B+G+1 Residential Building Cost Breakdown
Topics covered
B+G+1 Residential Building Cost Breakdown
Topics covered
B. SUPER – STRUCTURE
1. CONCRETE WORK BIRR 947,553.22
2. BLOCK WORK BIRR 212,032.92
3. ROOFING BIRR 240,826.43
4. WATER PROOFING WORK BIRR 24,797.85
5. CARPENTRY AND JOINERY BIRR 239,240.93
6. ALUMINUM & METAL WORK BIRR 572,795.43
7. GLASS & GLAZING BIRR 1,318,747.22
8. FINISHING BIRR 1,318,747.22
9. PAINTING BIRR 188,051.60
10. SANITARY INSTALLATION BIRR 473,287.51
11. ELECTRICAL INSTALLATION BIRR 837,735.34
Item No. Description of Work Unit Contract Qty Unit Price Contract Amount (Birr)
A . SUB – STRUCTURE
[Link] & Earth Works
1.1 Site clearing and removing the top 20cm thick soil. m2 171.36 28.60 4,900.90
pit Excavation in ordinary soil for for isolated and strap footing to
1.3 average depth not exceeding 250 cm from reduced ground level m3 119.65 214.90 25,712.79
Excavation in ordinary soil for trench foundation to average
1.4 depth not exceeding 145 cm from reduced ground level m3 42.36 231.13 9,790.74
2. CONCRETE WORK
Particular attention must be given to the following notes along
with the technical Specification and Method of Mesurnment
prepared by BaTCoDA.
Constituents of concrete:
Concrete:
The specified concrete strength must be confirmed by laboratory
test.
Reinforcement bar:
The specified yield strength and other related properties of
reinforcement bar must be certified either by manufacturer's
catalogue/manual or/and by laboratory test.
3. MASNORY WORK
50cm thick stone masonary foundation below ground level
3.1 bedded in cement mortar(1:3) in full joints. m3 23.92 4,583.30 109,655.45
B. SUPER – STRUCTURE
1. CONCRETE WORK
Particular attention must be given to the following notes along
with the technical Specification and Method of Mesurnment
prepared by BaTCoDA.
Constituents of concrete:
Concrete:
2. BLOCK WORK
Class C, 200mm thick HCB wall with the designed compressive m2
2.1 strength , bedded in cement mortar (1:3). 232.15 718.78 166,866.50
2.2 Ditto as item 2.1 but 10mm thick m2 69.49 650.00 45,166.42
c) 5*7 cm swan zigba wood purlin placed at c/c 90 cm ML 276.00 198.00 54,648.00
d) 4*5 cm celling buttan placed at c/c 60 cm ML 438.92 198.00 86,906.33
ML
Rectangular section down pipe flashing made G-28 with
3.03 ML 12.00 972.58 11,670.91
necesssary offsets properly fixed as shown on the drawings
75 mm diametere PVC Down pipes attached to external wall
3.04 surface with leader straps c/c 80 cm, and finally painted with two ML 12.00 259.60 3,115.20
coate fo syntetic paint.
Testing: Pond testing for atleast 24 hours should be done after the
contructor has acomplished the water proffing work. The surface
should be re-treated if leakage observed; and the test should be
done on the repaired surface.
Window
a) Type W1 size = 900x 1000 mm Pcs 7.00 10,800.00 75,600.00
b) Type W2 size = 2440 x 1000mm Pcs 1.00 29,280.00 29,280.00
c) Type Wd3 size =1620 x 2200mm Pcs 1.00 42,768.00 42,768.00
d) Type W4 size = 2440 x1700 mm Pcs 1.00 4,977.60 4,977.60
5.1.2 e) Type Wd5 size = 3130 x2200 mm Pcs 1.00 55,644.39 55,644.39
f) Type Wd6 size = 1650 x2200 mm Pcs 1.00 22,564.08 22,564.08
g) Type W7 size = 900 x1650 mm Pcs 3.00 53,333.28 159,999.84
h) Type W8 size = 2400 x1700 mm Pcs 2.00 32,969.66 65,939.33
i) Type W9 size = 2200 x1700 mm Pcs 1.00 30,222.19 30,222.19
Supply & fix 100x50mm Wooden Hand rail to stair case screwed
to 100x50mm wooden ballustrade placed c/c 300mm bolted with
2(60x60x5x100)mm angle iron anchored to concrete treads and
including 100x50mm Wooden bottom rail in single row screwed
5.1.3 to Wooden ml 20.00 1,950.00 39,000.00
Supply & fix 100x50mm Wooden Guard rail to balcony screwed
to 100x50mm wooden ballustrade placed c/c 150mm bolted with
2(60x60x5x100)mm angle iron anchored to concrete slab and
including 100x50mm Wooden bottom rail in single row screwed
5.1.4 to Wooden ball. ml 24.00 1,950.00 46,800.00
5mm thick clear glass glazed with beads, rubber gasket and
6.0.1 M2 43.46 1,100.00 47,804.90
sealant to Almunium profile frames.
8. FINISHING
50mm thick cement sand screed smoothly finished flooring in
mortar mix (1:3).
7.1
a)To receive pvc floor tile m2 175.33 347.95 61,006.07
b) To receive marble till m2 34.82 347.95 12,113.88
9. PAINTING
Apply three coats of approved quality paint. Price shall include
pre-cleaning and preparation of surfaces.
a) To internal wall surface m2 371.13 99.00 36,741.47
8.1 m
b) To concrete ceiling 2
186.06 99.00 18,419.62
c) To exposed column and beams . m 2
313.64 99.00 31,050.02
d) To Staircase soffit m 2
22.70 99.00 2,247.10
Provide and install float swich to start on and cut off the ground
9.1.2 pump at a pre determined water level No 3.00 2,400.00 7,200.00
11.1 Supply and lay internal PVC waste pipes according to where
shown on the drawings. Complete with all the necessary fittings.
3500*2450*3450
No. 1 70,000.00 70,000.00
11.3 Construct manholes on a sanitary sewerlines, in precast concrete
round pipes with reinforced concrete bottom and cover slabs.
Price shall include excavation, cart away, and all other civil
assistant works.
a) On waste water sewer lines with dia 150 mm thick bottom
slab and 120 mm cover slab reinforced with dia. 10 c/c 150 mm
both ways.
