0% found this document useful (0 votes)
79 views123 pages

B+G+1 Residential Building Cost Breakdown

Uploaded by

habtamuzewde277
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Topics covered

  • Site Management,
  • Construction Inspection,
  • Construction Workflow,
  • Labor Costs,
  • Construction Equipment,
  • Sanitary Installation,
  • Architectural Plans,
  • Construction Education,
  • Construction Compliance,
  • Carpentry
0% found this document useful (0 votes)
79 views123 pages

B+G+1 Residential Building Cost Breakdown

Uploaded by

habtamuzewde277
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Topics covered

  • Site Management,
  • Construction Inspection,
  • Construction Workflow,
  • Labor Costs,
  • Construction Equipment,
  • Sanitary Installation,
  • Architectural Plans,
  • Construction Education,
  • Construction Compliance,
  • Carpentry

SUMMARY

B+G+1 RESIDENCE BUILDING


A . SUB – STRUCTURE
[Link] & Earth Works BIRR 439,843.49
2. CONCRETE WORK BIRR 1,358,594.99
3. MASNORY WORK BIRR 109,655.45

SUB TOTAL 1,908,093.92

B. SUPER – STRUCTURE
1. CONCRETE WORK BIRR 947,553.22
2. BLOCK WORK BIRR 212,032.92
3. ROOFING BIRR 240,826.43
4. WATER PROOFING WORK BIRR 24,797.85
5. CARPENTRY AND JOINERY BIRR 239,240.93
6. ALUMINUM & METAL WORK BIRR 572,795.43
7. GLASS & GLAZING BIRR 1,318,747.22
8. FINISHING BIRR 1,318,747.22
9. PAINTING BIRR 188,051.60
10. SANITARY INSTALLATION BIRR 473,287.51
11. ELECTRICAL INSTALLATION BIRR 837,735.34

SUPER TOTAL BIRR 6,373,815.67

TOTAL A & B BIRR 8,281,909.60

15%VAT BIRR 1,242,286.44

GRAND TOTAL BIRR 9,524,196.04


PROJECT B+G+1 RESIDENTIAL
CLIENT
CONSULTANT
CONTRUCTOR
BILL OF QUANTITY

Item No. Description of Work Unit Contract Qty Unit Price Contract Amount (Birr)

A . SUB – STRUCTURE
[Link] & Earth Works

1.1 Site clearing and removing the top 20cm thick soil. m2 171.36 28.60 4,900.90

Bulk Excavation in ordinary soil to a depth not exceeding 100cm


1.2 from reduced ground level. m3 695.42 208.00 144,647.36

pit Excavation in ordinary soil for for isolated and strap footing to

1.3 average depth not exceeding 250 cm from reduced ground level m3 119.65 214.90 25,712.79
Excavation in ordinary soil for trench foundation to average
1.4 depth not exceeding 145 cm from reduced ground level m3 42.36 231.13 9,790.74

Fill around footing and foundation column to maintain the


desired level with selected borrowed non expansive material and
1.5 compact by using rammer in layers not exceeding 20cm. m3 105.33 686.17 72,274.29

Fill around stone masonary to maintain the desired level with


selected borrowed non expansive material and compact by using
1.6 rammer in layers not exceeding 20cm. m3 27.75 686.12 19,042.09
Backfill under hard core with non expansive selected material and
compact by 14ton drum roller in layers not exceeding 20cm thick
by sprinkling water to insure 95% modified AASHTO dry
1.7 density. m3 12.02 623.79 7,498.35

Cart away surplus excavated material to a distance not exceeding


1.8 5kms. m3 891.70 147.40 131,436.92
25cm thick sound basaltic or equivalent stone hard core finished
and blinded with crushed stone.
1.9 m2 60.10 408.30 24,540.05

TOTAL CARRIED TO SUMMARY ................................................... 439,843.49

2. CONCRETE WORK
Particular attention must be given to the following notes along
with the technical Specification and Method of Mesurnment
prepared by BaTCoDA.

Constituents of concrete:

The quality of ingredients of concrete must fulfill the


requirements,concrete trial mixes shall be done and certified by
laboratory test result before casting of structural [Link]
concrete casting samples should be taken for laboratory test.
2.1

Concrete:
The specified concrete strength must be confirmed by laboratory
test.

Reinforcement bar:
The specified yield strength and other related properties of
reinforcement bar must be certified either by manufacturer's
catalogue/manual or/and by laboratory test.

5cm thick lean concrete in C-7 with minimum PPC cement


content of 150kg/m3 of concrete under:
a) under footing pad m2 26.04 270.00 7,030.80
b) under gread beam m 2
3.50 270.00 944.46
c) under Stone masonary m 2
20.25 270.00 5,468.58

Reinforced concrete according to structural drawing, (with a 28


day 15cm cube crushing strength of 20Mpa for C20 ,25Mpa for C-
25 and 30Mpa for C-30 ), cast into formwork and vibrated Around
2.2 rod reinforcement bars.(formwork & reinforcement bars are
measured Separately.)in:''Type of cement to be ordinary portland
cement(OPC)''

a) footing m3 11.42 6,801.55 77,700.91


b) foundation column m 3
1.86 6,801.55 12,650.88
c) basment column m 3
2.42 6,801.55 16,446.15
d) shear wall m 3
9.66 6,801.55 65,719.30
e) basment beam m 3
6.11 6,801.55 41,562.91
f) ground beam m 3
5.70 6,801.55 38,796.04
g) basment slab m 2
52.82 680.16 35,927.83
h) 10 thick ground floor slab m 2
60.10 680.16 40,879.36
i) stair case m 2
3.49 6,801.55 23,767.61

2.3 Sawn zigba wood formwork for:

a) footing m2 28.80 879.56 25,331.33


b) foundation column m 2
19.84 879.56 17,450.47
c) basment column m 2
32.76 879.56 28,814.39
d) shear wall m 2
129.64 879.56 114,022.64
e) basment beam m2 48.46 879.56 42,627.00
f) ground beam m 2
91.34 879.56 80,342.53
g) 10 thick ground floor slab m 2
52.82 879.56 46,461.00
h) stair case m 2
22.03 879.56 19,374.95
Reinforcemnet steel bars according to structural [Link]
includes cutting,bending,placing in position and tying wires.
2.4
a) dia.8mm deformed bar kg 1,394.12 106.45 148,404.07
b) dia.10mm deformed bar kg 743.77 106.45 79,174.32
c) dia.12mm deformed bar kg 793.33 106.45 84,449.98
d) dia.14mm deformed bar kg 1,937.95 106.45 206,294.78
e) dia.16mm deformed bar kg 929.57 106.45 98,952.73
f) dia.20mm deformed bar kg 0.00 106.45 0.00

TOTAL CARRIED TO SUMMARY ................................................... 1,358,594.99

3. MASNORY WORK
50cm thick stone masonary foundation below ground level
3.1 bedded in cement mortar(1:3) in full joints. m3 23.92 4,583.30 109,655.45

TOTAL CARRIED TO SUMMARY ................................................... 109,655.45

B. SUPER – STRUCTURE

1. CONCRETE WORK
Particular attention must be given to the following notes along
with the technical Specification and Method of Mesurnment
prepared by BaTCoDA.
Constituents of concrete:

The quality of ingredients of concrete must fulfill the


requirements,concrete trial mixes shall be done and certified by
laboratory test result before casting of structural [Link]
concrete casting samples should be taken for laboratory test.

Concrete:

The specified concrete strength must be confirmed by laboratory


test.
Reinforcement bar:
The specified yield strength and other related properties of
reinforcement bar must be certified either by manufacturer's
catalogue/manual or/and by laboratory test.

Reinforced concrete according to structural drawing, (with a 28


day 15cm cube crushing strength of 25 for C-25 and 30Mpa for C-
30 ), cast into formwork and vibrated Around rod reinforcement
bars.(formwork & reinforcement bars are measured
Separately.)in:''Type of cement to be ordinary portland
cement(OPC)''
1.1
a) elevation column m3 4.41 6,801.55 30,021.36
b) floor beam m 3
10.85 6,801.55 73,826.61
c) floor slab m 2
56.72 680.16 38,580.43
d) water tanker slab m3 10.54 680.16 7,168.83
e) stair case m3 6.99 6,801.55 47,535.22

1.20 Sawn zigba wood formwork for:

a) elevation column m2 63.37 879.56 55,734.20


b) floor beam m 2
126.17 879.56 110,971.09
c) floor slab m 2
56.72 879.56 49,891.28
d) water tanker slab m2 10.54 879.56 9,270.56
e) stair case m2 44.06 879.56 38,749.90

Reinforcemnet steel bars according to structural [Link]


1.3
includes cutting,bending,placing in position and tying wires.

a) dia.6mm deformed bar kg 0.00 106.45 0.00


b) dia.8mm deformed bar kg 1,176.37 106.45 125,224.59
c) dia.10mm deformed bar kg 212.84 106.45 22,656.82
d) dia.12mm deformed bar kg 151.18 106.45 16,093.11
e) dia.14mm deformed bar kg 956.54 106.45 101,823.68
f) dia.16mm deformed bar kg 2,066.75 106.45 220,005.54
g) dia.20mm deformed bar kg 0.00 106.45 0.00
TOTAL CARRIED TO SUMMARY ................................................... 947,553.22

2. BLOCK WORK
Class C, 200mm thick HCB wall with the designed compressive m2
2.1 strength , bedded in cement mortar (1:3). 232.15 718.78 166,866.50

2.2 Ditto as item 2.1 but 10mm thick m2 69.49 650.00 45,166.42

TOTAL CARRIED TO SUMMARY ................................................... 212,032.92


3. ROOFING
Decra roof covering in G-28 including roof ridge cove fixed to
3.01 zigba wood purlins at c/c 30cm (roof cover measur in projection M2 74.40 990.00 73,656.00
purlin m/s
All structural members each truss shall be firmly fixed concrete
3.02
beam with diameter 6mm plain bar
a) Eucalyptus truss upper &lower chord DIA 10cm ML 82.07 104.50 8,576.32

b) Vertical and diagonal members DIA 6-8cm ML 25.61 88.00 2,253.68

c) 5*7 cm swan zigba wood purlin placed at c/c 90 cm ML 276.00 198.00 54,648.00
d) 4*5 cm celling buttan placed at c/c 60 cm ML 438.92 198.00 86,906.33
ML
Rectangular section down pipe flashing made G-28 with
3.03 ML 12.00 972.58 11,670.91
necesssary offsets properly fixed as shown on the drawings
75 mm diametere PVC Down pipes attached to external wall
3.04 surface with leader straps c/c 80 cm, and finally painted with two ML 12.00 259.60 3,115.20
coate fo syntetic paint.

TOTAL CARRIED TO SUMMARY .......................................................................................... 240,826.43


4. WATER PROOFING WORK
SPECIAL CHARACTERSTICS
Surface Preparation: Concrete surface must be clean and free of
dirt, films, coatings or other foreign matter. All surface
imperfections and protrusions are to be removed and repaired.
Structurally unsound and friable concrete must be removed and
repaired.

Responsibility: the contractor should provide the approved


product on site; store it properly in original unopened packing in
dry condition and away from sunlight and scorching heat. In
addition the application should be made with professionals
trained in the preparation, mixing and application.

Testing: Pond testing for atleast 24 hours should be done after the
contructor has acomplished the water proffing work. The surface
should be re-treated if leakage observed; and the test should be
done on the repaired surface.

Supply and coat XYPEX or Equivalent water proofing


as per manufacturers instruction for all wet areas,
toilets kichen, etc as per Engineer's instruction. The
contractor must consider the work as complete set and
3.10
provide appropriate measures for the connection b/n
pipes and concrete slab. After the completion of the
work the contractor should do ponding test using water
at level of 20cm from floor finish level for atleast 24
hours. M2 28.25 877.80 24,797.85

TOTAL CARRIED TO SUMMARY ................................................... 24,797.85

5. CARPENTRY AND JOINERY


Note: wood works include painting, varnishing, polishing oiling
& the like.
Supply and install clinical wooden door as per the schedule,
material HDF (High density fiberboard) chipping pine wood,
synthetic-resin bound or factory pre-finished water proof boards.
With matt covering paint system and finished with high glossy
varnish paint system. Price shall include all corrosion proof
accessories.
A. Doors
D1 size 90cm x 230 cm pcs 8.00 14,952.56 119,620.46
4.01
D2 size 80cm x 230cm pcs 9.00 13,291.16 119,620.46

TOTAL CARRIED TO SUMMARY ................................................... 239,240.93

6. ALUMINUM & METAL WORK


aluminum windows made of Aluminum tubular profile frames
ALLCO-5 or equivalent, 1.4mm thick with 6mm glasss according
to the detail drawing and window door schedule . Complete
work includes all the necessary .All aluminum windows and
doors type shall be approved by the Engineer.
5.1.1

Window
a) Type W1 size = 900x 1000 mm Pcs 7.00 10,800.00 75,600.00
b) Type W2 size = 2440 x 1000mm Pcs 1.00 29,280.00 29,280.00
c) Type Wd3 size =1620 x 2200mm Pcs 1.00 42,768.00 42,768.00
d) Type W4 size = 2440 x1700 mm Pcs 1.00 4,977.60 4,977.60
5.1.2 e) Type Wd5 size = 3130 x2200 mm Pcs 1.00 55,644.39 55,644.39
f) Type Wd6 size = 1650 x2200 mm Pcs 1.00 22,564.08 22,564.08
g) Type W7 size = 900 x1650 mm Pcs 3.00 53,333.28 159,999.84
h) Type W8 size = 2400 x1700 mm Pcs 2.00 32,969.66 65,939.33
i) Type W9 size = 2200 x1700 mm Pcs 1.00 30,222.19 30,222.19

Supply & fix 100x50mm Wooden Hand rail to stair case screwed
to 100x50mm wooden ballustrade placed c/c 300mm bolted with
2(60x60x5x100)mm angle iron anchored to concrete treads and
including 100x50mm Wooden bottom rail in single row screwed
5.1.3 to Wooden ml 20.00 1,950.00 39,000.00
Supply & fix 100x50mm Wooden Guard rail to balcony screwed
to 100x50mm wooden ballustrade placed c/c 150mm bolted with
2(60x60x5x100)mm angle iron anchored to concrete slab and
including 100x50mm Wooden bottom rail in single row screwed
5.1.4 to Wooden ball. ml 24.00 1,950.00 46,800.00

TOTAL CARRIED TO SUMMARY ................................................... 572,795.43


7. GLASS & GLAZING

5mm thick clear glass glazed with beads, rubber gasket and
6.0.1 M2 43.46 1,100.00 47,804.90
sealant to Almunium profile frames.

TOTAL CARRIED TO SUMMARY ................................................... 47,804.90

8. FINISHING
50mm thick cement sand screed smoothly finished flooring in
mortar mix (1:3).
7.1
a)To receive pvc floor tile m2 175.33 347.95 61,006.07
b) To receive marble till m2 34.82 347.95 12,113.88

10mm thick imported type approved quality pvc tile flooring


stuck down with approved type adhesive on cement sand screed
7.2 floor finish and joints grouted in appropriate color setting coat
mortar. Color and pattern of tile shall be approved by the
Engineers. m2 183.27 950.00 174,106.50

10x100mm high pvc skirting stuck to wall with approved type of


7.2.1 ml 105.12 265.00 27,856.80
adhesive.
20*30 mm marble window sill cut to appropriate size, weathered
and mounted on & including 30mm thick cement mortar (1:3)
ml 27.36 610.88 16,713.68
7.2.7 bedding. Price includes bullnosing and making water drip as
shown on the detail drawing.

Marble tile flooring to stair case bedded on and including cement


sand mortar mix 1:3 and joints grouted in appropriate color filler
setting coat mortar. Pattern and color of the tile shall be approved
7.2.8 by the Architect.
- Tread size 300x140mm ml 57 5,000.00 283,500.00

- Riser size 170x140mm ml 57 2,500.00 141,750.00

- 20x140mm Marble skirting ml 6 495.12 3,069.74

Supply and fix RAK or equivalent ceramic wall cladding, of


matching colour to floor, stuck to wall with cement sand mortar
1:3 backing and grouting with white cement wash. Mortar
backing measured separately with two coat plastering. Price
shall include rod anchors to backing. Colour and pattern
7.30 according to architect's drawings. m2 37.76 898.40 33,923.58

Apply two coats of plastering in cement mortar (1:3) up to fine


finish. Price shall include pre-cleaning and preparation of the
surface.

