0% found this document useful (0 votes)
458 views68 pages

Installation Testing & Commissioning - Efftronics SSBPAC D September 2022

Uploaded by

Prudhvi Mpr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
458 views68 pages

Installation Testing & Commissioning - Efftronics SSBPAC D September 2022

Uploaded by

Prudhvi Mpr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

i

भारत सरकार – रे ऱ मंत्राऱय


GOVERNMENT OF INDIA – MINISTRY OF RAILWAYS

Installation, Testing & Commissioning


Efftronics
Solid State Block Proving By Axle Counter – Digital
(SSBPAC – D)

End Users : SSE/JE (Signal) & Signal Maintainers of Indian Railways


CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0
September 2022

Indian Railways
Centre For Advanced Maintenance Technology Maharajpur,
Gwalior (M P) 474005
i
ii

Installation, Testing & Commissioning


Efftronics
SOLID STATE BLOCK PROVING BY AXLE COUNTER –DIGITAL

End Users : SSE/JE (Signal) & Signal Maintainers of Indian Railways


CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0
September 2022

Prepared by : Praveer Kumar Wakankar


SSE/Signal, Indian Railways CAMTECH,
Maharajpur, Gwalior (M.P.) 474005
Technical Sreehari K.
support: Senior Manager,
Efftronics Systems Pvt. Ltd.,
Plot No: 04, IT Park, Auto Nagar, Mangalagiri,
Guntur District – 522503.
Andhra Pradesh, INDIA
iii

Blank Page
iv

Table of Contents
Amendments & Revisions ............................................................................................................................. v
Disclaimer..................................................................................................................................................... vi
CAMTECH’s Objective ................................................................................................................................. vii
List of Figures ............................................................................................................................................. viii
List of Tables ................................................................................................................................................ ix
Abbreviations ................................................................................................................................................ x
Installation, Testing and Commissioning of SSBPAC (D) ........................................................................... 1
1.1 Introduction ...................................................................................................................................... 1
1.2 Strategy for installation, wiring, testing & commissioning of SSBPAC D ..................................... 1
1.3 Pre-site visit ..................................................................................................................................... 2
1.4 Wiring of Block Panel, Data logger & Station interface circuit ....................................................... 6
1.5 System ID setting ............................................................................................................................. 6
1.6 Section ID setting ............................................................................................................................. 7
1.7 Powering up of SSBPAC D ............................................................................................................. 8
1.8 Functional Test................................................................................................................................. 8
1.9 Training of operating staff ............................................................................................................. 14
1.10 Training of S&T maintenance staff ............................................................................................... 14
1.11 Commissioning .............................................................................................................................. 14
Annexure A – Wiring details between Block Panel & Equipment Rack ................................................ 16
Annexure B – Wiring details between SSBPAC D & Datalogger .......................................................... 20
Annexure C – Typical Interface circuits for Switch, Button type Panels and EI .................................... 21
Annexure D – Miscellaneous information useful in installation of SSBPAC D .................................... 34
Annexure E - Pre-commissioning check list of RDSO ........................................................................... 38
Annexure F.............................................................................................................................................. 52
RDSO Technical Advisory Note No. STS/E/TAN/6001 Ver. 1.0 dated 04.10.2011- Digital Axle
Counter- Wiring discipline .............................................................................................................. 52
v

Amendments & Revisions


The amendments/revisions to be issued in future for this report will be numbered as
follows:

CAMTECH/S&T/2022-23/SSBPAC-D/Vol.III/1.0 # XX date .......

Where “XX” is the serial number of the concerned amendment/revision (starting from 01
onwards).

Sr. No. Date of Amendment/Revision Remarks


issue
1.00 15.09.2022 First Release --

All rights reserved. This book or any other portion thereof may not
be reproduced or used in any manner whatsoever without
authorization from Indian Railways.
All Technical information and guidelines were latest at the time of
publishing and are subjected to change due to technology updates
and requirements.
vi

Disclaimer
This handbook is based on the latest RDSO Specification and
technical data provided by RDSO approved firm M/s Efftronics
Systems Pvt. Ltd., Guntur (A.P.) on the subject. It is clarified that
the information given in this handbook does not supersede any
existing provisions laid down in the Signal Engineering Manual,
Telecom Engineering Manual, Railway Board and RDSO
publications. This document is not statutory and the
information/instructions given in it are for the purpose of guidance
of railway officials concerned with the system/equipment. If at any
point contradiction is observed, then Signal Engineering Manual,
Telecom Engineering Manual, Railway Board/RDSO guidelines
may be referred or prevalent Zonal Railways instructions may be
followed. For any query on technical issue or detailed information
please contact:

M/s Efftronics Systems Pvt. Ltd.,


Plot No.4, IT Park, Auto Nagar Industrial Area, Near APIIC
Building, Mangalagiri, Guntur, Andhra Pradesh – 522503
Phone : +91-8645-666777
e-mail: [email protected], [email protected]
vii

CAMTECH’s Objective
To upgrade Maintenance Technologies and Methodologies and
achieve improvement in Productivity and Performance of all Railway
assets and manpower which inter-alia would cover Reliability,
Availability and Utilisation.

If you have any suggestion & any specific comments, please write to
us:

Contact person : Director (Signal & Telecommunication)


Postal Address : Indian Railways, Centre for Advanced
Maintenance Technology (IRCAMTECH),
Opposite Hotel Adityaz, Near DD Nagar,
Maharajpur, Gwalior (M.P.)
Pin Code – 474 005

Phone : 0751 - 2470185


Fax : 0751 – 2470841
Email : [email protected]
viii

List of Figures
Figure 1 : System ID Setting .......................................................................................................................... 7
Figure 2 : Section ID Setting .......................................................................................................................... 7
Figure 3 : Advanced Starter Control Reverse proving as input for SSBPAC (D) in Button type Panel -Relay
Interlocking ................................................................................................................................................. 21
Figure 4 :Reception Signal Control Reverse proving as input for SSBPAC (D) in Button type Panel -Relay
Interlocking – 3 Road station ...................................................................................................................... 22
Figure 5 : Advanced Starter Control Reverse proving as input for SSBPAC (D) in Switch type Panel -Relay
Interlocking ................................................................................................................................................. 24
Figure 6 : Reception Signal Control Reverse proving as input for SSBPAC (D) in Switch type Panel -Relay
Interlocking ................................................................................................................................................. 25
Figure 7 : Block diagram for EI interface with SSBPAC -D ........................................................................... 27
Figure 8 : SSBPAC-D Interface circuits for Single Line Station (Button Operation) ..................................... 28
Figure 9 : SSBPAC-D Interface Circuits for Single Line Station (Switch Operation) ..................................... 29
Figure 10 : SSBPAC-D Interface Circuits for Single Line Station (Electronic Interlocking) ........................... 30
Figure 11 : SSBPAC-D Interface circuits for Double Line Station (Button Operation).................................. 31
Figure 12 : SSBPAC-D Interface circuits for Double Line Station (Switch Operation) .................................. 32
Figure 13 : SSBPAC-D Interface circuits for Double Line Station (Electronic Interlocking) .......................... 33
Figure 14 : Foundation for Block Panel ....................................................................................................... 36
Figure 15 : Foundation for Equipment Rack................................................................................................ 36
ix

List of Tables
Table 1 : Space requirement for equipment ................................................................................................. 3
Table 2 : Relay Contact requirements - Relay Interlocking – Switch operation ........................................... 3
Table 3 : Relay Contact requirements - Relay Interlocking – Button operation [2 Road] ............................ 4
Table 4 : Relay Contact requirement -Electronic Interlocking ...................................................................... 5
Table 5 : Data logger requirements .............................................................................................................. 6
Table 6 : Details of Inputs from Station Interlocking for Correspondence Test ........................................... 8
Table 7 : Details of Inputs from Block Operating Panel for Correspondence Test ....................................... 9
Table 8 : Steps involved in Positive Test for taking Line Clear for train operation (Single Line) .................. 9
Table 9 : Steps involved in Positive Test for taking Line Clear for train operation (Double line) ............... 10
Table 10 : Steps involved in testing of Block Back operation ..................................................................... 11
Table 11 : Steps involved in Testing of Line Clear Cancellation .................................................................. 12
Table 12 : Conditions for Negative Test (Single Line) ................................................................................. 12
Table 13 : Conditions for Negative Test (Double line) ................................................................................ 13
Table 14 : Operations to check response of SSBPAC D Comminication link failure ................................... 13
Table 15 : Block Panel & Equipment Rack – Wire Termination (Single line) .............................................. 16
Table 16 : Block Panel & Equipment Rack – Wiring Termination (Double line) ......................................... 18
Table 17 : SSBPAC (D) & Data Logger – Wire termination (Double line) .................................................... 20
Table 18 : Input Interface Relays (Button type PI) ...................................................................................... 21
Table 19 : Input Interface Relays (Switch type PI) ...................................................................................... 24
Table 20 : Condition of Magnetic latch relays in different situations......................................................... 34
Table 21 : SSBPAC D Input details from Block Panel & Reset Buton .......................................................... 35
Table 22 : SSBPAC D Input relay contact details ......................................................................................... 35
Table 23 : Data Logger input details ........................................................................................................... 35
Table 24 : SSBPAC D Typical Installation, Testing & Commissioning schedule .......................................... 37
x