Dia. 160 mm, average depth 800 mm No 1 5,100.00 5,100.00
9.6 PUMPS AND ACCESSORIES
Tele phone line Intake Manhole in bricks and with concrete base
12.05 internally of 100x100x100cm including concrete cover with lifting
hole. No 1.00 13,600.34 13,600.34
12.06 PVC pipes.
12.07 50 mm diameter. ml 12.00 132.50 1,590.00
a) 2 pcs 10 A, MCB,1Phase
b) 7 pcs 16A, MCB,1Phase
c) 1 pcs 20A, MCB,1Phase
d) 1 pcs 25A, MCB,1Phase No 1.00 20,000.00 20,000.00
Telephone/Data System
Telephone System only conduits of 50/32/20 mm diameter
pulling wire, boxes, terminals all as shown on drawings
12.80
RJ 11 outlet type LEGRAND 74341 category 5E with 4 contacts
No 10.00 1,000.00 10,000.00
12.9 Tv System
Tv System conduits of 19/32mm diameter pulling wire, boxes,
terminals all as shown on drawings No 8.00 1,000.00 8,000.00
A . SUB – STRUCTURE
[Link] & Earth Works
1.1 Site clearing and removing the top 20cm thick soil. m2 171.36
pit Excavation in ordinary soil for for isolated and strap footing to
1.3 average depth not exceeding 250 cm from reduced ground level m3 119.65
Excavation in ordinary soil for trench foundation to average
1.4 depth not exceeding 145 cm from reduced ground level m3 42.36
Backfill under hard core with non expansive selected material and
compact by 14ton drum roller in layers not exceeding 20cm thick
by sprinkling water to insure 95% modified AASHTO dry
1.7 density. m3 12.02
2. CONCRETE WORK
Particular attention must be given to the following notes along
with the technical Specification and Method of Mesurnment
prepared by BaTCoDA.
Constituents of concrete:
Concrete:
The specified concrete strength must be confirmed by laboratory
test.
Reinforcement bar:
The specified yield strength and other related properties of
reinforcement bar must be certified either by manufacturer's
catalogue/manual or/and by laboratory test.
a) footing m3 11.42
b) foundation column m 3
1.86
c) basment column m 3
2.42
d) shear wall m 3
9.66
e) basment beam m 3
6.11
f) ground beam m3 5.70
g) basment slab m 2
52.82
h) 10 thick ground floor slab m 2
60.10
i) stair case m 2
3.49
a) footing m2 28.80
b) foundation column m2 19.84
c) basment column m 2
32.76
d) shear wall m 2
129.64
e) basment beam m 2
48.46
f) ground beam m 2
91.34
g) 10 thick ground floor slab m 2
52.82
h) stair case m 2
22.03
3. MASNORY WORK
50cm thick stone masonary foundation below ground level
3.1 bedded in cement mortar(1:3) in full joints. m3 23.92
B. SUPER – STRUCTURE
1. CONCRETE WORK
Particular attention must be given to the following notes along
with the technical Specification and Method of Mesurnment
prepared by BaTCoDA.
Constituents of concrete:
Concrete:
2. BLOCK WORK
Class C, 200mm thick HCB wall with the designed compressive m2
2.1 strength , bedded in cement mortar (1:3). 232.15
Testing: Pond testing for atleast 24 hours should be done after the
contructor has acomplished the water proffing work. The surface
should be re-treated if leakage observed; and the test should be
done on the repaired surface.
Window
a) Type W1 size = 900x 1000 mm Pcs 7.00
b) Type W2 size = 2440 x 1000mm Pcs 1.00
c) Type Wd3 size =1620 x 2200mm Pcs 1.00
d) Type W4 size = 2440 x1700 mm Pcs 1.00
5.1.2 e) Type Wd5 size = 3130 x2200 mm Pcs 1.00
f) Type Wd6 size = 1650 x2200 mm Pcs 1.00
g) Type W7 size = 900 x1650 mm Pcs 3.00
h) Type W8 size = 2400 x1700 mm Pcs 2.00
i) Type W9 size = 2200 x1700 mm Pcs 1.00
Supply & fix 100x50mm Wooden Hand rail to stair case screwed
to 100x50mm wooden ballustrade placed c/c 300mm bolted with
2(60x60x5x100)mm angle iron anchored to concrete treads and
including 100x50mm Wooden bottom rail in single row screwed
5.1.3 to Wooden ml 20.00
5mm thick clear glass glazed with beads, rubber gasket and
6.0.1 M2 43.46
sealant to Almunium profile frames.
8. FINISHING
50mm thick cement sand screed smoothly finished flooring in
mortar mix (1:3).
7.1
a)To receive pvc floor tile m2 175.33
b) To receive marble till m2 34.82
9.1.1 Provide dia. 50 mm vent pipe with cap for each water tank. No 3.00
Provide and install float swich to start on and cut off the ground
9.1.2 pump at a pre determined water level No 3.00
11.1 Supply and lay internal PVC waste pipes according to where
shown on the drawings. Complete with all the necessary fittings.
11.1
3500*2450*3450
No. 1
11.3 Construct manholes on a sanitary sewerlines, in precast concrete
round pipes with reinforced concrete bottom and cover slabs.
Price shall include excavation, cart away, and all other civil
assistant works.
a) On waste water sewer lines with dia 150 mm thick bottom
slab and 120 mm cover slab reinforced with dia. 10 c/c 150 mm
both ways.
