Construction Productivity Rates Philippines
Construction Productivity Rates Philippines
TENDER
Productivity / Productivity / Productivity /
CODE DESCRIPTION UNIT MH RATE
Man-Day(8hrs) Equipment-Day(8hrs) Crew-Day(8hrs)
VERTICAL STRUCTURES
DEMOLITION AND REMOVAL
DEMOLISH CONCRETE
0 ROAD 0.80 - 0.80 CM 10.000
DEMOLISH BUILDING
1 WOOD CONSTRUCTION 3.77 - 3.77 CM 2.120
2 CHB CONSTRUCTION 2.27 - 2.27 CM 3.530
3 MAJOR CONCRETE FRAME 2.27 - 2.27 CM 3.530
4 MAJOR STEEL FRAME 2.27 - 2.27 CM 3.530
SELECTIVE DEMOLITION
5 ACOUSTICAL CEILING TILES 7.41 - 7.41 SM 1.080
6 AC PAVEMENT 2.67 - 2.67 SM 3.000
7 BUILT-UP ROOFING, 4 PLY 36.36 - 36.36 SM 0.220
8 CEILING PLASTER 7.41 - 7.41 SM 1.080
9 CERAMIC TILE WALL INCLUDING MORTAR 4.97 - 4.97 SM 1.610
10 CERAMIC TILE FLOOR INCLUDING MORTAR 4.97 - 4.97 SM 1.610
11 CMU WALL 8" 29.63 - 148.15 SM 0.270
1
MANPOWER RATE 15 JUNE 2010
Actual
PRODUCTION Total Productivity / Productivity /
MANPOWER EQUIPMENT Prod/MH
RATE Manpower Man-Day(8hrs) Equipment-Day(8hrs)
1 0.1
1 0.47169811
1 0.28328612
1 0.28328612
1 0.28328612
1 0.92592593
1 0.33333333
1 4.54545455
1 0.92592593
1 0.62111801
1 0.62111801
5 LABOURERS 2 JACKHAMMER 18.519 5 3.7037037
1 AIR COMPRESSOR
5 LABOURERS 2 JACKHAMMER 18.520 5 3.7037037
1 AIR COMPRESSOR
5 LABOURERS 2 JACKHAMMER 18.520 5 3.7037037
1 AIR COMPRESSOR
5 0.05154639
5 0.09442871
5 LABOURERS 1.748 5 0.16666667
5 0.34965035
5 3.33333333
5 0.92592593
5 0.05154639
5 3.03030303
5 2
1 0.33333333
1 0.62111801
1 0.92592593
1 0.5
1 1.53846154
1 0.46511628
1 0.11111111
1 0.1
1 0.05555556
1 0.04166667
1 33.3333333
1 50
1 100
1 0.87719298
2
MANPOWER RATE 15 JUNE 2010
Average
Productivity / Productivity /
Man-Day(8hrs) Equipment-Day(8hrs)
0.80 -
3.77 -
2.27 -
2.27 -
2.27 -
7.41 -
2.67 -
36.36 -
7.41 -
4.97 -
4.97 -
29.63 -
29.63 -
29.63 -
0.41 -
0.76 -
1.33 -
2.80 -
26.67 -
7.41 -
0.41 -
24.24 -
16.00 -
0.50 -
12.50 -
12.31 -
4.71 -
2.00 -
2.67 -
4.97 -
50.00 -
4.21 -
7.41 -
4.00 -
12.31 -
3.72 -
0.89 -
0.80 -
0.44 -
0.33 -
266.67 -
400.00 -
800.00 -
7.02 -
3
MANPOWER RATE 15 JUNE 2010
TENDER
Productivity / Productivity /
CODE DESCRIPTION
Man-Day(8hrs) Equipment-Day(8hrs)
EARTH WORKS
1 CLEARING AND GRUBBING - 200.00
2 FINE GRADING - 800.00
2 TOPSOILING/STRIPPING - 800.00
3 STRUCUTURAL EXCAVATION, COMMON SOIL MANUAL 1.40 -
5 STRUCUTURAL EXCAVATION, SAND AND GRAVEL MANUAL 1.00 -
