BNB CONSOLIDATE
C-394/1 Block-6 F.B Area, Karachi Date:
Sindh, Karachi, 754000 Client ID:
021-36339999-98 Quotation ID:
Quote To: SECMC Quote Valid Till:
Ref: Procurement of CS Pipes and Fittings - CAD Prepared by:
Approved By:
Attn: Procurement Dept For:
M/s. SECMC
SINDH ENGRO COAL MINING COMPANY LIMITED
RELOCATION OF DEWATERING WELLS AT SECMC SITE THAR COAL
ESTIMATION PROPOSAL FOR MECHANICAL WORKS (CONSTR
OPTION 1: UTILIZATION OF EXISTING PIPELINE
CASE 1A – USING DN600 PIPELINE INSTALLED AT N8, N9 A
[Link]
A-1
A-2
B
B-1
D
D-1
D-2
D-3
E
NSOLIDATE
Block-6 F.B Area, Karachi Date:
Karachi, 754000 Client ID:
339999-98 Quotation ID:
To: SECMC Quote Valid Till:
curement of CS Pipes and Fittings - CAD Prepared by:
Approved By:
ocurement Dept For:
CMC
SINDH ENGRO COAL MINING COMPANY LIMITED
RELOCATION OF DEWATERING WELLS AT SECMC SITE THAR COAL BLOCK-II CAD
ESTIMATION PROPOSAL FOR MECHANICAL WORKS (CONSTRUCTION)
OPTION 1: UTILIZATION OF EXISTING PIPELINE
CASE 1A – USING DN600 PIPELINE INSTALLED AT N8, N9 AND N10
Item Description
Mobilization
Material supply to site locations
Shifting of components at designated locations.
Base Camp
Base Camp Establishment for complete Staff
Lodging ad boarding of team along mess
Pipeline Retrieval
Excavation and Preparation
Cleaning and Preparation of Right-of-Way (R.O.W):
Clearing and ensuring a minimum 2-meter-wide passage.
Cutting and filling the terrain where necessary.
Trenching: Excavation of trenches to accommodate the DN600 steel pipe.
Backfilling: Refilling the trenches and restoring the area.
Pipeline Repair & Maintenance
Surface preparation for protective coatings and repairs
Repair and maintenance of pipeline where needed.
Application of paint where needed.
Bolting and threading as necessary.
Non-destructive testing (NDT) for quality assurance.
Pipeline Installation
Excavation and Preparation
Cleaning and Preparation of Right-of-Way (R.O.W):
Clearing and ensuring a minimum 2-meter-wide passage.
Cutting and filling the terrain where necessary.
Trenching: Excavation of trenches to accommodate the DN600 steel pipe.
Backfilling: Refilling the trenches and restoring the area.
Installation Charges
Fabrication (as needed):
Creation of additional structures or components, if required.
Welding of piping elements.
Installation:
Placement and securing of DN600 steel pipes.
Installation of materials at designated locations.
Ensuring the use of Q-235 steel with a 3-layer polyethylene (3LPE) coating and internal epoxy.
Welding slip-on flanges at both ends for buried [Link] bedding, piping layoff and installation
along equipment charges
Testing and Commissioining
Testing: Conducting testing procedures to ensure system integrity.
Commissioning: Activation and verification of the operational functionality.
Completing All Aspects:
Ensuring the work complies with specifications and drawings.
Incorporating both field and factory bends.
Installing vents, drains, sleepers/supports, and flanges.
Executing the project from RN-10 to RN-4 wells, extending to the tie-in near N-3 wells.