Dia. 160 mm, average depth 800 mm No 1
9.6 PUMPS AND ACCESSORIES
Tele phone line Intake Manhole in bricks and with concrete base
12.05 internally of 100x100x100cm including concrete cover with lifting
hole. No 1.00
12.06 PVC pipes.
12.07 50 mm diameter. ml 12.00
a) 2 pcs 10 A, MCB,1Phase
b) 7 pcs 16A, MCB,1Phase
c) 1 pcs 20A, MCB,1Phase
d) 1 pcs 25A, MCB,1Phase No 1.00
Telephone/Data System
Telephone System only conduits of 50/32/20 mm diameter
pulling wire, boxes, terminals all as shown on drawings
12.80
RJ 11 outlet type LEGRAND 74341 category 5E with 4 contacts
No 10.00
12.9 Tv System
Tv System conduits of 19/32mm diameter pulling wire, boxes,
terminals all as shown on drawings No 8.00
A - SUB STRUCTURE
1- EXCAVATION & EARTH WORKS
-1.86 m³
#Footing F2
7 1.80 Lexc= 1.8
1.60 Wexc= 1.8
20.16 m²
b -Shear wall
on Axis A & on axsis 1-2
1 5.63 L =5.630
0.20 W = 0.20
2.20 D = 2.20
2.48 m³
c - foundation column
#C1
1 0.40 L = 0.40
0.30 W = 0.30
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
0.19 m³
#C2
3 0.40 L = 0.30
0.30 W = 0.30
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
0.56 m³
#C3
3 0.40 L = 0.30
0.30 W = 0.30
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
0.56 m³
#C4
3 0.40 L = 0.40
0.30 W = 0.30
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
0.56 m³
BB2
1 11.40 L =11.65
0.30 W = 0.30
0.40 D = 0.40
1.37 m³
BB3
1 3.50 L = 3.50
0.25 W = 0.25
0.40 D = 0.40
0.35 m³
BB4
1 5.63 L = 5.630
0.30 W = 0.30
0.40 D = 0.40
0.68 m³
BB5
1 5.63 L = 5.630
0.25 W = 0.250
0.40 D = 0.40
0.56 m³
BB6
2 5.63 L = 8.927
0.25 W = 0.250
0.40 D = 0.40
1.13 m³
BB7
1 5.63 L = 8.927
0.25 W = 0.250
0.40 D = 0.40
0.56 m³
BB6
1 5.63 L = 5.630
0.30 W = 0.30
0.40 D = 0.40
0.68 m³
GB2
1 11.65 L
0.30 W = 0.20
0.40 D = 0.40
1.40 m³
GB3
1 3.50 L = 3.50
0.25 W = 0.20
0.40 D = 0.40
0.35 m³
GB4
1 5.63 L = 5.630
0.30 W = 0.20
0.40 D = 0.40
0.68 m³
GB5
1 5.63 L = 5.630
0.25 W = 0.20
0.40 D = 0.40
0.56 m³
GB6
1 8.93 L
0.25 W = 0.20
0.40 D = 0.40
0.89 m³
GB7
1 8.93 L = 8.927
0.25 W = 0.250
0.40 D = 0.40
0.89 m³
landing beam
2 3 L=3.0
1.00 w=0.20
0.19 D=0.3
1.14 m³
a - for footing
#Footing F1
3 1.80 Lexc= 1.4
1.60 Wexc= 1.4
8.64 m²
#Footing F2
7 1.80 Lexc= 1.8
1.60 Wexc= 1.8
20.16 m²
b -shear wall
on Axis A & on axsis 1-2
1 11.66 L =(5.630*2)+(0.2*2)
2.60 D = 2.6
30.32 m²
c - foundation column
#C1
1 1.40 L = (0.40*2+0.3*2)
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
2.17 m²
#C2
3 1.20 L = (0.30*2+0.3*2)
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
5.58 m²
#C3
3 1.20 L = (0.30*2+0.3*2)
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
5.58 m²
#C4
3 1.40 L = (0.40*2+0.3*2)
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
6.51 m²
d- basement beam
BB1
1 11.65 L =11.65
0.80 D = 0.40+0.4
9.32 m²
BB2
1 11.65 L =11.65
0.80 D = 0.40+0.4
9.32 m²
BB3
1 3.50 L = 3.50
0.80 D = 0.40+0.4
2.80 m²
BB4
1 5.63 L = 5.630
0.80 D = 0.40+0.4
4.50 m²
BB5
1 5.63 L = 5.630
0.80 D = 0.40+0.4
4.50 m²
BB6
2 5.63 L = 8.927
0.80 D = 0.40+0.4
9.01 m²
BB7
1 5.63 L = 8.927
0.80 D = 0.40+0.4
4.50 m²
BB6
1 5.63 L = 5.630
0.80 D = 0.40+0.4
4.50 m²
GB2
2 11.40 L =11.65
1.00 D = 0.40+0.2+0.4
22.80 m²
GB3
3 3.50 L = 3.50
1.00 D = 0.40+0.2+0.4
10.50 m²
GB4
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
GB5
2 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
11.26 m²
GB6
1 8.93 L = 8.927
1.00 D = 0.40+0.2+0.4
8.93 m²
GB7
1 8.93 L = 8.927
1.00 D = 0.40+0.2+0.4
8.93 m²
landing beam
1 3 L=3.0
0.50 w=0.2+0.3
1.50 m²
for soffit
1 3 L=3.0
3.40 w=3.47
10.20 m²
main
14 11 3 1.900 62.70
14 11 3 1.900 62.70
F2
main
14 13 7 3.900 354.90
14 13 7 3.900 354.90
retaining wall
on axsis A B/N 1-2
10 36 1 5.630 200.80
12 71 1 2.600 184.60
on axsis 1 b/n A-D
10 35 1 12.400 429.87
12 156 1 2.600 405.60
on axsis D B/N 1-2
10 35 1 6.630 229.84
12 84 1 2.600 218.08
Foundation column
C1
16 10 1 2.650 26.50
8 6 1 1.300 8.19
8 4 1 1.300 4.79
C2
16 8 3 2.650 63.60
8 6 3 1.300 24.57
8 4 3 1.300 14.38
C3
16 8 3 2.650 63.60
8 6 3 1.300 24.57
8 4 3 1.300 14.38
C4
16 10 3 2.650 79.50
8 6 3 1.300 24.57
8 4 3 1.300 14.38
basement beam
BB1
top bar
14 3 1 9.530 28.59
14 3 1 3.260 9.78
bottom bar
14 3 1 7.495 22.49
14 3 1 4.695 14.09
stirap
8 28 1 1.200 33.20
8 28 1 1.200 33.20
8 28 1 1.200 33.20
8 7 1 1.200 7.87
BB2
top bar
14 2 1 9.530 19.06
14 2 1 3.260 6.52
bottom bar
14 2 1 7.495 14.99
14 2 1 4.695 9.39
stirap
8 28 1 1.100 30.43
8 28 1 1.100 30.43
8 28 1 1.100 30.43
8 7 1 1.100 7.21
BB3
top bar
14 2 1 4.320 8.64
bottom bar
14 2 1 3.620 7.24
stirap
8 27 1 1.100 29.21
BB4
top bar
14 3 1 6.480 19.44
bottom bar
14 3 1 6.000 18.00
stirap
8 43 1 1.300 55.32
BB5
top bar
14 3 1 6.480 19.44
bottom bar
14 3 1 6.000 18.00
stirap