Abbreviations
AC Alternating Current
ACCU Auto Communication Changeover Unit
ACKN Acknowledgement
AH Ampere Hour
ASCR Advanced Starter Signal Control Relay
AS DR Advanced Starter Green Aspect Controlling Relay
ASGNCR Advance Starter Signal Normal checking Relay
AS RECR Advanced Starter Red Lamp Proving Relay
AS DECR Advanced Starter Green Lamp Proving Relay
ASRR Advanced Starter Switch Control Relay
A UNR A Route Button Relay
AS UNR Advanced Starter Route Button Relay
AZTR Block Section track Relay
B UNR B Route Button Relay
CM Centimetre
CO GNR Calling On Button relay
CO HECR Calling On Off Aspect Proving Relay
CO HR Calling On Signal Control Relay
CO RR Calling On Switch Control Relay
CPU Central Processing Unit
CPC Critical Power Control
DAC Digital Axle Counter
dB Decibel
DC Direct Current
D DECR Distant Green Lamp Proving Relay
D DR Distant Green Aspect Controlling Relay
D HHECR Distant Double Yellow Lamp Proving Relay
D HHR Distant Double Yellow Aspect Controlling Relay
DIP Dual in line Package
DL Data Logger
EGNR Signal Cancel Button Relay
EI Electronic Interlocking
EKT Electrical Key Transmitter
ESM Electrical Signal Maintainer
FEXT Far End Cross Talk
GDT Gas Discharge Tube
GPS Global Positioning System
HSATPR First track for direction proving repeater relay
HSBTPR Second track for direction proving repeater relay
HS GNR Home Signal Button relay
HSGNCR Reception Signal Normal Checking Relay
HS DR Home Signal Green Aspect Controlling Relay
HS HR Home Signal Yellow Aspect Controlling Relay
HS RECR Home Signal Red Lamp Proving Relay
xi

HS DECR Home Signal Green Lamp Proving Relay


HS HECR Home Signal Yellow Lamp Proving Relay
HSRR Home/Calling On Switch Control Relay
HS UECR Home Signal Route Lamp Proving Relay
HS UGR Home Signal Route Aspect Controlling Relay
HQ Headquarter
IPS Integrated Power Supply
KHz Kilo Hertz
KV Kilo Volt
IBC Inter Board Connector
ID Identification
LCB Line Clear Blocking
LED Light Emitting Diode
LSS Last Stop Signal
LSS RECPR Last Stop Signal Red Lamp Proving Repeater Relay
LSS DECPR Last Stop Signal Green Lamp Proving Repeater Relay
MA Milli Ampere
MV Milli Volts
NEXT Near End Cross Talk
OEM Original Equipment Manufacturer
OFC Optic Fiber Communication
PCB Printed Circuit Board
POST Power On Self Test
RDSO Research Designs & Standards Organisation
REPR Repeater Relay
S&T Signal & Telecom
SNOEK Signal Normal Other End Indication
SSBPAC D Solid State Block Proving by Axle Counter -Digital
SHKR Shunt Key Indicating Relay
SM Station Manager
TCF Train Coming From
TCFR Train Coming From Relay
TGT Train Going To
TGTR Train Going To Relay
TOL Train On Line
TPR Track Proving Relay
UFSBI Universal Fail Safe Block Interface
VPR Repeater to Vital Relay
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Installation, Testing and Commissioning of SSBPAC (D)


1.1 Introduction
This handbook contains guidelines on installation, testing and commissioning of Efftronics make
SSBPAC (D) in reference to Fundamentals of SSBPAC (D) & System Description of Efftronics
SSBPAC (D) issued in July 2022. The installation, testing and commissioning of SSBPAC (D)
are important stages as unless the system is not installed and tested properly, its flawless
performance after commissioning cannot be ascertained. There are various steps involved in the
above process such as site survey, estimation of additional inputs and interface wiring, circuit
alterations in existing installation, equipment wiring, various types of testing, compliance as per
pre-commissioning check list etc. The details of these processes are given in following
paragraphs.

1.2 Strategy for installation, wiring, testing & commissioning of SSBPAC D


There are four scenarios– for commissioning of SSBPAC D. Strategy for each type is given
below.

1.2.1 Existing block instrument replacement by SSBPAC D in Relay Interlocking


(i) To wire inputs to SSBPAC D, spare contacts in the existing relays shall be used. Where
spare relays are not available repeater relays are to be picked up.
(ii) By this block instrument working can be tested – except for removal of existing block
conditions and including new block conditions in Advanced starter signal control circuit.
(iii) Advanced starter circuit alteration can be done during disconnection.

1.2.2 SSBPAC D commissioning with Station Interlocking in Relay interlocking


Since station interlocking and SSBPAC D are going to be commissioned at a time – installation,
wiring, testing, and commissioning can be done along with station interlocking.

1.2.3 Existing block instrument replacement by SSBPAC D in Electronic Interlocking


(i) Four output relays of EI - ASRR, HSRR, ASGNCR & HSGNCR – which are to be wired
as input relays to SSBPAC D are to be wired first
(ii) Output relay of SSBPAC D, ASCR – which must be wired as input to EI has to be wired

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 1 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

(iii) Other 3 input relays of SSBPAC D – i.e., HSATPR, HSBTPR & AZTR – are also to be
wired with spare contacts of the existing relays
(iv) Output relays – ASRR, HSRR, ASGNCR & HSGNCR – operation can be simulated with
switches – to test SSBPAC D
(v) After testing with simulation – EI logic can be changed, and testing can be done with EI
outputs and input

1.2.4 SSBPAC D commissioning with Station Interlocking in electronic Interlocking


Since station interlocking and SSBPACD are going to be commissioned at a time – installation,
wiring, testing, and commissioning can be done along with station interlocking

1.3 Pre-site visit


To prepare a proper strategy and avoid last minute hassle during commissioning, a pre-site visit
is performed. The outcomes of pre-site visit are:
 Smooth and timely commissioning of SSBPAC D and
 Trouble free working leading to its maximum availability

Items to be considered for pre-site visit


(i) Identification of space for placement of equipment
(ii) Checking communication medium and power supply requirements
(iii) Estimation of interface wiring – station interlocking relay contacts required as input to
SSBPAC D. Circuit changes in advanced starter circuit for usage of SSBPAC D output
[ASCR] in station interlocking
(iv) Estimation of additional inputs to be wired to data logger and spare capacity availability
(v) Spare ports in data logger to collect diagnostic data of SSBPAC & ACCU
(vi) Checking for competency of operating staff [possession of competency certificate]

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 2 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

1.3.1 Identification of space for placement of equipment

Table 1 : Space requirement for equipment


Sr. Sub system Location Footprint Overall space required
No.
1 Equipment Relay room 58X65 CM One-meter space on front and back side to
rack open the doors
2 Block panel SM room 38X38 CM One-meter space on front side for
& 2oo3 operation and one meter on back side to
alarm unit open the doors – 0.5 meter on right side for
block phone
3 Maintainer Maintainer -- On maintainer table – for comfortable
Terminal room operation and viewing
4 GPS module Relay room – -- Wall mounted near window such that
with receiver wall distance between GPS receiver & module
is least

1.3.2 Checking for communication medium and power supply requirements


(i) Ensure at least two communication media is available between two stations
(ii) Estimate laying of communication cable between telecom room and relay room to extend
the channels to SSBPAC D
(iii) Cater for a separate 24 V, 5A DC – DC converter with standby converter in IPS
(iv) In case of conventional supply plan for 80 AH battery with 24 V 10 Amp auto charger
(v) Measure earth resistance - if it is more than 2 ohms, take action to reduce it to 2 ohms.

1.3.3 Estimation of interface wiring


Check for spare contacts of station interlocking relays for proving in input interface circuit of
SSBPAC D.
(A) Stations with relay interlocking – switch operation
Table 2 : Relay Contact requirements - Relay Interlocking – Switch operation
Sr. SSBPAC D Station Relays spare contact
No. Input relay Relay name Front/ back Relay position Spare contact
st
1 HS ATPR 1 control TPR of Home Front
2 HS BTPR 2nd control TPR of Home Front
3 AZTR VPR Front
4 AS RR AS RR Front
5 HS RR HS RR Front

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 3 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Sr. SSBPAC D Station Relays spare contact


No. Input relay Relay name Front/ back Relay position Spare contact
CO RR Front
6 AS GNCR AS RR Back
AS DR Back
AS RECR Front
AS DECR Back
7 HS GNCR HS RR Back
HS RECR Front
HS HECR Back
HS HR Back
HS DECR Back
HS DR Back
HS UECR Back
HS UGR Back
D DECR Back
D DR Back
D HHECR Back
D HHR Back
CO HECR Back
CO HR Back
8 LSS red LSS RECPR Front
9 LSS Green LSS DECPR Front

(B) Stations with relay interlocking – button operation [2 Road]


Table 3 : Relay Contact requirements - Relay Interlocking – Button operation [2 Road]
Sr. SSBPAC D Station Relays spare contact
No. Input relay Relay name Front/ back Relay position Spare contact
1 HS ATPR 1st control TPR of Home Front
2 HS BTPR 2nd control TPR of Home Front
3 AZTR VPR Front
4 HS RR HS BTPR Front
HS GNR Front & Back
CO GNR Front & Back
A UNR
B UNR
EGNR
5 AS RR AS GNR Front & Back
UNR Front
EGNR Back
6 AS GNCR AS UNR Back

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 4 of 54


Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Sr. SSBPAC D Station Relays spare contact


No. Input relay Relay name Front/ back Relay position Spare contact
AS DR Back
AS RECR Front
AS DECR Back
7 HS GNCR HS GNR Back
HS RECR Front
HS HECR Back
HS HR Back
HS DECR Back
HS DR Back
HS UECR Back
HS UGR Back
D DECR Back
D DR Back
D HHECR Back
D HHR Back
CO HECR Back
CO HR Back
CO GNR Back
8 LSS red LSS RECPR Front
9 LSS Green LSS DECPR Front

(C) Station with Electronic interlocking


 Four relays i.e., HS RR, AS RR, HS GNCR and ASGNCR are to be generated by EI as
its output relays with the required logics.
 Remaining 3 relays i.e. HS ATPR, HS BTPR and AZTR are station relays. All the 7
relays contacts are to be checked for their availability and noted down in the table
below.
Table 4 : Relay Contact requirement -Electronic Interlocking
Sr. SSBPAC D Station Relays spare contact
No. Input relay Relay name Front/ back Relay position Spare contact
st
1 HS ATPR 1 control TPR of Home Front
2 HS BTPR 2nd control TPR of Home Front
3 AZTR VPR Front
4 AS RR AS RR [output relay of EI] Front
5 HS RR HS RR [output relay of EI] Front
6 AS GNCR AS GNCR [output relay of EI] Back
7 HS GNCR HS GNCR [output relay of EI] Back

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 5 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

(D) Station data logger detail - spare capacity, ID etc.