Total Estimated Cost
14th November,2023
CRM/HYD/2014/009
QUO/O&M/
2023/990
29th November,2023
Ms. Kanwal Naz
Mr. Faheem Ahmed
O&M SECTOR
MITED
R COAL BLOCK-II CAD
ONSTRUCTION)
LINE
N9 AND N10
Unit Quantity Unit Price Total Amount
Job 1 10,500,000 10,500,000
Month 5 4,505,000 22,525,000
RM 940 1,175 1,104,500
RM 100 119,876 11,987,600
RM 940 1,175 1,104,500
RM 940 7,855 7,383,700
RM 940 2,934 2,757,960
57,363,260
BNB CONSOLIDATE
C-394/1 Block-6 F.B Area, Karachi Date:
Sindh, Karachi, 754000 Client ID:
021-36339999-98 Quotation ID:
Quote To: SECMC Quote Valid Till:
Ref: Procurement of CS Pipes and Fittings - CAD Prepared by:
Approved By:
Attn: Procurement Dept For:
M/s. SECMC
SINDH ENGRO COAL MINING COMPANY LIMITED
RELOCATION OF DEWATERING WELLS AT SECMC SITE THAR COA
ESTIMATION PROPOSAL FOR MECHANICAL WORKS (CONST
OPTION 1: UTILIZATION OF EXISTING PIPELINE
CASE 1B - USING DN700 PIPELINE INSTALLED IN BETWEEN N7
[Link]
A-1
A-2
B
B-1
D
D-1
D-2
D-3
E
NSOLIDATE
Block-6 F.B Area, Karachi Date:
Karachi, 754000 Client ID:
339999-98 Quotation ID:
To: SECMC Quote Valid Till:
curement of CS Pipes and Fittings - CAD Prepared by:
Approved By:
ocurement Dept For:
CMC
SINDH ENGRO COAL MINING COMPANY LIMITED
RELOCATION OF DEWATERING WELLS AT SECMC SITE THAR COAL BLOCK-II CAD
ESTIMATION PROPOSAL FOR MECHANICAL WORKS (CONSTRUCTION)
OPTION 1: UTILIZATION OF EXISTING PIPELINE
CASE 1B - USING DN700 PIPELINE INSTALLED IN BETWEEN N7R AND N3
Item Description
Mobilization
Material supply to site locations
Shifting of components at designated locations.
Base Camp
Base Camp Establishment for complete Staff
Lodging ad boarding of team along mess
Pipeline Retrieval
Excavation and Preparation
Cleaning and Preparation of Right-of-Way (R.O.W):
Clearing and ensuring a minimum 2-meter-wide passage.
Cutting and filling the terrain where necessary.
Trenching: Excavation of trenches to accommodate the DN700 steel pipe.
Backfilling: Refilling the trenches and restoring the area.
Pipeline Repair & Maintenance
Surface preparation for protective coatings and repairs
Repair and maintenance of pipeline where needed.
Application of paint where needed.
Bolting and threading as necessary.
Non-destructive testing (NDT) for quality assurance.
Pipeline Installation
Excavation and Preparation
Cleaning and Preparation of Right-of-Way (R.O.W):
Clearing and ensuring a minimum 2-meter-wide passage.
Cutting and filling the terrain where necessary.
Trenching: Excavation of trenches to accommodate the DN700 steel pipe.
Backfilling: Refilling the trenches and restoring the area.
Installation Charges
Fabrication (as needed):
Creation of additional structures or components, if required.
Welding of piping elements.
Installation:
Placement and securing of DN700 steel pipes.
Installation of materials at designated locations.
Ensuring the use of Q-235 steel with a 3-layer polyethylene (3LPE) coating and internal epoxy.
Welding slip-on flanges at both ends for buried [Link] bedding, piping layoff and installation
along equipment charges
Testing and Commissioining
Testing: Conducting testing procedures to ensure system integrity.
Commissioning: Activation and verification of the operational functionality.
Completing All Aspects:
Ensuring the work complies with specifications and drawings.
Incorporating both field and factory bends.
Installing vents, drains, sleepers/supports, and flanges.
Executing the project from RN-10 to RN-4 wells, extending to the tie-in near N-3 wells.