7.3.1 a) To internal wall surface m2 371.13 347.95 129,133.29


b) To concrete ceiling m 2
186.06 347.95 64,738.46
c) To exposed column and beams . m 2
313.64 347.95 109,129.85
d) To Staircase soffit m 2
22.70 347.95 7,897.77

final coat Gypsum plastering

a) To internal wall surface m2 371.13 185.00 68,658.31


7.3.2
7.3.2 m2
b) To concrete ceiling 186.06 185.00 34,420.51
c) To exposed column and beams . m 2
313.64 185.00 58,022.77
d) To Staircase soffit m 2
22.70 185.00 4,199.13

Apply two coats of plastering in cement mortar (1.3)to receive


7.3.3 ceramic wall tile. m2 37.76 347.95 13,138.59

Apply two coats of plastering in cement mortar (1.3) to external


wall surface. (Price shall include Scaffolding)
7.3.4 m2 232.15 324.65 75,368.28

TOTAL CARRIED TO SUMMARY ................................................... 1,318,747.22

9. PAINTING
Apply three coats of approved quality paint. Price shall include
pre-cleaning and preparation of surfaces.
a) To internal wall surface m2 371.13 99.00 36,741.47
8.1 m
b) To concrete ceiling 2
186.06 99.00 18,419.62
c) To exposed column and beams . m 2
313.64 99.00 31,050.02
d) To Staircase soffit m 2
22.70 99.00 2,247.10

Apply approved quality Quartz paint for external wall . Price


8.1.1 shall include pre-cleaning and preparation of surfaces. m2 232.15 429.00 99,593.38

TOTAL CARRIED TO SUMMARY ................................................... 188,051.60

10. SANITARY INSTALLATION


8.1.2 SANITARY EQUIPMENT (FIXTURES)
All fixtures which differs from that specified below is subject to
the owner's approval, based on samples, catalogues and
brochures presented below is subject to the owner's approval,
based by the Contractor. Unit Price shall include all the necessary
fixing brackets or hooks and all the necessary assistance civil
works such as chiselling
8.1.3 Supply and fix hand wash basins for cold water discharge only
made of white vitreious china, complete with chrome plated
mixing battery, plug, chrome plated chain holder and ball chain,
P-smell trap with connection pipe and with all other necessary
accessories Size
No 4 7,500.00 30,000.00
8.1.4 Supply and fix wash down water closets made of white vitreous
china with plastic seat and cover including low flush cistern.
Complete with all necessary [Link] :- 760 x 380 x720
mm No 4 10,050.00 40,200.00
8.1.5 Bath Tub with accessories Supply and fix bath from vitreous
enamelled sheet steel. The fixture shall conform to BS1390
orequivalent [Link] with all the necessary
accessories. No 4 4,991.74 19,966.96
Supply and fix approved standard shower tray made of
8.1.6 reinforced fiber glass of 5mm thickness Accessories and Fittings
Including all the necessary acessories.
Size:- 700mm X 700mm No 4.00 5,500.00 22,000.00
8.1.7
Supply and fix slip resistant shower units made of enameled cast
iron or equivalent ,complete with approved quality adjustable
shower head, lever acion cold & hot water mixer/tap/& hanger,
P-smell trap and with all other necessary accessories. No 4 5,500.00 22,000.00
8.1.8 Supply and fix TEKA or Equivalent, 1.2mm GRADE
304 approved standard stainless steel kitchen sink
of Double bowl complete with chrome plated
REMER/JAQUAR or Equivalent cold and hot water
mixing battery (chrome plated faucet), plastic Bell
type smell trap, plug, chain holder, drain pipe, mixing
faucet, etc; and all other [Link] hose
to be REMER/JAQUAR or Equivalent to be Vinyle
coated and should be capable of resisting pressure
of 4 bar.
Size: 1500 x 600 mm No 3 4,000.00 12,000.00
8.1.9 Supply and fix toilet paper holder with chrome plated brass with
wall flange roll and with chrome plated fastening screws and
other accessories. No 4 850.00 3,400.00
8.2 Supply and fix R.A.K. or Equivalent white glazed
vitreous china wall mounting type soap holder with
chrome plated fastening screws and other
accessories. No 4 850.00 3,400.00
8.2.1 Supply and fix crystal glass mirrors for toilets handwash basins
with copper back protection, size 500/400 mm including chrome
plated brass mirror clips with chrome plated screws and etc... for
hand wash basins. No 4 2,050.00 8,200.00
8.2.2 Supply and fix floor drains made of polished steel of approved
quality, complete with P-smell trap and all other necessary
fittings and accessories.
Size:- Dia. 100 mm No 6 1,500.00 9,000.00
8.2.3 Supply and fix water heater made of polished steel of approved
quality, complete with P-smell trap and all other necessary
fittings and accessories.
50 lwh No 3 8,800.00 26,400.00
Supply and fix approved quality Towel Hanger made of chrome
plated copper alloys,single tubular,surrface mounted, bar length
8.2.4
of 600mm near hand wash basin complete with fastening screws
and other accessories.
No 4.00 656.23 2,624.91

WATER TANKS ON STAIR CASE ROOF


Supply and mount Fiber Glass or equivalent roof water tank on
the roof of the stair case as where shown on the drawing. Water
tank shall be reinforced as per the structural engineer
recommendation given on site and shall be provided with a
9.1 minimum of 100 mm high steel stand from roof level. Price shall
include all the necessary pipe connections and all other necessary
accessories.
Capacity: 5000 liters No 1.00 35,345.00 35,345.00
9.1.1 Provide dia. 50 mm vent pipe with cap for each water tank. No 3.00 1,000.00 3,000.00

Provide and install float swich to start on and cut off the ground
9.1.2 pump at a pre determined water level No 3.00 2,400.00 7,200.00

9.1.3 Provide dia. 25 mm overflow pipe ml 10.00 1,250.00 12,500.00

Supply and fix gate valves of approved quality.


a) On pipe inlet point to tank, dia. 40 mm. No 3.00 1,100.00 3,300.00
9.1.4 b) On water tank drain pipe, dia. 40 mm. No 3.00 1,100.00 3,300.00
c) On water distribution pipe after tank, dia. 32 mm NO 6.00 800.00 4,800.00

10) WATER SUPPLY PIPE LINE, AND VALVES


Supply and fix water pipes for cold water shall be PPR pipes,PN
10 to internal water distribution system and be fixed to walls.
with metal [Link] price shall include all assistant civil works
and necessary fitting such as T,bends, Y,reducers,unions,
chiseling & plastering etc. Gate valves and other necessary valves
shall be fixed properly as per the manufacturers instruction and
according to where shown on the drawing. All water pipes shall
be tested at pressure of 10kg/cm2 at the expense of the
[Link]
10.1 Supply and install ppr pipes to internal water distribution system
as shown on the drawing. Complete with all the necessary
accessories.
10.2 Dia. 20 mm ml 32 210.67 6,741.44
10.3 Supply and install HDEPE(PN-16)32mm diameter pipe to
external water distribution
Dia. 20 mm ml 20 450.00 9,000.00

Supply and fix PPR service valves of approved


standard, capable of resisting PN-10 on internal
branch and pipe inlet to toilet, kitchen, bath room,
etc; of the following size and as where shown on the
10.4 drawing. The gate valves should be compatible with
PPR pipe on internal and external branch pipes, at
inlet points to the building,
Dia. 20 mm No 30 356.64 10,699.20

WASTE WATER AND RAIN WATER SYSTEM


All internal domestic waste pipe lines shall be PVC pipes and
shall be provided with a minimum slope of 2% towards the
outlet. All PVC pipes and necessary fittings shall be standard
quality and shall be free from damage during storage,
11 construction and etc Unit price shall include all the necessary
assistance civil works, such as excavation and cartaway, fixing or
hanging to walls, beams and etc., necessary fittings such as bends,
Y, T, and storm water PVC pipes shall resist the external
temperature and the quality shall meet the purpose.

11.1 Supply and lay internal PVC waste pipes according to where
shown on the drawings. Complete with all the necessary fittings.

Dia '' 50 " ml 27 130.00 3,510.00


Dia " 110 " ml 10 300.00 3,000.00
11.2 construct septick tanks out of store masonary walls, reinforced
concrete bottom and top slabs , reinforced and concrte manhole
covers. The work shall be carried out in accordance with the
structural and sanitary drawings. Price shall including excavation
of pit caet away and bakfilling

3500*2450*3450
No. 1 70,000.00 70,000.00
11.3 Construct manholes on a sanitary sewerlines, in precast concrete
round pipes with reinforced concrete bottom and cover slabs.
Price shall include excavation, cart away, and all other civil
assistant works.
a) On waste water sewer lines with dia 150 mm thick bottom
slab and 120 mm cover slab reinforced with dia. 10 c/c 150 mm
both ways.
Dia. 160 mm, average depth 800 mm No 1 5,100.00 5,100.00
9.6 PUMPS AND ACCESSORIES

Supply,fix,test and commission approved quality centrifugal


domestic water pumps as per the manufacturer's instruction,
technical specification and drawing [Link] shall include all
the necessary valves(one-way and stop valves) level switch to
protect dry-running. (one stand-by)

Duty and Stand-by


Capacity : Discharge = 8 liters/second
Total head = 7 meters
Estimated power = 2Kw
Efficiency > 70%

- Control Panel (IP 55) to IEE Regulations incorporating the


following:

Indicators for - Power on, Pump tripped, High pressure, Low


pressure, Low water Hand (off), Lack of water and Auto selector
switch for each pump including all the necessary accessories. Set 1 42,000.00 42,000.00
9.6.1 Supply and fix fire extingushers of approved standard as will be
constructed on site.

Capacity: 9-12 kg of carbondioxide


No 4 13,650.00 54,600.00

TOTAL CARRIED TO SUMMARY ...... 473,287.51


11. ELECTRICAL INSTALLATION
12.01 Supply and install :-
12.02 BY EEPCO (PROVISIONAL) Ls 1.00 70,000.00 70,000.00
12.03 Power & Tele Intakes (Provisional Quality)
Power Intake Manhole in bricks and with concrete base internally
12.04
of 60x60x70cm including concrete cover with lifting hole. No 1.00 5,100.00 5,100.00

Tele phone line Intake Manhole in bricks and with concrete base
12.05 internally of 100x100x100cm including concrete cover with lifting
hole. No 1.00 13,600.34 13,600.34
12.06 PVC pipes.
12.07 50 mm diameter. ml 12.00 132.50 1,590.00

12.08 Low Voltage System Earthing


12.09 16 x 2400 mm earth rod. No 1.00 8,000.00 8,000.00
1x70 sq mm bare copper earth conductor from MDB,earthing
12.1
terminal to earth rod in PVC pipe 32mm diameter. ml 16.00 455.00 7,280.00

12.11 Low Voltage Switch Board


Main Switch Boards (MDB-GF) in sheet steel enclosure Floor
Standing with lockable door Including bus bars of 40 Amp 3
Phase [Link] and earth bars Connection Terminals
Complete and Consisting of:-

a) 3 pcs 10 A, MCB, 1phase


b) 5 pcs 16 A, MCB, 1Phase
c) 1 pcs 20 A, MCB, 1phase
12.12
d) 2 pcs 25 A, MCB, 3Phase
e) 3 pcs signal lamp
f) 1 pc voltmeter (0-500V) with selector switch
g) 3 pcs ammeter (0-100A) with transformer
h) 1 pc Frequency meter
complete with bus bar system of 4000A and 25% reserve space.
No 1.00 95,000.00 95,000.00
12.13 Distribution Boards
Flush mounted distribution Board, SDB-1F in sheet steel
enclosure with lockable door and including bus bars of 25
12.14
Amp/3 Phase, all necessary fixing and connecting accessories,
complete and consisting:-

a) 2 pcs 10A, MCB,1Phase


b) 4 pcs 16A, MCB, 1Phase No 1.00 20,000.00 20,000.00
Flush mounted distribution Board, SDB-2F in sheet steel
enclosure with lockable door and including bus bars of 25
Amp/1Phase, all necessary fixing and connecting accessories,
12.15 complete and consisting:-

a) 2 pcs 10 A, MCB,1Phase
b) 7 pcs 16A, MCB,1Phase
c) 1 pcs 20A, MCB,1Phase
d) 1 pcs 25A, MCB,1Phase No 1.00 20,000.00 20,000.00

12.16 Feeder Cables & Pipes


Multi-Core Power Cable Copper conductor PVC Color coded in
PVC Conduits Connected and Tested All as Specified and as
Shown on Drawings:-

12.17 a) (5*16)mm Sq. from MDB to SDB/GF ml 19.00 1,700.00 32,300.00


12.18 b) (5*6)mm Sq. from MDB to SDB/2F ml 25.00 1,400.00 35,000.00
12.9 d) (3x4)mm sq. from MDB to 1STF ml 22.00 1,200.00 26,400.00

12.2 Light Points


Flush mounted light points fed through PVC insulated
conductors of 2x2.5mm2 inside PVC conduits of 16mm diameter,
including junction boxes with covers and insulating screw cap
connectors, complete

12.21 Flush mounting single switch. No 7.00 1,200.00 8,400.00


12.22 Flush mounting Two Way switch. No 8.00 1,400.00 11,200.00
12.23 Flush mounting Double one way switch. No 20.00 1,500.00 30,000.00

12.24 Flush Mounted Socket Outlet Points

10-16A/1P socket outlet points fed through PVC insulated


conductors of 3x2.5mm2 inside PVC conduit of 16mm diameter
12.25
including junction boxes with covers and insulating screw cap
connectors.
NO 39.00 1,600.00 62,400.00
16A,Socket out point for Water heater with wire 3x2.5mmSq.
12.26
Fixed 1800mm above finished floor level. No 17.00 2,000.00 34,000.00

20 A,Socket out point for Stove with wire 3x4mmSq. Fixed


12.27
1800mm above finished floor level. No 15.00 1,800.00 27,000.00

Telephone/Data System
Telephone System only conduits of 50/32/20 mm diameter
pulling wire, boxes, terminals all as shown on drawings
12.80
RJ 11 outlet type LEGRAND 74341 category 5E with 4 contacts
No 10.00 1,000.00 10,000.00

12.9 Tv System
Tv System conduits of 19/32mm diameter pulling wire, boxes,
terminals all as shown on drawings No 8.00 1,000.00 8,000.00

Light Fittings and Lamps


Connected and tested including lamps and accessories complete,
all as specified or described in lighting fittings schedule and as
12.3 shown on the drawings.
N.B:- Recommended types of fitting indicated on the attached
lighiting fitting schedule or approved equivalent

Light Fittings and Lamps Complete


MASSIVE 32005/31/10 with E27 MAX WALL MOUNTED 60W
12.33
Lamp No 24.00 5,115.00 122,760.00
12.34 MASSIVE 32005/31/10 with E27 MAX 75 W Lamp No 19.00 5,115.00 97,185.00
12.35 PHILIPS TCW 098 236 C3 with 2 X 36W LAMP No 6.00 5,520.00 33,120.00
12.34 SUSPENDED LIGHT FOR SALON NO 3.00 19,800.00 59,400.00

TOTAL CARRIED SUMMARY TO ELECTRICAL WORK ...... 837,735.34


PROJECT B+G+1 RESIDENTIAL
CLIENT
CONSULTANT
CONTRUCTOR
BILL OF QUANTITY

Item No. Description of Work Unit Contract Qty

A . SUB – STRUCTURE
[Link] & Earth Works

1.1 Site clearing and removing the top 20cm thick soil. m2 171.36

Bulk Excavation in ordinary soil to a depth not exceeding 100cm


1.2 from reduced ground level. m3 695.42

pit Excavation in ordinary soil for for isolated and strap footing to

1.3 average depth not exceeding 250 cm from reduced ground level m3 119.65
Excavation in ordinary soil for trench foundation to average
1.4 depth not exceeding 145 cm from reduced ground level m3 42.36

Fill around footing and foundation column to maintain the


desired level with selected borrowed non expansive material and
compact by using rammer in layers not exceeding 20cm.
1.5 m3 105.33

Fill around stone masonary to maintain the desired level with


selected borrowed non expansive material and compact by using
1.6 rammer in layers not exceeding 20cm. m3 27.75

Backfill under hard core with non expansive selected material and
compact by 14ton drum roller in layers not exceeding 20cm thick
by sprinkling water to insure 95% modified AASHTO dry
1.7 density. m3 12.02

Cart away surplus excavated material to a distance not exceeding


1.8 5kms. m3 891.70
25cm thick sound basaltic or equivalent stone hard core finished
and blinded with crushed stone.
1.9 m2 60.10

TOTAL CARRIED TO SUMMARY ...................................................