 For one block instrument 24 contacts are to be wired to data logger as digital inputs.
 Two spare ports are required in data logger to take diagnostic data of SSBPAC D &
ACCU.
 The following information may be taken to cater for its expansion

Table 5 : Data logger requirements


Sr. Item Data
No.
1 Data logger ID
2 Data logger model
3 Spare analogue inputs
4 Spare digital inputs
5 Spare OPTO ports [40ma – 24 V]

1.4 Wiring of Block Panel, Data logger & Station interface circuit
 Block panel is factory wired. However, wiring between block panel and equipment rack must
be done at site as per wiring diagram provided by Efftronics.
 Data logger wiring must be done as per the estimation of data logger inputs to be wired.
 Station interface circuit must be wired as per the approved circuit issued by competent
railway authority.

1.5 System ID setting


(i) Each SSBPAC equipment has unique ID
(ii) For inter block communication i. e. for two SSBPAC equipment to communicate each other,
both self ID & remote SSBPAC ID must be set in the voter card
(iii) For getting data of each SSBPAC in test room through data logger network also SSBPAC
ID is required
(iv) Voter card has two 8way DIP switches to set systems ID, S1 which is nearer to Front facia is
used to set self ID and S2 which is nearer to top connector is used to set remote end
SSBPAC ID.
(v) Switch position ON indicates Zero and OFF indicates ONE.

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 6 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Figure 1 : System ID Setting

1.6 Section ID setting


(i) Section ID is required for Inter Block Communication between two SSBPACs
(ii) Each Block section has 16bit length unique section ID – provided on mother board set in
the factory while manufacturing
(iii) Two SSBPAC Ds should have same section ID
(iv) In case of mother board replacement, a spare universal mother board is kept whose address
can be set as follows –

Figure 2 : Section ID Setting

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 7 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

 Section ID should be set on Mother board, provided by wire provisions for each CPU, so
that all the 3 CPUs must have same section ID.
 To set „0‟, jumper is to be shorted and to set „1‟, jumper is to be opened.

1.7 Powering up of SSBPAC D


After ensuring that the power supply to all modules is within permitted limits and networking
cables are connected to the adjacent SSBPAC D and earth resistance is within the limits – power
supply is extended to equipment rack.
 It takes about 2 minutes for the SSBPAC D to complete POST [Power On Self Test].
 Error code 63 is displayed on all 3 CPUs. Then global reset button provided in equipment
rack should be pressed once.
 Health indication is displayed [green LED] & error code 00 is displayed on all CPUs

1.8 Functional Test


The functional test for SSBPAC D installation comprises of following types of tests before
commissioning:

1.8.1 Correspondence Test of inputs

(i) Inputs from Station Interlocking

Table 6 : Details of Inputs from Station Interlocking for Correspondence Test


Sr. Input Action Observation
No.
1 HSATPR Drop corresponding track repeater relay by
disconnecting at station CT rack
2 HSBTPR Drop corresponding track repeater relay by
disconnecting at station CT rack LED indication above the
3 AZTR Drop VPR relay by disconnecting at station CT relay in equipment rack is
rack not lit
4 ASGNCR Operate LSS control
5 HSGNCR Operate Home signal control
6 SHKR Insert shunt key & turn to right
7 ASRR Operate LSS control Observe status in
8 HSRR Operate Home signal control maintainer terminal

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 8 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

(ii) Inputs from Block Operating Panel

Table 7 : Details of Inputs from Block Operating Panel for Correspondence Test
Sr. Input Action Observation
No.
1 Reset B Press and release reset button
2 Reset F
4 ACKN Press and release ACKN button
5 Bell B Press and release BELL button
6 Bell F
7 Cancel B Operate Cancel button
8 Cancel F
9 Coop B Press and release Coop button
10 Coop F Observe status in maintainer terminal
11 Shunt Key B Insert turn to right – then to left
12 Shunt Key F and takeout Shunt Key
13 TGT B Press and release TGT button
14 TGT F
15 SM key B Insert turn to right – then to left
16 SM key F and takeout SM Key
17 TCF B Press and release TCF button
18 TCF A

1.8.2 Positive Test for taking Line Clear for train operation
Table 8 : Steps involved in Positive Test for taking Line Clear for train operation (Single Line)
Sr. Operation at Indication at Relay status at
No. Train sending Train
station [TSS] receiving TSS TRS TSS TRS
station [TRS]
1 Press TGT & Keep shunt TGT TCF TGTR TCFR
BELL buttons release key out up up
2 Operate LSS No action LSS changes to No change ASCR No
green up change
3 Drop AZTR by Drop AZTR by  LSS changes  Block changes ASCR No
disconnecting at disconnecting to RED to TOL drops change
WAGO at WAGO  Block changes  TOL Buzzer
terminal terminal to TOL
 TOL Buzzer
4 No action Operate home No change Home may/ No No
signal control may not change change change
its aspect

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 9 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Sr. Operation at Indication at Relay status at


No. Train sending Train
station [TSS] receiving TSS TRS TSS TRS
station [TRS]
5 Pick up AZTR  Drop AT, BT  TGT-TOL  TCF-TOL TGTR TCFR
 Normalize indication is indication is down down
home control extinguished extinguished
 Pick up AT,  Line closed  Line closed
BT & AZTR indication is indication is
lit lit
 Buzzer  Buzzer

Table 9 : Steps involved in Positive Test for taking Line Clear for train operation (Double line)
Sr. Operation at Indication at Relay status at
No. Train sending Train
station [TSS] receiving TSS TRS TSS TRS
station [TRS]
1 Press TGT & Keep LCB Key TGT TCF TGTR TCFR
BELL buttons IN up up
2 Operate LSS No action LSS changes to No change ASCR No
green up change
3 Drop AZTR by Drop AZTR by  LSS changes to  Block changes ASCR No
disconnecting at disconnecting RED to TOL drops change
WAGO at WAGO  Block changes  TOL Buzzer
terminal terminal to TOL
 TOL Buzzer
4 No action Operate home No change Home may/ No No
signal control may not change change change
its aspect
5 Pick up AZTR  Drop AT, BT  TGT-TOL  TCF-TOL TGTR TCFR
 Normalize indication is indication is down down
home control extinguished extinguished
 Pick up AT,  Line closed  Line closed
BT & AZTR indication is lit indication is
 Buzzer lit
 Buzzer

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 10 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

1.8.3 Block back operation

Table 10 : Steps involved in testing of Block Back operation


Sr. Operation at Indication at Relay status at
No. Train sending Train
station [TSS] receiving TSS TRS TSS TRS
station [TRS]
1 Insert shunt No action Shunt release SNOEK – yellow SHKR No
release key key indication indication lamp drops change
when in line changes from extinguishes
closed GREEN to RED
condition
2 Try for line No action No change No change No No
clear change change
3 Remove key No action No change No change No No
from EKT change change
4 Drop AZTR No action Line occupied Line occupied AZTR AZTR
indication indication drops drops
changes to changes to RED
RED – Line – Line closed
closed Yellow Yellow
indication indication
extinguishes extinguishes
5 Try for line No action No change No change No No
clear change change
6 Pick up AZTR No action Line occupied Line occupied AZTR AZTR
RED indication RED indication Up Up
extinguishes – extinguishes –
Line free Line free GREEN
GREEN indication lights –
indication lights Line closed
– Line closed yellow indication
yellow lights
indication lights
7 Insert EKT No action No change No change No No
key change change
8 Insert shunt No action Shunt release SNOEK – yellow SHKR No
release key key indication indication lamp up change
changes from lights
RED to GREEN
9 Carry out test at other end station also

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 11 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

1.8.4 Line clear cancellation

Table 11 : Steps involved in Testing of Line Clear Cancellation


Sr. Operation at Indication at Relay status at
No. Train sending station Train
[TSS] receiving TSS TRS TSS TRS
station [TRS]
1 Requests for Agrees for TGT TCF TGTR up TGTR up
cancellation with train cancellation
details
2 Presses cancel
& bell buttons
3 Presses cancel coop & Cancel coop TCFR TGTR
bell buttons indication lit down down after
Number after 2 2 minutes
increments minutes
After 2 minutes
Lince closed lit

1.8.5 Negative test


Try for line clear without the following conditions one at a time:

Table 12 : Conditions for Negative Test (Single Line)


Sr. Condition Line clear Sr. Condition Line clear obtained
No. obtained OR not No. OR not
Sending station Receiving station
1 AZTR down Not obtained 1 AZTR down Not obtained
2 SHKR down Not obtained 2 SHKR down Not obtained
3 HSGNCR Not obtained 3 HSGNCR down Not obtained
down
4 ASGNCR Not obtained 4 ASGNCR down Not obtained
down
5 HSATPR Not obtained 5 HSATPR down Not obtained
down
6 HSBTPR down Not obtained 6 HSBTPR down Not obtained
7 SM Key OUT Not obtained 7 SM Key OUT Obtained
8 SM Key IN Obtained 8 SM Key IN Obtained
9 SH Key OUT Obtained 9 SH Key OUT Obtained
10 SH Key IN Not obtained 10 SH Key IN Not obtained

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 12 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Table 13 : Conditions for Negative Test (Double line)