Total Estimated Cost
14th November,2023
CRM/HYD/2014/009
QUO/O&M/2023/990
29th November,2023
Ms. Kanwal Naz
Mr. Faheem Ahmed
O&M SECTOR
MITED
R COAL BLOCK-II CAD
CONSTRUCTION)
LINE
EEN N7R AND N3
Unit Quantity Unit Price Total Amount
Job 1 10,500,000 10,500,000
Month 5 4,505,000 22,525,000
RM 940 1,375 1,292,500
RM 100 109,876 10,987,600
RM 940 1,375 1,292,500
RM 940 8,150 7,661,000
RM 940 2,934 2,757,960
57,016,560
BNB CONSOLIDATE
C-394/1 Block-6 F.B Area, Karachi Date:
Sindh, Karachi, 754000 Client ID:
021-36339999-98 Quotation ID:
Quote To: SECMC Quote Valid Till:
Ref: Procurement of CS Pipes and Fittings - CAD Prepared by:
Approved By:
Attn: Procurement Dept For:
M/s. SECMC
SINDH ENGRO COAL MINING COMPANY LIMITED
RELOCATION OF DEWATERING WELLS AT SECMC SITE THAR COA
ESTIMATION PROPOSAL FOR MECHANICAL WORKS (CONST
OPTION:2 INSTALLATION OF NEW PIPELINE
PIPELINE MATERIAL: HDPE
[Link]
A
A-1
A-2
A-3
A-4
A-5
B
B-1
B-2
C
NSOLIDATE
Block-6 F.B Area, Karachi Date:
Karachi, 754000 Client ID:
339999-98 Quotation ID:
To: SECMC Quote Valid Till:
curement of CS Pipes and Fittings - CAD Prepared by:
Approved By:
ocurement Dept For:
CMC
SINDH ENGRO COAL MINING COMPANY LIMITED
RELOCATION OF DEWATERING WELLS AT SECMC SITE THAR COAL BLOCK-II CAD
ESTIMATION PROPOSAL FOR MECHANICAL WORKS (CONSTRUCTION)
OPTION:2 INSTALLATION OF NEW PIPELINE
PIPELINE MATERIAL: HDPE
Item Description
Pipeline Construction
Mobilization
Logistic from Factory to site
Material supply to site locations
Shifting of components at designated locations.
Base Camp
Base Camp Establishment for complete Staff
Lodging ad boarding of team along mess
Excavation and Preparation
Cleaning and Preparation of Right-of-Way (R.O.W):
Clearing and ensuring a minimum 2-meter-wide passage.
Cutting and filling the terrain where necessary.
Trenching: Excavation of trenches to accommodate the DN700 pipe.
Backfilling: Refilling the trenches and restoring the area.
Installation Charges
Butt fusion Welding of piping elements.
Installation:
Placement and securing of DN700 pipes.
Installation of materials at designated locations.
Sand bedding, piping layoff and installation along equipment charges
Testing and Commissioining
Testing: Conducting testing procedures to ensure system integrity.
Commissioning: Activation and verification of the operational functionality.
Completing All Aspects:
Ensuring the work complies with specifications
Installing vents, drains, sleepers/supports, and flanges.
