Sample Project 1

The document outlines a project schedule with two phases. Phase 1 involves demolition and construction work over 55 days from October to November. Phase 2 involves further construction work from November to December over 38 days.

Uploaded by

choco haech
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views6 pages

Sample Project 1

The document outlines a project schedule with two phases. Phase 1 involves demolition and construction work over 55 days from October to November. Phase 2 involves further construction work from November to December over 38 days.

Uploaded by

choco haech
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

ID Task Task Name Duration Start Finish Predecessors relationship Sep '24

Mode 8 15
1 Phase 1 55 days Tue 10/1/24 Mon 11/25/24

2 Board-up Installation 3 days Tue 10/1/24 Fri 10/4/24

3 Demolition Works 10 days Fri 10/4/24 Mon 10/14/24 2 F-S

4 Hauling, Disposal and Clearing 11 days Fri 10/4/24 Tue 10/15/24 3SS S-S

5 Black Paint Application on Exposed 10 days Sun Wed 10/30/24 12FF F-F
Ceiling 10/20/24
6 Installation of 600x600mm Granite 15 days Wed Thu 11/7/24 5SS,7SS,15FF 5&7:S-S 15: F-F
10/23/24
7 Suspended Ceiling of Entrance lobby 7 days Wed Wed 10/30/24 12FF F-F
10/23/24
8 Installation of Dry Wall Partition 8 days Tue Wed 10/23/24 4 F-S
10/15/24
9 Installation of Featured Wall 6 days Sun Sat 11/23/24 6,8,16 F-S
11/17/24
10 Installation of Vertical Blinds 4 days Thu 11/7/24 Mon 11/11/24 6 F-S

11 Installation of 2 Floor Mounted 5TR AC 12 days Thu 11/7/24 Tue 11/19/24 6,12 F-S
Unit
12 Rough-ins and Cabling Works 15 days Tue Wed 10/30/24 4 F-S
10/15/24

Task Manual Task Deadline

Split Duration-only Critical

Milestone Manual Summary Rollup Critical Split

Project: SAMPLE PROJECT 1 Summary Manual Summary Progress


Date: Thu 5/16/24 Project Summary Start-only Manual Progress

Inactive Task Finish-only Slack

Inactive Milestone External Tasks

Inactive Summary External Milestone

Page 1
ID Task Task Name Duration Start Finish Predecessors relationship Sep '24
Mode 8 15
13 Relocation and Installation of New 3 days Sun Wed 10/30/24 12FF F-F
Panels 10/27/24
14 Installation of Lighting fixtures and 4 days Wed Sun 11/3/24 7 F-S
devices on lobby 10/30/24
15 Installation of Lighting fixtures and 8 days Wed Thu 11/7/24 12 F-S
devices on Main Hall 10/30/24
16 Painting of Walls 10 days Thu 11/7/24 Sun 11/17/24 6,8 F-S

17 Installation of Board-up for Phase 2 3 days Wed Sat 11/23/24 9FF F-F
11/20/24
18 Dismantling of Board-up Installed for 2 days Sat 11/23/24 Mon 11/25/24 17 F-S
Phase 1
19 Phase 2 38 days Sat Tue 12/31/24
11/23/24
20 Masonry and Concreting Works 7 days Sat 11/23/24 Sat 11/30/24 2,3,4,5,6,7,8,9,10,11,12,13,14,15,16
F-S

21 Electrical Rough-ins and Cabling Works 5 days Sat 11/23/24 Thu 11/28/24 20SS S-S

22 Piping Works for toilet and pantry 6 days Sat 11/23/24 Fri 11/29/24 20SS S-S

23 Waterproofing Works 3 days Sat 11/30/24 Tue 12/3/24 20,21,22,27 F-S

24 Inst. Of Dry Wall Partitions 3 days Wed Sat 11/30/24 20FF F-F
11/27/24

Task Manual Task Deadline

Split Duration-only Critical

Milestone Manual Summary Rollup Critical Split

Project: SAMPLE PROJECT 1 Summary Manual Summary Progress


Date: Thu 5/16/24 Project Summary Start-only Manual Progress

Inactive Task Finish-only Slack

Inactive Milestone External Tasks

Inactive Summary External Milestone

Page 2
ID Task Task Name Duration Start Finish Predecessors relationship Sep '24
Mode 8 15
25 Wall Tiles Inst. Of Toilets 10 days Tue 12/3/24 Fri 12/13/24 23 F-S