4 STRUCUTURAL EXCAVATION, ADOBE AND ROCK - 1.20
23
13 TRENCHING, COMMON SOIL, MECHANICAL - 80.00
25 TRENCHING, GRAVEL AND SAND, MECHANICAL - 66.67
14 STRUCTURAL FILL, COMPACTED - 2.82
15 STRUCTURAL FILL, COMPACTED, MANUAL TAMPING 4.00 -
28 STRUCTURAL FILL, UNCOMPACTED 8.00 -
16 STRUCTURAL FILL, COMPACTED, MECHANICAL - 800.00
30 STRUCTURAL FILL, UNCOMPACTED, MECHANICAL - 800.00
17 ROADWAY SUBBASE FILL, COMPACTED, MECHANICAL - 800.00
18 ROADWAY BASE COURSE FILL, COMPACTED, MECHANICAL - 400.00
19 RIPRAP, UNGROUT, MANUAL 1.50 -
20 RIPRAP, GROUTED, MANUAL 1 -
62.5
4
MANPOWER RATE 15 JUNE 2010
TENDER
Productivity / Total
UNIT MH RATE MANPOWER EQUIPMENT
Crew-Day(8hrs) Manpower
5
MANPOWER RATE 15 JUNE 2010
Actual Average
Productivity / Productivity / Productivity / Productivity /
Prod/MH
Man-Day(8hrs) Equipment-Day(8hrs) Man-Day(8hrs) Equipment-Day(8hrs)
25 400 - 300.00
100 - 800.00
100 - 800.00
0.175131348511 1.40 -
0.125 1.00 -
0.149925037481 - 1.20
0.3003003003 - 2.40
0.125 - 1.00
100 240 - 520.00
14.28571428571 - 114.29
25 - 200.00
10 - 80.00
10 - 80.00
12.5 - 100.00
20 160.00 -
0.166666666667 1.33 -
0.125 1.00 -
0.149925037481 - 1.20
#DIV/0! #DIV/0!
10 - 80.00
8.333333333333 - 66.67
0.352112676056 - 2.82
0.5 4.00 -
1 8.00 -
100 - 800.00
100 - 800.00
100 - 800.00
50 - 400.00
0.187617260788 1.50 -
0.125 1.00 -
#DIV/0! #DIV/0!
- 0.00
- 0.00
- 0.00
63
6
MANPOWER RATE 10 JUNE 2010
TENDER
CONCRETE WORKS
CAST IN PLACE CONCRETE
FORMWORKS
0 MEVA FORMWORKS 3.28 - 6.56 SM
REINFORCEMENTS
15 GRADE 60 REBARS 160.00 - 1600.00 KG
7
MANPOWER RATE 10 JUNE 2010
8
MANPOWER RATE 10 JUNE 2010
Actual
3 MASONS
4.200 9 0.2380952381
4.600 9 0.2173913043
5.000 9 0.2
5.500 9 0.1818181818
8 LABOURERS
1 OPERATOR
5.050 12 0.198019802
5.550 12 0.1801801802
6.050 12 0.1652892562
8 LABOURERS
7.750 11 0.1290322581
10.100 11 0.099009901
9
MANPOWER RATE 10 JUNE 2010
2 LABOURERS 1 TRUCK/CRANE
10
MANPOWER RATE 10 JUNE 2010
Average
Productivity / Productivity /
Man-Day(8hrs) Equipment-Day(8hrs)
3.28 -
2.50 -
6.96 -
1.92 -
11.25 -
1.92 -
1.92 -
4.00 -
1.92 -
1.00 -
1.33 -
1.92 -
1.92 -
16.00 -
53.33 -
160.00 -
160.00 -
160.00 -
800.00 -
133.33 -
57.14 -
1.90 -
1.74 -
1.60 -
1.45 -
1.58 -
1.44 -
1.32 -
1.03 -
0.79 -
11
MANPOWER RATE 10 JUNE 2010
Productivity / Productivity /
Man-Day(8hrs) Equipment-Day(8hrs)
5.52 -
3.48 -
2.86 -
2.22 -
6.15 -
2.86 -
4.26 -