Material Supplies
HDPE Pipeline
Supply of HDPE pipe DN-700 (PN-16)
including tee fittings, elbow connectors, end caps, as well as both reducers and reducer tees etc
Piping Accessories
Exhaust valves (Carbon Steel)
Butterfly valves (Carbon Steel)
Pressure gauges
Total Estimated Cost
14th November,2023
CRM/HYD/2014/009
QUO/O&M/2022/990
29th November,2023
Ms. Kanwal Naz
Mr. Faheem Ahmed
O&M SECTOR
MITED
R COAL BLOCK-II CAD
ONSTRUCTION)
NE
Unit Quantity Unit Price Total Amount
Job 1 40,500,000 40,500,000
Month 4 4,505,000 18,020,000
RM 940 1,375 1,292,500
RM 940 8,934 8,397,960
RM 940 2,934 2,757,960
RM 940 128,000 120,320,000
LS 1 36,096,000 36,096,000
Nos 8 598,000 4,784,000
Nos 1 2,687,300 2,687,300
Nos 2 22,000 44,000
234,899,720
BNB CONSOLIDATE
C-394/1 Block-6 F.B Area, Karachi Date:
Sindh, Karachi, 754000 Client ID:
021-36339999-98 Quotation ID:
Quote To: SECMC Quote Valid Till:
Ref: Procurement of CS Pipes and Fittings - CAD Prepared by:
Approved By:
Attn: Procurement Dept For:
M/s. SECMC
SINDH ENGRO COAL MINING COMPANY LIMITED
RELOCATION OF DEWATERING WELLS AT SECMC SITE THAR COA
ESTIMATION PROPOSAL FOR MECHANICAL WORKS (CONST
OPTION:2 INSTALLATION OF NEW PIPELINE
PIPELINE MATERIAL: CARBON STEEL
[Link]
A
A-2
A-3
A-4
A-5
B
B-1
B-2
C
NSOLIDATE
Block-6 F.B Area, Karachi Date:
Karachi, 754000 Client ID:
339999-98 Quotation ID:
To: SECMC Quote Valid Till:
curement of CS Pipes and Fittings - CAD Prepared by:
Approved By:
ocurement Dept For:
CMC
SINDH ENGRO COAL MINING COMPANY LIMITED
RELOCATION OF DEWATERING WELLS AT SECMC SITE THAR COAL BLOCK-II CAD
ESTIMATION PROPOSAL FOR MECHANICAL WORKS (CONSTRUCTION)
OPTION:2 INSTALLATION OF NEW PIPELINE
PIPELINE MATERIAL: CARBON STEEL
Item Description
Pipeline Construction
Logistic from Factory to site
Material supply to site locations
Shifting of components at designated locations.
Base Camp
Base Camp Establishment for complete Staff
Lodging ad boarding of team along mess
Excavation and Preparation
Cleaning and Preparation of Right-of-Way (R.O.W):
Clearing and ensuring a minimum 2-meter-wide passage.
Cutting and filling the terrain where necessary.
Trenching: Excavation of trenches to accommodate the DN700 steel pipe.
Backfilling: Refilling the trenches and restoring the area.
Installation Charges
Fabrication (as needed):
Creation of additional structures or components, if required.
Welding of piping elements.
Installation:
Placement and securing of DN700 pipes.
Installation of materials at designated locations.
Sand bedding, piping layoff and installation along equipment charges
Testing and Commissioining
Testing: Conducting testing procedures to ensure system integrity.
Commissioning: Activation and verification of the operational functionality.
Completing All Aspects:
Ensuring the work complies with specifications
Installing vents, drains, sleepers/supports, and flanges.