2. CONCRETE WORK
Particular attention must be given to the following notes along
with the technical Specification and Method of Mesurnment
prepared by BaTCoDA.

Constituents of concrete:

The quality of ingredients of concrete must fulfill the


requirements,concrete trial mixes shall be done and certified by
laboratory test result before casting of structural [Link]
concrete casting samples should be taken for laboratory test.
2.1

Concrete:
The specified concrete strength must be confirmed by laboratory
test.

Reinforcement bar:
The specified yield strength and other related properties of
reinforcement bar must be certified either by manufacturer's
catalogue/manual or/and by laboratory test.

5cm thick lean concrete in C-7 with minimum PPC cement


content of 150kg/m3 of concrete under:
a) under footing pad m2 26.04
b) under gread beam m 2
3.50
c) under Stone masonary m 2
20.25
Reinforced concrete according to structural drawing, (with a 28
day 15cm cube crushing strength of 20Mpa for C20 ,25Mpa for C-
25 and 30Mpa for C-30 ), cast into formwork and vibrated Around
2.2 rod reinforcement bars.(formwork & reinforcement bars are
measured Separately.)in:''Type of cement to be ordinary portland
cement(OPC)''

a) footing m3 11.42
b) foundation column m 3
1.86
c) basment column m 3
2.42
d) shear wall m 3
9.66
e) basment beam m 3
6.11
f) ground beam m3 5.70
g) basment slab m 2
52.82
h) 10 thick ground floor slab m 2
60.10
i) stair case m 2
3.49

2.3 Sawn zigba wood formwork for:

a) footing m2 28.80
b) foundation column m2 19.84
c) basment column m 2
32.76
d) shear wall m 2
129.64
e) basment beam m 2
48.46
f) ground beam m 2
91.34
g) 10 thick ground floor slab m 2
52.82
h) stair case m 2
22.03

Reinforcemnet steel bars according to structural [Link]


includes cutting,bending,placing in position and tying wires.
2.4
a) dia.8mm deformed bar kg 1,394.12
b) dia.10mm deformed bar kg 743.77
c) dia.12mm deformed bar kg 793.33
d) dia.14mm deformed bar kg 1,937.95
e) dia.16mm deformed bar kg 929.57
f) dia.20mm deformed bar kg 0.00

TOTAL CARRIED TO SUMMARY ...................................................

3. MASNORY WORK
50cm thick stone masonary foundation below ground level
3.1 bedded in cement mortar(1:3) in full joints. m3 23.92

TOTAL CARRIED TO SUMMARY ...................................................

B. SUPER – STRUCTURE

1. CONCRETE WORK
Particular attention must be given to the following notes along
with the technical Specification and Method of Mesurnment
prepared by BaTCoDA.
Constituents of concrete:

The quality of ingredients of concrete must fulfill the


requirements,concrete trial mixes shall be done and certified by
laboratory test result before casting of structural [Link]
concrete casting samples should be taken for laboratory test.

Concrete:

The specified concrete strength must be confirmed by laboratory


test.
Reinforcement bar:

The specified yield strength and other related properties of


reinforcement bar must be certified either by manufacturer's
catalogue/manual or/and by laboratory test.
Reinforced concrete according to structural drawing, (with a 28
day 15cm cube crushing strength of 25 for C-25 and 30Mpa for C-
30 ), cast into formwork and vibrated Around rod reinforcement
bars.(formwork & reinforcement bars are measured
Separately.)in:''Type of cement to be ordinary portland
cement(OPC)''
1.1
a) elevation column m3 4.41
b) floor beam m 3
10.85
c) floor slab m 2
56.72
d) water tanker slab m3 10.54
e) stair case m3 6.99

1.20 Sawn zigba wood formwork for:

a) elevation column m2 63.37


b) floor beam m 2
126.17
c) floor slab m 2
56.72
d) water tanker slab m2 10.54
e) stair case m2 44.06

Reinforcemnet steel bars according to structural [Link]


1.3
includes cutting,bending,placing in position and tying wires.

a) dia.6mm deformed bar kg 0.00


b) dia.8mm deformed bar kg 1,176.37
c) dia.10mm deformed bar kg 212.84
d) dia.12mm deformed bar kg 151.18
e) dia.14mm deformed bar kg 956.54
f) dia.16mm deformed bar kg 2,066.75
g) dia.20mm deformed bar kg 0.00

TOTAL CARRIED TO SUMMARY ...................................................

2. BLOCK WORK
Class C, 200mm thick HCB wall with the designed compressive m2
2.1 strength , bedded in cement mortar (1:3). 232.15

2.2 Ditto as item 2.1 but 10mm thick m2 69.49

TOTAL CARRIED TO SUMMARY ...................................................


3. ROOFING
Decra roof covering in G-28 including roof ridge cove fixed to
3.01 zigba wood purlins at c/c 30cm (roof cover measur in projection M2 74.40
purlin m/s
All structural members each truss shall be firmly fixed concrete
3.02
beam with diameter 6mm plain bar
a) Eucalyptus truss upper &lower chord DIA 10cm ML 82.07

b) Vertical and diagonal members DIA 6-8cm ML 25.61


c) 5*7 cm swan zigba wood purlin placed at c/c 90 cm ML 276.00
d) 4*5 cm celling buttan placed at c/c 60 cm ML 438.92
ML
Rectangular section down pipe flashing made G-28 with
3.03 ML 12.00
necesssary offsets properly fixed as shown on the drawings
75 mm diametere PVC Down pipes attached to external wall
3.04 surface with leader straps c/c 80 cm, and finally painted with two ML 12.00
coate fo syntetic paint.

TOTAL CARRIED TO SUMMARY ..........................................................................................

4. WATER PROOFING WORK


SPECIAL CHARACTERSTICS

Surface Preparation: Concrete surface must be clean and free of


dirt, films, coatings or other foreign matter. All surface
imperfections and protrusions are to be removed and repaired.
Structurally unsound and friable concrete must be removed and
repaired.
Responsibility: the contractor should provide the approved
product on site; store it properly in original unopened packing in
dry condition and away from sunlight and scorching heat. In
addition the application should be made with professionals
trained in the preparation, mixing and application.

Testing: Pond testing for atleast 24 hours should be done after the
contructor has acomplished the water proffing work. The surface
should be re-treated if leakage observed; and the test should be
done on the repaired surface.

Supply and coat XYPEX or Equivalent water proofing


as per manufacturers instruction for all wet areas,
toilets kichen, etc as per Engineer's instruction. The
contractor must consider the work as complete set and
3.10
provide appropriate measures for the connection b/n
pipes and concrete slab. After the completion of the
work the contractor should do ponding test using water
at level of 20cm from floor finish level for atleast 24
hours. M2 28.25

TOTAL CARRIED TO SUMMARY ...................................................

5. CARPENTRY AND JOINERY


Note: wood works include painting, varnishing, polishing oiling
& the like.
Supply and install clinical wooden door as per the schedule,
material HDF (High density fiberboard) chipping pine wood,
synthetic-resin bound or factory pre-finished water proof boards.
With matt covering paint system and finished with high glossy
varnish paint system. Price shall include all corrosion proof
accessories.
A. Doors
D1 size 90cm x 230 cm pcs 8.00
4.01
D2 size 80cm x 230cm pcs 9.00

TOTAL CARRIED TO SUMMARY ...................................................

6. ALUMINUM & METAL WORK


aluminum windows made of Aluminum tubular profile frames
ALLCO-5 or equivalent, 1.4mm thick with 6mm glasss according
to the detail drawing and window door schedule . Complete
work includes all the necessary .All aluminum windows and
doors type shall be approved by the Engineer.
5.1.1

Window
a) Type W1 size = 900x 1000 mm Pcs 7.00
b) Type W2 size = 2440 x 1000mm Pcs 1.00
c) Type Wd3 size =1620 x 2200mm Pcs 1.00
d) Type W4 size = 2440 x1700 mm Pcs 1.00
5.1.2 e) Type Wd5 size = 3130 x2200 mm Pcs 1.00
f) Type Wd6 size = 1650 x2200 mm Pcs 1.00
g) Type W7 size = 900 x1650 mm Pcs 3.00
h) Type W8 size = 2400 x1700 mm Pcs 2.00
i) Type W9 size = 2200 x1700 mm Pcs 1.00

Supply & fix 100x50mm Wooden Hand rail to stair case screwed
to 100x50mm wooden ballustrade placed c/c 300mm bolted with
2(60x60x5x100)mm angle iron anchored to concrete treads and
including 100x50mm Wooden bottom rail in single row screwed
5.1.3 to Wooden ml 20.00

Supply & fix 100x50mm Wooden Guard rail to balcony screwed


to 100x50mm wooden ballustrade placed c/c 150mm bolted with
2(60x60x5x100)mm angle iron anchored to concrete slab and
including 100x50mm Wooden bottom rail in single row screwed
5.1.4 to Wooden ball. ml 24.00
TOTAL CARRIED TO SUMMARY ...................................................
7. GLASS & GLAZING

5mm thick clear glass glazed with beads, rubber gasket and
6.0.1 M2 43.46
sealant to Almunium profile frames.

TOTAL CARRIED TO SUMMARY ...................................................

8. FINISHING
50mm thick cement sand screed smoothly finished flooring in
mortar mix (1:3).
7.1
a)To receive pvc floor tile m2 175.33
b) To receive marble till m2 34.82

10mm thick imported type approved quality pvc tile flooring


stuck down with approved type adhesive on cement sand screed
7.2 floor finish and joints grouted in appropriate color setting coat
mortar. Color and pattern of tile shall be approved by the
Engineers. m2 183.27

10x100mm high pvc skirting stuck to wall with approved type of


7.2.1 ml 105.12
adhesive.

20*30 mm marble window sill cut to appropriate size, weathered


and mounted on & including 30mm thick cement mortar (1:3)
ml 27.36
7.2.7 bedding. Price includes bullnosing and making water drip as
shown on the detail drawing.

Marble tile flooring to stair case bedded on and including cement


sand mortar mix 1:3 and joints grouted in appropriate color filler
setting coat mortar. Pattern and color of the tile shall be approved
7.2.8 by the Architect.
- Tread size 300x140mm ml 57

- Riser size 170x140mm ml 57

- 20x140mm Marble skirting ml 6

Supply and fix RAK or equivalent ceramic wall cladding, of


matching colour to floor, stuck to wall with cement sand mortar
1:3 backing and grouting with white cement wash. Mortar
backing measured separately with two coat plastering. Price
shall include rod anchors to backing. Colour and pattern
7.30 according to architect's drawings. m2 37.76

Apply two coats of plastering in cement mortar (1:3) up to fine


finish. Price shall include pre-cleaning and preparation of the
surface.

7.3.1 a) To internal wall surface m2 371.13


b) To concrete ceiling m 2
186.06
c) To exposed column and beams . m2 313.64
d) To Staircase soffit m 2
22.70

final coat Gypsum plastering

a) To internal wall surface m2 371.13


7.3.2 m
b) To concrete ceiling 2
186.06
c) To exposed column and beams . m 2
313.64
d) To Staircase soffit m 2
22.70

Apply two coats of plastering in cement mortar (1.3)to receive


7.3.3 ceramic wall tile. m2 37.76

Apply two coats of plastering in cement mortar (1.3) to external


wall surface. (Price shall include Scaffolding)
7.3.4 m2 232.15

TOTAL CARRIED TO SUMMARY ...................................................


9. PAINTING
Apply three coats of approved quality paint. Price shall include
pre-cleaning and preparation of surfaces.
a) To internal wall surface m2 371.13
8.1 m
b) To concrete ceiling 2
186.06
c) To exposed column and beams . m 2
313.64
d) To Staircase soffit m 2
22.70

Apply approved quality Quartz paint for external wall . Price


8.1.1 shall include pre-cleaning and preparation of surfaces. m2 232.15

TOTAL CARRIED TO SUMMARY ...................................................

10. SANITARY INSTALLATION


8.1.2 SANITARY EQUIPMENT (FIXTURES)
All fixtures which differs from that specified below is subject to
the owner's approval, based on samples, catalogues and
brochures presented below is subject to the owner's approval,
based by the Contractor. Unit Price shall include all the necessary
fixing brackets or hooks and all the necessary assistance civil
works such as chiselling
8.1.3 Supply and fix hand wash basins for cold water discharge only
made of white vitreious china, complete with chrome plated
mixing battery, plug, chrome plated chain holder and ball chain,
P-smell trap with connection pipe and with all other necessary
accessories Size
No 4
8.1.4 Supply and fix wash down water closets made of white vitreous
china with plastic seat and cover including low flush cistern.
Complete with all necessary [Link] :- 760 x 380 x720
mm No 4
8.1.5 Bath Tub with accessories Supply and fix bath from vitreous
enamelled sheet steel. The fixture shall conform to BS1390
orequivalent [Link] with all the necessary
accessories. No 4
Supply and fix approved standard shower tray made of
8.1.6 reinforced fiber glass of 5mm thickness Accessories and Fittings
Including all the necessary acessories.
Size:- 700mm X 700mm No 4.00
8.1.7
Supply and fix slip resistant shower units made of enameled cast
iron or equivalent ,complete with approved quality adjustable
shower head, lever acion cold & hot water mixer/tap/& hanger,
P-smell trap and with all other necessary accessories. No 4
8.1.8 Supply and fix TEKA or Equivalent, 1.2mm GRADE
304 approved standard stainless steel kitchen sink
of Double bowl complete with chrome plated
REMER/JAQUAR or Equivalent cold and hot water
mixing battery (chrome plated faucet), plastic Bell
type smell trap, plug, chain holder, drain pipe, mixing
faucet, etc; and all other [Link] hose
to be REMER/JAQUAR or Equivalent to be Vinyle
coated and should be capable of resisting pressure
of 4 bar.
Size: 1500 x 600 mm No 3
8.1.9 Supply and fix toilet paper holder with chrome plated brass with
wall flange roll and with chrome plated fastening screws and
other accessories. No 4
8.2 Supply and fix R.A.K. or Equivalent white glazed
vitreous china wall mounting type soap holder with
chrome plated fastening screws and other
accessories. No 4
8.2.1 Supply and fix crystal glass mirrors for toilets handwash basins
with copper back protection, size 500/400 mm including chrome
plated brass mirror clips with chrome plated screws and etc... for
hand wash basins. No 4
8.2.2 Supply and fix floor drains made of polished steel of approved
quality, complete with P-smell trap and all other necessary
fittings and accessories.
Size:- Dia. 100 mm No 6
8.2.3 Supply and fix water heater made of polished steel of approved
quality, complete with P-smell trap and all other necessary
fittings and accessories.
50 lwh No 3
Supply and fix approved quality Towel Hanger made of chrome
plated copper alloys,single tubular,surrface mounted, bar length
8.2.4
of 600mm near hand wash basin complete with fastening screws
and other accessories.
No 4.00

WATER TANKS ON STAIR CASE ROOF


Supply and mount Fiber Glass or equivalent roof water tank on
the roof of the stair case as where shown on the drawing. Water
tank shall be reinforced as per the structural engineer
recommendation given on site and shall be provided with a
9.1 minimum of 100 mm high steel stand from roof level. Price shall
include all the necessary pipe connections and all other necessary
accessories.
Capacity: 5000 liters No 1.00

9.1.1 Provide dia. 50 mm vent pipe with cap for each water tank. No 3.00

Provide and install float swich to start on and cut off the ground
9.1.2 pump at a pre determined water level No 3.00

9.1.3 Provide dia. 25 mm overflow pipe ml 10.00

Supply and fix gate valves of approved quality.


a) On pipe inlet point to tank, dia. 40 mm. No 3.00
9.1.4 b) On water tank drain pipe, dia. 40 mm. No 3.00
c) On water distribution pipe after tank, dia. 32 mm NO 6.00

10) WATER SUPPLY PIPE LINE, AND VALVES


Supply and fix water pipes for cold water shall be PPR pipes,PN
10 to internal water distribution system and be fixed to walls.
with metal [Link] price shall include all assistant civil works
and necessary fitting such as T,bends, Y,reducers,unions,
chiseling & plastering etc. Gate valves and other necessary valves
shall be fixed properly as per the manufacturers instruction and
according to where shown on the drawing. All water pipes shall
be tested at pressure of 10kg/cm2 at the expense of the
[Link]
10.1 Supply and install ppr pipes to internal water distribution system
as shown on the drawing. Complete with all the necessary
accessories.
10.2 Dia. 20 mm ml 32
10.3 Supply and install HDEPE(PN-16)32mm diameter pipe to
external water distribution
Dia. 20 mm ml 20

Supply and fix PPR service valves of approved


standard, capable of resisting PN-10 on internal
branch and pipe inlet to toilet, kitchen, bath room,
etc; of the following size and as where shown on the
10.4 drawing. The gate valves should be compatible with
PPR pipe on internal and external branch pipes, at
inlet points to the building,
Dia. 20 mm No 30

WASTE WATER AND RAIN WATER SYSTEM


All internal domestic waste pipe lines shall be PVC pipes and
shall be provided with a minimum slope of 2% towards the
outlet. All PVC pipes and necessary fittings shall be standard
quality and shall be free from damage during storage,
11 construction and etc Unit price shall include all the necessary
assistance civil works, such as excavation and cartaway, fixing or
hanging to walls, beams and etc., necessary fittings such as bends,
Y, T, and storm water PVC pipes shall resist the external
temperature and the quality shall meet the purpose.