8 43 1 1.100 46.81
BB6
top bar
14 2 2 9.577 38.31
bottom bar
14 2 2 8.877 35.51
stirap
8 43 2 1.100 93.62
8 24 2 1.100 52.56
BB7
top bar
14 3 1 6.480 19.44
bottom bar
14 3 1 6.000 18.00
stirap
8 43 1 1.300 55.32
ground floor
Y-dir
8 24 1 9.750 231.56
8 23 1 12.000 276.75
8 24 1 9.755 237.78
8 7 1 9.755 70.72
10 22 1 2.908 62.78
X-dir
8 36 1 8.667 313.64
8 36 1 4.570 164.52
8 20 1 3.066 62.47
10 39 1 2.332 89.86
10 39 1 2.481 95.60
bottom bar
14 3 1 7.495 22.49
14 3 1 4.695 14.09
stirap
8 28 1 1.200 33.20
8 28 1 1.200 33.20
8 28 1 1.200 33.20
8 7 1 1.200 7.87
GB2
top bar
14 2 1 9.530 19.06
14 2 1 3.260 6.52
Negative bar
14 2 1 1.530 3.06
14 2 1 2.390 4.78
14 2 1 2.320 4.64
14 2 1 2.481 4.96
bottom bar
14 3 1 7.495 22.49
14 3 1 4.695 14.09
stirap
8 28 1 1.100 30.43
8 28 1 1.100 30.43
8 28 1 1.100 30.43
8 7 1 1.100 7.21
GB3
top bar
14 2 1 4.320 8.64
Negative bar
14 2 1 3.210 6.42
14 2 1 1.506 3.01
bottom bar
14 2 1 3.620 7.24
stirap
8 27 1 1.100 29.21
GB4
top bar
14 3 1 6.480 19.44
Negative bar
14 2 1 3.210 6.42
14 2 1 1.506 3.01
bottom bar
14 3 1 6.000 18.00
stirap
8 43 1 1.300 55.32
GB5
top bar
16 2 1 6.480 12.96
Negative bar
14 2 1 2.226 4.45
14 2 1 2.226 4.45
bottom bar
16 4 1 6.000 24.00
stirap
8 43 1 1.100 46.81
GB6
top bar
16 2 2 9.577 38.31
Negative bar
14 2 2 2.226 8.90
14 2 2 2.226 8.90
14 2 2 1.382 5.53
bottom bar
16 4 2 8.977 71.82
stirap
8 43 2 1.100 93.62
8 24 2 1.100 52.56
GB7
top bar
16 2 1 6.480 12.96
14 2 1 2.226 4.45
14 2 1 2.908 5.82
14 2 1 1.382 2.76
16 4 1 6.000 24.00
8 43 1 1.300 55.32
8 24 1 1.100 26.28
Stair case from [Link] 1st
stair case
for beam
14 2 1 3.77 7.53
14 2 1 3.20 6.40
8 9 1 1.20 10.20
for landing
16 9 1 1.20 10.20
8 9 1 1.20 10.20
for soffit
1 16 10 1 5.34 55.18
2 12 10 1 2.83 27.59
3 8 10 9 0.77 67.57
4 12 10 1 2.95 28.76
5 16 10 1 2.83 27.59
6 12 10 1 2.95 28.76
7 14 10 1 1.68 16.41
8 8 10 9 0.77 67.57
9 16 10 1 5.10 49.73
10 14 10 1 2.83 27.59
11 14 10 1 2.83 27.59
12 16 10 1 2.95 28.76
13 14 10 1 2.83 27.59
14 14 10 1 5.10 49.73
15 8 20 1 1.40 27.65
16 8 20 1 1.40 27.65
B - SUPER STRUCTURE
1.01 - concrete work
a - elevation column
for ground floor
#C1
1 0.30 L = 0.30
0.30 W = 0.30
2.66 D[avg.] = 2.66
0.24 m³
#C2
3 0.30 L = 0.30
0.25 W = 0.25
2.66 D[avg.] = 2.66
0.60 m³
#C3
3 0.30 L = 0.30
0.25 W = 0.25
2.66 D[avg.] = 2.66
0.60 m³
#C4
3 0.30 L = 0.30
0.25 W = 0.25
2.66 D[avg.] = 2.66
0.60 m³
FB2
1 5.20 L =1.73+3.470
0.30 W = 0.20
0.40 D = 0.40
0.62 m³
FB3
1 5.63 L = 5.630
0.25 W = 0.20
0.40 D = 0.40
0.56 m³
FB4
1 5.63 L = 5.630
0.30 W = 0.20
0.40 D = 0.40
0.68 m³
FB5
1 5.63 L = 8.830
0.25 W = 0.20
0.40 D = 0.40
0.56 m³
FB6
1 8.87 L =8.87
0.25 W = 0.20
0.40 D = 0.40
0.89 m³
g. for terrace floor beam
RB1
1 11.65 L =11.65
0.20 W = 0.20
0.35 D = 0.35
0.82 m³
RB2
1 11.65 L =11.65
0.20 W = 0.20
0.35 D = 0.35
0.82 m³
RB3
1 5.20 L = 1.73+3.47
0.20 W = 0.20
0.35 D = 0.35
0.36 m³
RB4
2 5.63 L = 5.630
0.20 W = 0.20
0.35 D = 0.35
0.79 m³
RB5
2 5.63 L = 5.630
0.20 W = 0.20
0.40 D = 0.35
0.90 m³
RB6
1 8.93 L
0.20 W = 0.20
0.35 D = 0.40
0.62 m³
RB7
1 8.93 L = 8.927
0.20 W = 0.20
0.35 D = 0.35
0.62 m³
0.30 D = 0.30
0.37 m³
WTB 2
2 3.10 L= 2.5-0.20 = 2.30
0.20 W = 0.20
0.30 D = 0.30
0.37 m³
i. stair
for Gr - 1st floor
riser & tread total steps =17
34 0.0238 riser=0.17m
1.40 tread width=0.28m tread length=1.4m
1.13 m³
landing beam
4 3 L=3.0
1.00 w=0.20
0.19 D=0.3
2.28 m³
56.72 m² total concrete work for 1st floor slab ( 16cm thick )
10.54 m² total concrete work for W.T floor slab ( 16cm thick )
Form Work
Tims. Dim. Result Description
FB2
1 5.20 L =1.73+3.470
1.00 D = 0.40+0.2+0.4
5.20 m²
FB3
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
FB4
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
FB5
1 5.63 L = 8.830
1.00 D = 0.40+0.2+0.4
5.63 m²
FB6
1 8.87 L =8.87
1.00 D = 0.40+0.2+0.4
8.87 m²
D. for roof floor beam Formwork
RB1
1 11.65 L =11.65
0.90 D = 0.35+0.2+0.35
10.49 m²
RB2
1 11.65 L =11.65
0.90 D = 0.35+0.2+0.35
10.49 m²
RB3
1 5.20 L = 1.73+3.47
0.90 D = 0.35+0.2+0.35
4.68 m²
RB4
2 5.63 L = 5.630
0.90 D = 0.35+0.2+0.35
10.13 m²
RB5
2 5.63 L = 5.630
0.90 D = 0.35+0.2+0.35
10.13 m²
RB6
1 8.93 L=8.93
0.90 D = 0.35+0.2+0.35
8.03 m²
RB7
1 8.93 L = 8.927
0.90 D = 0.35+0.2+0.35
8.03 m²
f. stair case
for Gr- 1st( 20 steps )
riser & tread total steps =18
36 0.17 riser=0.17m
1.20 tread width=0.280m tread length=1.4m
7.34 m²
landing beam
2 3 L=3.0
0.50 w=0.2+0.3
3.00 m²
for soffit
2 3 L=3.0
3.40 w=3.47
20.40 m²
j. water tanker
on Axis A - B b/n 1- 3
1 3.10 L= 3.10
3.40 W = 3.40
10.54 m²
C2
16 8 2 3.800 60.80
8 11 2 1.000 21.60
8 6 2 1.000 12.00
C3
16 8 1 3.800 30.40
8 11 1 1.000 10.80
8 6 1 1.000 6.00
C4
16 8 2 3.800 60.80
8 11 2 1.000 21.60
