PROJECT: Bridge Design at Prey Vang (W=5.2m and L=132m)
No DESCRIPTION Duration QTY UNIT PRICE TOTAL
1 Site Visiting and Collection data LS 1 $ 200.00 $ 200.00
2 Super Structures Design (Span 16m and Span 20m)
a 2 Span 16m 2 1 1500.00 $ 1,500.00
b 5 Span 20m 2 1 1500.00 $ 1,500.00
3 Sub Structures Design
a 2 Abutments 2 1 1000.00 $ 1,000.00
b 6 Piers 4 1 2000.00 $ 2,000.00
4 Miscellaneou (Approach slab, Handrail, and ect.) 1 1 300.00 $ 300.00
5 Detail Design Drawings 10 1 1000.00 $ 1,000.00