11.1 Supply and lay internal PVC waste pipes according to where
shown on the drawings. Complete with all the necessary fittings.
11.1

Dia '' 50 " ml 27


Dia " 110 " ml 10
11.2 construct septick tanks out of store masonary walls, reinforced
concrete bottom and top slabs , reinforced and concrte manhole
covers. The work shall be carried out in accordance with the
structural and sanitary drawings. Price shall including excavation
of pit caet away and bakfilling

3500*2450*3450
No. 1
11.3 Construct manholes on a sanitary sewerlines, in precast concrete
round pipes with reinforced concrete bottom and cover slabs.
Price shall include excavation, cart away, and all other civil
assistant works.
a) On waste water sewer lines with dia 150 mm thick bottom
slab and 120 mm cover slab reinforced with dia. 10 c/c 150 mm
both ways.
Dia. 160 mm, average depth 800 mm No 1
9.6 PUMPS AND ACCESSORIES

Supply,fix,test and commission approved quality centrifugal


domestic water pumps as per the manufacturer's instruction,
technical specification and drawing [Link] shall include all
the necessary valves(one-way and stop valves) level switch to
protect dry-running. (one stand-by)

Duty and Stand-by


Capacity : Discharge = 8 liters/second
Total head = 7 meters
Estimated power = 2Kw
Efficiency > 70%

- Control Panel (IP 55) to IEE Regulations incorporating the


following:

Indicators for - Power on, Pump tripped, High pressure, Low


pressure, Low water Hand (off), Lack of water and Auto selector
switch for each pump including all the necessary accessories. Set 1
9.6.1 Supply and fix fire extingushers of approved standard as will be
constructed on site.

Capacity: 9-12 kg of carbondioxide


No 4

TOTAL CARRIED TO SUMMARY ......


11. ELECTRICAL INSTALLATION
12.01 Supply and install :-
12.02 BY EEPCO (PROVISIONAL) Ls 1.00

12.03 Power & Tele Intakes (Provisional Quality)


Power Intake Manhole in bricks and with concrete base internally
12.04
of 60x60x70cm including concrete cover with lifting hole. No 1.00

Tele phone line Intake Manhole in bricks and with concrete base
12.05 internally of 100x100x100cm including concrete cover with lifting
hole. No 1.00
12.06 PVC pipes.
12.07 50 mm diameter. ml 12.00

12.08 Low Voltage System Earthing


12.09 16 x 2400 mm earth rod. No 1.00

1x70 sq mm bare copper earth conductor from MDB,earthing


12.1
terminal to earth rod in PVC pipe 32mm diameter.
ml 16.00

12.11 Low Voltage Switch Board


Main Switch Boards (MDB-GF) in sheet steel enclosure Floor
Standing with lockable door Including bus bars of 40 Amp 3
Phase [Link] and earth bars Connection Terminals
Complete and Consisting of:-

a) 3 pcs 10 A, MCB, 1phase


b) 5 pcs 16 A, MCB, 1Phase
c) 1 pcs 20 A, MCB, 1phase
12.12
d) 2 pcs 25 A, MCB, 3Phase
e) 3 pcs signal lamp
f) 1 pc voltmeter (0-500V) with selector switch
g) 3 pcs ammeter (0-100A) with transformer
h) 1 pc Frequency meter
complete with bus bar system of 4000A and 25% reserve space.
No 1.00
12.13 Distribution Boards

Flush mounted distribution Board, SDB-1F in sheet steel


enclosure with lockable door and including bus bars of 25
12.14
Amp/3 Phase, all necessary fixing and connecting accessories,
complete and consisting:-

a) 2 pcs 10A, MCB,1Phase


b) 4 pcs 16A, MCB, 1Phase No 1.00
Flush mounted distribution Board, SDB-2F in sheet steel
enclosure with lockable door and including bus bars of 25
Amp/1Phase, all necessary fixing and connecting accessories,
12.15 complete and consisting:-

a) 2 pcs 10 A, MCB,1Phase
b) 7 pcs 16A, MCB,1Phase
c) 1 pcs 20A, MCB,1Phase
d) 1 pcs 25A, MCB,1Phase No 1.00

12.16 Feeder Cables & Pipes


Multi-Core Power Cable Copper conductor PVC Color coded in
PVC Conduits Connected and Tested All as Specified and as
Shown on Drawings:-

12.17 a) (5*16)mm Sq. from MDB to SDB/GF ml 19.00


12.18 b) (5*6)mm Sq. from MDB to SDB/2F ml 25.00
12.9 d) (3x4)mm sq. from MDB to 1STF ml 22.00

12.2 Light Points


Flush mounted light points fed through PVC insulated
conductors of 2x2.5mm2 inside PVC conduits of 16mm diameter,
including junction boxes with covers and insulating screw cap
connectors, complete

12.21 Flush mounting single switch. No 7.00


12.22 Flush mounting Two Way switch. No 8.00
12.23 Flush mounting Double one way switch. No 20.00

12.24 Flush Mounted Socket Outlet Points

10-16A/1P socket outlet points fed through PVC insulated


conductors of 3x2.5mm2 inside PVC conduit of 16mm diameter
12.25
including junction boxes with covers and insulating screw cap
connectors.
NO 39.00
16A,Socket out point for Water heater with wire 3x2.5mmSq.
12.26
Fixed 1800mm above finished floor level. No 17.00

20 A,Socket out point for Stove with wire 3x4mmSq. Fixed


12.27
1800mm above finished floor level. No 15.00

Telephone/Data System
Telephone System only conduits of 50/32/20 mm diameter
pulling wire, boxes, terminals all as shown on drawings
12.80
RJ 11 outlet type LEGRAND 74341 category 5E with 4 contacts
No 10.00

12.9 Tv System
Tv System conduits of 19/32mm diameter pulling wire, boxes,
terminals all as shown on drawings No 8.00

Light Fittings and Lamps


Connected and tested including lamps and accessories complete,
all as specified or described in lighting fittings schedule and as
12.3 shown on the drawings.
N.B:- Recommended types of fitting indicated on the attached
lighiting fitting schedule or approved equivalent

Light Fittings and Lamps Complete


MASSIVE 32005/31/10 with E27 MAX WALL MOUNTED 60W
12.33
Lamp No 24.00
12.34 MASSIVE 32005/31/10 with E27 MAX 75 W Lamp No 19.00
12.35 PHILIPS TCW 098 236 C3 with 2 X 36W LAMP No 6.00
12.34 SUSPENDED LIGHT FOR SALON NO 3.00

TOTAL CARRIED SUMMARY TO ELECTRICAL WORK ......


PROJECT :- B+G+1 RESIDENCE BUILDING
CLIENT :-
CONSULTANT :-
contractor:-
Takeoff Sheet - 1
EXCAVATION & EARTH WORKS

Tims. Dim. Result Description

A - SUB STRUCTURE
1- EXCAVATION & EARTH WORKS

1.1 Site clerance of top soil


on Axis 1 - 4 b/n A- D
1 14.40 L = 1+12.40+1= 14.40
11.90 W = 1+9.9+1 = 11.9
171.36 m²

171.36 m² total site clearing

1.2 Bulk Excavation of above reduced level


on Axis A - D & 1-4
1 11.60 L = 0.5+12.40+0.5= 14.40
10.90 L = 0.5+12.40+0.5= 14.40
5.50 D[avg.]= 2.70
695.42 m³

695.42 m³ total bulk excavation

1.3 Excavation for footing


#Footing F1
3 1.90 Lexc= 1.4 + 2*0.25 = 1.9
1.90 Wexc= 1.4+ 2*0.25 = 1.9
2.50 D[avg.]= 2.5
27.08 m³
#Footing F2
7 2.30 Lexc= 1.8 + 2*0.25 = 1.9
2.30 Wexc= 1.8+ 2*0.25 = 1.9
2.50 D[avg.]= 2.5
92.58 m³

119.65 m³ total pit excavation


1.4 Treanch Excavation
on Axis A b/n 1 - 2
2 5.03 L =5.630-(0.3*2)
0.90 W[avg.]=0.2+0.5+0.2=0.9
1.45 D[avg.]=1.45
13.13 m³

on Axis 1 b/n A-D


2 11.20 L =12.40-(0.4*4)
0.90 W[avg.]=0.2+0.5+0.2=0.9
1.45 D[avg.]= 1.45
29.23 m³

42.36 m³ total trench excavation

1.5 back fill around footing pad & footing column


concrete for footing
#Footing F1
3 1.40 Lexc= 1.4
1.40 Wexc= 1.4
0.40 D[avg.]= 2.5
2.35 m³
#Footing F2
7 1.90 Lexc= 1.4
1.90 Wexc= 1.4
0.40 D[avg.]= 2.5
10.11 m³

-12.46 m³ total concrete for footing

Concrete for foundation column


#C1
1 0.40 L = 0.40
0.30 W = 0.30
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
0.19 m³
#C2
3 0.40 L = 0.30
0.30 W = 0.30
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
0.56 m³
#C3
3 0.40 L = 0.30
0.30 W = 0.30
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
0.56 m³
#C4
3 0.40 L = 0.40
0.30 W = 0.30
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
0.56 m³

-1.86 m³

119.65 m³ - total exc for isolated footing


-12.46 m³ - total didt for isolated footing pad concrete
-1.86 m³ - total didt for footing column concrete

105.33 m³ - total back fill for isolated footing

1.6 - Fill around masonry


42.36 m³ - total exc for treanch
-14.61 m³ - total didt for masnory work
.
27.75 m³ - total back fill around masnory work
1.7- Fill below hard core
on Axis 1&2 b/n Axis A&B
1 3.44 L=3.64-0.20
5.23 W=5.630-(0.2*2)
0.20 D=0.20
3.60 m³

on Axis B & C b/n Axis 1 - 2


1 3.33 L=3.530-0.20=2.30
5.23 W=5.63-(0.20*2)=11.35
0.20 D=0.20
3.48 m³
on Axis C & D b/n Axis 1 - 2
1 3.33 L=3.470-0.20=2.30
5.23 W=5.63-(0.20*2)=11.35
0.20 D=0.20
3.48 m³
on Axis stair
1 2.80 L=3-0.20=2.80
2.60 W=3-(0.20*2)
0.20 D=0.20
1.46 m³

12.02 m³ total back fill under hard core

1.8 - cart away unnecessary soil


1 171.36
0.2
34.27 total site clerance
695.42 bulk excavation
119.65 pit excavation
42.36 treanch excavtion
891.70 m³ - total cart away
1.9 - Hard core
on Axis 1&2 b/n Axis A&B
1 3.44 L=3.64-0.20
5.23 W=5.630-(0.2*2)
17.99 m²

on Axis B & C b/n Axis 1 - 2


1 3.33 L=3.530-0.20=2.30
5.23 W=5.63-(0.20*2)=11.35
17.42 m²
on Axis C & D b/n Axis 1 - 2
1 3.33 L=3.470-0.20=2.30
5.23 W=5.63-(0.20*2)=11.35
17.42 m²
on Axis stair
1 2.80 L=3-0.20=2.80
2.60 W=3-(0.20*2)
7.28 m²

60.10 m² total hard core

3.1 - masonry work

on Axis A' b/n 1 - 4


2 9.10 L = (3.6-(0.1+0.1))+(2.5-(0.1+0.1))+(3.6-(0.1+0.1))=9.1
0.50 W = 0.50
1.45 D[avg.]= 1.45
13.19 m³

on Axis A b/n 2 - 3 / on axis D b/n 2-3


2 2.30 L = 2.5-(0.1+0.1)=2.3
0.50 W = 0.50
1.45 D[avg.]= 1.45
3.33 m³

on Axis A b/n 3- 4 /on axis D b/n 3-4 /on Axis D b/n 1- 2


3 3.40 L = 3.6-(0.1+0.1)=3.4
0.50 W = 0.50
1.45 D[avg.]= 1.45
7.40 m³

23.92 m³ total masnory work


Concrete Work
Tims. Dim. Result Description

2.1 - 5cm thick lean concrete


a - for isolated footing
#Footing F1
3 1.40 Lexc= 1.4
1.40 Wexc= 1.4
5.88 m²

#Footing F2
7 1.80 Lexc= 1.8
1.60 Wexc= 1.8
20.16 m²

26.04 m² total lean concrete for footing

b - under masonry work


on Axis A b/n 1 - 2
2 5.03 L =5.630-(0.3*2)
0.90 W[avg.]=0.5
9.05 m²

on Axis 1 b/n A-D


2 11.20 L =12.40-(0.4*4)
0.50 W[avg.]=0.5
11.20 m²

20.25 m² total lean concrete for masnory work

c- Under grade beam


# [Link] GB5
2 5.83 Lexc= 5.830
0.20 Wexc= 0.2
2.33 m²
#[Link] GB6
1 5.83 Lexc= 5.830
0.20 Wexc= 0.2
1.17 m²

3.50 m² total lean for gread beam


2.2- Reinforced concrete c25
a- concrete for strap footing
#Footing F1
3 1.40 Lexc= 1.4
1.40 Wexc= 1.4
0.40 D[avg.]= 0.40
2.35 m³
#Footing F2
7 1.80 Lexc= 1.8
1.80 Wexc= 1.8
0.40 D[avg.]=0.40
9.07 m³

11.42 m³ total concrete work for footing

b -Shear wall
on Axis A & on axsis 1-2
1 5.63 L =5.630
0.20 W = 0.20
2.20 D = 2.20
2.48 m³

on Axis 1 B/N A-D


1 9.70 L = 12.40
0.20 W = 0.20
2.20 D = 2.20
4.27 m³

on Axis D B/N 1-2


1 6.63 L = 6.630
0.20 W = 0.20
2.20 D = 2.2
2.92 m³

9.66 m³ total concrete work for shear wall

c - foundation column
#C1
1 0.40 L = 0.40
0.30 W = 0.30
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
0.19 m³
#C2
3 0.40 L = 0.30
0.30 W = 0.30
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
0.56 m³
#C3
3 0.40 L = 0.30
0.30 W = 0.30
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
0.56 m³
#C4
3 0.40 L = 0.40
0.30 W = 0.30
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
0.56 m³

1.86 m³ total concrete work for foundation column

d - concrete work for basement beam


BB1
1 9.87 L =11.65
0.20 W = 0.30
0.40 D = 0.40
0.79 m³

BB2
1 11.40 L =11.65
0.30 W = 0.30
0.40 D = 0.40
1.37 m³
BB3
1 3.50 L = 3.50
0.25 W = 0.25
0.40 D = 0.40
0.35 m³

BB4
1 5.63 L = 5.630
0.30 W = 0.30
0.40 D = 0.40
0.68 m³
BB5
1 5.63 L = 5.630
0.25 W = 0.250
0.40 D = 0.40
0.56 m³
BB6
2 5.63 L = 8.927
0.25 W = 0.250
0.40 D = 0.40
1.13 m³
BB7
1 5.63 L = 8.927
0.25 W = 0.250
0.40 D = 0.40
0.56 m³
BB6
1 5.63 L = 5.630
0.30 W = 0.30
0.40 D = 0.40
0.68 m³

