0% found this document useful (0 votes)
47 views33 pages

Punjab Road Projects Overview

Uploaded by

msawan83
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views33 pages

Punjab Road Projects Overview

Uploaded by

msawan83
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

COMMUNICATION & WORKS DEPARTMENT, PUNJAB

ROAD SECTOR
ONGOING MEGA PROJECTS
COMMUNICATION & WORKS DEPARTMENT, PUNJAB

CONSTRUCTION OF ROAD FROM BAHAWALPUR (N-5) TO JHANGRA SHARQI


INTERCHANGE (KLM) (LENGTH: 42.00 KM) DISTRICT BAHAWALPUR

APPROVED COST RS. 3,998 (M)


CONSTRUCTION OF ROAD FROM BAHAWALPUR (N-5) TO JHANGRA SHARQI
INTERCHANGE (KLM) (LENGTH: 42.00 KM) DISTRICT BAHAWALPUR

SALIENT FEATURES
➢ ADP No. = 3159 (Nov-Feb, 2023-24)
➢ Executing Agency = PUNJAB HIGHWAY DEPARTMENT
➢ Project Cost = 3,998 Million
➢ Contractor = M/s. Abdul Waheed Khan & Co.
➢ Consultant = NESPAK Pvt. Ltd
➢ Length of the Road = 42.00 Km
➢ Metaled width incl. treaded shoulders = 24-Ft Each side
on Each Carriageway (2+24+6)
➢ Date of Commencement = 10 November 2021
➢ Date of Completion = 09 November 2023
COMMUNICATION & WORKS DEPARTMENT, PUNJAB

DUALIZATION OF METALLED ROAD FROM THALLI CHOWK RAHIM YAR KHAN


TO IQBALABAD (N-5) DISTRICT [Link]

APPROVED COST RS. 953 (M)


DUALIZATION OF METALLED ROAD FROM THALLI CHOWK RAHIM YAR KHAN TO
IQBALABAD (N-5) DISTRICT [Link]

SALIENT FEATURES
➢ ADP No. = 3663 (Nov-Feb, 2023-24)
➢ Executing Agency = PUNJAB RING ROAD AUTHOIRTY
➢ Project Cost = 953 Million
➢ Contractor = M/s. Khalid & Brother.
➢ Consultant = ESSIR (Pvt) Ltd
➢ Length of the Road = 11.00 Km
➢ Metaled width = Dual Carriageway
➢ Date of Commencement = 12 November 2021
➢ Date of Completion = 11 November 2023
COMMUNICATION & WORKS DEPARTMENT, PUNJAB

REHABILITATION OF LAHORE SARGODHA MIANWALI BANNU ROAD ART-2 KM (PULL DAS


HAZAR TO KALABAGH) KM NO.340 TO 350 LENGTH 10.00 KM DISTRICT MIANWALI

APPROVED COST RS. 170 (M)


SALIENT FEATURES
➢ ADP No. = 2987 (Nov-Feb, 2023-24)
➢ Executing Agency = PUNJAB HIGHWAY DEPARTMENT
➢ Project Cost = 170 Million
➢ Contractor = M/s. GKB.
➢ Consultant = AZ Engineering
➢ Length of the Road = 10.00 Km
➢ Metaled width = 24-ftLane Dual Carriageway
➢ Date of Commencement = 09 December 2021
➢ Date of Completion = 31 December 2023
13
COMMUNICATION & WORKS DEPARTMENT, PUNJAB

DUALIZATION OF MUZAFFAR GARH ROAD (JAUHARABAD-CHOWK GIROT) LENGTH = 25.25


KM IN DISTRICT KHUSHAB.

APPROVED COST RS. 3,315 (M)


SALIENT FEATURES
➢ ADP No. = 3034 (Nov-Feb, 2023-24)
➢ Executing Agency = PUNJAB HIGHWAY DEPARTMENT
➢ Project Cost = 1649 Million
➢ Group-I (Completed) = Rs.438 Million
➢ Contractor = M/s. ABDUL WAHEED & CO.
➢ Consultant = NESPAK Pvt. Ltd
➢ Length of the Road = 13.70 Km
➢ Metaled width = 24-FT
➢ Date of Commencement = 02 JUNE 2020
➢ Date of Completion = 30 SEPTEMBER 2022
17
COMMUNICATION & WORKS DEPARTMENT, PUNJAB

DUALIZATION OF DINA - MANGLA ROAD, LENGTH 12.83 KM.

APPROVED COST RS. 1,708 (M)


SALIENT FEATURES
➢ Executing Agency = PUNJAB HIGHWAY DEPARTMENT
➢ Project Cost = 1,708 Million
➢ Contractor = M/s. SARCO
➢ Consultant = NESPAK Pvt. Ltd
➢ Length of the Road = 12.83 Km
➢ Metaled width = 24-FT
➢ Date of Commencement = 06 JUNE 2021
➢ Date of Completion = 31 MARCH 2023
21
COMMUNICATION & WORKS DEPARTMENT, PUNJAB

REHABILITATION / IMPROVEMENT / CARPETING OF KASHMIR ROAD


(LENGTH 2.05 KM) IN DISTRICT SIALKOT

APPROVED COST RS. 506 (M)


SALIENT FEATURES
➢ ADP No. = 3474 (Nov-Feb, 2023-24)
➢ Executing Agency = PUNJAB HIGHWAY DEPARTMENT
➢ Project Cost = 506 Million
➢ Contractor = M/s. Asad & Co.
➢ Consultant = NESPAK Pvt. Ltd
➢ Length of the Road = 2.05 Km
➢ Metaled width = 55-FT
➢ Date of Commencement = 29 OCTOBER 2022
➢ Date of Completion = 15 OCTOBER 2023
26
COMMUNICATION & WORKS DEPARTMENT, PUNJAB

COMPLETE SIGNAL FREE JINNAH INTERCHANGE CONSTRCUTED AT


AZIZ CROSS ON G.T ROAD GUJRANWALA

APPROVED COST RS. 7,580 (M)


SALIENT FEATURES
➢ Executing Agency = PUNJAB HIGHWAY DEPARTMENT
➢ Project Cost = 7,580 Million
➢ Contractor = M/s. NLC
➢ Consultant = NESPAK Pvt. Ltd
➢ Length of Flyover = 1.67 Km
➢ Metaled width = 24-FT Each Carriageway
➢ Date of Commencement = 31 JANUARY 2016
➢ Date of Completion = 30 JUNE 2019