SAUDI ARAMCO ID/PIEU -30-Oct-2017 -REV. 2017.06.00(Standards Cutoff -June 30, 2017) Rev.2017.06.
00 30-Jun-17
SATIP No. APPROVED DATE DISCIPLINE:
Saudi Aramco TYPICAL INSPECTION PLAN
SOIL IMPROVEMENT (VIBRO REPLACEMENT & VIBRO COMPACTION) SATIP-A -000-01 30-Oct-17 CIVIL
PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE & QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD
Contractor SA
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period Saudi Aramco Inspection may adjust the levels
1 of Saudi Aramco participation based upon the Contractor's performance
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is not
3 present
4 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco
LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection
Notes:
Inspection Intervals: The inspection shall be conducted once in every month.
Surveillance: The first 3 inspection will be notified to company as HOLD point.
Hold Point: 100% participation of contractor inspector shall be required.
Saudi Aramco: Company General Use