6.11 m³ total concrete work for basemetnt beam

e - for basement floor slab


on Axis 1&2 b/n Axis A&B
1 3.44 L=3.64-0.20
5.23 W=5.630-(0.2*2)
17.99 m²

on Axis B & C b/n Axis 1 - 2


1 3.33 L=3.530-0.20=2.30
5.23 W=5.63-(0.20*2)=11.35
17.42 m²
on Axis C & D b/n Axis 1 - 2
1 3.33 L=3.470-0.20=2.30
5.23 W=5.63-(0.20*2)=11.35
17.42 m²

52.82 m² total concrete for basement floor slab

f - concreat work for basement floor column


#C1
1 0.40 L = 0.40
0.30 W = 0.30
2.60 D[avg.] = 2.6
0.31 m³
#C2
3 0.30 L = 0.30
0.30 W = 0.30
2.60 D[avg.] = 2.6
0.70 m³
#C3
3 0.30 L = 0.30
0.30 W = 0.30
2.60 D[avg.] = 2.6
0.70 m³
#C4
3 0.30 L = 0.30
0.30 W = 0.30
2.60 D[avg.] = 2.6
0.70 m³

2.42 m³ total concrete for basement floor slab column

g - for Ground floor slab


on Axis 1&2 b/n Axis A&B
1 3.44 L=3.64-0.20
5.23 W=5.630-(0.2*2)
17.99 m²

on Axis B & C b/n Axis 1 - 2


1 3.33 L=3.530-0.20=2.30
5.23 W=5.63-(0.20*2)=11.35
17.42 m²
on Axis C & D b/n Axis 1 - 2
1 3.33 L=3.470-0.20=2.30
5.23 W=5.63-(0.20*2)=11.35
17.42 m²
on Axis stair
1 2.80 L=3-0.20=2.80
2.60 W=3-(0.20*2)
7.28 m²

60.10 m² total concret for Ground floor slab

h - concret work for Ground Floor beam


GB1
1 11.65 L =11.65
0.20 W = 0.20
0.40 D = 0.40
0.93 m³

GB2
1 11.65 L
0.30 W = 0.20
0.40 D = 0.40
1.40 m³
GB3
1 3.50 L = 3.50
0.25 W = 0.20
0.40 D = 0.40
0.35 m³

GB4
1 5.63 L = 5.630
0.30 W = 0.20
0.40 D = 0.40
0.68 m³
GB5
1 5.63 L = 5.630
0.25 W = 0.20
0.40 D = 0.40
0.56 m³
GB6
1 8.93 L
0.25 W = 0.20
0.40 D = 0.40
0.89 m³
GB7
1 8.93 L = 8.927
0.25 W = 0.250
0.40 D = 0.40
0.89 m³

5.70 m³ total concrete work for ground floor beam

i) stair case concret


stair case Basement.F-Ground floor
riser & tread total steps =17
17 0.0238 riser=0.17m
1.40 tread width=0.28m tread length=1.4m
0.57 m³

weist slab for stair case


1 3.00 L=3.00
1.40 W=1.4
0.29 D=0.29
1.22 m³

landing for stair case


1 3 L=3.0
1.00 w=1.00
0.19 D=0.19
0.57 m³

landing beam
2 3 L=3.0
1.00 w=0.20
0.19 D=0.3
1.14 m³

3.49 m³ stair case concreat for Basement.F-Ground floor


Form Work
Tims. Dim. Result Description

2.3 - form work

a - for footing
#Footing F1
3 1.80 Lexc= 1.4
1.60 Wexc= 1.4
8.64 m²

#Footing F2
7 1.80 Lexc= 1.8
1.60 Wexc= 1.8
20.16 m²

28.80 m² total form work for footing

b -shear wall
on Axis A & on axsis 1-2
1 11.66 L =(5.630*2)+(0.2*2)
2.60 D = 2.6
30.32 m²

on Axis 1 B/N A-D


1 25.20 L = (12.4*2)+(0.2*2)
2.60 D = 2.6
65.52 m²

on Axis D B/N 1-2


1 13.00 L = (6.30*2)+(0.2*2)
2.60 D = 2.6
33.80 m²

129.64 m² total form work shear wall

c - foundation column
#C1
1 1.40 L = (0.40*2+0.3*2)
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
2.17 m²
#C2
3 1.20 L = (0.30*2+0.3*2)
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
5.58 m²
#C3
3 1.20 L = (0.30*2+0.3*2)
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
5.58 m²
#C4
3 1.40 L = (0.40*2+0.3*2)
1.55 D[avg.] = 2.5-0.5-0.4-0.05 = 1.550
6.51 m²

19.84 m² total form work for footing column

d- basement beam
BB1
1 11.65 L =11.65
0.80 D = 0.40+0.4
9.32 m²

BB2
1 11.65 L =11.65
0.80 D = 0.40+0.4
9.32 m²
BB3
1 3.50 L = 3.50
0.80 D = 0.40+0.4
2.80 m²

BB4
1 5.63 L = 5.630
0.80 D = 0.40+0.4
4.50 m²
BB5
1 5.63 L = 5.630
0.80 D = 0.40+0.4
4.50 m²
BB6
2 5.63 L = 8.927
0.80 D = 0.40+0.4
9.01 m²
BB7
1 5.63 L = 8.927
0.80 D = 0.40+0.4
4.50 m²
BB6
1 5.63 L = 5.630
0.80 D = 0.40+0.4
4.50 m²

48.46 m² total form work for Basement beam

e - formwork for basement floor column


#C1
1 1.80 L = (0.40*3+0.3*2)
2.60 D[avg.] = 2.6
4.68 m²
#C2
3 1.20 L = 0.30*4
2.60 D[avg.] = 2.6
9.36 m²
#C3
3 1.20 L = 0.30*4
2.60 D[avg.] = 2.6
9.36 m²
#C4
3 1.20 L = 0.30*4
2.60 D[avg.] = 2.6
9.36 m²

32.76 m² total form work for Basement floor column

f - for Ground floor slab


on Axis 1&2 b/n Axis A&B
1 3.44 L=3.64-0.20
5.23 W=5.630-(0.2*2)
17.99 m²

on Axis B & C b/n Axis 1 - 2


1 3.33 L=3.530-0.20=2.30
5.23 W=5.63-(0.20*2)=11.35
17.42 m²
on Axis C & D b/n Axis 1 - 2
1 3.33 L=3.470-0.20=2.30
5.23 W=5.63-(0.20*2)=11.35
17.42 m²

52.82 m² total formwork for Ground floor slab

g - Form work for Ground Floor beam


GB1
2 11.65 L =11.65
1.00 D = 0.40+0.2+0.4
23.30 m²

GB2
2 11.40 L =11.65
1.00 D = 0.40+0.2+0.4
22.80 m²
GB3
3 3.50 L = 3.50
1.00 D = 0.40+0.2+0.4
10.50 m²

GB4
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
GB5
2 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
11.26 m²
GB6
1 8.93 L = 8.927
1.00 D = 0.40+0.2+0.4
8.93 m²
GB7
1 8.93 L = 8.927
1.00 D = 0.40+0.2+0.4
8.93 m²

91.34 m² total formwork for ground floor beam

h) stair case form work


stair case Basement.F-Ground floor
riser & tread total steps =18
18 0.17 riser=0.17m
1.20 tread width=0.280m tread length=1.4m
3.67 m²

weist slab for stair case


1 6.80 L=3.40+3.40
0.70 W=0.35+0.35
4.76 m²

landing for stair case


1 1.2 L=1.2
1.58 w=1.2+0.19+0.19=1.58
1.90 m²

landing beam
1 3 L=3.0
0.50 w=0.2+0.3
1.50 m²

for soffit
1 3 L=3.0
3.40 w=3.47
10.20 m²

22.03 m² total formwork for stair case


[Link] FOR SUB-STRUCTERE
No. of Total Length of Reinforcement Bar (m)
It. No. Structural Member Shape Bar Dia. Qun. (pcs) Length (m)
Memb. 6mm 8mm 10mm 12mm 14mm 16mm 20mm 24mm
SUB STRUCTURE
Footing
F1

main
14 11 3 1.900 62.70
14 11 3 1.900 62.70

F2

main
14 13 7 3.900 354.90
14 13 7 3.900 354.90

retaining wall
on axsis A B/N 1-2
10 36 1 5.630 200.80
12 71 1 2.600 184.60
on axsis 1 b/n A-D
10 35 1 12.400 429.87
12 156 1 2.600 405.60
on axsis D B/N 1-2
10 35 1 6.630 229.84
12 84 1 2.600 218.08

Foundation column
C1
16 10 1 2.650 26.50
8 6 1 1.300 8.19
8 4 1 1.300 4.79
C2
16 8 3 2.650 63.60
8 6 3 1.300 24.57
8 4 3 1.300 14.38
C3
16 8 3 2.650 63.60
8 6 3 1.300 24.57
8 4 3 1.300 14.38
C4
16 10 3 2.650 79.50
8 6 3 1.300 24.57
8 4 3 1.300 14.38

basement floor slab


1 - 2 b/n A- B
8 29 1 3.600 104.40
8 19 1 5.600 106.40
1 - 2 b/n B- C
8 29 1 3.600 104.40
8 19 1 5.600 106.40
1 - 2 b/n C - D
8 29 1 3.600 104.40
8 19 1 5.600 106.40
Stair area
8 15 1 3.070 47.59
8 16 1 2.900 47.42

basement beam

BB1
top bar
14 3 1 9.530 28.59
14 3 1 3.260 9.78
bottom bar
14 3 1 7.495 22.49
14 3 1 4.695 14.09
stirap
8 28 1 1.200 33.20
8 28 1 1.200 33.20
8 28 1 1.200 33.20
8 7 1 1.200 7.87

BB2
top bar
14 2 1 9.530 19.06
14 2 1 3.260 6.52
bottom bar
14 2 1 7.495 14.99
14 2 1 4.695 9.39
stirap
8 28 1 1.100 30.43
8 28 1 1.100 30.43
8 28 1 1.100 30.43
8 7 1 1.100 7.21

BB3
top bar
14 2 1 4.320 8.64
bottom bar
14 2 1 3.620 7.24
stirap
8 27 1 1.100 29.21

BB4
top bar
14 3 1 6.480 19.44
bottom bar
14 3 1 6.000 18.00
stirap
8 43 1 1.300 55.32

BB5
top bar
14 3 1 6.480 19.44
bottom bar
14 3 1 6.000 18.00
stirap
8 43 1 1.100 46.81

BB6
top bar
14 2 2 9.577 38.31
bottom bar
14 2 2 8.877 35.51
stirap
8 43 2 1.100 93.62
8 24 2 1.100 52.56

BB7
top bar
14 3 1 6.480 19.44
bottom bar
14 3 1 6.000 18.00
stirap
8 43 1 1.300 55.32

ground floor
Y-dir

8 24 1 9.750 231.56
8 23 1 12.000 276.75

8 24 1 9.755 237.78
8 7 1 9.755 70.72
10 22 1 2.908 62.78

X-dir

8 36 1 8.667 313.64
8 36 1 4.570 164.52

8 20 1 3.066 62.47

negative bar 10 39 1 2.510 96.72

10 39 1 2.332 89.86

10 39 1 2.481 95.60

ground floor beam


GB1
top bar
14 2 1 9.530 19.06
14 2 1 3.260 6.52
Negative bar
14 2 1 1.530 3.06
14 2 1 2.390 4.78
14 2 1 2.320 4.64
14 2 1 2.481 4.96

bottom bar
14 3 1 7.495 22.49
14 3 1 4.695 14.09
stirap
8 28 1 1.200 33.20
8 28 1 1.200 33.20
8 28 1 1.200 33.20
8 7 1 1.200 7.87

GB2
top bar
14 2 1 9.530 19.06
14 2 1 3.260 6.52
Negative bar
14 2 1 1.530 3.06
14 2 1 2.390 4.78
14 2 1 2.320 4.64
14 2 1 2.481 4.96
bottom bar
14 3 1 7.495 22.49
14 3 1 4.695 14.09
stirap
8 28 1 1.100 30.43
8 28 1 1.100 30.43
8 28 1 1.100 30.43
8 7 1 1.100 7.21

GB3
top bar
14 2 1 4.320 8.64
Negative bar
14 2 1 3.210 6.42
14 2 1 1.506 3.01
bottom bar
14 2 1 3.620 7.24
stirap
8 27 1 1.100 29.21

GB4
top bar
14 3 1 6.480 19.44
Negative bar
14 2 1 3.210 6.42
14 2 1 1.506 3.01
bottom bar
14 3 1 6.000 18.00
stirap
8 43 1 1.300 55.32

GB5
top bar
16 2 1 6.480 12.96
Negative bar
14 2 1 2.226 4.45
14 2 1 2.226 4.45
bottom bar
16 4 1 6.000 24.00
stirap
8 43 1 1.100 46.81

GB6
top bar
16 2 2 9.577 38.31
Negative bar
14 2 2 2.226 8.90
14 2 2 2.226 8.90
14 2 2 1.382 5.53
bottom bar
16 4 2 8.977 71.82
stirap
8 43 2 1.100 93.62
8 24 2 1.100 52.56

GB7
top bar
16 2 1 6.480 12.96

14 2 1 2.226 4.45
14 2 1 2.908 5.82
14 2 1 1.382 2.76

16 4 1 6.000 24.00

8 43 1 1.300 55.32
8 24 1 1.100 26.28
Stair case from [Link] 1st
stair case
for beam
14 2 1 3.77 7.53
14 2 1 3.20 6.40
8 9 1 1.20 10.20
for landing
16 9 1 1.20 10.20
8 9 1 1.20 10.20
for soffit
1 16 10 1 5.34 55.18
2 12 10 1 2.83 27.59
3 8 10 9 0.77 67.57
4 12 10 1 2.95 28.76
5 16 10 1 2.83 27.59
6 12 10 1 2.95 28.76
7 14 10 1 1.68 16.41
8 8 10 9 0.77 67.57
9 16 10 1 5.10 49.73
10 14 10 1 2.83 27.59
11 14 10 1 2.83 27.59
12 16 10 1 2.95 28.76
13 14 10 1 2.83 27.59
14 14 10 1 5.10 49.73
15 8 20 1 1.40 27.65
16 8 20 1 1.40 27.65

- 3,529.42 1,205.47 893.39 1,601.61 588.71 - -


0.222 0.395 0.617 0.888 1.21 1.579 2.47
- 1,394.12 743.77 793.33 1,937.95 929.57 - -

6mm 8mm 10mm 12mm 14mm 16mm 20mm 24mm


Concrete Work

Tims. Dim. Result Description

B - SUPER STRUCTURE
1.01 - concrete work
a - elevation column
for ground floor
#C1
1 0.30 L = 0.30
0.30 W = 0.30
2.66 D[avg.] = 2.66
0.24 m³
#C2
3 0.30 L = 0.30
0.25 W = 0.25
2.66 D[avg.] = 2.66
0.60 m³
#C3
3 0.30 L = 0.30
0.25 W = 0.25
2.66 D[avg.] = 2.66
0.60 m³
#C4
3 0.30 L = 0.30
0.25 W = 0.25
2.66 D[avg.] = 2.66
0.60 m³

b. for 1st floor


#C1
1 0.30 L = 0.30
0.25 W = 0.250
2.66 D[avg.] = 2.66
0.20 m³
#C2
3 0.30 L = 0.30
0.25 W = 0.250
2.66 D[avg.] = 2.66
0.60 m³
#C3
3 0.30 L = 0.30
0.25 W = 0.250
2.66 D[avg.] = 2.66
0.60 m³
#C4
3 0.30 L = 0.30
0.25 W = 0.250
2.66 D[avg.] = 2.66
0.60 m³
c. for Roof
#C1
1 0.30 L = 0.30
0.20 W = 0.20
1.60 D[avg.] = 1.6
0.10 m³
#C2
3 0.30 L = 0.30
0.20 W = 0.20
1.60 D[avg.] =1.6
0.29 m³

4.41 m³ total concrete work for floor column

e - for First floor beam


FB1
2 11.65 L =11.65
0.20 W = 0.20
0.40 D = 0.40
1.86 m³

FB2
1 5.20 L =1.73+3.470
0.30 W = 0.20
0.40 D = 0.40
0.62 m³
FB3
1 5.63 L = 5.630
0.25 W = 0.20
0.40 D = 0.40
0.56 m³

FB4
1 5.63 L = 5.630
0.30 W = 0.20
0.40 D = 0.40
0.68 m³
FB5
1 5.63 L = 8.830
0.25 W = 0.20
0.40 D = 0.40
0.56 m³
FB6
1 8.87 L =8.87
0.25 W = 0.20
0.40 D = 0.40
0.89 m³
g. for terrace floor beam
RB1
1 11.65 L =11.65
0.20 W = 0.20
0.35 D = 0.35
0.82 m³