Material Supplies
HDPE Pipeline
Carbon steel Pipeline: DN 700, Thickness 9mm - Welded Joints
3 LPE Coating & internal epoxy (3mm coating of LPE outside & inside 1mm FBE coating)
along shipping from china to Karachi Port
including tee fittings, elbow connectors, end caps, as well as both reducers and reducer tees etc
Piping Accessories
Exhaust valves (Carbon Steel)
Butterfly valves (Carbon Steel)
Pressure gauges
Total Estimated Cost
14th November,2023
CRM/HYD/2014/009
QUO/O&M/2023/990
29th November,2023
Ms. Kanwal Naz
Mr. Faheem Ahmed
O&M SECTOR
MITED
R COAL BLOCK-II CAD
ONSTRUCTION)
NE
Unit Quantity Unit Price Total Amount
Job 1 40,500,000 40,500,000
Month 4 4,505,000 18,020,000
RM 940 1,375 1,292,500
RM 940 14,934 14,037,960
RM 940 2,934 2,757,960
RM 940 391,500 368,010,000
LS 1 110,403,000 110,403,000
Nos 8 598,000 4,784,000
Nos 1 2,687,300 2,687,300
Nos 2 22,000 44,000
562,536,720
BNB CONSOLIDATE
C-394/1 Block-6 F.B Area, Karachi Date:
Sindh, Karachi, 754000 Client ID:
021-36339999-98 Quotation ID:
Quote To: SECMC Quote Valid Till:
Ref: Procurement of CS Pipes and Fittings - CAD Prepared by:
Approved By:
Attn: Procurement Dept For:
M/s. SECMC
SINDH ENGRO COAL MINING COMPANY LIMITED
RELOCATION OF DEWATERING WELLS AT SECMC SITE THAR COAL
ESTIMATION PROPOSAL FOR MECHANICAL WORKS (CONSTR
OPTION:2 INSTALLATION OF NEW PIPELINE
PIPELINE MATERIAL: GRE
[Link]
A
A-1
A-2
A-3
A-4
A-5
B
B-1
B-2
C
NSOLIDATE
Block-6 F.B Area, Karachi Date:
Karachi, 754000 Client ID:
339999-98 Quotation ID:
To: SECMC Quote Valid Till:
curement of CS Pipes and Fittings - CAD Prepared by:
Approved By:
ocurement Dept For:
CMC
SINDH ENGRO COAL MINING COMPANY LIMITED
RELOCATION OF DEWATERING WELLS AT SECMC SITE THAR COAL BLOCK-II CAD
ESTIMATION PROPOSAL FOR MECHANICAL WORKS (CONSTRUCTION)
OPTION:2 INSTALLATION OF NEW PIPELINE
PIPELINE MATERIAL: GRE
Item Description
Pipeline Construction
Mobilization
Logistic from Factory to site
Material supply to site locations
Shifting of components at designated locations.
Base Camp
Base Camp Establishment for complete Staff
Lodging ad boarding of team along mess
Excavation and Preparation
Cleaning and Preparation of Right-of-Way (R.O.W):
Clearing and ensuring a minimum 2-meter-wide passage.
Cutting and filling the terrain where necessary.
Trenching: Excavation of trenches to accommodate the DN700 pipe.
Backfilling: Refilling the trenches and restoring the area.
Installation Charges
Lining and pipe lamination with epoxy for the jointing.
Installation:
Placement and securing of DN700 pipes.
Installation of materials at designated locations.
Sand bedding, piping layoff and installation along equipment charges
Testing and Commissioining
Testing: Conducting testing procedures to ensure system integrity.
Commissioning: Activation and verification of the operational functionality.
Completing All Aspects:
Ensuring the work complies with specifications
Installing vents, drains, sleepers/supports, and flanges.
Material Supplies
GRE Pipeline
GRE Pipeline: DN 700, (PN-25)
including tee fittings, elbow connectors, end caps, as well as both reducers and reducer tees etc
Piping Accessories
Exhaust valves (Carbon Steel)
Butterfly valves (Carbon Steel)
Pressure gauges
Total Estimated Cost
14th November,2023
CRM/HYD/2014/009
QUO/O&M/
2023/990
29th November,2023
Ms. Kanwal Naz
Mr. Faheem Ahmed
O&M SECTOR
MITED
R COAL BLOCK-II CAD
ONSTRUCTION)
NE
Unit Quantity Unit Price Total Amount
Job 1 40,500,000 40,500,000