Sr. Condition Line clear Sr. Condition Line clear obtained
No. obtained OR not No. OR not
Sending station Receiving station
1 AZTR down Not obtained 1 AZTR down Not obtained
2 HSGNCR Not obtained 2 HSGNCR down Not obtained
down
3 ASGNCR Not obtained 3 HSATPR down Not obtained
down
4 HSATPR Not obtained 4 HSBTPR down Not obtained
down
5 HSBTPR down Not obtained 5 SM Key OUT Obtained
6 SM Key OUT Not obtained 6 SM Key IN Obtained
7 SM Key IN Obtained 7 LCB Key IN Obtained
8 LCB Key IN Obtained 8 LCB Key OUT Not obtained
9 LCB Key OUT Not obtained

1.8.6 Response of SSBPAC D for Communication link failure

Table 14 : Operations to check response of SSBPAC D Comminication link failure


Sr. Operation at Indication at Relay status at
No. Train Train TSS TRS TSS TRS
sending receiving
station station
1 Press Keep shunt TGT TCF TGTR up TCFR up
TGT & release key out
BELL
buttons
Cut off communication Communication Communication No No
for 10 Sec fail & restored fail & restored change change
2 Operate No action LSS changes to No change ASCR up No
LSS green change
Cut off communication Communication Communication No No
for 10 Sec fail & restored fail & restored change change
3 Drop Drop AZTR by  LSS changes  Block changes ASCR No
AZTR by disconnecting at to RED to TOL drops change
disconne WAGO  Block changes  TOL Buzzer
cting at terminal to TOL
WAGO  TOL Buzzer
terminal
Cut off communication Communication Communication No No
for 10 Sec fail & restored fail & restored change change
4 No action Operate home No change Home may/ No No

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 13 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Sr. Operation at Indication at Relay status at


No. Train Train TSS TRS TSS TRS
sending receiving
station station
signal control may not change change change
its aspect
5 Pick up  Drop AT, BT  TGT-TOL  TCF-TOL TGTR TCFR
AZTR  Normalize indication is indication is down down
home control extinguished extinguished
 Pick up AT,  Line closed  Line closed
BT & AZTR indication is indication is
lit lit
 Buzzer  Buzzer

1.9 Training of operating staff


(a) SSBPAC D block panel is same as block panel of UFSBI MUX. However, a separate block
working manual must be developed by each zonal railway. Similarly, separate block
competency certificate must be issued to all the station masters responsible for working on
SSBPAC D.
(b) While planning the installation of SSBPAC D, S&T officials has to bring it to the notice of
traffic officials so that arrangements are made to train and issue block competency
certificate in time for commissioning of SSBPAC D.

1.10 Training of S&T maintenance staff


(a) Ensuring competency of maintenance personnel in maintenance of SSBPAC D helps in
trouble free service
(b) Involving maintenance personnel in the installation process helps onsite training
(c) While carrying out functional test, various failure states may be created to familiarise the
maintenance staff with various failure states.

1.11 Commissioning
(i) SSBPAC D is commissioned by S&T officials by issuing traffic notice.
(ii) Joint Functional test is performed by S&T officials & OEM engineer compliance of RDSO
recommended pre-commissioning check list is ensured before commissioning.

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 14 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

(iii) Familiarization of error codes shall be done by practically simulating as many conditions as
possible.
(iv) Wiring details between block panel and equipment rack are given in Annexure A.
(v) Wiring details between SSBPAC D and Datalogger are given in Annexure B.
(vi) Typical Interface circuits for Switch, Button type panels and EI are given in Annexure C.
(vii) Miscellaneous information useful for installation of SSBPAC D is given in Annexure D.
(viii) Pre-commissioning check list is given in the ANNEXURE E
(ix) RDSO Technical Advisory Note No. STS/E/TAN/6001 for Digital Axle Counter – Wiring
Discipline is given in Annexure F.

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 15 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Annexure A – Wiring details between Block Panel & Equipment Rack


Table 15 : Block Panel & Equipment Rack – Wire Termination (Single line)
Sr. No. Equipment Rack Block Panel Remarks
1 690M1_CN_CNTRL 623_W2-1 CN_CNTRL
2 690M1_TCF_RED 623_W2-10 TCF_RED
3 690M1_TGT_RED 623_W2-9 TGT_RED
4 690M1_TGT_RA 623_W2-16 TGT_RA
5 690M1_TGT_GRN 623_W2-18 TGT_GRN
6 690M1_TCF_RA 623_W2-12 TCF_RA
7 690M1_TCF_GRN 623_W2-17 TCF_GRN
8 690M1_TGT_GA 623_W2-15 TGT_GA
9 690M1_TCF_GA 623_W2-11 TCF_GA
10 690M1_CANCEL 623_W2-8 CANCEL
11 690M1_CN_COOP 623_W2-7 CN_COOP
12 690M1_SM_KEY 623_W2-2 SM_KEY
13 NC NC NC
14 690M1_SNK 623_W2-19 SNK
15 690M1_LN_CL 623_W2-14 LN_CL
16 690M1_ACKN 623_W2-3 ACKN
17 690M1_COM_STA 623_W2-4 COM_STA
18 690M1_SHK_G 623_W2-20 SHK_G
19 690M1_SHK_R 623_W2-21 SHK_R
20 NC NC NC
21 690M1_SNOEK(SNKR) 623_W2-22 SNOEK (SNKR)
22 NC NC NC
23 NC NC NC
24 690M1_2_OO_3 623_W3-10 2_OO_3
25 C1W1 623_W3-8 SSBPACOK
26 C1W2 623_W3-7 SSBPACFAIL
27 C1W3 623_W3-12 DECR
28 C1W4 623_W3-11 RECR
C1W5 623_W2-24 SGND
29
623_W3-3
30 C1W6 NC NC
31 C1W7 NC NC
32 C1W8 NC NC
33 C1W9 NC NC
34 C1W10 623_W3-1 AX_F
35 C1W11 623_W3-2 AX_B
36 C1W12 B2W14 SHUNT_EKT_LOCK_POSITIVE

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 16 of 54


Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Sr. No. Equipment Rack Block Panel Remarks


37 C1W13 B2W15 SHUNT_EKT_LOCK_ NEGATIVE
38 C1W14 B2W17 EKT_4
39 C1W15 B2W18 EKT_1
40 C1W16 B2W16 EKT_5
41 C1W17 B2W2 ACKN_ DL_F
42 C1W18 B2W3 BELL_DL_F
43 C1W19 B2W4 CANCEL_DL_F
44 C1W20 B2W5 CANCELCOOP_DL_F
45 C1W21 B2W6 SH_RLS_KEY_DL_F
46 C1W22 B2W7 TGT_DL_F
47 C1W23 NC NC
48 C1W24 B2W9 SM_KEY_DL_F
49 C2W1 B1W1 NC
50 C2W2 B1W2 ACKN_OUT
51 C2W3 B1W3 BELL_B_OUT
52 C2W4 B1W4 BELL_F_OUT
53 C2W5 B1W5 CANCEL_B_OUT
54 C2W6 B1W6 CANCEL_F_OUT
55 C2W7 B1W7 CO_OP_B_OUT
56 C2W8 B1W8 CO_OP_F_OUT
57 C2W9 B1W9 SH_RLSKEYB OUT
58 C2W10 B1W10 SH_RLSKEYF OUT
59 C2W11 B1W11 TGT_B_OUT
60 C2W12 B1W12 TGT_F_OUT
61 C2W13 B1W13 SM_KEY_B_OUT
62 C2W14 B1W14 SM_KEY_F_OUT
63 C2W15 B1W23 PANEL GND
64 C2W16 B1W24
65 C2W17 B1W24
66 C2W18 B1W22 BLOCK TELEPHONE GND
67 C2W19 B1W21
68 C2W20 NC NC
69 C2W21 B1W15 PANEL SUPPLY
70 C2W22 B1W16
71 C2W23 BIW18 BLOCK TELEPHONE SUPPLY
72 C2W24 B1W17
73 Telecom CT RACK B1W19 TXBT
74 Telecom CT RACK B1W20 RXBT

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 17 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Table 16 : Block Panel & Equipment Rack – Wiring Termination (Double line)
Sr. No. Equipment Rack Block Panel Remarks
1 690M1_CN_CNTRL 623_W2-1 CN_CNTRL
2 690M1_TCF_RED 623_W2-10 TCF_RED
3 690M1_TGT_RED 623_W2-9 TGT_RED
4 690M1_TGT_RA 623_W2-16 TGT_RA
5 690M1_TGT_GRN 623_W2-18 TGT_GRN
6 690M1_TCF_RA 623_W2-12 TCF_RA
7 690M1_TCF_GRN 623_W2-17 TCF_GRN
8 690M1_TGT_GA 623_W2-15 TGT_GA
9 690M1_TCF_GA 623_W2-11 TCF_GA
10 690M1_CANCEL 623_W2-8 CANCEL
11 690M1_CN_COOP 623_W2-7 CN_COOP
12 690M1_SM_KEY 623_W2-2 SM_KEY
13 690M1_SNOEK 623_W2-23 SNOEK
14 690M1_SNK_D 623_W2-19 SNK_D
15 690M1_LN_CL_D 623_W2-14 LN_CL_D
16 690M1_ACKN_R 623_W2-3 ACKN_R
17 690M1_COM_STA 623_W2-4 COM_STA
18 NC NC NC
19 NC NC NC
20 690M1_ACKN_D 623_W2-5 ACKN_D
21 690M1_SNK R/(SNOEK) 623_W2-22 SNK R /(SNOEK)
22 690M1_LN_CL_R 623_W2-13 LN_CL_R
23 NC NC NC
24 690M1_2_OO_3 623_W3-10 2_OO_3
25 C1W1 623_W3-8 SSBPAC OK
26 C1W2 623_W3-7 SSBPAC FAIL
27 C1W3 623_W3-12 DECR
28 C1W4 623_W3-11 RECR
29 C1W5 623_W2-24 SGND
623_W3-3
30 C1W6 NC NC
31 C1W7 NC NC
32 C1W8 NC NC
33 C1W9 NC NC
34 C1W10 623_W2-20 AX_D_F
35 C1W11 623_W2-21 AX_D_B
36 C1W12 623_W3-1 AX_R_F
37 C1W13 623_W3-2 AX_R_B
38 C1W14 B2W17 NC
Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 18 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Sr. No. Equipment Rack Block Panel Remarks