RB2
1 11.65 L =11.65
0.20 W = 0.20
0.35 D = 0.35
0.82 m³
RB3
1 5.20 L = 1.73+3.47
0.20 W = 0.20
0.35 D = 0.35
0.36 m³

RB4
2 5.63 L = 5.630
0.20 W = 0.20
0.35 D = 0.35
0.79 m³
RB5
2 5.63 L = 5.630
0.20 W = 0.20
0.40 D = 0.35
0.90 m³
RB6
1 8.93 L
0.20 W = 0.20
0.35 D = 0.40
0.62 m³
RB7
1 8.93 L = 8.927
0.20 W = 0.20
0.35 D = 0.35
0.62 m³

h. water tanker beam


WTB 1
2 3.10 L= 3.470
0.20 W = 0.20

0.30 D = 0.30
0.37 m³

WTB 2
2 3.10 L= 2.5-0.20 = 2.30
0.20 W = 0.20
0.30 D = 0.30
0.37 m³

10.85 m³ total concrete work for beam

i. stair
for Gr - 1st floor
riser & tread total steps =17
34 0.0238 riser=0.17m
1.40 tread width=0.28m tread length=1.4m
1.13 m³

weist slab for stair case


2 3.00 L=3.00
1.40 W=1.4
0.29 D=0.29
2.44 m³

landing for stair case


2 3 L=3.0
1.00 w=1.00
0.19 D=0.19
1.14 m³

landing beam
4 3 L=3.0
1.00 w=0.20
0.19 D=0.3
2.28 m³

6.99 m³ stair case concreat for Ground floor-1st floor

j. floor slab ( 16cm thick )


1st floor slab
on Axis 1&2 b/n Axis A&B
1 3.44 L=3.64-0.20
5.23 W=5.630-(0.2*2)
17.99 m²

on Axis B & C b/n Axis 1 - 2


1 3.33 L=3.530-0.20=2.30
5.23 W=5.63-(0.20*2)=11.35
17.42 m²
on Axis C & D b/n Axis 1 - 2
1 3.33 L=3.470-0.20=2.30
5.23 W=5.63-(0.20*2)=11.35
17.42 m²
on Axis corridor
1 1.50 L=1.7-0.20
2.60 W=3-(0.20*2)
3.90 m²

56.72 m² total concrete work for 1st floor slab ( 16cm thick )

m. water tanker floor slab ( 16cm thick )


on Axis A - B b/n 1- 3
1 3.10 L= 3.10
3.40 W = 3.40
10.54

10.54 m² total concrete work for W.T floor slab ( 16cm thick )
Form Work
Tims. Dim. Result Description

1.2 - form work


a - column
for Ground floor
#C1
1 1.20 L = 0.30*4
2.66 D[avg.] = 2.66
3.19 m²
#C2
3 1.10 L = 0.30*2+0.25*2
2.66 D[avg.] = 2.66
8.78 m²
#C3
3 1.10 L = 0.30*2+0.25*2
2.66 D[avg.] = 2.66
8.78 m²
#C4
3 1.10 L = 0.30*2+0.25*2
2.66 D[avg.] = 2.66
8.78 m²

for 1st floor


#C1
1 1.20 L = 0.30*2+0.3*2
2.66 D[avg.] = 2.66
3.19 m²
#C2
3 1.20 L = 0.30*2+0.3*2
2.66 D[avg.] = 2.66
9.58 m²
#C3
3 1.20 L = 0.30*2+0.3*2
2.66 D[avg.] = 2.66
9.58 m²
#C4
3 1.20 L = 0.30*2+0.3*2
2.66 D[avg.] = 2.66
9.58 m²
for roof columns
#C1
1 0.30 L = 0.30
1.60 D[avg.] = 1.6
0.48 m²
#C2
3 0.30 L = 0.30
1.60 D[avg.] =1.6
1.44 m²

63.37 m² total form work for column

B. 1st floor beam formwork


FB1
2 11.65 L =11.65
1.00 D = 0.40+0.2+0.4
23.30 m²

FB2
1 5.20 L =1.73+3.470
1.00 D = 0.40+0.2+0.4
5.20 m²
FB3
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²

FB4
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
FB5
1 5.63 L = 8.830
1.00 D = 0.40+0.2+0.4
5.63 m²
FB6
1 8.87 L =8.87
1.00 D = 0.40+0.2+0.4
8.87 m²
D. for roof floor beam Formwork
RB1
1 11.65 L =11.65
0.90 D = 0.35+0.2+0.35
10.49 m²

RB2
1 11.65 L =11.65
0.90 D = 0.35+0.2+0.35
10.49 m²
RB3
1 5.20 L = 1.73+3.47
0.90 D = 0.35+0.2+0.35
4.68 m²

RB4
2 5.63 L = 5.630
0.90 D = 0.35+0.2+0.35
10.13 m²
RB5
2 5.63 L = 5.630
0.90 D = 0.35+0.2+0.35
10.13 m²
RB6
1 8.93 L=8.93
0.90 D = 0.35+0.2+0.35
8.03 m²
RB7
1 8.93 L = 8.927
0.90 D = 0.35+0.2+0.35
8.03 m²

D. for water tank beam Formwork


WTB 1
2 3.10 L= 3.470
0.80 D = 0.30+0.2+0.3
4.96 m²
WTB 2
2 3.10 L= 2.5-0.20 = 2.30
0.80 D = 0.30+0.2+0.3
4.96 m²

126.17 m² total formwork for beam

f. stair case
for Gr- 1st( 20 steps )
riser & tread total steps =18
36 0.17 riser=0.17m
1.20 tread width=0.280m tread length=1.4m
7.34 m²

weist slab for stair case


2 6.80 L=3.40+3.40
0.70 W=0.35+0.35
9.52 m²

landing for stair case


2 1.2 L=1.2
1.58 w=1.2+0.19+0.19=1.58
3.79 m²

landing beam
2 3 L=3.0
0.50 w=0.2+0.3
3.00 m²

for soffit
2 3 L=3.0
3.40 w=3.47
20.40 m²

44.06 m² stair case concreat for ground-1st floor


g. floor slab ( 16cm thick )
1st floor slab
on Axis 1&2 b/n Axis A&B
1 3.44 L=3.64-0.20
5.23 W=5.630-(0.2*2)
17.99 m²

on Axis B & C b/n Axis 1 - 2


1 3.33 L=3.530-0.20=2.30
5.23 W=5.63-(0.20*2)=11.35
17.42 m²
on Axis C & D b/n Axis 1 - 2
1 3.33 L=3.470-0.20=2.30
5.23 W=5.63-(0.20*2)=11.35
17.42 m²
on Axis corridor
1 1.50 L=1.7-0.20
2.60 W=3-(0.20*2)
3.90 m²

56.72 m² total form work for 1st floor slab

j. water tanker
on Axis A - B b/n 1- 3
1 3.10 L= 3.10
3.40 W = 3.40
10.54 m²

10.54 m² total form work W.T floor slab


Qun. No. of Total Length of Reinforcement Bar (m)
Structural Member Shape Bar Dia. Length (m)
(pcs) Memb. 6mm 8mm 10mm 12mm 14mm 16mm 20mm 24mm
elevation column
ground floor column
C1
16 8 10 3.800 304.00
8 11 10 1.000 108.00
8 6 10 1.000 60.00

C2
16 8 2 3.800 60.80
8 11 2 1.000 21.60
8 6 2 1.000 12.00

C3
16 8 1 3.800 30.40
8 11 1 1.000 10.80
8 6 1 1.000 6.00

C4
16 8 2 3.800 60.80
8 11 2 1.000 21.60
8 6 2 1.000 12.00

First floor column


C1
16 8 1 3.800 30.40
8 11 1 1.000 10.80
8 6 1 1.000 6.00

C2
16 8 3 3.800 91.20
8 11 3 1.000 32.40
8 6 3 1.000 18.00

C3
16 8 3 3.800 91.20
8 11 3 1.000 32.40
8 6 3 1.000 18.00

C4
16 8 3 3.800 91.20
8 11 3 1.000 32.40
8 6 3 1.000 18.00

Roof floor column


C
14 8 1 3.800 30.40
8 11 1 1.000 10.80
8 6 1 1.000 6.00

C2
14 8 3 3.800 91.20
8 11 3 1.000 32.40
8 6 3 1.000 18.00

C4
14 10 2 3.800 76.00
8 11 2 1.000 21.60
8 6 2 1.000 12.00

1st floor beam

FFB1

top bar
14 2 2 9.890 39.56
14 2 2 3.260 13.04
negative bar
14 2 2 1.560 6.24
14 2 2 2.390 9.56
14 2 2 2.332 9.33
14 2 2 2.481 9.92
bottom bar
14 3 2 7.855 47.13
14 3 2 4.695 28.17
stirap
8 22 2 1.000 44.00
8 22 2 1.000 44.00
8 22 2 1.000 44.00
8 7 2 1.080 14.16

FFB2

top bar
14 2 1 5.950 11.90
negative bar
14 2 1 3.210 6.42
14 2 1 1.506 3.01
bottom bar
14 3 1 5.250 15.75
stirap
8 21 1 1.000 20.89
8 11 1 1.000 10.61
FFB3

top bar
16 2 1 6.480 12.96
negative bar
16 2 1 1.560 3.12
16 2 1 2.390 4.78
bottom bar
16 3 1 6.000 18.00
stirap
8 21 1 1.000 20.89

FFB4

top bar
16 2 1 6.480 12.96
negative bar
16 2 1 1.560 3.12
16 2 1 2.390 4.78
bottom bar
16 3 1 6.000 18.00
stirap
8 32 1 1.000 31.93
FFB5

top bar
16 2 1 9.577 19.15
negative bar
16 2 1 2.226 4.45
16 3 1 2.908 8.72
14 2 1 1.390 2.78
bottom bar
16 4 1 8.870 35.48
stirap
8 32 1 1.000 31.93
8 19 1 1.000 18.87
FFB6

top bar
16 2 1 9.577 19.15
negative bar
14 2 1 2.226 4.45
16 2 1 2.908 5.82
14 2 1 1.390 2.78
bottom bar
16 4 1 8.870 35.48
stirap
8 32 1 1.000 31.93
8 19 1 1.000 18.87
Water tank beam
WTB1
top bar
14 2 1 4.320 8.64
bottom bar
14 3 1 3.620 10.86
stirap
8 13 1 1.000 13.50
8 7 1 1.000 7.39
WTB2
top bar
14 2 2 4.320 17.28
bottom bar
14 3 2 3.620 21.72
stirap
8 13 2 1.080 29.16
8 7 2 1.080 15.96
1st floor slab
X-dir

8 24 1 9.750 231.56
8 23 1 12.000 276.75

8 24 1 9.755 237.78
8 7 1 9.755 70.72
10 22 1 2.908 62.78

X-dir
8 36 1 8.667 313.64
8 36 1 4.570 164.52

8 20 1 3.066 62.47

negative bar 10 39 1 2.510 96.72

10 39 1 2.332 89.86

10 39 1 2.481 95.60

W.T floor slab


X-dir

8 20 1 6.152 121.50

Y-dir

8 26 1 6.152 158.63

Stair case

stair case
for beam
14 2 2 3.77 15.06
14 2 2 3.20 12.80
8 9 2 1.20 20.40
for landing
16 9 2 1.20 20.40
8 9 2 1.20 20.40
for soffit
1 16 10 2 5.34 110.36
2 12 10 2 2.83 55.19
3 8 10 18 0.77 135.14
4 12 10 2 2.95 57.53
5 16 10 2 2.83 55.19
6 12 10 2 2.95 57.53
7 14 10 2 1.68 32.82
8 8 10 18 0.77 135.14
9 16 10 2 5.10 99.45
10 14 10 2 2.83 55.19
11 14 10 2 2.83 55.19
12 16 10 2 2.95 57.53
13 14 10 2 2.83 55.19
14 14 10 2 5.10 99.45
15 8 20 2 1.40 55.30
16 8 20 2 1.40 55.30

- 2,978.14 344.96 170.25 791.84 1,308.90 - -


0.222 0.395 0.617 0.888 1.208 1.579 2.467
- 1,176.37 212.84 151.18 956.54 2,066.75 - -

6mm 8mm 10mm 12mm 14mm 16mm 20mm 24mm


BLOCK WORK
Tims. Dim. Result Description
2- BLOCK WORK
2.1. 20cm HCB block
ground floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²

on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²

on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²

diduction D1
1 1.62 L=1.62
2.20 H=2.20
-3.56 m²

diduction D2
1 3.04 L=1.58+1.46
2.20 H=2.20
-6.69 m²

diduction D3
1 1.65 L=1.65
2.20 H=2.20
-3.63 m²

on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²

diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

corrridor
1 2.53 L=1.53+1.0
2.86 H=2.86
-7.24 m²

on axis 2'
1 5.40 L=5.40
2.86 H=2.86
15.44 m²

diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²

on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²

on axis 1' & 1''


2 3.10 L=3.20
2.86 H=2.86
17.73 m²

diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²

on axis B' & C'


2 1.55 L=1.55
2.86 H=2.86
8.87 m²

first floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²
on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²

on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²

diduction D1
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

diduction D2
1 1.80 L=0.90+0.90
1.70 H=1.70
-3.06 m²

diduction D3
1 2.20 L=2.20
1.70 H=1.70
-3.74 m²

on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²

diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

corrridor
1 3.13 L=1.53+1.60
2.86 H=2.86
-8.95 m²

on axis 3
1 5.40 L=5.40
2.86 H=2.86
15.44 m²

diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²

on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²

on axis 1' & 1''


2 3.10 L=3.20
2.86 H=2.86
17.73 m²

diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²

on axis B' & C'


2 0.54 L=0.54
2.86 H=2.86
3.09 m²

232.15 m² total 20 thick HCB block

2.2. 10cm HCB block


Ground floor
on axis B'',B' & C' b/n 1-1'
3 2.93 L=2.93
2.86 H=2.86
25.14 m²

on axis 1'
1 2.65 L=1.70+0.95
2.86 H=2.86
7.58 m²
first floor
on axis A-B
1 3.46 L=1.81+0.79+0.45+0.41
2.86 H=2.86
9.90 m²
on axis C-D
1 3.82 L=2.17+0.79+0.45+0.41
2.86 H=2.86
10.93 m²
on axis B & C
1 1.66 L=1.66
2.86 H=2.86
4.75 m²
on axis 1'
1 4.00 L=4
2.80 H=2.8
11.20 m²

69.49 m² total 10 thick HCB block


PLASTERING
Tims. Dim. Result Description
2- plastering
2.1. external plastering
ground floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²

on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²

on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²

diduction D1
1 1.62 L=1.62
2.20 H=2.20
-3.56 m²

diduction D2
1 3.04 L=1.58+1.46
2.20 H=2.20
-6.69 m²

diduction D3
1 1.65 L=1.65
2.20 H=2.20
-3.63 m²

on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²

diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

corrridor
1 2.53 L=1.53+1.0
2.86 H=2.86
-7.24 m²

on axis 2'
1 5.40 L=5.40
2.86 H=2.86
15.44 m²

diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²

on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²

on axis 1' & 1''


2 3.10 L=3.20
2.86 H=2.86
17.73 m²

diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²

on axis B' & C'


2 1.55 L=1.55
2.86 H=2.86
8.87 m²

first floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²
on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²

on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²

diduction D1
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

diduction D2
1 1.80 L=0.90+0.90
1.70 H=1.70
-3.06 m²

diduction D3
1 2.20 L=2.20
1.70 H=1.70
-3.74 m²

on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²

diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

corrridor
1 3.13 L=1.53+1.60
2.86 H=2.86
-8.95 m²

on axis 3
1 5.40 L=5.40
2.86 H=2.86
15.44 m²

diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²

on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²

on axis 1' & 1''


2 3.10 L=3.20
2.86 H=2.86
17.73 m²

diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²

on axis B' & C'