32.00 -
40.00 -
14.81 -
61.54 -
57.14 -
- 8.00
- 7.27
- 2.50
- 10.26
12
MANPOWER RATE 10 JUNE 2010
- - - -- -- -
13
MANPOWER RATE 10 JUNE 2010
---
14
MANPOWER RATE 10 JUNE 2010
15
MANPOWER RATE 10 JUNE 2010
TENDER
Productivity / Productivity /
CODE DESCRIPTION
Man-Day(8hrs) Equipment-Day(8hrs)
MASONRY WORKS
1920 BRICK MASONRY
1921 BRICK VENEER 3-3/4" x 2-1/2" x 8" 2.70 -
1926 FACE BRICK VENEER, ELECTRO MODULAR 3-3/4" x 2-1/4" x 7-5/8 2.25 -
16
MANPOWER RATE 10 JUNE 2010
Productivity / Productivity /
CODE DESCRIPTION
Man-Day(8hrs) Equipment-Day(8hrs)
17
MANPOWER RATE 10 JUNE 2010
Productivity / Productivity /
CODE DESCRIPTION
Man-Day(8hrs) Equipment-Day(8hrs)
5090 CARPET
5091 CARPET 6.67 -
18
MANPOWER RATE 10 JUNE 2010
ER Actual
Productivity / Productivity / Productivity /
UNIT MH RATE MANPOWER EQUIPMENT
Crew-Day(8hrs) Man-Day(8hrs) Equipment-Day(8hrs)
19
MANPOWER RATE 10 JUNE 2010
20
MANPOWER RATE 10 JUNE 2010
4.97 SM 1.610
3.72 SM 2.150
12.31 SM 0.650
18.60 SM 0.430
18.60 LM 0.430
6.67 SM 1.200
11.27 SM 0.710
8.99 SM 0.890
9.20 SM 0.870
7.62 SM 1.050
12.90 SM 0.620
11.76 SM 0.680
11.11 SM 0.720
9.09 SM 0.880
19.05 SM 0.420
5.48 SM 1.460
4.97 SM 1.610
3.72 SM 2.150
3.24 SM 2.470
2.12 SM 3.770
2.48 SM 3.230
1.49 SM 5.380
1.49 SM 5.380
1.45 SM 5.500
7.41 SM 1.080
pcs 1 towercrane
2 rigger
4 skilled
1.44 sqm 4 skilled
21
MANPOWER RATE 10 JUNE 2010
Average
Productivity / Productivity /
Man-Day(8hrs) Equipment-Day(8hrs)
2.70 -
2.90 -
3.81 -
5.52 -
6.50 -
2.25 -
1.08 -
1.05 -
0.83 -
0.73 -
3.20 -
2.91 -
2.67 -
3.20 -
2.91 -
2.67 -
16.00 -
14.55 -
13.33 -
160.00 -
57.14 -
5.41 -
17.78 -
16.67 -
2.97 -
3.01 -
2.91 -
12.50 -
4.00 -
4.23 -
2.86 -
4.57 -
4.00 -
8.00 -
22
MANPOWER RATE 10 JUNE 2010
Productivity / Productivity /
Man-Day(8hrs) Equipment-Day(8hrs)
4.26 -
4.21 -
14.81 -
12.50 -
11.11 -
10.00 -
7.62 -
7.27 -
6.96 -
5.41 -
5.26 -
5.26 -
5.26 -
0.85 -
1.32 -
2.03 -
2.56 -
5.48 -
2.73 -
2.03 -
2.03 -
2.03 -
3.20 -
3.33 -
2.68 -
2.13 -
2.17 -
2.17 -
2.17 -
7.14 -
3.20 -
3.17 -
2.76 -
2.76 -
2.76 -
3.10 -
2.68 -
3.92 -
3.92 -
23
MANPOWER RATE 10 JUNE 2010
Productivity / Productivity /
Man-Day(8hrs) Equipment-Day(8hrs)
3.92 -
3.92 -
4.97 -
3.72 -
12.31 -
18.60 -
18.60 -
6.67 -
11.27 -
8.99 -
9.20 -
7.62 -
12.90 -
11.76 -
11.11 -
9.09 -
19.05 -
5.48 -
4.97 -
3.72 -
3.24 -
2.12 -
2.48 -
1.49 -
1.49 -
1.45 -
7.41 -
24