39 C1W15 B2W18 NC
40 C1W16 B2W16 NC
41 C1W17 B2W2 ACKN_R_ DL_F
42 C1W18 B2W3 BELL_DL_F
43 C1W19 B2W4 CANCEL_DL_F
44 C1W20 B2W5 CANCELCOOP_DL_F
45 C1W21 B2W6 LCB_KEY_DL_F
46 C1W22 B2W7 TGT_DL_F
47 C1W23 B2W8 ACKN_D_ DL_F
48 C1W24 B2W9 SM_KEY_DL_F
49 C2W1 B1W1 ACKN_D_OUT
50 C2W2 B1W2 ACKN_R_OUT
51 C2W3 B1W3 BELL_B_OUT
52 C2W4 B1W4 BELL_F_OUT
53 C2W5 B1W5 CANCEL_B_OUT
54 C2W6 B1W6 CANCEL_F_OUT
55 C2W7 B1W7 CO_OP_B_OUT
56 C2W8 B1W8 CO_OP_F_OUT
57 C2W9 B1W9 LCB_ KEY_ B OUT
58 C2W10 B1W10 LCB_ KEY_ F OUT
59 C2W11 B1W11 TGT_B_OUT
60 C2W12 B1W12 TGT_F_OUT
61 C2W13 B1W13 SM_KEY_B_OUT
62 C2W14 B1W14 SM_KEY_F_OUT
63 C2W15 B1W23 PANEL GND
64 C2W16 B1W24
65 C2W17 B1W24
66 C2W18 B1W22 BLOCK
TELEPHONE GND
67 C2W19 B1W21
68 C2W20 NC NC
69 C2W21 B1W15 PANEL SUPPLY
70 C2W22 B1W16
71 C2W23 BIW18 BLOCK TELEPHONE
SUPPLY
72 C2W24 B1W17
73 C3W1 B2W1 DL PANEL GND

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 19 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Annexure B – Wiring details between SSBPAC D & Datalogger

Table 17 : SSBPAC (D) & Data Logger – Wire termination (Double line)

Sr. RELAY NAME CONTACT Description


No.
1 BACK DOOR FRONT -
2 FRONT DOOR FRONT -
3 HSGNCR Relay BACK B5B6
4 ASGNCR Relay BACK B5B6
5 SHKR Relay BACK B5B6
6 AZTRD Relay BACK B5B6
7 CPC0 Relay BACK B5B6
8 CPC1 Relay BACK C5C6
9 TCFR Relay BACK D7D8
10 TGTR Relay BACK D7D8
11 ASCR Relay BACK A7A8
12 HSBTPR Relay BACK B5B6
13 HSATPR Relay BACK B5B6
14 REP0 Relay BACK B7B8
15 REP1 Relay BACK C7C8
16 GLOBAL RESET Button FRONT -
17 ACKN Button FRONT -
18 BELL Button FRONT -
19 CANCEL Button FRONT -
20 CANCELCOOP Button FRONT -
21 SH_RLS_KEY FRONT -
22 TGT Button FRONT -
23 Spare -
24 SM KEY FRONT -

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 20 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Annexure C – Typical Interface circuits for Switch, Button type Panels and EI

(i) Interface circuit for button type Panel Interlocking station


Input Interface Relay Wiring
8 relays circuits are to be wired at station signalling for input interface circuit

Table 18 : Input Interface Relays (Button type PI)


Sr. Relay Location Sr. Relay Location
No. No.
1 ASRR Station relay 5 AZTR SSBPAC D
2 HSRR rack 6 SHKR relay rack
3 ASGNCR SSBPAC D 7 HSATPR
4 HSGNCR relay rack 8 HSBTPR

(a) ASRR
 ASRR relay is in station relay rack

 ASRR picks up when – advanced starter signal button and route button are pressed and
EGN not pressed

 ASRR is held by bypassing route & signal button relay front contacts even after the buttons
are released

 ASRR drops in two cases:


(i) When ASCR dropped after train passing advanced starter OR
(ii) Advanced starter is put back to danger by pressing its GN & EGN buttons.

Figure 3 : Advanced Starter Control Reverse proving as input for SSBPAC (D) in Button type
Panel -Relay Interlocking
Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 21 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

(b) HSRR
 HSRR is in station relay rack
 HSRR picks up when:
(i) Home signal or calling on signal button is pressed
(ii) Any of the berthing track route buttons are pressed
(iii) EGN button not pressed
(iv) Home signal 2nd controlling track circuit is not occupied
 HSRR drops when:
(i) Train occupies home 2nd controlling track OR
(ii) Home / calling on is put back to danger by pressing GN & EGN buttons

Figure 4 :Reception Signal Control Reverse proving as input for SSBPAC (D) in Button type
Panel -Relay Interlocking – 3 Road station

ASGNCR
 ASGNCR is in SSBPAC D equipment rack
 ASGNCR picks up when the following conditions are satisfied:
(i) Its red lamp is lit
(ii) Its green [any OFF aspect] lamp is not lit
(iii) Its OFF aspects controlling relays are dropped
(iv) Its button is not pressed

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 22 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

 ASGNCR drops when:


(i) Any of the above conditions are not fulfilled
(ii) When attempt to operate advanced starter signal is done

(c) HSGNCR
 HSGNCR is in SSBPAC D equipment rack
 HSGNCR picks up when the following conditions are satisfied:
(i) All reception signals [home, calling-on, distant] controls are normal – button relays
down
(ii) All reception signals OFF aspect control relays are dropped
(iii) All reception signals OFF aspect lamps are not lit
(iv) Home signal red lamp is lit
(d) AZTR is in SSBPAC D equipment rack. It is repeater of block proving axle counter relay
(e) SHKR is in SSBPAC D equipment rack. It is shunt key IN proving relay of EKT.
(f) HSATPR is in SSBPAC D equipment rack. Repeater relay of home first controlling track
relay
(g) HSBTPR is in SSBPAC D equipment rack. Repeater relay of home second controlling track
relay

Output interface relay wiring


(a) Three contacts of ASCR are wired in the ASDR circuit of the station. Two front contacts in
positive and negative limbs. One back contact across the coil of ASDR as cross protection.
(Ref Figure 8) In case proving block conditions in station interlocking is required – TGTR
& TCFR relays‟ contacts are used.

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 23 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

(ii) Interface circuit for switch type Panel Interlocking station


Input interface relays wiring:
8 relays circuits are to be wired at station signalling for input interface circuit

Table 19 : Input Interface Relays (Switch type PI)


Sr. Relay Sr. Relay Sr. Relay Sr. Relay
No. No. No. No.
1 ASRR 3 ASGNCR 5 AZTR 7 HSATPR
2 HSRR 4 HSGNCR 6 SHKR 8 HSBTPR

(a) ASRR
 ASRR relay is in station relay rack
 ASRR picks up when advanced starter signal switch is reversed
 ASRR drops when the switch is normalized

Figure 5 : Advanced Starter Control Reverse proving as input for SSBPAC (D) in Switch type
Panel -Relay Interlocking

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 24 of 54


Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

(b) HSRR
 HSRR is in station relay rack
 HSRR picks up when home signal or calling on signal switch is reversed
 HSRR drops when home and calling on switches are normalized.

Figure 6 : Reception Signal Control Reverse proving as input for SSBPAC (D) in Switch type
Panel -Relay Interlocking

(c) ASGNCR
 ASGNCR is in SSBPAC D equipment rack
 ASGNCR picks up when the following conditions are satisfied
(i) Its red lamp is lit
(ii) Its green [any OFF aspect] lamp is not lit
(iii) Its OFF aspects controlling relays are dropped
(iv) Its switch is normal
 ASGNCR drops when any of the above conditions are not fulfilled – its drops when
attempt to operate advanced starter signal is done
(d) HSGNCR
 HSGNCR is in SSBPAC D equipment rack
 HSGNCR picks up when the following conditions are satisfied

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 25 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

(i) All reception signals [home, calling-on, distant] controls are normal – switch relays are
down
(ii) All reception signals OFF aspect control relays are dropped
(iii) All reception signals OFF aspect lamps are not lit
(iv) Home signal red lamp is lit
(e) AZTR is in SSBPAC D equipment rack. It is repeater of block proving axle counter relay.
(f) SHKR is in SSBPAC D equipment rack. It is shunt key IN proving relay of EKT.
(g) HSATPR is in SSBPAC D equipment rack. Repeater relay of home first controlling track
relay
(h) HSBTPR is in SSBPAC D equipment rack. Repeater relay of home second controlling track
relay
Output interface relay wiring:
(a) Three contacts of ASCR are wired in the ASDR circuit of the station. Two front contacts in
positive and negative limbs. One back contact across the coil of ASDR as cross protection
(Ref. Figure 9 )
In case proving block conditions in station interlocking is required – TGTR & TCFR relays‟
contacts are used.

(iii) Interface circuit for EI station


 In EI there are no interface relays hence additional 4 relays are required to be energized by
EI, the contacts of which are given as input to SSBPAC (D).
(i) ASGNCR: Proving advanced starter signal off aspects controls & lamp status as
normal
(ii) HSGNCR: Proving home signal off aspects controls status and lamp status as normal
(iii) HSRR: Home or calling on signal control reverse
(iv) ASRR: Advanced starter signal control reverse
 Additional input: EI needs to receive an input as ASCR from block instrument hence ASCR
relay contacts are given as input to EI. EI in turn drives ASDR relay as output relay. The
ASDR Relay is the controlling relay for Advanced Starter.