2 0.54 L=0.54
2.86 H=2.86
3.09 m²

232.15 m² total external plastering

2.2. internal plastering


Ground floor
on axis B'',B' & C' b/n 1-1'
6 2.93 L=2.93
2.86 H=2.86
50.28 m²

on axis 1'
2 2.65 L=1.70+0.95
2.86 H=2.86
15.16 m²

first floor
on axis A-B
2 3.46 L=1.81+0.79+0.45+0.41
2.86 H=2.86
19.79 m²
on axis C-D
2 3.82 L=2.17+0.79+0.45+0.41
2.86 H=2.86
21.85 m²
on axis B & C
2 1.66 L=1.66
2.86 H=2.86
9.50 m²
on axis 1'
2 4.00 L=4
2.80 H=2.8
22.40 m²

ground floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²

on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²

on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²

diduction D1
1 1.62 L=1.62
2.20 H=2.20
-3.56 m²

diduction D2
1 3.04 L=1.58+1.46
2.20 H=2.20
-6.69 m²
diduction D3
1 1.65 L=1.65
2.20 H=2.20
-3.63 m²

on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²

diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

corrridor
1 2.53 L=1.53+1.0
2.86 H=2.86
-7.24 m²

on axis 2'
1 5.40 L=5.40
2.86 H=2.86
15.44 m²

diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²

on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²

on axis 1' & 1''


2 3.10 L=3.20
2.86 H=2.86
17.73 m²

diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²

on axis B' & C'


2 1.55 L=1.55
2.86 H=2.86
8.87 m²

first floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²

on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²

on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²

diduction D1
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

diduction D2
1 1.80 L=0.90+0.90
1.70 H=1.70
-3.06 m²

diduction D3
1 2.20 L=2.20
1.70 H=1.70
-3.74 m²

on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²
diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

corrridor
1 3.13 L=1.53+1.60
2.86 H=2.86
-8.95 m²

on axis 3
1 5.40 L=5.40
2.86 H=2.86
15.44 m²

diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²

on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²

on axis 1' & 1''


2 3.10 L=3.20
2.86 H=2.86
17.73 m²

diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²

on axis B' & C'


2 0.54 L=0.54
2.86 H=2.86
3.09 m²

371.13 m² total internal plastering


a - plastring for elevation column
basement floor column
#C1
1 1.80 L = (0.40*3+0.3*2)
2.60 D[avg.] = 2.6
4.68 m²
#C2
3 1.20 L = 0.30*4
2.60 D[avg.] = 2.6
9.36 m²
#C3
3 1.20 L = 0.30*4
2.60 D[avg.] = 2.6
9.36 m²
#C4
3 1.20 L = 0.30*4
2.60 D[avg.] = 2.6
9.36 m²

for Ground floor


#C1
1 1.20 L = 0.30*4
2.66 D[avg.] = 2.66
3.19 m²
#C2
3 1.10 L = 0.30*2+0.25*2
2.66 D[avg.] = 2.66
8.78 m²
#C3
3 1.10 L = 0.30*2+0.25*2
2.66 D[avg.] = 2.66
8.78 m²
#C4
3 1.10 L = 0.30*2+0.25*2
2.66 D[avg.] = 2.66
8.78 m²

for 1st floor


#C1
1 1.20 L = 0.30*2+0.3*2
2.66 D[avg.] = 2.66
3.19 m²
#C2
3 1.20 L = 0.30*2+0.3*2
2.66 D[avg.] = 2.66
9.58 m²
#C3
3 1.20 L = 0.30*2+0.3*2
2.66 D[avg.] = 2.66
9.58 m²
#C4
3 1.20 L = 0.30*2+0.3*2
2.66 D[avg.] = 2.66
9.58 m²

for roof columns


#C1
1 0.30 L = 0.30
1.60 D[avg.] = 1.6
0.48 m²
#C2
3 0.30 L = 0.30
1.60 D[avg.] =1.6
1.44 m²

96.13 m² total plastering for column

b - plastering for beam


GB1
2 11.65 L =11.65
1.00 D = 0.40+0.2+0.4
23.30 m²

GB2
2 11.40 L =11.65
1.00 D = 0.40+0.2+0.4
22.80 m²
GB3
3 3.50 L = 3.50
1.00 D = 0.40+0.2+0.4
10.50 m²

GB4
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
GB5
2 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
11.26 m²
GB6
1 8.93 L = 8.927
1.00 D = 0.40+0.2+0.4
8.93 m²
GB7
1 8.93 L = 8.927
1.00 D = 0.40+0.2+0.4
8.93 m²

1st floor beam


FB1
2 11.65 L =11.65
1.00 D = 0.40+0.2+0.4
23.30 m²

FB2
1 5.20 L =1.73+3.470
1.00 D = 0.40+0.2+0.4
5.20 m²
FB3
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²

FB4
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
FB5
1 5.63 L = 8.830
1.00 D = 0.40+0.2+0.4
5.63 m²
FB6
1 8.87 L =8.87
1.00 D = 0.40+0.2+0.4
8.87 m²
roof floor beam
RB1
1 11.65 L =11.65
0.90 D = 0.35+0.2+0.35
10.49 m²

RB2
1 11.65 L =11.65
0.90 D = 0.35+0.2+0.35
10.49 m²
RB3
1 5.20 L = 1.73+3.47
0.90 D = 0.35+0.2+0.35
4.68 m²

RB4
2 5.63 L = 5.630
0.90 D = 0.35+0.2+0.35
10.13 m²
RB5
2 5.63 L = 5.630
0.90 D = 0.35+0.2+0.35
10.13 m²
RB6
1 8.93 L=8.93
0.90 D = 0.35+0.2+0.35
8.03 m²
RB7
1 8.93 L = 8.927
0.90 D = 0.35+0.2+0.35
8.03 m²

water tank beam


WTB 1
2 3.10 L= 3.470
0.80 D = 0.30+0.2+0.3
4.96 m²

WTB 2
2 3.10 L= 2.5-0.20 = 2.30
0.80 D = 0.30+0.2+0.3
4.96 m²

217.51 m² total plastering for beam

stair case
basment floor - 1st floor
soffit + side form work
4 2.91 L=2.91
1.95 W=1.35+0.3+0.3
22.70 m²

22.70 m² total plastering for stair

slab plastering
ground-roof floor
on axis A-D b/n 1-2
3 10.84 L=3.64+3.53+3.47+1-(4*0.2)
5.43 W=5.63-0.2
176.58 m²

water tank slab


on axis C-D b/n 2-3
1 3.27 L=3.47-0.2
2.90 W=3.097-0.2
9.47 m²

186.06 m² total plastering For SLAB


GYPSUM
Tims. Dim. Result Description
GYPSUM
2.2. internal gypsum paint
Ground floor
on axis B'',B' & C' b/n 1-1'
6 2.93 L=2.93
2.86 H=2.86
50.28 m²

on axis 1'
2 2.65 L=1.70+0.95
2.86 H=2.86
15.16 m²

first floor
on axis A-B
2 3.46 L=1.81+0.79+0.45+0.41
2.86 H=2.86
19.79 m²
on axis C-D
2 3.82 L=2.17+0.79+0.45+0.41
2.86 H=2.86
21.85 m²
on axis B & C
2 1.66 L=1.66
2.86 H=2.86
9.50 m²
on axis 1'
2 4.00 L=4
2.80 H=2.8
22.40 m²

ground floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²

on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²

on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²

diduction D1
1 1.62 L=1.62
2.20 H=2.20
-3.56 m²

diduction D2
1 3.04 L=1.58+1.46
2.20 H=2.20
-6.69 m²

diduction D3
1 1.65 L=1.65
2.20 H=2.20
-3.63 m²

on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²

diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

corrridor
1 2.53 L=1.53+1.0
2.86 H=2.86
-7.24 m²

on axis 2'
1 5.40 L=5.40
2.86 H=2.86
15.44 m²

diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²

on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²

on axis 1' & 1''


2 3.10 L=3.20
2.86 H=2.86
17.73 m²

diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²

on axis B' & C'


2 1.55 L=1.55
2.86 H=2.86
8.87 m²

first floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²

on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²

on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²

diduction D1
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

diduction D2
1 1.80 L=0.90+0.90
1.70 H=1.70
-3.06 m²

diduction D3
1 2.20 L=2.20
1.70 H=1.70
-3.74 m²

on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²

diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

corrridor
1 3.13 L=1.53+1.60
2.86 H=2.86
-8.95 m²

on axis 3
1 5.40 L=5.40
2.86 H=2.86
15.44 m²

diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²

on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²

on axis 1' & 1''


2 3.10 L=3.20
2.86 H=2.86
17.73 m²

diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²

on axis B' & C'


2 0.54 L=0.54
2.86 H=2.86
3.09 m²

371.13 m² total internal gypsum work

gypsum for elevation column


basement floor column
#C1
1 1.80 L = (0.40*3+0.3*2)
2.60 D[avg.] = 2.6
4.68 m²
#C2
3 1.20 L = 0.30*4
2.60 D[avg.] = 2.6
9.36 m²
#C3
3 1.20 L = 0.30*4
2.60 D[avg.] = 2.6
9.36 m²
#C4
3 1.20 L = 0.30*4
2.60 D[avg.] = 2.6
9.36 m²

for Ground floor


#C1
1 1.20 L = 0.30*4
2.66 D[avg.] = 2.66
3.19 m²
#C2
3 1.10 L = 0.30*2+0.25*2
2.66 D[avg.] = 2.66
8.78 m²
#C3
3 1.10 L = 0.30*2+0.25*2
2.66 D[avg.] = 2.66
8.78 m²
#C4
3 1.10 L = 0.30*2+0.25*2
2.66 D[avg.] = 2.66
8.78 m²

for 1st floor


#C1
1 1.20 L = 0.30*2+0.3*2
2.66 D[avg.] = 2.66
3.19 m²
#C2
3 1.20 L = 0.30*2+0.3*2
2.66 D[avg.] = 2.66
9.58 m²
#C3
3 1.20 L = 0.30*2+0.3*2
2.66 D[avg.] = 2.66
9.58 m²
#C4
3 1.20 L = 0.30*2+0.3*2
2.66 D[avg.] = 2.66
9.58 m²

for roof columns


#C1
1 0.30 L = 0.30
1.60 D[avg.] = 1.6
0.48 m²
#C2
3 0.30 L = 0.30
1.60 D[avg.] =1.6
1.44 m²

96.13 m² total gypsum paint for column


gypsum for beam
GB1
2 11.65 L =11.65
1.00 D = 0.40+0.2+0.4
23.30 m²

GB2
2 11.40 L =11.65
1.00 D = 0.40+0.2+0.4
22.80 m²
GB3
3 3.50 L = 3.50
1.00 D = 0.40+0.2+0.4
10.50 m²

GB4
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
GB5
2 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
11.26 m²
GB6
1 8.93 L = 8.927
1.00 D = 0.40+0.2+0.4
8.93 m²
GB7
1 8.93 L = 8.927
1.00 D = 0.40+0.2+0.4
8.93 m²

1st floor beam


FB1
2 11.65 L =11.65
1.00 D = 0.40+0.2+0.4
23.30 m²

FB2
1 5.20 L =1.73+3.470
1.00 D = 0.40+0.2+0.4
5.20 m²
FB3
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²

FB4
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
FB5
1 5.63 L = 8.830
1.00 D = 0.40+0.2+0.4
5.63 m²
FB6
1 8.87 L =8.87
1.00 D = 0.40+0.2+0.4
8.87 m²

roof floor beam


RB1
1 11.65 L =11.65
0.90 D = 0.35+0.2+0.35
10.49 m²

RB2
1 11.65 L =11.65
0.90 D = 0.35+0.2+0.35
10.49 m²
RB3
1 5.20 L = 1.73+3.47
0.90 D = 0.35+0.2+0.35
4.68 m²

RB4
2 5.63 L = 5.630
0.90 D = 0.35+0.2+0.35
10.13 m²
RB5
2 5.63 L = 5.630
0.90 D = 0.35+0.2+0.35
10.13 m²
RB6
1 8.93 L=8.93
0.90 D = 0.35+0.2+0.35
8.03 m²
RB7
1 8.93 L = 8.927
0.90 D = 0.35+0.2+0.35
8.03 m²

water tank beam


WTB 1
2 3.10 L= 3.470
0.80 D = 0.30+0.2+0.3
4.96 m²

WTB 2
2 3.10 L= 2.5-0.20 = 2.30
0.80 D = 0.30+0.2+0.3
4.96 m²

217.51 m² total gypsum paint for beam

stair case
basment floor - 1st floor
soffit + side form work
4 2.91 L=2.91
1.95 W=1.35+0.3+0.3
22.70 m²

22.70 m² total gypsum paint for stair

slab gypsum ceiling


ground-roof floor
on axis A-D b/n 1-2
3 10.84 L=3.64+3.53+3.47+1-(4*0.2)
5.43 W=5.63-0.2
176.58 m²

water tank slab


on axis C-D b/n 2-3
1 3.27 L=3.47-0.2
2.90 W=3.097-0.2
9.47 m²

186.06 m² total gypsum ceiling For SLAB


PAINTING
Tims. Dim. Result Description
2- painting
2.1. external painting
ground floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²

on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²

on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²

diduction D1
1 1.62 L=1.62
2.20 H=2.20
-3.56 m²

diduction D2
1 3.04 L=1.58+1.46
2.20 H=2.20
-6.69 m²

diduction D3
1 1.65 L=1.65
2.20 H=2.20
-3.63 m²

on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²

diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

corrridor
1 2.53 L=1.53+1.0
2.86 H=2.86
-7.24 m²

on axis 2'
1 5.40 L=5.40
2.86 H=2.86
15.44 m²

diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²

on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²

on axis 1' & 1''


2 3.10 L=3.20
2.86 H=2.86
17.73 m²

diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²

on axis B' & C'


2 1.55 L=1.55
2.86 H=2.86
8.87 m²

first floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²
on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²

on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²

diduction D1
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

diduction D2
1 1.80 L=0.90+0.90
1.70 H=1.70
-3.06 m²

diduction D3
1 2.20 L=2.20
1.70 H=1.70
-3.74 m²

on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²

diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

corrridor
1 3.13 L=1.53+1.60
2.86 H=2.86
-8.95 m²

on axis 3
1 5.40 L=5.40
2.86 H=2.86
15.44 m²

diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²

on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²

on axis 1' & 1''


2 3.10 L=3.20
2.86 H=2.86
17.73 m²

diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²

on axis B' & C'


2 0.54 L=0.54
2.86 H=2.86
3.09 m²

232.15 m² total external quartz painting

2.2. internal painting


Ground floor
on axis B'',B' & C' b/n 1-1'
6 2.93 L=2.93
2.86 H=2.86
50.28 m²

on axis 1'
2 2.65 L=1.70+0.95
2.86 H=2.86
15.16 m²

first floor
on axis A-B
2 3.46 L=1.81+0.79+0.45+0.41
2.86 H=2.86
19.79 m²
on axis C-D
2 3.82 L=2.17+0.79+0.45+0.41
2.86 H=2.86
21.85 m²
on axis B & C
2 1.66 L=1.66
2.86 H=2.86
9.50 m²
on axis 1'
2 4.00 L=4
2.80 H=2.8
22.40 m²

ground floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²

on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²

on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²

diduction D1
1 1.62 L=1.62
2.20 H=2.20
-3.56 m²

diduction D2
1 3.04 L=1.58+1.46
2.20 H=2.20
-6.69 m²
diduction D3
1 1.65 L=1.65
2.20 H=2.20
-3.63 m²

on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²

diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

corrridor
1 2.53 L=1.53+1.0
2.86 H=2.86
-7.24 m²

on axis 2'
1 5.40 L=5.40
2.86 H=2.86
15.44 m²

diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²

on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²

on axis 1' & 1''


2 3.10 L=3.20
2.86 H=2.86
17.73 m²

diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²

on axis B' & C'


2 1.55 L=1.55
2.86 H=2.86
8.87 m²

first floor
on axis A b/n 1-2
1 5.35 L=5.43
2.86 H=2.86
15.30 m²

on axis D'
1 5.43 L=5.43
2.86 H=2.86
15.53 m²

on axis 1
1 11.64 L=3.64+3.53+3.47+1
2.86 H=2.86
33.29 m²

diduction D1
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

diduction D2
1 1.80 L=0.90+0.90
1.70 H=1.70
-3.06 m²

diduction D3
1 2.20 L=2.20
1.70 H=1.70
-3.74 m²

on axis 2
1 11.84 L=5.64+5.40+0.80
2.86 H=2.86
33.86 m²
diduction D4
1 2.44 L=2.44
1.70 H=1.70
-4.15 m²

corrridor
1 3.13 L=1.53+1.60
2.86 H=2.86
-8.95 m²

on axis 3
1 5.40 L=5.40
2.86 H=2.86
15.44 m²

diduction D5
1 0.90 L=0.90
1.70 H=1.70
-1.53 m²

on axis D
1 3.10 L=3.10
2.86 H=2.86
8.87 m²

on axis 1' & 1''


