00 ₱ 15,370.00
₱ 2,000.00 ₱ 7,000.00
₱ 2,000.00 ₱ 14,000.00
₱ 380.00 ₱ 13,300.00
₱ 85.00 ₱ 170.00
₱ 720.00 ₱ 1,440.00
₱ 180.00 ₱ 2,880.00
₱ 2,708.00 ₱ 2,708.00
56,868.00
URE
₱ 1,365.00 ₱ 2,730.00
₱ 1,542.00 ₱ 4,626.00
₱ 500.00 ₱ 11,000.00
₱ 550.00 ₱ 12,100.00
₱ 500.00 ₱ 30,000.00
₱ 690.00 ₱ 10,350.00
₱ 840.00 ₱ 20,160.00
₱ 80.00 ₱ 1,600.00
₱ 75.00 ₱ 750.00
₱ 137.00 ₱ 4,110.00
₱ 290.00 ₱ 4,930.00
₱ 2,000.00 ₱ 2,000.00
₱ 2,000.00 ₱ 4,000.00
₱ 450.00 ₱ 7,200.00
₱ 380.00 ₱ 9,120.00
₱ 85.00 ₱ 425.00
₱ 720.00 ₱ 2,880.00
₱ 180.00 ₱ 4,680.00
₱ 6,633.05 ₱ 6,633.05
139,294.05
196,162.05
Cost/Day TOTAL
BOR WORKS
600 ₱ 3,600.00
600 ₱ 3,600.00
600 ₱ 2,400.00
680 ₱ 14,280.00
680 ₱ 14,280.00
680 ₱ 12,240.00
680 ₱ 2,720.00
₱ 53,120.00
37,392.31
24,928.21
29,913.85
92,234.36
413,384.41
BILL OF MATERIALS
ITEM NO. DESCRIPTION QTY UNIT
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
SUB-TOTAL
2.0 POWER HOUSE STRUCTURE
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
SUB-TOTAL
TOTAL DIRECT COST
No. Man No. of
ITEM NO. DESCRIPTION
power Days
3.0 COMFORT ROOM PROIVISION LABOR WORKS
3.1 Area Preparation 3 2
3.2 Excavation Works (5.36 cu.m) 2 3
3.3 Backfilling (1 cu.m) 2 2
3.4 Concreting Works (Column works, footing) 3 7
3.5 Structural Works 3 7
3.6 Roofing works 3 6
3.7 Formworks Works 2 2
SUB-TOTAL
TOTAL COST ₱
IALS
UNIT COST TOTAL
-
URE
-
-
Cost/Day TOTAL
BOR WORKS
600 ₱ 3,600.00
600 ₱ 3,600.00
600 ₱ 2,400.00
680 ₱ 14,280.00
680 ₱ 14,280.00
680 ₱ 12,240.00
680 ₱ 2,720.00
₱ 53,120.00
53,120.00
FLOOR PAVEMENT
Area
Length 6.25 m
Width 5.6 m
Thickness 0.2 m
Cement 53 bags
Sand 3.5 cu.m
Gravel 7 cu.m
DRB 12 35 length
Tie Wire 2 kg
Plywood 2 sheet 3.9 1.354166666667
Lumber 16 length 46.8 15.6
FOOTING
Area
Length 1m
Width 1m
Thickness 0.15 m
Cement 6 bags
Sand 0.3 cu.m
Gravel 0.6 cu.m
DRB 12 8 length
Tie Wire 1 kg
Plywood 1 sheet
Lumber 13 length 36.8 12.26666666667
COLUMN
Area
Length 0.3 m
Width 0.3 m
Cement 5 bags
Sand 0.3 cu.m
Gravel 0.6 cu.m
DRB 12 8 length
DRB 10 14 length
Tie Wire 3 kg
Plywood 2 sheet
Lumber 10 length
PLATFORM
Area
Length 3.2 m
Width 2.5 m
Thickness 0.1 m
Cement 6 bags
Sand 0.4 cu.m
Gravel 0.8 cu.m
DRB 10 10 length
Tie Wire 1 kg
Plywood 1 sheet 1.14
Lumber 3 length 24
STRUCTURE
2" GI Pipe 3 lengths
1" GI Pipe 2 lengths
Steel matting 21.725 sheets 62.568 sq.
Square Bar 14mm thk x 6m 21.32 lengths 127.92 m
Angle Bar 2"x2" 15 lengths
C-Purlins 13.75 lengths
Total
Cement 17 bags
Sand 1 cu.m
Gravel 2 cu.m
DRB 12 16 length
DRB 10 24 length
Tie Wire 5 kg
Plywood 4 sheet
Lumber 26 length