8 6 2 1.000 12.00
C2
16 8 3 3.800 91.20
8 11 3 1.000 32.40
8 6 3 1.000 18.00
C3
16 8 3 3.800 91.20
8 11 3 1.000 32.40
8 6 3 1.000 18.00
C4
16 8 3 3.800 91.20
8 11 3 1.000 32.40
8 6 3 1.000 18.00
C2
14 8 3 3.800 91.20
8 11 3 1.000 32.40
8 6 3 1.000 18.00
C4
14 10 2 3.800 76.00
8 11 2 1.000 21.60
8 6 2 1.000 12.00
FFB1
top bar
14 2 2 9.890 39.56
14 2 2 3.260 13.04
negative bar
14 2 2 1.560 6.24
14 2 2 2.390 9.56
14 2 2 2.332 9.33
14 2 2 2.481 9.92
bottom bar
14 3 2 7.855 47.13
14 3 2 4.695 28.17
stirap
8 22 2 1.000 44.00
8 22 2 1.000 44.00
8 22 2 1.000 44.00
8 7 2 1.080 14.16
FFB2
top bar
14 2 1 5.950 11.90
negative bar
14 2 1 3.210 6.42
14 2 1 1.506 3.01
bottom bar
14 3 1 5.250 15.75
stirap
8 21 1 1.000 20.89
8 11 1 1.000 10.61
FFB3
top bar
16 2 1 6.480 12.96
negative bar
16 2 1 1.560 3.12
16 2 1 2.390 4.78
bottom bar
16 3 1 6.000 18.00
stirap
8 21 1 1.000 20.89
FFB4
top bar
16 2 1 6.480 12.96
negative bar
16 2 1 1.560 3.12
16 2 1 2.390 4.78
bottom bar
16 3 1 6.000 18.00
stirap
8 32 1 1.000 31.93
FFB5
top bar
16 2 1 9.577 19.15
negative bar
16 2 1 2.226 4.45
16 3 1 2.908 8.72
14 2 1 1.390 2.78
bottom bar
16 4 1 8.870 35.48
stirap
8 32 1 1.000 31.93
8 19 1 1.000 18.87
FFB6
top bar
16 2 1 9.577 19.15
negative bar
14 2 1 2.226 4.45
16 2 1 2.908 5.82
14 2 1 1.390 2.78
bottom bar
16 4 1 8.870 35.48
stirap
8 32 1 1.000 31.93
8 19 1 1.000 18.87
Water tank beam
WTB1
top bar
14 2 1 4.320 8.64
bottom bar
14 3 1 3.620 10.86
stirap
8 13 1 1.000 13.50
8 7 1 1.000 7.39
WTB2
top bar
14 2 2 4.320 17.28
bottom bar
14 3 2 3.620 21.72
stirap
8 13 2 1.080 29.16
8 7 2 1.080 15.96
1st floor slab
X-dir
8 24 1 9.750 231.56
8 23 1 12.000 276.75
8 24 1 9.755 237.78
8 7 1 9.755 70.72
10 22 1 2.908 62.78
X-dir
8 36 1 8.667 313.64
8 36 1 4.570 164.52
8 20 1 3.066 62.47
10 39 1 2.332 89.86
10 39 1 2.481 95.60
8 20 1 6.152 121.50
Y-dir
8 26 1 6.152 158.63
Stair case
stair case
for beam
14 2 2 3.77 15.06
14 2 2 3.20 12.80
8 9 2 1.20 20.40
for landing
16 9 2 1.20 20.40
8 9 2 1.20 20.40
for soffit
1 16 10 2 5.34 110.36
2 12 10 2 2.83 55.19
3 8 10 18 0.77 135.14
4 12 10 2 2.95 57.53
5 16 10 2 2.83 55.19
6 12 10 2 2.95 57.53
7 14 10 2 1.68 32.82
8 8 10 18 0.77 135.14
9 16 10 2 5.10 99.45
10 14 10 2 2.83 55.19
11 14 10 2 2.83 55.19
12 16 10 2 2.95 57.53
13 14 10 2 2.83 55.19
14 14 10 2 5.10 99.45
15 8 20 2 1.40 55.30
16 8 20 2 1.40 55.30
on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²
on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²
diduction D1
1 1.62 L=1.62
2.20 H=2.20
-3.56 m²
diduction D2
1 3.04 L=1.58+1.46
2.20 H=2.20
-6.69 m²
diduction D3
1 1.65 L=1.65
2.20 H=2.20
-3.63 m²
on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²
diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
corrridor
1 2.53 L=1.53+1.0
2.86 H=2.86
-7.24 m²
on axis 2'
1 5.40 L=5.40
2.86 H=2.86
15.44 m²
diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²
on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²
diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²
first floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²
on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²
on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²
diduction D1
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
diduction D2
1 1.80 L=0.90+0.90
1.70 H=1.70
-3.06 m²
diduction D3
1 2.20 L=2.20
1.70 H=1.70
-3.74 m²
on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²
diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
corrridor
1 3.13 L=1.53+1.60
2.86 H=2.86
-8.95 m²
on axis 3
1 5.40 L=5.40
2.86 H=2.86
15.44 m²
diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²
on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²
diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²
on axis 1'
1 2.65 L=1.70+0.95
2.86 H=2.86
7.58 m²
first floor
on axis A-B
1 3.46 L=1.81+0.79+0.45+0.41
2.86 H=2.86
9.90 m²
on axis C-D
1 3.82 L=2.17+0.79+0.45+0.41
2.86 H=2.86
10.93 m²
on axis B & C
1 1.66 L=1.66
2.86 H=2.86
4.75 m²
on axis 1'
1 4.00 L=4
2.80 H=2.8
11.20 m²
on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²
on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²
diduction D1
1 1.62 L=1.62
2.20 H=2.20
-3.56 m²
diduction D2
1 3.04 L=1.58+1.46
2.20 H=2.20
-6.69 m²
diduction D3
1 1.65 L=1.65
2.20 H=2.20
-3.63 m²
on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²
diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
corrridor
1 2.53 L=1.53+1.0
2.86 H=2.86
-7.24 m²
on axis 2'
1 5.40 L=5.40
2.86 H=2.86
15.44 m²
diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²
on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²
diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²
first floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²