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 26 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

 At stations with special conditions like slip / catch sidings – TGTR and TCFR relays contacts
also shall be accepted as inputs to EI.

Figure 7 : Block diagram for EI interface with SSBPAC -D

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 27 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Figure 8 : SSBPAC-D Interface circuits for Single Line Station (Button Operation)

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 28 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Figure 9 : SSBPAC-D Interface Circuits for Single Line Station (Switch Operation)

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 29 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Figure 10 : SSBPAC-D Interface Circuits for Single Line Station (Electronic Interlocking)

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 30 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Figure 11 : SSBPAC-D Interface circuits for Double Line Station (Button Operation)

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 31 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Figure 12 : SSBPAC-D Interface circuits for Double Line Station (Switch Operation)

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 32 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Figure 13 : SSBPAC-D Interface circuits for Double Line Station (Electronic Interlocking)

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 33 of 54


Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Annexure D – Miscellaneous information useful in installation of SSBPAC D

(A) Magnetic LATCH relay


Neutral relay working principle:
 Neutral relay has one coil – if supply is given to the coil, relay picks up – when supply is
cut off, relay drops
Magnetic latch relay working principle:
 Magnetic latch relay has two coils – operating / reverse coil, release / normal coil
 In addition, it has permanent magnet at the heal of the core
 When supply is given to operating / reverse coil relay picks up – it remains picked up
even after supply to operating / reverse coil is cut off – with the help of flux of permanent
magnet
 To drop the relay, supply is given to release / normal coil - relay remains dropped even
after supply is cut off to release/normal coil – the flux of release coil works against the
flux of permanent magnet and drops the relay. The flux of permanent magnet is not
sufficient to pick up the relay – hence when once the relay drops, it cannot pick up unless
supply is given to operating coil
Two magnetic latch relays are used in SSBPAC D – for TGTR & TCFR. Two outputs are
generated by SSBPAC D to operate each magnetic latch relay. TGTR is operated at train
sending station and TCFR at train receiving station.

Table 20 : Condition of Magnetic latch relays in different situations


Sr. Condition At Station When
No.
1 TGTR up Train sending Line clear is obtained
2 TGTR down Train sending Train arrives completely at receiving station
3 TCFR up Train receiving Line clear is granted
4 TCFR down Train receiving Train arrives completely at receiving station

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 34 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

(B) SSBPAC D Inputs [1 to 18] from Block Panel and Reset Button
Table 21 : SSBPAC D Input details from Block Panel & Reset Buton
Input Input name Input Input name Input Input name
1 Reset B 8 Cancel F 15 SM key B
2 Reset F 9 Coop B 16 SM key F
3 - 10 Coop F 17 ASRRl
4 ACKN 11 Sh Key B 18 HSRR
5 Bell B 12 Sh Key F
6 Bell F 13 TGT B
7 Cancel B 14 TGT F

(C) SSBPAC D Inputs [19 to 50] relay contacts

Table 22 : SSBPAC D Input relay contact details


Input Relay name & Input Relay name & contact Input Relay name &
contact contact
19 ASCR B - A5, A6 31 OP R RLY1 B - A5, A6 41 AZTR B - A5, A6
20 ASCR F - A1, A2 32 OP R RLY1 F - A1, A2 42 AZTR F - A1, A2
21 TCFR B - A5, A6 33 IP R RLY1 B 43 HSGNCR B - A5, A6
22 TCFR F - A1, A2 34 IP R RLY1 F 44 HSGNCR F - A1, A2
23 CPC1 B - A5, A6 35 IP R RLY2 B 45 HSATPR B - A5, A6
24 CPC1 F - A1, A2 36 IP R RLY2 F 46 HSATPR F - A1, A2
25 CPC2 B - D5, D6 37 ASGNCR B - A5, A6 47 HSBTPR B - A5, A6
26 CPC2 F - D1, D2 38 ASGNCR F - A1, A2 48 HSBTPR F - A1, A2
29 OP R RLY2 B 39 SHKR B - A5, A6 49 TGTR B - A5, A6
- D5, D6
30 OP R RLY2 F 40 SHKR F - A1, A2 50 TGTR F - A1, A2
- D1, D2

(D) Data logger inputs [23]


Table 23 : Data Logger input details
Input Input name Input Input name Input Input name
1 Back door of equipment rack 9 TCFR 17 ACKN
2 Front door of equipment rack 10 TGTR 18 BELL
3 HSGNCR 11 ASCR 19 CANCEL
4 ASGNCR 12 HSBTPR 20 CANCEL COOP
5 SHKR 13 HSATPR 21 SH Key
6 AZTR 14 REP- 1 22 TGT
7 CPC1 15 REP- 2 23 SM Key
8 CPC2 16 RESET

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 35 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

(E) Foundations for Block Panel & Equipment Racks

Figure 14 : Foundation for Block Panel

Figure 15 : Foundation for Equipment Rack

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 36 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

(F) A typical Installation, Testing and Commissioning schedule

Table 24 : SSBPAC D Typical Installation, Testing & Commissioning schedule


Sr. Activity Days
No.
1 Fixing foundation bolts for SM‟s block panel and Equipment rack 1st day
2 Erection of Block panel & Equipment rack 1st& 2nd days
3 Measuring communication medium parameters between stations Before shifting
4 Cables laying between block panel, telecom room & equipment rack 1st& 2nd days
5 Termination of Cables in Block panel & Equipment rack
6 Extending communication cable to block phone 2nd day
7 Extending communication cable to equipment rack
8 Carrying out station Internal wiring in relay room for interface relays Before shifting
9 Interface wiring to equipment rack & data logger 2nd day
10 Termination of power cable for extending 24V DC and earthing 2nd day
11 Powering up of equipment rack and SM‟s block panel 3rd day
12 Correspondence test of input interface relays 3rd day
13 Connecting both end Block instruments by communication medium 3rd day
14 Functional test by OEM 4th& 5th days
15 Functional Joint test& signing pre-commissioning check list 6th day
16 Training of signal technicians 7th day
17 Training of SMs in block operations 6th& 7th days
18 72 hours observation of SSBPAC D working after energization 4th , 5th, & 6th
19 Commissioning of SSBPAC D block working 8th day

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 37 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Annexure E - Pre-commissioning check list of RDSO


Pre commissioning checklist for Solid State Block Proving by Axle Counter (Digital)
(AS PER RDSO/SPN/175/2005 Version 1)

1. GENERAL INFORMATION
1.1 Station Name:
1.2 Section Name ::
1.3 Single Line/ Double Line
1.4 Division/Zonal Railway:
1.5 System ID :
1.6 Remote System ID :
1.7 Block Section ID :
1.8 Data Logger ID :
1.9 Contact Details of Railways at site:
1.10 Contact Details of Railways at
HQ/Division
1.11 Contract No./P.O. No.
1.12 Name and Address of
manufacturer/supplier:
(RDSO Approved vendor)
1.13 Serial number of the equipment:
1.14 Software checksum:
SSBPAC(D) system
For Efftronics make
For Single Line – „3F2A‟
For Double Line – „77BB‟
1.15 SSBPAC(D) System Version No.
(D01 S005 H02)
1.16 SSBPAC(D) working on:
OFC(Voice/E1 Channel) / Microwave /
Quad Cable/others(please specify media
used)
1.17 Date of installation:

1.18 Date of pre-commissioning inspection:

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 38 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Note:
(i) System should be installed and commissioned by authorized technical staff of manufacturer
only.
(ii) Commissioning of Solid-State Block Proving By Axle Counter (Digital) (SSBPAC) has to
be done by OEM as per RDSO approved pre-commissioning checklist No. SIG 0614 Ver.0.
(iii) OEM shall certify that verification of system installation has been completed by OEM and
all necessary arrangements meet the required standards of engineering for trouble free
working of installed system.
(Ref: This office letter no.: STS/E/AC/Dig/Genl dt 21.06.2011)

2 QUAD CABLE:

2.1 Test format for testing of QUAD Cable


Item Expected Measured/ Remarks
S
Observed (OK/ Not
No.
OK)
1 Block Section length ≤ 12 Km/30 db
As per appendex-1, Proper pair of
2 Use of Pair
wires to be used for connectivity.
3 Duplication of wires No wires are to be paralleled.
Insulation Resistance > than 10 Mega ohm.
4
of QUAD cable
Loop resistance of 56 ohms/Kms
5
designated pair.
6 Attenuation loss Shall not be greater than 30.0 dB
Near End Cross Shall be better than 55 dB
7
Talk(NEXT)
Far End Cross Shall be better than 55 dB
8
Talk(FEXT)
Continuity of Cable Continuity shall be provided.
9
armor.
Separate earth of Shall be less than One ohm
10
QUAD cable
11 Cable allocation Table Shall be filled up & attached.
To be cut in such a way that none
12 Unused QUAD pair. of the conductors remains
exposed.
Dressing of QUAD To be properly dressed with
13 pair insulated tape.
Spiral before No individual conductor to be
14
termination made spiral.

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 39 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

3 OFC:

3.1 Test format for Testing of OFC

Sr. Item Expected Measured/ Remarks


No. Observed (OK/ Not
OK)
1 Block Section length
2 Use of fiber details Proper fiber pair to be used
for connectivity.

Dressing of OFC pair To be properly dressed with


3
insulated tape.
Spiral before No individual fibers to be
4
termination made spiral.
Channel line up For 0 dB Trans signal level,
the received signal level at
5
other end shall not be more
than -3.0dB.

Note:
(i) Attenuation Loss: The Output/Input impedance of signal generator/dB meter shall be
600 ohm.
(ii) Near End Crosstalk: Test tone of 150 KHz to be fed in the adjacent pair of the same
quad & NEXT to be measured at the same end on the other pair of the same quad.
(iii) Far End Crosstalk: Test tone of 150 KHz to be fed in the adjacent pair of the same
quad &NEXT to be measured at the same end on the other pair of the same quad.