Month 4 4,505,000 18,020,000
RM 940 1,375 1,292,500
RM 940 11,934 11,217,960
RM 940 2,934 2,757,960
RM 940 224,000 210,560,000
LS 1 63,168,000 63,168,000
Nos 8 598,000 4,784,000
Nos 1 2,687,300 2,687,300
Nos 2 22,000 44,000
355,031,720
BNB CONSOLIDATE
C-394/1 Block-6 F.B Area, Karachi Date:
Sindh, Karachi, 754000 Client ID:
021-36339999-98 Quotation ID:
Quote To: SECMC Quote Valid Till:
Ref: Procurement of CS Pipes and Fittings - CAD Prepared by:
Approved By:
Attn: Procurement Dept For:
M/s. SECMC
SINDH ENGRO COAL MINING COMPANY LIMITED
RELOCATION OF DEWATERING WELLS AT SECMC SITE THAR COA
ESTIMATION PROPOSAL FOR MECHANICAL WORKS (CONST
OPTION:2 INSTALLATION OF NEW PIPELINE
PIPELINE MATERIAL: GRP
[Link]
A
A-1
A-2
A-3
A-4
A-5
B
B-1
B-2
C
NSOLIDATE
Block-6 F.B Area, Karachi Date:
Karachi, 754000 Client ID:
339999-98 Quotation ID:
To: SECMC Quote Valid Till:
curement of CS Pipes and Fittings - CAD Prepared by:
Approved By:
ocurement Dept For:
CMC
SINDH ENGRO COAL MINING COMPANY LIMITED
RELOCATION OF DEWATERING WELLS AT SECMC SITE THAR COAL BLOCK-II CAD
ESTIMATION PROPOSAL FOR MECHANICAL WORKS (CONSTRUCTION)
OPTION:2 INSTALLATION OF NEW PIPELINE
PIPELINE MATERIAL: GRP
Item Description
Pipeline Construction
Mobilization
Logistic from Factory to site
Material supply to site locations
Shifting of components at designated locations.
Base Camp
Base Camp Establishment for complete Staff
Lodging ad boarding of team along mess
Excavation and Preparation
Cleaning and Preparation of Right-of-Way (R.O.W):
Clearing and ensuring a minimum 2-meter-wide passage.
Cutting and filling the terrain where necessary.
Trenching: Excavation of trenches to accommodate the DN700 steel pipe.
Backfilling: Refilling the trenches and restoring the area.
Installation Charges
Lining and pipe lamination with epoxy for the jointing.
Installation:
Placement and securing of DN700 pipes.
Installation of materials at designated locations.
Sand bedding, piping layoff and installation along equipment charges
Testing and Commissioining
Testing: Conducting testing procedures to ensure system integrity.
Commissioning: Activation and verification of the operational functionality.
Completing All Aspects:
Ensuring the work complies with specifications
Installing vents, drains, sleepers/supports, and flanges.
Material Supplies
GRP Pipeline
GRP Pipeline: DN 700, (PN-25)
including tee fittings, elbow connectors, end caps, as well as both reducers and reducer tees etc
Piping Accessories
Exhaust valves (Carbon Steel)
Butterfly valves (Carbon Steel)
Pressure gauges
Total Estimated Cost
14th November,2023
CRM/HYD/2014/009
QUO/O&M/2023/990
29th November,2023
Ms. Kanwal Naz
Mr. Faheem Ahmed
O&M SECTOR
MITED
R COAL BLOCK-II CAD
CONSTRUCTION)
NE
Unit Quantity Unit Price Total Amount
Job 1 40,500,000 40,500,000
Month 4 4,505,000 18,020,000
RM 940 1,375 1,292,500
RM 940 11,934 11,217,960
RM 940 2,934 2,757,960
RM 940 196,000 184,240,000
LS 1 55,272,000 55,272,000
Nos 8 598,000 4,784,000
Nos 1 2,687,300 2,687,300
Nos 2 22,000 44,000
320,815,720
TERMS AND CONDITIONS:
• This quote is exclusive of all Government Tax (Income Tax, GST/SST), if applicable it
shall add above the quoted amount
• The quoted amount is based on Open market dollar rates, which is cited to be
282.84 PKR to 1USD, if the Dollar rates fluctuate, the quoted price shall be reevaluate
after effective period of this quote.
• All issues related to government, local bodies and security shall be solved/ handled
by client.