on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²
on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²
diduction D1
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
diduction D2
1 1.80 L=0.90+0.90
1.70 H=1.70
-3.06 m²
diduction D3
1 2.20 L=2.20
1.70 H=1.70
-3.74 m²
on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²
diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
corrridor
1 3.13 L=1.53+1.60
2.86 H=2.86
-8.95 m²
on axis 3
1 5.40 L=5.40
2.86 H=2.86
15.44 m²
diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²
on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²
diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²
on axis 1'
2 2.65 L=1.70+0.95
2.86 H=2.86
15.16 m²
first floor
on axis A-B
2 3.46 L=1.81+0.79+0.45+0.41
2.86 H=2.86
19.79 m²
on axis C-D
2 3.82 L=2.17+0.79+0.45+0.41
2.86 H=2.86
21.85 m²
on axis B & C
2 1.66 L=1.66
2.86 H=2.86
9.50 m²
on axis 1'
2 4.00 L=4
2.80 H=2.8
22.40 m²
ground floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²
on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²
on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²
diduction D1
1 1.62 L=1.62
2.20 H=2.20
-3.56 m²
diduction D2
1 3.04 L=1.58+1.46
2.20 H=2.20
-6.69 m²
diduction D3
1 1.65 L=1.65
2.20 H=2.20
-3.63 m²
on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²
diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
corrridor
1 2.53 L=1.53+1.0
2.86 H=2.86
-7.24 m²
on axis 2'
1 5.40 L=5.40
2.86 H=2.86
15.44 m²
diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²
on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²
diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²
first floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²
on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²
on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²
diduction D1
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
diduction D2
1 1.80 L=0.90+0.90
1.70 H=1.70
-3.06 m²
diduction D3
1 2.20 L=2.20
1.70 H=1.70
-3.74 m²
on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²
diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
corrridor
1 3.13 L=1.53+1.60
2.86 H=2.86
-8.95 m²
on axis 3
1 5.40 L=5.40
2.86 H=2.86
15.44 m²
diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²
on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²
diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²
GB2
2 11.40 L =11.65
1.00 D = 0.40+0.2+0.4
22.80 m²
GB3
3 3.50 L = 3.50
1.00 D = 0.40+0.2+0.4
10.50 m²
GB4
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
GB5
2 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
11.26 m²
GB6
1 8.93 L = 8.927
1.00 D = 0.40+0.2+0.4
8.93 m²
GB7
1 8.93 L = 8.927
1.00 D = 0.40+0.2+0.4
8.93 m²
FB2
1 5.20 L =1.73+3.470
1.00 D = 0.40+0.2+0.4
5.20 m²
FB3
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
FB4
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
FB5
1 5.63 L = 8.830
1.00 D = 0.40+0.2+0.4
5.63 m²
FB6
1 8.87 L =8.87
1.00 D = 0.40+0.2+0.4
8.87 m²
roof floor beam
RB1
1 11.65 L =11.65
0.90 D = 0.35+0.2+0.35
10.49 m²
RB2
1 11.65 L =11.65
0.90 D = 0.35+0.2+0.35
10.49 m²
RB3
1 5.20 L = 1.73+3.47
0.90 D = 0.35+0.2+0.35
4.68 m²
RB4
2 5.63 L = 5.630
0.90 D = 0.35+0.2+0.35
10.13 m²
RB5
2 5.63 L = 5.630
0.90 D = 0.35+0.2+0.35
10.13 m²
RB6
1 8.93 L=8.93
0.90 D = 0.35+0.2+0.35
8.03 m²
RB7
1 8.93 L = 8.927
0.90 D = 0.35+0.2+0.35
8.03 m²
WTB 2
2 3.10 L= 2.5-0.20 = 2.30
0.80 D = 0.30+0.2+0.3
4.96 m²
stair case
basment floor - 1st floor
soffit + side form work
4 2.91 L=2.91
1.95 W=1.35+0.3+0.3
22.70 m²
slab plastering
ground-roof floor
on axis A-D b/n 1-2
3 10.84 L=3.64+3.53+3.47+1-(4*0.2)
5.43 W=5.63-0.2
176.58 m²
on axis 1'
2 2.65 L=1.70+0.95
2.86 H=2.86
15.16 m²
first floor
on axis A-B
2 3.46 L=1.81+0.79+0.45+0.41
2.86 H=2.86
19.79 m²
on axis C-D
2 3.82 L=2.17+0.79+0.45+0.41
2.86 H=2.86
21.85 m²
on axis B & C
2 1.66 L=1.66
2.86 H=2.86
9.50 m²
on axis 1'
2 4.00 L=4
2.80 H=2.8
22.40 m²
ground floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²
on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²
on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²
diduction D1
1 1.62 L=1.62
2.20 H=2.20
-3.56 m²
diduction D2
1 3.04 L=1.58+1.46
2.20 H=2.20
-6.69 m²
diduction D3
1 1.65 L=1.65
2.20 H=2.20
-3.63 m²
on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²
diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
corrridor
1 2.53 L=1.53+1.0
2.86 H=2.86
-7.24 m²
on axis 2'
1 5.40 L=5.40
2.86 H=2.86
15.44 m²
diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²
on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²
diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²
first floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²
on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²
on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²
diduction D1
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
diduction D2
1 1.80 L=0.90+0.90
1.70 H=1.70
-3.06 m²
diduction D3
1 2.20 L=2.20
1.70 H=1.70
-3.74 m²
on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²
diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
corrridor
1 3.13 L=1.53+1.60
2.86 H=2.86
-8.95 m²
on axis 3
1 5.40 L=5.40
2.86 H=2.86
15.44 m²
diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²
on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²
diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²
GB2
2 11.40 L =11.65
1.00 D = 0.40+0.2+0.4
22.80 m²
GB3
3 3.50 L = 3.50
1.00 D = 0.40+0.2+0.4
10.50 m²
GB4
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
GB5
2 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
11.26 m²
GB6
1 8.93 L = 8.927
1.00 D = 0.40+0.2+0.4
8.93 m²
GB7
1 8.93 L = 8.927
1.00 D = 0.40+0.2+0.4
8.93 m²
FB2
1 5.20 L =1.73+3.470
1.00 D = 0.40+0.2+0.4
5.20 m²
FB3
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
FB4
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
FB5
1 5.63 L = 8.830
1.00 D = 0.40+0.2+0.4
5.63 m²
FB6
1 8.87 L =8.87
1.00 D = 0.40+0.2+0.4
8.87 m²
RB2
1 11.65 L =11.65
0.90 D = 0.35+0.2+0.35
10.49 m²
RB3
1 5.20 L = 1.73+3.47
0.90 D = 0.35+0.2+0.35
4.68 m²
RB4
2 5.63 L = 5.630
0.90 D = 0.35+0.2+0.35
10.13 m²
RB5
2 5.63 L = 5.630
0.90 D = 0.35+0.2+0.35
10.13 m²
RB6
1 8.93 L=8.93
0.90 D = 0.35+0.2+0.35
8.03 m²
RB7
1 8.93 L = 8.927
0.90 D = 0.35+0.2+0.35
8.03 m²
WTB 2
2 3.10 L= 2.5-0.20 = 2.30
0.80 D = 0.30+0.2+0.3
4.96 m²
stair case
basment floor - 1st floor
soffit + side form work
4 2.91 L=2.91
1.95 W=1.35+0.3+0.3
22.70 m²
on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²
on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²
diduction D1
1 1.62 L=1.62
2.20 H=2.20
-3.56 m²
diduction D2
1 3.04 L=1.58+1.46
2.20 H=2.20
-6.69 m²
diduction D3
1 1.65 L=1.65
2.20 H=2.20
-3.63 m²
on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²
diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
corrridor
1 2.53 L=1.53+1.0
2.86 H=2.86
-7.24 m²
on axis 2'
1 5.40 L=5.40
2.86 H=2.86
15.44 m²
diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²
on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²
diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²
first floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²
on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²
on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²
diduction D1
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
diduction D2
1 1.80 L=0.90+0.90
1.70 H=1.70
-3.06 m²
diduction D3
1 2.20 L=2.20
1.70 H=1.70
-3.74 m²
on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²
diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
corrridor
1 3.13 L=1.53+1.60
2.86 H=2.86
-8.95 m²
on axis 3
1 5.40 L=5.40
2.86 H=2.86
15.44 m²
diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²
on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²
diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²
on axis 1'
2 2.65 L=1.70+0.95
2.86 H=2.86
15.16 m²
first floor
on axis A-B
2 3.46 L=1.81+0.79+0.45+0.41
2.86 H=2.86
19.79 m²
on axis C-D
2 3.82 L=2.17+0.79+0.45+0.41
2.86 H=2.86
21.85 m²
on axis B & C
2 1.66 L=1.66
2.86 H=2.86
9.50 m²
on axis 1'
2 4.00 L=4
2.80 H=2.8
22.40 m²
ground floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²
on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²
on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²
diduction D1
1 1.62 L=1.62
2.20 H=2.20
-3.56 m²
diduction D2
1 3.04 L=1.58+1.46
2.20 H=2.20
-6.69 m²
diduction D3
1 1.65 L=1.65
2.20 H=2.20
-3.63 m²
on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²
diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
corrridor
1 2.53 L=1.53+1.0
2.86 H=2.86
-7.24 m²
on axis 2'
1 5.40 L=5.40
2.86 H=2.86
15.44 m²
diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²
on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²
diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²
first floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²
on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²
on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²
diduction D1
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
diduction D2
1 1.80 L=0.90+0.90
1.70 H=1.70
-3.06 m²
diduction D3
1 2.20 L=2.20
1.70 H=1.70
-3.74 m²
on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²
diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²
corrridor
1 3.13 L=1.53+1.60
2.86 H=2.86
