Saudi Aramco Pre-Commissioning Form: HV Power Circuit Breakers

Uploaded by

Bala Subramani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

Form No.

P- 032 Issue Date: March 2006 Sheet 1 of 3


SAUDI ARAMCO PRE-COMMISSIONING FORM
HV POWER CIRCUIT BREAKERS
Equipment Type: SWITCHGEAR User Reference:
Equipment Tag No: H01-SG-CAB-201 Equipment Description: MV SWITCHGEAR
BI/JO No: 10-09442 Plant No. / Location: HAWAIYAH WIP-1
Ref. Drawings & Documents:
Manufacturer: POWELL ELECTRICAL SYSTEM ,INC
Model No: Serial No:
Test Completion Date:

FIELD INSTALLATION TESTS

VISUAL INSPECTION

Yes No
1. Inspect for physical damage and nameplate compliance with single line diagram.
2. Inspect the breaker for defects or damage especially to inter phase insulation.
3. Inspect primary bushings and insulators for cracks and damage.
4. Inspect primary disconnects, finger clusters etc. for damage and proper installation.
5. Check contact wear indicator on vacuum circuit breakers.
6. Check for adequate electrical and mechanical clearances.
7. Check mounting frame, all castings, and vacuum bottles for cracks.
8. Check MOC and TOC switches in the cell if so equipped.
9. Check that the mechanism is properly lubricated and parts are corrosion free.

MECHANICAL INSPECTION/TESTS

Yes No
1. Check flexible bus connectors and all brazed or soldered connections.
2. Check the operating mechanism for friction.
3. Check the push rods, and the latching mechanism.
4. Check the trip mechanism, latch load, and sneak settings if applicable.
5. Check manual close, latch and trip operation.
6. Check trip free operation.
7. Check auxiliary switches for proper operating sequence, contact alignment, and
proper adjustment of the operating linkage.
8. Check terminal blocks and connections.
9. Check the mechanical condition of auxiliary devices, shock absorbers, bumpers,
position indicators, latch checking switches , key lock out, etc.
10. Check alignment of secondary contacts of circuit breaker to cell.
11. Verify correct operation of the shutter mechanism.
12. Verify primary contacts are properly aligned and lubricated.
13. Check lock out mechanism operation of circuit breaker when installed in the cell.
14. Rack breaker into the cell checking for proper operation in the test, transient, and
connected positions. Verify the circuit breaker is trip-free through the transient
position. Verify that the circuit breaker moves in and out of position with ease.
15. Measure and record moving contact travel. (wear indicator)
16. Check and record opening and closing speed (timing) of the circuit breaker.
17. Verify that all circuit breakers of the same rating are interchangeable by racking each
circuit breaker into each cell of the designated size.

Witness POD Inspection Operation/Maintenance Contractor


Signature & Date
Copyright©Saudi Aramco 2009. All rights reserved.
Form No. P- 032 Issue Date: March 2006 Sheet 2 of 3
SAUDI ARAMCO PRE-COMMISSIONING FORM
HV POWER CIRCUIT BREAKERS
Equipment Type: SWITCHGEAR User Reference:
Equipment Tag No: H01-SG-CAB-201 Equipment Description: MV SWITCHGEAR
BI/JO No: 10-09442 Plant No. / Location: HAWAIYAH WIP-1
Ref. Drawings & Documents:
Manufacturer: POWELL ELECTRICAL SYSTEM ,INC
Model No: Serial No:
Test Completion Date:

ELECTRICAL INSPECTION/TESTS

Yes No
1. Measure and record contact resistance of each pole with the test probes connected to
the main current carrying bus, at the back of the breaker. Do not connect to the
disconnecting stabs or finger clusters for measurements.
Values must be consistent with manufacturer's recommendations.
2. Perform an insulation resistance test with a 1000 megger for one (1) minute from
pole to pole and from each pole to ground and across open contacts of each phase.
3. Check for vacuum integrity by testing with high potential AC from line to load with
the breaker in the open position. The voltage rating of the interrupter shall determine
the test voltage. The minimum test voltage for 5 KV interrupters is 14.3 KV AC and
27 KV AC for interrupters above 5 kV, up to and including 15 KV.
4. Perform AC high potential tests line to load, phase-to-phase, line to ground and load
to ground.
5. Test the insulation resistance of the circuit breaker control wiring per recommended
values in P-000.
6. Close and open the breaker using the control switch, trip the breaker from each
protective relay and trip device.
7. Auxiliary protective devices, such as ground fault or under voltage relays, shall be
activated to insure operation of shunt trip devices.

Witness POD Inspection Operation/Maintenance Contractor


Signature & Date
Copyright©Saudi Aramco 2009. All rights reserved.
Form No. P- 032 Issue Date: March 2006 Sheet 3 of 3
SAUDI ARAMCO PRE-COMMISSIONING FORM
HV POWER CIRCUIT BREAKERS
Equipment Type: SWITCHGEAR User Reference:
Equipment Tag No: H01-SG-CAB-201 Equipment Description: MV SWITCHGEAR
BI/JO No: 10-09442 Plant No. / Location: HAWAIYAH WIP-1
Ref. Drawings & Documents:
Manufacturer: POWELL ELECTRICAL SYSTEM ,INC
Model No: Serial No:
Test Completion Date:

TEST DATA

Electrical Manufacturer's
Mechanical tests recommended test PHASE A PHASE B PHASE C
values
INSULATION Breaker closed Breaker closed Phase Breaker closed
RESISTANCE Phase to ground to ground Phase to ground
Megohms Megohms_________ Megohms_________
CONTACT Breaker closed Breaker closed Breaker closed
RESISTANCE micro-ohms micro-ohms micro-ohms
_______________ ________________ ________________
INTERRUPTER PASS  PASS  PASS 
AC HIGHPOT FAIL  FAIL  FAIL 
TIMING TESTS
100% Voltage
CLOSE
100% Voltage
TRIP
50% Voltage
CLOSE
50% Voltage
TRIP

High Potential Test

Breaker Closed Current AC milliamps Breaker Open Current AC milliamps


Phase A to gnd Phase A line to load
Phase B to gnd Phase B line to load
Phase C to gnd Phase C line to load
Phase A to B
Phase A to C
Phase B to C

Witness POD Inspection Operation/Maintenance Contractor


Signature & Date
Copyright©Saudi Aramco 2009. All rights reserved.