4 OBSERVATION:
Sr. Item Required Observed OK/
No. Not OK
1 Placements of Should be in proper position.
Cards/modules
2 Firmness of Should be tightened with screw/clip
card/modules provided
3 MC WAGO Connectors Installed & tightened properly.
4 WAGO Terminations Wired properly as per color code.
&cables
5 Earthing of SSBPAC Should be provided firmly through
units copper strips or other standard
copper cable. Value <= 1 ohm
6 Cable for taking 24v D.C Depends upon distance between

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 40 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Sr. Item Required Observed OK/


No. Not OK
from central location to relay room and power supply room
SSBPAC (D) unit
7 Ripple of input power Less than 10 mV rms/ 50 mV peak
supply. to peak.
8 Address of SSBPAC(D) Address pair, which is provided
through dip switches present on the
voter card should be different from
any SSBPAC (D) system working
on the same station /section.
9 2 / 4 wire connections in Only 2 wires are coming from
OFC relay hut system for IBC, So ensure that it
have to convert to 4 wires or not. If
it has to convert log that changes at
both ends

5 POWER SUPPLY:
Sr. Item Required Observed OK/
No. Not OK

1 Power supply for Power supply should be +24V DC


SSBPAC with +30%, -20% tolerance. i.e.
voltage range should be within 19.2V
to 31.2V.
There should not be any other load on
the power supply except SSBPAC.
2 Input Voltage with Voltage range should be within 19.2V
charger OFF (Keeping to 31.2V.
charger OFF for 15
minutes before taking
readings (if battery
charger is provided
3 Ripple of Input Power Less than 10 mV rms/ 50 mV peak to
supply. peak.
4 Glitch in input power No glitch should be there & System
supply by putting Working should not be disturbed.
ON/OFF the charger.
(if battery charger is
provided)

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 41 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

6. DETAILED OBSERVATION:

6 .1 LOCKINGS:
Proper functioning of locks should be verified.
Sr. Item Required Observation with
No. Remarks (OK/Not OK)
1 SSBPAC The 2 locks (one for SM & another for ESM)
Panel provided at the back side of the panel should work
normally.
When both SM key & ESM key are “IN” then
only the panel back door should open.
2 SSBPAC The two pairs of locks provided for front door &
System the back door
Housing should work normally.
Rack When both SM Key & ESM Key are “IN “ then
only that door will be opened.

6.2 EKT KEY: (for single line system only)


Sr. Item Required Observation with
No. Remarks (OK/Not OK)
1 Wiring The EKT cable shall be terminated in the WAGO
connectors provided in the panel.
2 Testing i) Shunting permission shall be granted i.e the
Shunt key of EKT shall come out only when the
shunt release key on the block panel is “IN”.
ii) Shunting permission shall not be granted i.e.
the Shunt key of EKT shall not come out, when
the shunt release key on the block panel is
“OUT”.

6.3 DATALOGGER INTERFACE:


SSBPAC (D) can be connected to Data Logger in two different manners as per modems
available.
Sr. Item Required Observation with
No. Remarks (OK/Not
OK)
1 Wiring For the Dual modem, connect the DL pair to
for Dual answering TX+,TX- terminals of GDT PCB (EFF
Modem. 728M) placed at right to backside of SSBPAC(D)
housing rack.
2 Wiring For the single modem, connect the DL network port
for single to SSBPAC (D) DL COM port provided at the back
Modem. side of euro rack using appropriate line drivers.

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 42 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

6.4 MAINTAINER’S TERMINAL:


Sr. Item Required Observation with
No. Remarks (OK/Not
OK)
1 Wiring The Maintainer‟s terminal shall be connected to the
SSBPAC (D) housing rack through appropriate line
driver.
One end is connected to the maintainer‟s terminal
and the other end is connected to the MAINTAINER
TERMINAL PORT (15pin female D-connector) at
the back side of euro rack.

6.5 RELAY WIRINGS:


As per Circuit Diagram

6.6 WIRING BETWEEN SSBPAC PANEL & HOUSING RACK:

Sr. Item Required Observation with


No. remarks (OK/Not OK)
1 Wiring The WAGO Connectors shall be used to
communicate between SSBPAC panel & its housing
rack.

6.7 LABELINGS:

Sr. Item Required Observation with


No. Remarks (OK/Not
OK)
1 SSBPAC Panel Station name TRAIN GOING TO & TRAIN
COMING FROM labels should be mentioned
in the panel.
Panel Serial number shall be mentioned on
the panel & shall be recorded.
2 SSBPAC SSBPAC Housing rack shall be labeled with
Housing rack Station & section names.
SSBPAC Housing rack Serial number shall
be mentioned on the housing rack & shall be
recorded.
3 EKT EKT shall be labeled with section & station
name.
Serial number shall be mentioned in the
EKT& shall be recorded.

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 43 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Sr. Item Required Observation with


No. Remarks (OK/Not
OK)
4 Maintainer‟s Maintainer‟s Terminal shall be labeled with
Terminal section & station name.
Serial number shall be mentioned in the
Maintainer‟s Terminal.
5 Wago Wiring shall be bunched & labeled with
connectors Section name.
/Wiring
6 Communication Communication cable shall be bunched &
cable labeled with Section name.

6.8 COMMISSIONING:

S Item Required Observation with


No. Remarks (OK/Not
OK)
1 System should be installed & commissioned
Commissioning
by personal trained by the manufacturer.
Railway personnel should be trained before
2 Training
commissioning.
System should be monitored for 72 Hours for
3 Verification of
trouble free operation before commissioning.
working

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 44 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Commissioning Log sheet for SSBPAC:


The following cards & its corresponding modification numbers should be checked after installation
of the system.

6.8.1 For Double Line:

Sr. Type of Card Part no. No of Observation with


No. Cards Remarks (OK/Not OK)
1 Mother Board Card No. 811 1
2 Communication Card Card No. 533M5 1
3 Input Card Card No. 529M3 3 (i)
(ii)
(iii)
4 CPU Card Card No. 528M7 3 (i)
(ii)
(iii)
5 Voter Card Card No. 530M2 1
6 Vital Output Card Card No. 532M3 1
7 Non-Vital Output Card Card No. 531M3 1
8 2 out of 3 buzzer PCB Card No. 989 1
9 Line protection ckt with GDT Card No. 728M 1
10 Seven Segment Display PCB Eff 534M1

6.8.2 For Single Line:

Sr. Type of Card Part no. No of Observation with


No. Cards Remarks (OK/Not OK)
1 Mother Board Card No. 810 1
2 Communication Card Card No. 533M5 1
3 Input Card Card No. 529M3 3 (i)
(ii)
(iii)
4 CPU Card Card No. 528M7 3 (i)
(ii)
(iii)
5 Voter Card Card No. 530M2 1
6 Vital Output Card Card No. 532M3 1
7 Non-Vital Output Card Card No. 531M3 1
8 2 out of 3 buzzer PCB Card No. 989 1
9 Line protection ckt with GDT Card No. 728M 1
10 Seven Segment Display PCB Eff 534M1

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 45 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

7. Checking after installation of the system:

7.1 Voltage & Current Ratings:


After running the system, check the voltage & current ratings.
Sr. Parameter Range Observed OK/Not OK
No.
1 Voltage 24V-28V
2 Current < 3.0 Amp

7.2 Indications:
Status of panel indications when system is in Normal line closed state.

Sr. Indication Required State Observed Remarks


No. OK/Not OK
1 SSBPAC(D) O.K GREEN
2 SSBPAC(D) FAIL OFF
3 COMMUNICATON LINK- BLINKING YELLOW
FAIL
4 LINE CLOSED YELLOW
indication(s)
5 TRAIN GOING TO arrow OFF
indication
6 TRAIN COMING FROM OFF
arrow indication
7 LINE FREE GREEN
8 LINE OCCUPIED OFF
9 SNK YELLOW if all the signals
are in normal state.
10 SNOEK YELLOW if other end
SSBPAC system is in
working condition &
signals in normal state.
11 SM KEY IN indication GREEN if SM key turned
into in position else off.
12 ACKN indication(s) OFF
13 SHUNT KEY indication GREEN
(for single line)

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 46 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

7.3 Buttons:

Sr. Item Required Observed Remarks


No. OK/Not OK
1 Bell When bell button is pressed at one station,
Button the bell code should reach at the other end
(Black in station i.e. block buzzer sound should come
color) at the other end.
2 TRAIN When TGT & bell buttons are pressed
GOING simultaneously at the line closed state & all
TO Button signals are at normal, the TRAIN GOING
(Red in TO & its arrow indication should glow up.
color)
3 ACKN By pressing the ACKN button, it shall
Button silence the SECTION buzzer on occupation
(BLACK or clearance of block section.
in Color)
Cancel
4 When the Cancel co-op button is pressed at
CO-OP train sending station along with cancel & bell
Button buttons at train receiving station at train
(GREEN going to state, then TGT arrow indication
in color) shall be in flashing state.

The system shall go to the line closed state


after completion of the 120 seconds if no
train enters into block section during this
transition time.
CANCEL
5 When the Cancel button & bell buttons are
Button pressed at train receiving station along with
(Yellow in cancel button at train sending station at train
color) going to state, the TGT indication shall be in
flashing state.

The system shall go to the line closed state


after completion of the 120 seconds if no
train enters into block section during this
transition time.

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 47 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

7.4 Keys:
Sr. Key name Required Observation
No. with remarks
(OK/Not OK)
1 SM Key When it is out SM key indication should be OFF &
when it turned to in position, the SM key indication
should glow.
2 Shunt release When shunt release key is “OUT” shunting
key permission shall not be granted i.e the EKT key shall
(for single not come out.
line system) When shunt release key is “IN” then only shunting
permission is granted i.e the EKT key is allowed to
come out.
3 LCB key When LCB key is “OUT” at receiving station, then
(for Double TGT state shall not be obtained on applying line
line system) clear request at dispatch station.
When LCB key is “IN” at receiving station, then
TGT state must come on applying line clear request
at dispatch station if other necessary conditions are
satisfying.