26 Suspended Ceiling for Toilet and Pantry 5 days Fri 12/13/24 Wed 12/18/24 24,25 F-S

27 Installation of Flush Hollow Core Doors 5 days Mon Sat 11/30/24 20FF,24FF F-F
11/25/24
28 Floor Tiles Installation 5 days Wed Mon 12/23/24 26 F-S
12/18/24
29 Painting Works on Walls and Ceiling 6 days Mon Sun 12/29/24 24,26,28 F-S
12/23/24
30 Installation of ToileT Fixtures and 5 days Mon Sat 12/28/24 28 F-S
Accessories 12/23/24
31 Installation of Pantry Fixtures and 8 days Sat 12/21/24 Sun 12/29/24 29FF F-F
Accessories
32 Dismantling of Board-up for Phase 2 2 days Sun Tue 12/31/24 30,31 F-S
12/29/24

Task Manual Task Deadline

Split Duration-only Critical

Milestone Manual Summary Rollup Critical Split

Project: SAMPLE PROJECT 1 Summary Manual Summary Progress


Date: Thu 5/16/24 Project Summary Start-only Manual Progress

Inactive Task Finish-only Slack

Inactive Milestone External Tasks

Inactive Summary External Milestone

Page 3
Oct '24 Nov '24 Dec '24 Jan '25
15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12

NA
Board-up Installation
NA
Demolition Works
NA
Hauling, Disposal and Clearing
₱ 0.00
Black Paint Application on Exposed Ceiling
NA
Installation of 600x600mm Granite
NA
Suspended Ceiling of Entrance lobby
₱ 0.00
Installation of Dry Wall Partition
NA
Installation of Featured Wall
₱ 0.00
Installation of Vertical Blinds
₱ 0.00
Installation of 2 Floor Mounted 5TR AC Unit
NA
Rough-ins and Cabling Works

Task Manual Task Deadline

Split Duration-only Critical

Milestone Manual Summary Rollup Critical Split

Project: SAMPLE PROJECT 1 Summary Manual Summary Progress


Date: Thu 5/16/24 Project Summary Start-only Manual Progress

Inactive Task Finish-only Slack

Inactive Milestone External Tasks

Inactive Summary External Milestone

Page 4
Oct '24 Nov '24 Dec '24 Jan '25
15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12
₱ 0.00
Relocation and Installation of New Panels
₱ 0.00
Installation of Lighting fixtures and devices on lobby
NA
Installation of Lighting fixtures and devices on Main Hall
NA
Painting of Walls
₱ 0.00
Installation of Board-up for Phase 2
₱ 0.00
Dismantling of Board-up Installed for Phase 1

NA
Masonry and Concreting Works
₱ 0.00
Electrical Rough-ins and Cabling Works
₱ 0.00
Piping Works for toilet and pantry
NA
Waterproofing Works
NA
Inst. Of Dry Wall Partitions

Task Manual Task Deadline

Split Duration-only Critical

Milestone Manual Summary Rollup Critical Split

Project: SAMPLE PROJECT 1 Summary Manual Summary Progress


Date: Thu 5/16/24 Project Summary Start-only Manual Progress

Inactive Task Finish-only Slack

Inactive Milestone External Tasks

Inactive Summary External Milestone

Page 5
Oct '24 Nov '24 Dec '24 Jan '25
15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12
NA
Wall Tiles Inst. Of Toilets
NA
Suspended Ceiling for Toilet and Pantry
NA
Installation of Flush Hollow Core Doors
NA
Floor Tiles Installation
NA
Painting Works on Walls and Ceiling
₱ 0.00
Installation of ToileT Fixtures and Accessories
NA
Installation of Pantry Fixtures and Accessories
NA
Dismantling of Board-up for Phase 2

Task Manual Task Deadline

Split Duration-only Critical

Milestone Manual Summary Rollup Critical Split

Project: SAMPLE PROJECT 1 Summary Manual Summary Progress


Date: Thu 5/16/24 Project Summary Start-only Manual Progress

Inactive Task Finish-only Slack

Inactive Milestone External Tasks

Inactive Summary External Milestone

Page 6