2 3.10 L=3.20
2.86 H=2.86
17.73 m²

diduction D6
1 1.70 L=0.90+0.80
2.20 H=2.20
-3.74 m²

on axis B' & C'


2 0.54 L=0.54
2.86 H=2.86
3.09 m²

371.13 m² total internal painting


a - painting for elevation column
basement floor column
#C1
1 1.80 L = (0.40*3+0.3*2)
2.60 D[avg.] = 2.6
4.68 m²
#C2
3 1.20 L = 0.30*4
2.60 D[avg.] = 2.6
9.36 m²
#C3
3 1.20 L = 0.30*4
2.60 D[avg.] = 2.6
9.36 m²
#C4
3 1.20 L = 0.30*4
2.60 D[avg.] = 2.6
9.36 m²

for Ground floor


#C1
1 1.20 L = 0.30*4
2.66 D[avg.] = 2.66
3.19 m²
#C2
3 1.10 L = 0.30*2+0.25*2
2.66 D[avg.] = 2.66
8.78 m²
#C3
3 1.10 L = 0.30*2+0.25*2
2.66 D[avg.] = 2.66
8.78 m²
#C4
3 1.10 L = 0.30*2+0.25*2
2.66 D[avg.] = 2.66
8.78 m²

for 1st floor


#C1
1 1.20 L = 0.30*2+0.3*2
2.66 D[avg.] = 2.66
3.19 m²
#C2
3 1.20 L = 0.30*2+0.3*2
2.66 D[avg.] = 2.66
9.58 m²
#C3
3 1.20 L = 0.30*2+0.3*2
2.66 D[avg.] = 2.66
9.58 m²
#C4
3 1.20 L = 0.30*2+0.3*2
2.66 D[avg.] = 2.66
9.58 m²

for roof columns


#C1
1 0.30 L = 0.30
1.60 D[avg.] = 1.6
0.48 m²
#C2
3 0.30 L = 0.30
1.60 D[avg.] =1.6
1.44 m²

96.13 m² total painting for column

b - painting for beam


GB1
2 11.65 L =11.65
1.00 D = 0.40+0.2+0.4
23.30 m²

GB2
2 11.40 L =11.65
1.00 D = 0.40+0.2+0.4
22.80 m²
GB3
3 3.50 L = 3.50
1.00 D = 0.40+0.2+0.4
10.50 m²

GB4
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
GB5
2 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
11.26 m²
GB6
1 8.93 L = 8.927
1.00 D = 0.40+0.2+0.4
8.93 m²
GB7
1 8.93 L = 8.927
1.00 D = 0.40+0.2+0.4
8.93 m²

1st floor beam


FB1
2 11.65 L =11.65
1.00 D = 0.40+0.2+0.4
23.30 m²

FB2
1 5.20 L =1.73+3.470
1.00 D = 0.40+0.2+0.4
5.20 m²
FB3
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²

FB4
1 5.63 L = 5.630
1.00 D = 0.40+0.2+0.4
5.63 m²
FB5
1 5.63 L = 8.830
1.00 D = 0.40+0.2+0.4
5.63 m²
FB6
1 8.87 L =8.87
1.00 D = 0.40+0.2+0.4
8.87 m²
roof floor beam
RB1
1 11.65 L =11.65
0.90 D = 0.35+0.2+0.35
10.49 m²

RB2
1 11.65 L =11.65
0.90 D = 0.35+0.2+0.35
10.49 m²
RB3
1 5.20 L = 1.73+3.47
0.90 D = 0.35+0.2+0.35
4.68 m²

RB4
2 5.63 L = 5.630
0.90 D = 0.35+0.2+0.35
10.13 m²
RB5
2 5.63 L = 5.630
0.90 D = 0.35+0.2+0.35
10.13 m²
RB6
1 8.93 L=8.93
0.90 D = 0.35+0.2+0.35
8.03 m²
RB7
1 8.93 L = 8.927
0.90 D = 0.35+0.2+0.35
8.03 m²

water tank beam


WTB 1
2 3.10 L= 3.470
0.80 D = 0.30+0.2+0.3
4.96 m²

WTB 2
2 3.10 L= 2.5-0.20 = 2.30
0.80 D = 0.30+0.2+0.3
4.96 m²

217.51 m² total painting for beam

stair case
basment floor - 1st floor
soffit + side form work
4 2.91 L=2.91
1.95 W=1.35+0.3+0.3
22.70 m²

22.70 m² total painting for stair

slab ceiling paint


ground-roof floor
on axis A-D b/n 1-2
3 10.84 L=3.64+3.53+3.47+1-(4*0.2)
5.43 W=5.63-0.2
176.58 m²

water tank slab


on axis C-D b/n 2-3
1 3.27 L=3.47-0.2
2.90 W=3.097-0.2
9.47 m²

186.06 m² total painting For SLAB


FLOOR FINISH
TIME DIMN TOTAL DESCRIPTION
1)FLOOR FINSH
PVC TILE
BASMENT floor
BED ROOM
A=8.13m2
1 8.13
8.13 m²
Kitchen
A= 7.50m2
1 7.50
7.50 m²
LIVING ROOM
A=12.53m2
1 12.53
12.53 m²
BATH ROOM
A=2.70 m2
1 2.70
2.70 m²

LAUNDRY
A=3.57m2
1 3.57
3.57 m²

STORY
A=21.41m2
1 21.41
21.41 m²

GROUND FLOOR
SHOP 1
A=20.71m2
1 20.71
20.71 m²

SHOP 2
A=7.57m2
1 7.57
7.57 m²
SHOP 3
A=7.58m2
1 7.58
7.58 m²
SHOP 4
A=19.04 m2
1 19.04
19.04 m²
BATHROOM
A=3.07 m2
1 3.07
3.07 m²
CORRIDOR
A=8.74 m2
1 8.74
8.74 m²

FIRST floor
BED ROOM
A=7.94m2
2 7.94
15.88 m²
Kitchen
A= 5.0m2
1 5.00
5.00 m²
Kitchen
A=5.0m2
1 5.00
5.00 m²
BED ROOM
A=7.94m2
1 7.94
7.94 m²

LIVING ROOM
A=12.88 m2
1 12.88
12.88 m²

BATH ROOM
A=2.24 m2
1 2.24
2.24 m²
BATH ROOM
A=2.24 m2
1 2.24
2.24 m²

CORRIDOR
A=9.54m2
1 9.54
9.54 m²

183.27 m² total PVC TILE

marble for stair case


for Gr- first for ( 42steps )
stair case 1= 2 flight
riser
42 1.35 L =0.17
56.70 ml

tread
42 1.35 L =0.28
56.70 ml

113.40 ml total marble for stair


wqa
Skirting
PVC SKIRTING
BASMENT floor
BED room
1 7.19 L=0.56+0.40+1.02+1+0.90+0.61+0.45+0.79+0.56+0.90
7.19 ml
kitchen
1 6.58 L=0.84+0.40+0.40+3.53+0.80+0.61
6.58 ml
living room
1 8.54 L=8.54
8.54 ml
ground floor
shop 1
1 12.96 L=12.96
12.96 ml

shop 2
1 6.33 L=6.33
6.33 ml
shop 3
1 7.33 L=7.33
7.33 ml
shop 4
1 14.41 L=14.41
14.41 ml
corridor
1 1.10 L=1.1
1.10 ml
first floor
bed room
2 6.83 L=6.83
13.66 ml

living room
2 6.91 L=6.91
13.82 ml
kitchen
2 6.60 6.6
13.20 ml

105.12 ml ml total pvc skirting

marble skirting for stair case


for Gr- first for ( 42 steps )
stair case 1= 2 flight
landing
2 3.10 L =3.10
6.20 ml

6.20 ml total marble skirting for stair

Wall ceramic
Ceramic
basment floor
bathroom
1 4.51 L=1.50+1.80+1.21
3.00 H=3
13.53 m²
ground floor
bathroom
1 5.45 L=2.80+0.55+1.10+1
3.00 H=3
16.35 m²
first floor
bath room
2 3.94 L=1.40+1.60+0.54+0.40
3.00 H=3
7.88 m²

37.76 m² total ceramic wall


CEMENT SCREED AND WATER PROOF
TIME DIMN TOTAL DESCRIPTION
1)CEMENT SCREED
PVC TILE
BASMENT floor
BED ROOM
A=8.13m2
1 8.13
8.13 m²
Kitchen
A= 7.50m2
1 7.50
7.50 m²
LIVING ROOM
A=12.53m2
1 12.53
12.53 m²
BATH ROOM
A=2.70 m2
1 2.70
2.70 m²

LAUNDRY
A=3.57m2
1 3.57
3.57 m²

STORY
A=21.41m2
1 21.41
21.41 m²

GROUND FLOOR
SHOP 1
A=20.71m2
1 20.71
20.71 m²

SHOP 2
A=7.57m2
1 7.57
7.57 m²

SHOP 3
A=7.58m2
1 7.58
7.58 m²
SHOP 4
A=19.04 m2
1 19.04
19.04 m²
BATHROOM
A=3.07 m2
1 3.07
3.07 m²
CORRIDOR
A=8.74 m2
1 8.74
8.74 m²

FIRST floor
BED ROOM
A=7.94m2
1 7.94
7.94 m²
Kitchen
A= 5.0m2
1 5.00
5.00 m²
Kitchen
A=5.0m2
1 5.00
5.00 m²
BED ROOM
A=7.94m2
1 7.94
7.94 m²

LIVING ROOM
A=12.88 m2
1 12.88
12.88 m²

BATH ROOM
A=2.24 m2
1 2.24
2.24 m²

BATH ROOM
A=2.24 m2
1 2.24
2.24 m²

CORRIDOR
A=9.54m2
1 9.54
9.54 m²
175.33 m² total cement screed for PVC TILE

marble for stair case


for Gr- first for ( 42steps )
stair case 1= 2 flight
riser
42 1.35 L =1.35
0.17 d=0.17
9.64 m²

tread
42 1.35 L =1.35
0.28 w=0.28
15.88 m²

landing
2 3.10 L =3.10
1.50 w=1.50
9.30 m²

34.82 m² total cement screed for marble stair

Wall ceramic
Ceramic
basment floor
bathroom
1 4.51 L=1.50+1.80+1.21
3.00 H=3
13.53 m²
ground floor
bathroom
1 5.45 L=2.80+0.55+1.10+1
3.00 H=3
16.35 m²
first floor
bath room
2 3.94 L=1.40+1.60+0.54+0.40
3.00 H=3
7.88 m²

37.76 m² total ccement screed for ceramic wall

Water proof
BASMENT floor
Kitchen
A= 7.50m2
1 7.50
7.50 m²
BATH ROOM
A=2.70 m2
1 2.70
2.70 m²

LAUNDRY
A=3.57m2
1 3.57
3.57 m²

FIRST floor
Kitchen
A= 5.0m2
1 5.00
5.00 m²
Kitchen
A=5.0m2
1 5.00
5.00 m²
BATH ROOM
A=2.24 m2
1 2.24
2.24 m²

BATH ROOM
A=2.24 m2
1 2.24
2.24 m²

28.25 m² total water proof work


almunium work
TIME DIMN TOTAL DESCRIPTION

almunium framework

almunium framework
w1 size 900*1000mm
1 7.00
7.00 PCS
w2 size 2440*1000mm
1 1.00
1.00 PCS

wD3 size 1620*2200mm


1 1.00
1.00 PCS

w4 size 2440*1700mm
1 1.00
1.00 PCS

Wd5 size 3130*2200mm


1 1.00
1.00 PCS

Wd6 size 1650*2200mm


1 1.00
1.00 PCS

w7 size 900*1650mm
1 3.00
3.00 PCS

w8 size 2440*1700mm
1 2.00
2.00 PCS

w9 size 2200*1700mm
1 1.00
1.00 PCS

18.00 PCS total window almunium framework


CARPENTRY WORK
DOOR WORK
1 8.00 D1 size 900 *2300mm
8.00 PCS

D2 size 800*2300mm
1 9.00
9.00 PCS

17.00 PCS total door CARPENTRY WORK


glass & glazing work
TIME DIMN TOTAL DESCRIPTION

glass & glazing work

almunium glass work


w1 size 900*1000mm
7 0.90 L=0.90
1.00 H=1
6.30 m²
w2 size 2440*1000mm
1 2.44 l=2.44
1.00 H=1
2.44 m²

wD3 size 1620*2200mm


1 1.62 l=1.62
2.20 h=2.2
3.56 m²

w4 size 2440*1700mm
1 2.44 l=2.44
1.70 h=1.70
4.15 m²

Wd5 size 3130*2200mm


1 3.13 l=3.13
2.20 h=2.2
6.89 m²

Wd6 size 1650*2200mm


1 1.65 l=1.65
2.20 h=2.2
3.63 m²

w7 size 900*1650mm
3 0.90 l=0.90
1.65 h=1.65
4.46 m²

w8 size 2440*1700mm
2 2.44 l=2.44
1.70 h=1.70
8.30 m²

w9 size 2200*1700mm
1 2.20 l=2.2
1.70 h=1.70
3.74 m²

43.46 m² total window glass work

window sill
w1 size 900*1000mm
7 0.90 L=0.90
6.30 ml
w2 size 2440*1000mm
1 2.44 l=2.44
2.44 ml

wD3 size 1620*2200mm


1 1.62 l=1.62
1.62 ml

w4 size 2440*1700mm
1 2.44 l=2.44
2.44 ml

Wd5 size 3130*2200mm


1 3.13 l=3.13
3.13 ml

Wd6 size 1650*2200mm


1 1.65 l=1.65
1.65 ml

w7 size 900*1650mm
3 0.90 l=0.90
2.70 ml

w8 size 2440*1700mm
2 2.44 l=2.44
4.88 ml
w9 size 2200*1700mm
1 2.20 l=2.2
2.20 ml

27.36 ml total window sill

door sill
DOOR WORK
8 0.90 D1 size 900 *2300mm
7.20 ml

D2 size 800*2300mm
9 0.80
7.20 ml

14.40 ml total door sill


ROOF WORK
Tims. Dim. Result Description
3 - ROOF WORK
Decra roof cover

1 12.40 L=12.40
6.00 W=6.0
74.40 m²
R
74.40 m² total Decra roof cover

Wooden structural works


dia 10 Eculaptuse Tree Truss
a)dia 10 ,main members (T1)
1 23.75 L=(6*2)+11.75 m
23.75 m

3 11.90 L=6+5.9 m (T2)


35.7 m

1 5.76 L=3.06+2.7 (T3)


5.76 m

b)dia 10 ,vertical members


1 6.20 L=(0.2+0.34+0.63+0.84+1.09)*2 (T1)
6.2 m

3 3.10 L=0.2+0.34+0.63+0.84+1.09 (T2)


9.3 m

L=0.83+0.33+0.2 (T3)
1 1.36
1.36 m

82.07 m total dia 10 tree truss

c)dia 8 ,diagonal members


1 9.78 L=(0.75+1.3+1.37+1.47)*2 (T1)
9.78 m

3 4.89 L=0.75+1.3+1.37+1.47 (T2)


14.67 m

L=0.84+0.62 (T3)
1 1.16
1.16 m

25.61 m total dia 8 tree truss

d)7*5 zigba purlin c/c 90cm


11 12.00 l=12 m
132 m

e)7*5 zigba purlin c/c 90cm


12 12.00 l=10.3 m
144 m

276 m total 7*5 zigba purline

f)4*5 ceilling buttan


19 0.50 H=0.5 No=19*1
9.5 m

30 0.50 H=0.5 No=10*1*3


15 m

15 0.50 H=0.5 No=5*1*3


7.5 m
h)4*5 horizontal ceilling buttan under truss in X dic
20 11.75 L=11.75 No=11.75/0.6
230.10 m

i)4*5 horizontal ceilling buttan under truss inY dic


17 10.30 L=10.3 No=10.3/0.6
176.82 m

438.92 m total 4*5 ceilling buttan

Gutter

1 16.00
16.00 ml

1 12.40
12.40 ml

28.40 ml total gutter

dawn pipe

1 12.00
12.00 ml