7.5 Block Telephone:

Sr. Item Required Observation


No. with remarks
(OK/Not OK)
1 Block Phone When the push buttons of the block phone (available
on the receiver) is pressed at both side systems, it
shall be possible to talk on the phone until the same is
pressed.

7.6 Buzzers:

Sr. Item Required Observation


No. with remarks
(OK/Not OK)
1 Block buzzer Block buzzer should activate when the bell code is
received from the other end system.
2 Section Section buzzer should activate on the occupation and
buzzer clearance of block section.

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 48 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

7.7 Counters:

Sr. Item Required Observation


No. with remarks
(OK/Not OK)
1 Reset counter When global reset is pressed after the completion of
the POST, the Non resettable RESET COUNTER
value shall be incremented by one. If so, the same is
working fine.
2 Cancel When cancellation of line clear is done, the cancel
counter counter value shall be increment by one. If so, the
same is working fine.

7.8 Repeater Relays:


Mention whether repeater relay is used or not? If used mention the names.

Sr. Item Relay used Observation with remarks


No. (OK/Not OK)
1 Repeater Relay-1
2 Repeater Relay-2

8. Testing of SSBPAC block working during commissioning:


The testing of block working through SSBPAC shall be done as per SI-F-7.1-0670 for single line
& SI-F-7.1-0672 for double line.

Note: Continuous testing should be done to assure that the system is working fine.

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 49 of 54


Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Annexure - I

Precautions to be taken during the wiring/connections at the time of commissioning of SSBPAC


(D):

Position of One Quad in Quad cable:

White
(A)
X

Red (C) X X (D) Grey

X
(B)
Quad colour

1st pair = White & Quad colour i.e A & B Wires


2nd pair= Red & Grey colour i.e C & D Wires of designated colour of Quad.

Each Quad is binded by the respective Quad colour binder

Table-1
Colour scheme of PE insulated Quads
Quad Colour
Quad No Pair A - Wire B -Wire Pair No. C- Wire D - Wire
No.
Orange 1 1A White Orange 1B Red Grey
Blue 2 2A White Blue 2B Red Grey
Brown 3 3A White Brown 3B Red Grey
Green 4 4A White Green 4B Red Grey
Yellow 5 5A White Yellow 5B Red Grey
Black 6 6A White Black 6B Red Grey

Precautions to be taken for using QUAD Cable:

 Designated pair of wire of the same Quad (mentioned in Table -1) should be used.

 Do not use one wire from one Quad and another wire from some other Quad.

 If any wire of a pair of the Quad is broken/Non functional, then use fresh pair of wire.

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 50 of 54


Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Annexure-II

Temperature correction factor for conductor resistance for annealed high conductivity
copper

Temp. Corre. Temp. Corre. Temp Corre. Temp. Corre. Temp. Corre.
Deg C factor deg C Factor deg C factor deg C factor deg C Factor
1. 2. 1. 2. 1. 2. 1. 2. 1. 2
5. 1.0638 17 1.0122 29 0.9653 41 0.9225 53 0.8834
5.5 1.0618 17.5 1.0101 29.5 0.9634 41.5 0.9208 53.5 0.8818
6. 1.0593 18 1.0081 30 0.9615 42 0.9191 54 0.8803
6.5 1.0571 18.5 1.0060 30.5 0.9597 42.5 0.9174 54.5 0.8787
7. 1.0549 19. 1.0040 31. 0.9579 43. 0.9158 55. 0.8772
7.5 1.0526 19.5 1.0020 31.5 0.9560 43.5 0.9141 55.5 0.8757
8. 1.0504 20. 1.0000 32. 0.9542 44.. 0.9124 56. 0.8741
8.5 1.0482 20.5 0.9980 32.5 0.9524 44.5 0.9107 56.5 0.8726
9. 1.0460 21. 0.9960 33. 0.9506 45. 0.9091 57. 0.8711
9.5 1.0438 21.5 0.9940 33.5 0.9488 45.5 0.9074 57.5 0.8696
10. 1.0417 22. 0.9920 34. 0.9470 46. 0.9058 58. 0.8681
10.5 1.0395 22.5 0.9900 34.5 0.9452 46.5 0.9048 58.5 0.8667
11. 1.0373 23. 0.9881 35. 0.9434 47. 0.9025 59. 0.8651
11.5 1.0352 23.5 0.9862 35.5 0.9416 47.5 0.9009 59.5 0.8636
12. 1.0331 24. 0.9843 36. 0.9398 48. 0.8993 60. 0.8621
12.5 1.0309 24.5 0.9823 36.5 0.9380 48.5 0.8977 60.5 0.8606
13. 1.0288 25. 0.9804 37. 0.9363 49. 0.8961 61. 0.8591
13.5 1.0267 25.5 0.9785 37.5 0.9346 49.5 0.8945 61.5 0.8576
14. 1.0246 26. 0.9766 38. 0.9328 50. 0.8929 62. 0.8562
14.5 1.0223 26.5 0.9747 38.5 0.9311 50.5 0.8913 62.5 0.8547
15. 1.0204 27. 0.9728 39. 0.9294 51. 0.8897 63. 0.8532
15.5 1.0183 27.5 0.9709 39.5 0.9276 51.5 0.8881 63.5 0.8518
16. 1.0163 28. 0.9690 40. 0.9259 52. 0.8863 64. 0.8503
16.5 1.0142 28.5 0.9671 40.5 0.9242 52.5 0.8850 64.5 0.8489

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 51 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Annexure F
RDSO Technical Advisory Note No. STS/E/TAN/6001 Ver. 1.0 dated
04.10.2011- Digital Axle Counter- Wiring discipline

In order to overcome intermittent failures due to electromagnetic interference from parallel


circuits RDSO had issued a Technical Advisory Note No.TAN/6001 vide letter No.
STS/E/AC/Digital/GenI dated 04.10.2011:

1. Parallel circuits
a. Requirement is that parallel circuits shall be as far spaced, spatially, as possible. Long
parallel circuits shall be avoided in the same quad. So, one long and one short circuit can
be accommodated in same quad but not both long circuits.
b. DAC circuits in BPAC of UP and DN lines in double line sections shall be in separate
quads and kept one/two quad distance away from each other to avoid mutual interference
in long parallel circuits.
c. DAC circuits in location shall not be bunched along with parallel relay/power circuits.
Relay circuits are known to generate switching transients that can couple enough energy
in parallel circuits nearby and interfere with low power DAC data circuits.
d. Any other parallel wiring (relay circuits/power circuits/earthing wires etc) shall cross
DAC circuits at perpendicular and any parallel portion shall be kept at minimum 150
mm (lateral distance) away from the wiring for DAC circuits.
e. Relay circuits shall preferably not be taken in same cable as DAC circuits. In unavoidable
circumstances relay circuits shall be in furthest quad (spatially) from the one containing
DAC circuits.

Note: Relays driven by quad cables may be provided with free whelling diodes.

2. Twisting of cable pair


a. Twisted pairs are required to avoid mutual interference between low level data signals.
Even short lengths of non- twisting (few inches) can couple enough noise to interfere low
voltage DAC communication signals.
b. Quad cable twisting shall be ensured during termination so that minimum one twist per
inch is maintained till the last inch into terminations.
c. Any wiring from quad cable terminations to equipment shall be done using twisted
singles of indoor signal1ing cable (1 mm square) or any other approved indoor twisted
pair cable.
d. Signalling cable or any other untwisted cable pair shall never be used in DAC
communication circuits to avoid intermittent type of failure.

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 52 of 54

Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

3. Wiring & Terminations


a. Preferably, quad cable shall be terminated in cage clamp type terminals that provide
solid 360 degree surface connection and sufficient pressure on the wire to make a good
electrical contact.
b. Cables shall be terminated at the bottom portion of location keeping equipment and their
wiring at higher level inside location. This will help in keeping wiring of different types
segregated from each other. All earth wires and surge protection devices also shall be
kept at the lower levels for the same reasons.
c. Wiring and cabling shall not be bent abruptly and shall be given sufficient bending
radius to ensure that conductors inside the cabling/wiring are not damaged due to
bending.
d. Wiring shall be properly supported by channels troughing, cable clamps and other
means to ensure that connections are not under pressure due to wire hang.
e. Wiring and cabling shall not be supported at any sharp edged object to ensure that
conductors are not damaged during their installation/maintenance.

4. Continuity and Earthing of cable armor & screen at intermediate terminations/ Joints
a. Screening of quad cable is effective only when sufficient induced current can flow in the
screen thereby cancelling/reducing the induction from 25KV AC for the cable
conductors. For adequate induced current to flow in screen, it is necessary that good
earth connections are provided for cable screen & armor.
b. Quad cable screen & armor shall be made electrically continuous at the intermediate
terminations/joints by soldering and connecting both ends of cable screens & amours at
the locations.
c. Connections to screen shall preferably be made by thin metallic clamps soldered to
screens to ensure good surface connection for electrical continuity.
d. Combined Earth for armor and screen at intermediate locations shall have earth values as
low as possible but shall be never more than 5 ohms.
e. Earth connections shall be kept as short and as straight as possible because any loop or
turns can create inductive elements that impede quick discharge of transients and surges
to ground.

Abbreviations
AC Alternating Current
BPAC Block Proving by Axle Counter
DAC Digital Axle Counter
KV Kilo Volt



 

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 53 of 54


Table of Contents
CAMTECH/S&T/2022-23/ITC-SSBPAC-D/1.0 September 2022

Notes
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………
………………………………………………………………………………………………………

Installation, Testing & Commissioning –Efftronics SSBPAC-D Page 54 of 54

Table of Contents
Indian Railways
Centre For Advanced Maintenance Technology
Maharajpur, Gwalior (M.P.) 474005

You might also like