-8.95 m²
on axis 3
1 5.40 L=5.40
2.86 H=2.86
15.44 m²
diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²
on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²
diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²
GB2
2 11.40 L =11.65
1.00 D = 0.40+0.2+0.4
22.80 m²
GB3
3 3.50 L = 3.50
1.00 D = 0.40+0.2+0.4
10.50 m²
GB4
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
GB5
2 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
11.26 m²
GB6
1 8.93 L = 8.927
1.00 D = 0.40+0.2+0.4
8.93 m²
GB7
1 8.93 L = 8.927
1.00 D = 0.40+0.2+0.4
8.93 m²
FB2
1 5.20 L =1.73+3.470
1.00 D = 0.40+0.2+0.4
5.20 m²
FB3
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
FB4
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
FB5
1 5.63 L = 8.830
1.00 D = 0.40+0.2+0.4
5.63 m²
FB6
1 8.87 L =8.87
1.00 D = 0.40+0.2+0.4
8.87 m²
roof floor beam
RB1
1 11.65 L =11.65
0.90 D = 0.35+0.2+0.35
10.49 m²
RB2
1 11.65 L =11.65
0.90 D = 0.35+0.2+0.35
10.49 m²
RB3
1 5.20 L = 1.73+3.47
0.90 D = 0.35+0.2+0.35
4.68 m²
RB4
2 5.63 L = 5.630
0.90 D = 0.35+0.2+0.35
10.13 m²
RB5
2 5.63 L = 5.630
0.90 D = 0.35+0.2+0.35
10.13 m²
RB6
1 8.93 L=8.93
0.90 D = 0.35+0.2+0.35
8.03 m²
RB7
1 8.93 L = 8.927
0.90 D = 0.35+0.2+0.35
8.03 m²
WTB 2
2 3.10 L= 2.5-0.20 = 2.30
0.80 D = 0.30+0.2+0.3
4.96 m²
stair case
basment floor - 1st floor
soffit + side form work
4 2.91 L=2.91
1.95 W=1.35+0.3+0.3
22.70 m²
LAUNDRY
A=3.57m2
1 3.57
3.57 m²
STORY
A=21.41m2
1 21.41
21.41 m²
GROUND FLOOR
SHOP 1
A=20.71m2
1 20.71
20.71 m²
SHOP 2
A=7.57m2
1 7.57
7.57 m²
SHOP 3
A=7.58m2
1 7.58
7.58 m²
SHOP 4
A=19.04 m2
1 19.04
19.04 m²
BATHROOM
A=3.07 m2
1 3.07
3.07 m²
CORRIDOR
A=8.74 m2
1 8.74
8.74 m²
FIRST floor
BED ROOM
A=7.94m2
2 7.94
15.88 m²
Kitchen
A= 5.0m2
1 5.00
5.00 m²
Kitchen
A=5.0m2
1 5.00
5.00 m²
BED ROOM
A=7.94m2
1 7.94
7.94 m²
LIVING ROOM
A=12.88 m2
1 12.88
12.88 m²
BATH ROOM
A=2.24 m2
1 2.24
2.24 m²
BATH ROOM
A=2.24 m2
1 2.24
2.24 m²
CORRIDOR
A=9.54m2
1 9.54
9.54 m²
tread
42 1.35 L =0.28
56.70 ml
shop 2
1 6.33 L=6.33
6.33 ml
shop 3
1 7.33 L=7.33
7.33 ml
shop 4
1 14.41 L=14.41
14.41 ml
corridor
1 1.10 L=1.1
1.10 ml
first floor
bed room
2 6.83 L=6.83
13.66 ml
living room
2 6.91 L=6.91
13.82 ml
kitchen
2 6.60 6.6
13.20 ml
Wall ceramic
Ceramic
basment floor
bathroom
1 4.51 L=1.50+1.80+1.21
3.00 H=3
13.53 m²
ground floor
bathroom
1 5.45 L=2.80+0.55+1.10+1
3.00 H=3
16.35 m²
first floor
bath room
2 3.94 L=1.40+1.60+0.54+0.40
3.00 H=3
7.88 m²
LAUNDRY
A=3.57m2
1 3.57
3.57 m²
STORY
A=21.41m2
1 21.41
21.41 m²
GROUND FLOOR
SHOP 1
A=20.71m2
1 20.71
20.71 m²
SHOP 2
A=7.57m2
1 7.57
7.57 m²
SHOP 3
A=7.58m2
1 7.58
7.58 m²
SHOP 4
A=19.04 m2
1 19.04
19.04 m²
BATHROOM
A=3.07 m2
1 3.07
3.07 m²
CORRIDOR
A=8.74 m2
1 8.74
8.74 m²
FIRST floor
BED ROOM
A=7.94m2
1 7.94
7.94 m²
Kitchen
A= 5.0m2
1 5.00
5.00 m²
Kitchen
A=5.0m2
1 5.00
5.00 m²
BED ROOM
A=7.94m2
1 7.94
7.94 m²
LIVING ROOM
A=12.88 m2
1 12.88
12.88 m²
BATH ROOM
A=2.24 m2
1 2.24
2.24 m²
BATH ROOM
A=2.24 m2
1 2.24
2.24 m²
CORRIDOR
A=9.54m2
1 9.54
9.54 m²
175.33 m² total cement screed for PVC TILE
tread
42 1.35 L =1.35
0.28 w=0.28
15.88 m²
landing
2 3.10 L =3.10
1.50 w=1.50
9.30 m²
Wall ceramic
Ceramic
basment floor
bathroom
1 4.51 L=1.50+1.80+1.21
3.00 H=3
13.53 m²
ground floor
bathroom
1 5.45 L=2.80+0.55+1.10+1
3.00 H=3
16.35 m²
first floor
bath room
2 3.94 L=1.40+1.60+0.54+0.40
3.00 H=3
7.88 m²
Water proof
BASMENT floor
Kitchen
A= 7.50m2
1 7.50
7.50 m²
BATH ROOM
A=2.70 m2
1 2.70
2.70 m²
LAUNDRY
A=3.57m2
1 3.57
3.57 m²
FIRST floor
Kitchen
A= 5.0m2
1 5.00
5.00 m²
Kitchen
A=5.0m2
1 5.00
5.00 m²
BATH ROOM
A=2.24 m2
1 2.24
2.24 m²
BATH ROOM
A=2.24 m2
1 2.24
2.24 m²
almunium framework
almunium framework
w1 size 900*1000mm
1 7.00
7.00 PCS
w2 size 2440*1000mm
1 1.00
1.00 PCS
w4 size 2440*1700mm
1 1.00
1.00 PCS
w7 size 900*1650mm
1 3.00
3.00 PCS
w8 size 2440*1700mm
1 2.00
2.00 PCS
w9 size 2200*1700mm
1 1.00
1.00 PCS
D2 size 800*2300mm
1 9.00
9.00 PCS
w4 size 2440*1700mm
1 2.44 l=2.44
1.70 h=1.70
4.15 m²
w7 size 900*1650mm
3 0.90 l=0.90
1.65 h=1.65
4.46 m²
w8 size 2440*1700mm
2 2.44 l=2.44
1.70 h=1.70
8.30 m²
w9 size 2200*1700mm
1 2.20 l=2.2
1.70 h=1.70
3.74 m²
window sill
w1 size 900*1000mm
7 0.90 L=0.90
6.30 ml
w2 size 2440*1000mm
1 2.44 l=2.44
2.44 ml
w4 size 2440*1700mm
1 2.44 l=2.44
2.44 ml
w7 size 900*1650mm
3 0.90 l=0.90
2.70 ml
w8 size 2440*1700mm
2 2.44 l=2.44
4.88 ml
w9 size 2200*1700mm
1 2.20 l=2.2
2.20 ml
door sill
DOOR WORK
8 0.90 D1 size 900 *2300mm
7.20 ml
D2 size 800*2300mm
9 0.80
7.20 ml
1 12.40 L=12.40
6.00 W=6.0
74.40 m²
R
74.40 m² total Decra roof cover
L=0.83+0.33+0.2 (T3)
1 1.36
1.36 m
L=0.84+0.62 (T3)
1 1.16
1.16 m
Gutter
1 16.00
16.00 ml
1 12.40
12.40 ml
dawn pipe
1 12.00
12.00 ml